[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143237":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1143237,800,1,"单选题","饱和黏性土地基， 灌注桩进行承载力检测前的休止时间是（） d。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":14},"C","15",{"key":22,"text":23,"correct":24},"D","25",true,"",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]