[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143873":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143873,800,2,"多选题","关于装饰装修施工阶段的质量管理， 说法正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工主管向施工工长做详尽的图纸、施工方法、质量标准交底",false,{"key":16,"text":17,"correct":14},"B","工序开始前工长向班组长做详细的图纸工艺要求、质量要求交底",{"key":19,"text":20,"correct":21},"C","作业开始前班长向班组成员做具体的操作方法、工具使用、质量要求的详细交底",true,{"key":23,"text":24,"correct":21},"D","对于重要的工序或对工程质量有重大影响的工序，在自检、互检的基础上，还要组织专职人员进行工序交接检查",{"key":26,"text":27,"correct":21},"E","凡是隐蔽工程均应检查认证后方能掩盖","CDE","",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]