[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143249":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143249,800,2,"多选题","下列关于锤击沉桩法施工要求的说法中， 正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","接桩时桩头宜高出地面1m~1.5m",false,{"key":16,"text":17,"correct":18},"B","接桩方法分为焊接、螺纹接头和机械啮合接头",true,{"key":20,"text":21,"correct":18},"C","密集桩宜从中间向四周或两边对称施打",{"key":23,"text":24,"correct":14},"D","一侧毗邻建筑物时，应向毗邻建筑物处施打",{"key":26,"text":27,"correct":14},"E","贯入度达到设计要求而标高未达到时，应继续锤击2阵，每阵10击","BC","",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]