[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143634":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143634,800,2,"多选题","建筑信息模型（BIM） 的应用应包括（） 等的施工全过程。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","规划",false,{"key":16,"text":17,"correct":18},"B","深化设计",true,{"key":20,"text":21,"correct":18},"C","施工实施",{"key":23,"text":24,"correct":18},"D","竣工验收",{"key":26,"text":27,"correct":14},"E","运行","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]