[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143377":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143377,800,2,"多选题","关于地下防水混凝土施工技术要求的说法， 正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","防水混凝土应采用机械搅拌，搅拌时间不少于3min",false,{"key":16,"text":17,"correct":18},"B","防水混凝土浇筑时分层厚度不得大于500mm",true,{"key":20,"text":21,"correct":18},"C","应采用高频机械分层振捣密实，振捣时间宜为10~30s",{"key":23,"text":24,"correct":14},"D","宜选用粗砂，含泥量不应大于3%",{"key":26,"text":27,"correct":18},"E","碎石和卵石含泥量不得大于1%","BCE","防水混凝土施工要点。 （1）防水混凝土拌合物应采用机械搅拌，搅拌时间不宜小于 2min。 （2）防水混凝土冬期施工时，入模温度不应低于 5℃。 （3）防水混凝土应分层连续浇筑，分层厚度不得大于 500mm。 （4）防水混凝土应采用高频机械分层振捣密实，振捣时间宜为 10~30s。当采用自密实混凝土时，可不进行机械振捣。 （5）防水混凝土养护时间不得少于 14d。 （6）连续浇筑的防水混凝土， 每 500m3应留置一组 6 个抗渗试件，且每项工程不少于 2 组。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]