[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":634},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,9,50,2721,[13,34,46,64,78,90,102,112,124,136,151,165,179,190,202,216,230,244,256,265,276,291,302,314,326,338,347,358,370,382,394,406,418,430,441,450,462,474,486,494,509,523,537,551,563,575,587,599,610,622],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1140842,1,"单选题","关于施工方项目管理目标和任务的说法，正确的是（ ）。( 2015真题 )",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","施工方项目管理仅服务于施工方本身的利益",false,{"key":24,"text":25,"correct":22},"B","施工方项目管理不涉及动用前准备阶段",{"key":27,"text":28,"correct":29},"C","施工方成本目标由施工企业根据其生产和经营情况自行确定",true,{"key":31,"text":32,"correct":22},"D","施工方不对业主方指定分包承担的目标和任务负责","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1140843,"建设工程项目总承包方项目管理工作涉及（ ）的全过程。2014",[38,40,42,44],{"key":20,"text":39,"correct":22},"决策阶段",{"key":24,"text":41,"correct":29},"实施阶段",{"key":27,"text":43,"correct":22},"使用阶段",{"key":31,"text":45,"correct":22},"全寿命周期",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1140844,2,"多选题","根据《建设项目工程总承包管理规范》GB\u002FT50358-2005，工程总承包项目管理的主要内容有（ ）。2017",[52,54,56,58,60],{"key":20,"text":53,"correct":29},"任命项目经理，组建项目部",{"key":24,"text":55,"correct":22},"编制和报批项目可行性研究报告",{"key":27,"text":57,"correct":22},"落实项目建设资金",{"key":31,"text":59,"correct":29},"进行项目策划，编制项目计划",{"key":61,"text":62,"correct":22},"E","实施项目运行管理","AD",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":77,"analysis":33},1140845,"根据《建设项目工程总承包管理规范》（GB\u002FT50358—2005），工程总承包项目管理的主要内容包括（ ）。2014",[68,69,71,73,75],{"key":20,"text":53,"correct":29},{"key":24,"text":70,"correct":29},"实施设计管理",{"key":27,"text":72,"correct":29},"实施采购管理",{"key":31,"text":74,"correct":22},"进行项目可行性研究并报批",{"key":61,"text":76,"correct":29},"进行项目范围管理","ABCE",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":33},1140848,"构成业主方项目管理的任务中，最重要的任务是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"进度管理",{"key":24,"text":85,"correct":22},"投资控制",{"key":27,"text":87,"correct":22},"质量控制",{"key":31,"text":89,"correct":29},"安全管理",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":33},1140849,"对于建设工程项目业主方而言，项目管理的进度目标是指项目（ ）的时间目标。",[94,96,98,100],{"key":20,"text":95,"correct":22},"建安工程完成",{"key":24,"text":97,"correct":22},"竣工验收",{"key":27,"text":99,"correct":29},"动用",{"key":31,"text":101,"correct":22},"保修期结束",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},1140850,"供货方的项目管理工作主要在建设工程项目的（ ）进行。",[106,108,109,110],{"key":20,"text":107,"correct":22},"审批阶段",{"key":24,"text":43,"correct":22},{"key":27,"text":39,"correct":22},{"key":31,"text":111,"correct":29},"施工阶段",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":20,"analysis":33},1140851,"某业主欲投资建造一座五星级宾馆，业主方项目管理的进度目标指的是（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":29},"宾馆可以开业",{"key":24,"text":119,"correct":22},"项目竣工结算完成",{"key":27,"text":121,"correct":22},"宾馆开始盈利",{"key":31,"text":123,"correct":22},"项目通过竣工验收",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":27,"analysis":33},1140852,"业主方项目管理目标中的（ ） 是指项目动用的时间目标。",[128,130,132,134],{"key":20,"text":129,"correct":22},"投资目标",{"key":24,"text":131,"correct":22},"成本目标",{"key":27,"text":133,"correct":29},"进度目标",{"key":31,"text":135,"correct":22},"质量目标",{"id":137,"libraryId":5,"type":48,"typeLabel":49,"stem":138,"options":139,"answer":150,"analysis":33},1140853,"建设项目工程总承包方作为项目建设的一个重要参与方，其项目管理主要服务于项目的整体利益和建设项目工程总承包方本身的利益，其项目管理的目标应符合合同的要求，包括（ ）。",[140,142,144,146,148],{"key":20,"text":141,"correct":29},"工程建设的安全管理目标",{"key":24,"text":143,"correct":29},"项目的总投资目标和建设项目工程总承包方的成本目标",{"key":27,"text":145,"correct":29},"建设项目工程总承包方的进度目标",{"key":31,"text":147,"correct":29},"建设项目工程总承包方的质量目标",{"key":61,"text":149,"correct":22},"建设项目工程信息管理目标","ABCD",{"id":152,"libraryId":5,"type":48,"typeLabel":49,"stem":153,"options":154,"answer":150,"analysis":33},1140854,"业主方的项目管理工作涉及（）阶段。",[155,157,159,161,163],{"key":20,"text":156,"correct":29},"设计前的准备",{"key":24,"text":158,"correct":29},"设计",{"key":27,"text":160,"correct":29},"施工",{"key":31,"text":162,"correct":29},"动用准备阶段",{"key":61,"text":164,"correct":22},"决策",{"id":166,"libraryId":5,"type":48,"typeLabel":49,"stem":167,"options":168,"answer":150,"analysis":33},1140855,"供货方的项目管理工作主要在施工阶段进行，但它也涉及（ ）。",[169,171,173,175,177],{"key":20,"text":170,"correct":29},"设计准备阶段",{"key":24,"text":172,"correct":29},"设计阶段",{"key":27,"text":174,"correct":29},"动用前准备阶段",{"key":31,"text":176,"correct":29},"保修期",{"key":61,"text":178,"correct":22},"运营阶段",{"id":180,"libraryId":5,"type":48,"typeLabel":49,"stem":181,"options":182,"answer":189,"analysis":33},1140856,"建设工程设计方的项目管理工作涉及（ ）阶段。",[183,184,185,186,187],{"key":20,"text":156,"correct":29},{"key":24,"text":158,"correct":29},{"key":27,"text":164,"correct":22},{"key":31,"text":160,"correct":29},{"key":61,"text":188,"correct":29},"动用前准备","ABDE",{"id":191,"libraryId":5,"type":48,"typeLabel":49,"stem":192,"options":193,"answer":201,"analysis":33},1140857,"建设工程业主方项目管理中主要涉及物质利益的任务包括（ ）。",[194,196,197,199,200],{"key":20,"text":195,"correct":29},"进度控制",{"key":24,"text":87,"correct":29},{"key":27,"text":198,"correct":22},"信息管理",{"key":31,"text":89,"correct":22},{"key":61,"text":85,"correct":29},"ABE",{"id":203,"libraryId":5,"type":48,"typeLabel":49,"stem":204,"options":205,"answer":201,"analysis":33},1140858,"在建设工程项目各参与单位中，需对项目总投资或总造价进行目标管理的单位有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":29},"业主方",{"key":24,"text":209,"correct":29},"设计方",{"key":27,"text":211,"correct":22},"施工方",{"key":31,"text":213,"correct":22},"供货方",{"key":61,"text":215,"correct":29},"项目总承包方",{"id":217,"libraryId":5,"type":48,"typeLabel":49,"stem":218,"options":219,"answer":150,"analysis":33},1140859,"设计方作为项目建设的一个参与方，其项目管理的目标包括（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":29},"设计的成本目标",{"key":24,"text":223,"correct":29},"设计的进度目标",{"key":27,"text":225,"correct":29},"设计的质量目标",{"key":31,"text":227,"correct":29},"项目的投资目标",{"key":61