[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143427":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1143427,800,1,"单选题","下列做法符合涂饰工程施工工艺要求的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","现浇混凝土常温要求7d后方可涂饰涂料",false,{"key":16,"text":17,"correct":14},"B","涂刷抗碱封闭底漆时，先涂刷墙面后涂刷天花",{"key":19,"text":20,"correct":14},"C","涂刷乳胶漆前应刮两遍腻子，且底层腻子未干透不得做面层",{"key":22,"text":23,"correct":24},"D","墙面涂刷抗碱封闭底漆时，应先上后下",true,"A.现浇混凝土常温要求 21d 后方可涂饰涂料（砂浆 14d） B.涂刷抗碱封闭底漆时，先涂刷天花后涂刷墙面 C.涂刷乳胶漆前应刮三遍腻子，且底层腻子未干透不得做面层",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]