[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-147472":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},147472,80,1,"单选题","交通运输建设项目评价期一般设为（ ）年。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","5～10",false,{"key":16,"text":17,"correct":14},"B","10～20",{"key":19,"text":20,"correct":21},"C","20～30",true,{"key":23,"text":24,"correct":14},"D","25～30","交通运输建设项目评价期的起始年为建设开始年，建设期根据工程建设的合理工期确定。交通运输建设项目评价期一般设为20～30年。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 运输经济","经济金融",0]