[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143701":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143701,800,2,"多选题","进度计划调整的方法包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","关键工作的调整",true,{"key":16,"text":17,"correct":14},"B","改变某些工作间的逻辑关系",{"key":19,"text":20,"correct":21},"C","工期的调整",false,{"key":23,"text":24,"correct":14},"D","剩余工作重新编制进度计划",{"key":26,"text":27,"correct":14},"E","资源调整","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]