[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144330":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1144330,800,1,"单选题","建筑物施工控制网的坐标轴，应与工程设计所采用的（ ）一致。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","黄海坐标",false,{"key":16,"text":17,"correct":18},"B","主副轴线",true,{"key":20,"text":21,"correct":14},"C","平面控制网坐标",{"key":23,"text":24,"correct":14},"D","高程控制网坐标","2020\u002F2019版教材P75 -77建筑物施工控制网，应根据场区控制网进行定位、 定向和起算； 控制网的坐标轴应与工程设计所采用的主副轴线一致； 建筑物的 ±0.000高程面，应根据场区水准点测设",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]