[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143286":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1143286,800,1,"单选题","关于后张法预应力（无粘结） 施工的说法， 正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预应力混凝土楼盖中的张拉顺序是先张拉主梁、后张拉楼板、次梁",false,{"key":16,"text":17,"correct":18},"B","预应力筋的张拉宜按均匀、对称的原则张拉",true,{"key":20,"text":21,"correct":14},"C","无粘结预应力筋长度超过20m时，宜采用两端张拉",{"key":23,"text":24,"correct":14},"D","无粘结预应力筋长度超过40m时，宜采用分段张拉","后张法预应力施工工艺： （1）预应力混凝土楼盖中的张拉顺序是先张拉楼板、 后张拉楼面梁。 （2）无粘结预应力筋长度不大于 40m 时，可一端张拉；大于 40m 时，宜两端张拉。 （3）有粘结预应力筋长度不大于 20m 时，可一端张拉；大于 20m 时，宜两端张拉，预应力筋为直线时，不超过 35m 也可以采用一端张拉",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]