,"text":229,"correct":22},"项目的范围目标",{"id":231,"libraryId":5,"type":48,"typeLabel":49,"stem":232,"options":233,"answer":150,"analysis":33},1140860,"在建设工程项目管理中，管理目标中包含项目总投资目标的单位有（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":29},"建设工程项目总承包单位",{"key":24,"text":237,"correct":29},"业主委托的工程咨询单位",{"key":27,"text":239,"correct":29},"业主委托的工程监理单位",{"key":31,"text":241,"correct":29},"设计单位",{"key":61,"text":243,"correct":22},"施工单位",{"id":245,"libraryId":5,"type":48,"typeLabel":49,"stem":246,"options":247,"answer":255,"analysis":33},1140861,"设计方的项目管理工作主要在建设工程项目设计阶段进行，但也会涉及（ ）等阶段。",[248,249,250,251,253],{"key":20,"text":164,"correct":22},{"key":24,"text":160,"correct":29},{"key":27,"text":188,"correct":29},{"key":31,"text":252,"correct":29},"保修",{"key":61,"text":254,"correct":22},"运营","BCD",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1140862,"作为工程项目建设的参与方之一，供货方的项目管理工作主要是在（ ）进行。",[260,261,262,264],{"key":20,"text":172,"correct":22},{"key":24,"text":111,"correct":29},{"key":27,"text":263,"correct":22},"保修阶段",{"key":31,"text":174,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},1140863,"在建设工程项目管理的基本概念中，“进度目标”对业主而言是项目（ ）的时间目标。2014",[269,271,273,275],{"key":20,"text":270,"correct":22},"竣工",{"key":24,"text":272,"correct":22},"调试",{"key":27,"text":274,"correct":22},"试生产",{"key":31,"text":99,"correct":29},{"id":277,"libraryId":5,"type":48,"typeLabel":49,"stem":278,"options":279,"answer":290,"analysis":33},1140864,"关于业主方项目管理目标和任务的说法中，正确的有（ ）。( 2015真题 )",[280,282,284,286,288],{"key":20,"text":281,"correct":29},"关于业主方项目管理是建设工程项目管理的核心",{"key":24,"text":283,"correct":22},"关于业主方项目管理工作不涉及施工阶段的安全管理工作",{"key":27,"text":285,"correct":29},"关于业主方项目管理目标包括项目的投资目标、进度目标和质量目标",{"key":31,"text":287,"correct":22},"关于业主方项目管理目标不包括影响项目运行的环境质量",{"key":61,"text":289,"correct":29},"关于业主方项目管理工作涉及项目实施阶段的全过程","ACE",{"id":292,"libraryId":5,"type":48,"typeLabel":49,"stem":293,"options":294,"answer":301,"analysis":33},1140865,"业主方项目管理服务于业主的利益，其项目管理的目标包括项目的（ ）。",[295,296,297,299,300],{"key":20,"text":131,"correct":22},{"key":24,"text":135,"correct":29},{"key":27,"text":298,"correct":22},"安全目标",{"key":31,"text":133,"correct":29},{"key":61,"text":129,"correct":29},"BDE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1140867,"关于《项目管理知识体系指南（PMBOK）指南》中项目集和项目组合的说法，正确的是（）。2018真题",[306,308,310,312],{"key":20,"text":307,"correct":29},"项目组合的管理包括识别、排序、管理和控制项目等",{"key":24,"text":309,"correct":22},"项目组合中的项目一定彼此依赖或有直接关系",{"key":27,"text":311,"correct":22},"项目集指的是为有效管理，实现战略业务目标而组合在一起的项目",{"key":31,"text":313,"correct":22},"项目集中不包括各单个项目范围之外的相关工作",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},1140868,"关于业主方项目管理目标和任务的说法，正确的是（ ）。 