[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143722":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143722,800,2,"多选题","关于防水工程施工完成后的检查与验收的说法， 正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","屋面防水层完工后，应在雨后或持续淋水24h后进行检查",false,{"key":16,"text":17,"correct":18},"B","有可能做蓄水试验的屋面，蓄水时间不应少于24h",true,{"key":20,"text":21,"correct":18},"C","厨房、厕浴间防水工程应进行两次蓄水试验，蓄水试验时间不应少于24h",{"key":23,"text":24,"correct":14},"D","厕浴间墙面持续淋水试验应达到30min以上不渗漏",{"key":26,"text":27,"correct":14},"E","厨房、厕浴间蓄水试验的蓄水深度在最深处不得小于10mm","BC","",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]