[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143220":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143220,800,2,"多选题","关于土方开挖的说法， 正确的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","人工挖土不能立即进行下道工序时，保留土层厚度为15~30cm",true,{"key":16,"text":17,"correct":14},"B","采用机械开挖时，保留土层厚度为20~30cm",{"key":19,"text":20,"correct":21},"C","在地下水位以下挖土，应将水位降低至开挖面",false,{"key":23,"text":24,"correct":21},"D","降水工程应持续到基础完成或地下室完工",{"key":26,"text":27,"correct":21},"E","相邻基坑开挖时，应遵循先浅后深或同时进行的施工程序","AB","土方开挖要点： （1）人工开挖时，基坑挖好后不能立即进行下道工序施工时，应预留 15~30cm 一层土不挖，待下道工序开始再挖至设计标高。 （2）采用机械开挖基坑时， 为避免破坏基底土，应在基底标高以上预留 20~30cm 结合人工挖除。 （3）降水深度：应使地下水稳定在坑底 0.5m 以下。 （4）降水工程应持续到基础施工完成（包括地下水位下回填土）",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]