2016",[318,320,322,324],{"key":20,"text":319,"correct":29},"业主方的进度目标指项目交付使用的时间目标",{"key":24,"text":321,"correct":22},"业主方的投资目标指项目的施工成本目标",{"key":27,"text":323,"correct":22},"投资控制是业主方项目管理任务中最重要的任务",{"key":31,"text":325,"correct":22},"业主方项目管理任务不包括设计阶段的信息管理",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},1140869,"（2020年真题）对建设工程项目整个实施阶段的进度进行控制是（ ）的任务。",[330,332,334,336],{"key":20,"text":331,"correct":29},"投资方",{"key":24,"text":333,"correct":22},"DB总承包方",{"key":27,"text":335,"correct":22},"施工总承包管理方",{"key":31,"text":337,"correct":22},"项目使用方",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1140870,"编制设计任务书是项目（ ）阶段的工作。2017年",[342,344,345,346],{"key":20,"text":343,"correct":29},"设计准备",{"key":24,"text":164,"correct":22},{"key":27,"text":158,"correct":22},{"key":31,"text":160,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},1140871,"建设工程管理工作的核心任务是（ ）。2020年",[351,353,354,356],{"key":20,"text":352,"correct":22},"质量管理",{"key":24,"text":89,"correct":22},{"key":27,"text":355,"correct":22},"目标控制",{"key":31,"text":357,"correct":29},"增值服务",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1140873,"不属于施工成本计划一般指标的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"成本计划的质量指标",{"key":24,"text":365,"correct":22},"成本计划的效益指标",{"key":27,"text":367,"correct":22},"成本计划的数量指标",{"key":31,"text":369,"correct":29},"成本计划的价格指标",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},1140874,"施工成本分析是在施工（ ）的基础上，对成本的形成过程和影响成本升降的因素进行分析，以寻求进一步降低成本的途径，包括有利偏差的挖掘和不利偏差的纠正。",[374,376,378,380],{"key":20,"text":375,"correct":22},"成本控制",{"key":24,"text":377,"correct":22},"成本考核",{"key":27,"text":379,"correct":22},"成本计划",{"key":31,"text":381,"correct":29},"成本核算",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},1140875,"建设工程项目施工成本一般以（ ）为成本核算对象。",[386,388,390,392],{"key":20,"text":387,"correct":22},"单项工程",{"key":24,"text":389,"correct":22},"分部工程",{"key":27,"text":391,"correct":29},"单位工程",{"key":31,"text":393,"correct":22},"分项工程",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1140876,"在施工项目形成过程中，对施工项目成本进行对比评价和总结的工作是成本（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"核算",{"key":24,"text":401,"correct":22},"控制",{"key":27,"text":403,"correct":22},"考核",{"key":31,"text":405,"correct":29},"分析",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1140878,"建设工程项目施工成本管理的任务和环节包括：①成本分析；②成本控制；③成本考核；④成本预测；⑤成本核算；⑥成本计划。其正确的顺序是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"⑥-④-②-①-⑤-③",{"key":24,"text":413,"correct":29},"④-⑥-②-⑤-①-③",{"key":27,"text":415,"correct":22},"④-①-⑥-②-⑤-③",{"key":31,"text":417,"correct":22},"①-④-⑥-②-③-⑤",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1140879,"关于施工成本及其管理的说法，正确的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":29},"施工成本管理就是在保证工期和满足质量要求的情况下，采取相应措施把成本控制在计划范围内，并最大程度地节约成本。",{"key":24,"text":425,"correct":22},"施工成本是指施工过程中消耗的构成工程实体的各项费用支出。",{"key":27,"text":427,"correct":22},"施工成本考核是在施工成本核算的基础上，对成本形成过程和影响成本升降的因素进行分析，以寻求进一步降低成本的途径。",{"key":31,"text":429,"correct":22},"施工成本预测是以货币形式编制施工项目在计划期内的生产费用，成本水平，成本降低率及降低成本措施的书面方案",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1140880,"建设工程项目施工成本控制包括若干环节，其中最具实质性的是（ ）。",[434,436,437,439],{"key":20,"text":435,"correct":29},"纠偏",{"key":24,"text":405,"correct":22},{"key":27,"text":438,"correct":22},"比较",{"key":31,"text":440,"correct":22},"检查",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1140881,"施工成本管理中的（ ）是该项目降低成本的指导文件，是设立目标成本的依据。",[445,446,448,449],{"key":20,"text":379,"correct":29},{"key":24,"text":447,"correct":22},"成本预测",{"key":27,"text":381,"correct":22},{"key":31,"text":375,"correct":22},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},1140882,"施工成本管理任务中，（ ）是建立施工项目成本管理责任制、开展成本控制和核算的基础。",[454,456,458,460],{"key":20,"text":455,"correct":22},"施工成本预测",{"key":24,"text":457,"correct":22},"施工成本分析",{"key":27,"text":459,"correct":29},"施工成本计划",{"key":31,"text":461,"correct":22},"施工成本考核",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1140883,"项目经理部对竣工工程成本核算的目的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":29},"考核项目管理绩效",{"key":24,"text":469,"correct":22},"寻求进一步降低成本的途径",{"key":27,"text":471,"correct":22},"考核企业经营效益",{"key":31,"text":473,"correct":22},"分析成本偏差的原因",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1140884,"施工成本分析是施工成本管理的主要任务之一，下列关于施工成本分析的表述中正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":481,"correct":22},"施工成本分析是指科学地预测成本水平及其发展趋势",{"key":27,"text":483,"correct":22},"施工成本分析是指预测成本控制的薄弱环节",{"key":31,"text":485,"correct":29},"施工成本分析应贯穿于施工成本管理的全过程",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1140885,"建设工程项目施工成本偏差控制的核心是（ ）。",[490,491,492,493],{"key":20,"text":405,"correct":22},{"key":24,"text":435,"correct":29},{"key":27,"text":401,"correct":22},{"key":31,"text":399,"correct":22},{"id":495,"libraryId":5,"type":48,"typeLabel":49,"stem":496,"options":497,"answer":508,"analysis":33},1140886,"建设工程项目施工成本偏差分为（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":29},"累计成本偏差",{"key":24,"text":501,"correct":29},"局部成本偏差",{"key":27,"text":503,"correct":22},"单项工程成本偏差",{"key":31,"text":505,"correct":22},"专项成本偏差",{"key":61,"text":507,"correct":22},"单位工程成本偏差","AB",{"id":510,"libraryId":5,"type":48,"typeLabel":49,"stem":511,"options":512,"answer":150,"analysis":33},1140887,"建设工程项目施工成本核算的内容包括（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":29},"措施费核算",{"key":24,"text":516,"correct":29},"人工费核算",{"key":27,"text":518,"correct":29},"分包工程成本核算",{"key":31,"text":520,"correct":29},"材料费核算",{"key":61,"text":522,"correct":22},"税金的核算",{"id":524,"libraryId":5,"type":48,"typeLabel":49,"stem":525,"options":526,"answer":508,"analysis":33},1140888,"施工成本构成的内容包括（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":29},"人工费",{"key":24,"text":530,"correct":29},"材料费",{"key":27,"text":532,"correct":22},"利润",{"key":31,"text":534,"correct":22},"税金",{"key":61,"text":536,"correct":22},"设备及工器具购置费",{"id":538,"libraryId":5,"type":48,"typeLabel":49,"stem":539,"options":540,"answer":290,"analysis":33},1140889,"下列关于施工成本管理任务的说明，正确的是（ ）。",[541,543,545,547,549],{"key":20,"text":542,"correct":29},"建设工程项目施工成本控制应贯穿项目从投标阶段开始直至竣工验收的全过程",{"key":24,"text":544,"correct":22},"施工成本考核是指对成本的形成过程和影响成本的因素进行分析",{"key":27,"text":546,"correct":29},"成本计划是成本决策所确定目标的具体化",{"key":31,"text":548,"correct":22},"成本考核是对成本计划是否实现的最后检验",{"key":61,"text":550,"correct":29},"分析成本偏差的原因，应采取定性和定量相结合的方法",{"id":552,"libraryId":5,"type":48,"typeLabel":49,"stem":553,"options":554,"answer":255,"analysis":33},1140890,"建设工程项目施工成本由直接成本和间接成本所组成，其中直接成本主要有（ ）。",[555,557,559,560,561],{"key":20,"text":556,"correct":22},"差旅交通费",{"key":24,"text":558,"correct":29},"施工机具使用费",{"key":27,"text":530,"correct":29},{"key":31,"text":528,"correct":29},{"key":61,"text":562,"correct":22},"管理人员工资",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1140891,"作为施工企业全面成本管理的重要环节，施工项目成本控制应贯穿于（ ）的全过程。",[567,569,571,573],{"key":20,"text":568,"correct":22},"从项目策划开始到项目开始运营",{"key":24,"text":570,"correct":22},"从项目设计开始到项目开始运营",{"key":27,"text":572,"correct":29},"从项目投标开始到项目竣工验收",{"key":31,"text":574,"correct":22},"从项目施工开始到项目竣工验收",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1140892,"关于建设工程项目施工成本管理责任体系的说法，正确的是（ ）。2017",[579,581,583,585],{"key":20,"text":580,"correct":22},"项目经理部的成本管理体现效益中心的管理职能",{"key":24,"text":582,"correct":22},"项目经理部的成本管理贯穿于单位投标和实施.结算过程",{"key":27,"text":584,"correct":22},"项目经理部的成本管理除生产成本以外，还包括经营管理费用",{"key":31,"text":586,"correct":29},"成本管理责任体系包括公司层和项目经理部的成本管理",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},1140893,"建设工程项目施工成本管理涉及的时间范围是（ ）。 2016",[591,593,595,597],{"key":20,"text":592,"correct":29},"从工程投标报价开始至项目保证金返还为止",{"key":24,"text":594,"correct":22},"从施工图预算开始至项目运用为止",{"key":27,"text":596,"correct":22},"从工程投标报价开始至项目竣工结算完成为止",{"key":31,"text":598,"correct":22},"从施工准备开始至项目竣工结算完成为止",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":27,"analysis":33},1140894,"根据建设工程项目施工成本的组成，属于直接成本的是（ ）。( 2015真题 )",[603,605,607,609],{"key":20,"text":604,"correct":22},"工具用具使用费",{"key":24,"text":606,"correct":22},"职工教育经费",{"key":27,"text":608,"correct":29},"机械折旧费",{"key":31,"text":562,"correct":22},{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":31,"analysis":33},1140895,"竣工工程进行现场成本、完全成本核算的目的是分别考核（）。2018真题",[614,616,618,620],{"key":20,"text":615,"correct":22},"企业经营效益、企业社会效益",{"key":24,"text":617,"correct":22},"项目管理绩效、项目管理责任",{"key":27,"text":619,"correct":22},"项目管理责任、企业经营效益",{"key":31,"text":621,"correct":29},"项目管理绩效、企业经营效益",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":20,"analysis":33},1140896,"施工成本核算要求的归集“三同步”是指（ ）的取值范围应当一致。( 2015真题 )",[626,628,630,632],{"key":20,"text":627,"correct":29},"形象进度、产值统计、实际成本",{"key":24,"text":629,"correct":22},"成本预测、成本计划、成本分析",{"key":27,"text":631,"correct":22},"目标成本、预算成本、实际成本",{"key":31,"text":633,"correct":22},"人工成本、材料成本、机械成本",[635,638,641,644,647,650],{"id":15,"name":636,"category":7,"favorite":637},"领导干部任职前廉政法规知识测试题",92,{"id":639,"name":640,"category":7,"favorite":15},595,"建筑结构与设备",{"id":642,"name":643,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":645,"name":646,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":648,"name":649,"category":7,"favorite":8},534,"BIM工程师",{"id":651,"name":649,"category":7,"favorite":8},535]