[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143414":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143414,800,2,"多选题","关于吊顶工程施工工艺的说法， 正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","采用膨胀螺栓固定吊挂杆件",true,{"key":16,"text":17,"correct":18},"B","主龙骨应依次从一边向另一边分",false,{"key":20,"text":21,"correct":14},"C","跨度大于15m以上的吊顶，应在主龙骨上每隔15m加一道大龙骨",{"key":23,"text":24,"correct":18},"D","重型灯具、电扇、风道等重型设备可安装在吊顶工程的龙骨上，但必须增设吊杆",{"key":26,"text":27,"correct":18},"E","吊杆长度大于2500mm时，应设置反支撑","AC","B.主龙骨应从中间向两边分 D.重型灯具、电扇、风道等重型设备严禁安装在吊顶工程的龙骨上，必须增设附加吊杆 E.吊杆长度大于 2500mm 时，应设置转换层",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]