[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143919":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1143919,800,1,"单选题","项目管理机构在项目运行之前， 应由（） 组织编制项目管理沟通计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目责任工程师",false,{"key":16,"text":17,"correct":18},"B","项目负责人",true,{"key":20,"text":21,"correct":14},"C","项目技术负责人",{"key":23,"text":24,"correct":14},"D","单位技术负责人","",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]