[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":636},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,8,50,2721,[13,38,52,64,74,88,100,112,124,136,148,158,166,178,190,202,214,225,240,255,270,285,297,311,321,330,338,348,359,374,389,402,415,424,434,446,461,475,489,500,511,526,538,547,559,570,582,597,611,624],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1140785,2,"多选题","项目风险对策应形成风险管理计划，它包括（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","风险管理目标",true,{"key":24,"text":25,"correct":22},"B","风险管理范围",{"key":27,"text":28,"correct":22},"C","风险跟踪的要求",{"key":30,"text":31,"correct":22},"D","相应的资源预算",{"key":33,"text":34,"correct":35},"E","确定风险因素",false,"ABCD","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},1140786,1,"单选题","某投标人在招标工程开标后发现自己由于报价失误，比正常报价少报18%，虽然被确定为中标人，但拒绝与业主签订施工合同。该投标人所采用的风险对策是（ ）。",[44,46,48,50],{"key":20,"text":45,"correct":22},"风险规避",{"key":24,"text":47,"correct":35},"风险减轻",{"key":27,"text":49,"correct":35},"风险自留",{"key":30,"text":51,"correct":35},"风险转移",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":30,"analysis":37},1140787,"下列项目风险管理工作中，属于风险响应的是（ ）。 2016",[56,58,60,62],{"key":20,"text":57,"correct":35},"收集与项目风险有关的信息",{"key":24,"text":59,"correct":35},"监控可能发生的风险并提出预警",{"key":27,"text":61,"correct":35},"确定各种风险的风险量和风险等级",{"key":30,"text":63,"correct":22},"向保险公司投保难以控制的风险",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":27,"analysis":37},1140788,"下列工程项目风险管理工作中，属于风险评估阶段的是（ ）。2014",[68,69,71,72],{"key":20,"text":34,"correct":35},{"key":24,"text":70,"correct":35},"编制项目风险识别报告",{"key":27,"text":61,"correct":22},{"key":30,"text":73,"correct":35},"对风险进行监控",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":36,"analysis":37},1140790,"下列风险管理工作内容中，属于项目风险评估工作的有（）。2018真题",[78,80,82,84,86],{"key":20,"text":79,"correct":22},"分析各种风险因素发生的概率",{"key":24,"text":81,"correct":22},"分析各种风险发生的损失量",{"key":27,"text":83,"correct":22},"确定风险等级",{"key":30,"text":85,"correct":22},"确定风险量",{"key":33,"text":87,"correct":35},"确定风险管理范围",{"id":89,"libraryId":5,"type":40,"typeLabel":41,"stem":90,"options":91,"answer":24,"analysis":37},1140792,"当业主方和施工方发生利益冲突或矛盾时，受业主的委托进行工程建设监理活动的监理机构应该以事实为依据，以法律和合同为准绳进行处理，这体现了监理的（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":35},"服务性",{"key":24,"text":95,"correct":22},"公平性",{"key":27,"text":97,"correct":35},"科学性",{"key":30,"text":99,"correct":35},"独立性",{"id":101,"libraryId":5,"type":40,"typeLabel":41,"stem":102,"options":103,"answer":24,"analysis":37},1140793,"下列建设市场主体中，其工作性质属于业主方项目管理范畴的是（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":35},"设备供货单位",{"key":24,"text":107,"correct":22},"建设监理单位",{"key":27,"text":109,"correct":35},"施工总承包单位",{"key":30,"text":111,"correct":35},"工程设计单位",{"id":113,"libraryId":5,"type":40,"typeLabel":41,"stem":114,"options":115,"answer":27,"analysis":37},1140794,"向工程监理单位委托建设工程项目监理任务的单位是（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":35},"政府主管部门",{"key":24,"text":119,"correct":35},"质量监督机构",{"key":27,"text":121,"correct":22},"项目法人",{"key":30,"text":123,"correct":35},"项目总承包方",{"id":125,"libraryId":5,"type":40,"typeLabel":41,"stem":126,"options":127,"answer":24,"analysis":37},1140795,"我国《建筑法》规定，（ ）可以规定实行强制监理的建筑工程的范围。",[128,130,132,134],{"key":20,"text":129,"correct":35},"全国人大常委会",{"key":24,"text":131,"correct":22},"国务院",{"key":27,"text":133,"correct":35},"各级地方政府",{"key":30,"text":135,"correct":35},"县级以上建设行政主管部门",{"id":137,"libraryId":5,"type":40,"typeLabel":41,"stem":138,"options":139,"answer":20,"analysis":37},1140796,"《建设工程质量管理条例》规定，未经（ ）签字，建筑材料、建筑构配件和设备不得在工程上使用和安装，施工单位不得进行下一道工序的施工。",[140,142,144,146],{"key":20,"text":141,"correct":22},"监理工程师",{"key":24,"text":143,"correct":35},"项目经理",{"key":27,"text":145,"correct":35},"总监理工程师",{"key":30,"text":147,"correct":35},"业主",{"id":149,"libraryId":5,"type":40,"typeLabel":41,"stem":150,"options":151,"answer":24,"analysis":37},1140797,"我国实行的建设工程监理，属于（ ）项目管理的范畴。",[152,153,155,156],{"key":20,"text":117,"correct":35},{"key":24,"text":154,"correct":22},"业主方",{"key":27,"text":119,"correct":35},{"key":30,"text":157,"correct":35},"建设工程项目总承包方",{"id":159,"libraryId":5,"type":40,"typeLabel":41,"stem":160,"options":161,"answer":20,"analysis":37},1140798,"工程监理单位将尽一切努力进行项目目标控制，但它不可能承担由于不是它的责任而导致的目标失控，这体现了监理的（ ）。",[162,163,164,165],{"key":20,"text":93,"correct":22},{"key":24,"text":97,"correct":35},{"key":27,"text":99,"correct":35},{"key":30,"text":95,"correct":35},{"id":167,"libraryId":5,"type":40,"typeLabel":41,"stem":168,"options":169,"answer":24,"analysis":37},1140799,"关于工程监理单位工作性质的说法，正确的是（ ）。( 2015真题 )",[170,172,174,176],{"key":20,"text":171,"correct":35},"工程监理单位接受业主的委托必须保证项目目标的实现",{"key":24,"text":173,"correct":22},"工程监理单位在组织上不能依附于监理工作的对象",{"key":27,"text":175,"correct":35},"工程监理单位从事监理工作的人员均应是注册监理工程师",{"key":30,"text":177,"correct":35},"工程监理单位以独立的第三方身份处理业主和承包商的冲突",{"id":179,"libraryId":5,"type":40,"typeLabel":41,"stem":180,"options":181,"answer":30,"analysis":37},1140801,"在建设工程项目中，监理单位与施工单位之间的关系是（ ）关系。",[182,184,186,188],{"key":20,"text":183,"correct":35},"代理与被代理",{"key":24,"text":185,"correct":35},"合同",{"key":27,"text":187,"correct":35},"委托和被委托",{"key":30,"text":189,"correct":22},"监理和被监理",{"id":191,"libraryId":5,"type":40,"typeLabel":41,"stem":192,"options":193,"answer":27,"analysis":37},1140802,"在建设工程项目施工作业实施过程中，监理机构应根据（ ）对施工作业质量进行监督控制。",[194,196,198,200],{"key":20,"text":195,"correct":35},"项目管理实施规划",{"key":24,"text":197,"correct":35},"施工质量计划",{"key":27,"text":199,"correct":22},"监理规划与实施细则",{"key":30,"text":201,"correct":35},"施工组织设计",{"id":203,"libraryId":5,"type":40,"typeLabel":41,"stem":204,"options":205,"answer":27,"analysis":37},1140803,"工程施工阶段建设监理工作的主要任务中，属于施工阶段投资控制工作的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":35},"监督施工单位严格按照施工合同规定的工期组织施工",{"key":24,"text":209,"correct":35},"监督施工单位对各类土木和混凝土试件按规定进行检查和抽查",{"key":27,"text":211,"correct":22},"建立计量支付签证台账，定期与施工单位核对清算",{"key":30,"text":213,"correct":35},"建立工程进度台账，核对工程形象进度，按月、季和年度向 业主报告工程执行情况、工程进度以及存在的问题",{"id":215,"libraryId":5,"type":40,"typeLabel":41,"stem":216,"options":217,"answer":24,"analysis":37},1140804,"对专业性较强的工程项目，项目监理机构应编制工程建设监理实施细则，并必须经（ ）批准后执行。",[218,220,221,223],{"key":20,"text":219,"correct":35},"监理单位技术负责人",{"key":24,"text":145,"correct":22},{"key":27,"text":222,"correct":35},"专业监理工程师",{"key":30,"text":224,"correct":35},"专业工程师",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1140806,"按照《建设工程监理规范》关于工程变更的有关规定，下列做法正确的是（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"设计单位对原设计存在的缺陷提出的变更应编制设计变更文件",{"key":24,"text":232,"correct":35},"在发包人和承包人未能就工程变更的费用等方面达成协议时，项目变更不能实施",{"key":27,"text":234,"correct":22},"工程变更应由总监理工程师签发",{"key":30,"text":236,"correct":35},"建设单位提出的变更应提交专业监理工程师审查",{"key":33,"text":238,"correct":22},"有设计变更文件的工程变更单应附设计变更文件","ACE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},1140807,"根据《建筑工程质量管理条例》，在工程项目建设监理过程中，未经监理工程师签字，（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"建筑材料、构配件不得在工程上使用",{"key":24,"text":247,"correct":22},"建筑设备不得在工程上安装",{"key":27,"text":249,"correct":22},"施工单位不得进行下一道工序的施工",{"key":30,"text":251,"correct":35},"建设单位不得进行竣工验收",{"key":33,"text":253,"correct":35},"施工单位不得更换施工作业人员","ABC",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1140808,"按照我国现行规定，下列属于施工准备阶段建设监理工作任务的有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":35},"主持设计单位向施工单位的设计交底",{"key":24,"text":262,"correct":22},"审核分包单位的资质",{"key":27,"text":264,"correct":22},"签发开工令",{"key":30,"text":266,"correct":22},"查验施工单位的施工测量放线结果",{"key":33,"text":268,"correct":35},"审查施工单位提交的施工进度计划","BCD",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1140809,"在工程项目竣工验收阶段，项目监理机构的主要工作任务有（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"监督施工单位及时整理各种文件和资料，受理单位工程竣工验收报告，并提出意见",{"key":24,"text":277,"correct":22},"根据施工单位的竣工报告，提出工程质量检验报告",{"key":27,"text":279,"correct":35},"对工程主要部位、主要环节及技术复杂工程进行检查",{"key":30,"text":281,"correct":22},"组织工程预验收，参加业主组织的竣工验收",{"key":33,"text":283,"correct":35},"在质量责任缺陷期间，监督和检查质量问题的处理结果","ABD",{"id":286,"libraryId":5,"type":40,"typeLabel":41,"stem":287,"options":288,"answer":20,"analysis":37},1140810,"根据《建设工程监理规范》（GB 50319-2000），属于施工阶段监理工作任务的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"检查施工单位的测量、检测仪器设备定期检验的证明文件",{"key":24,"text":292,"correct":35},"检查施工单位专职安全生产管理人员的资格",{"key":27,"text":294,"correct":35},"审核分包单位资质条件",{"key":30,"text":296,"correct":35},"查验施工单位的施工测量定位放线成果",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":310,"analysis":37},1140811,"在工程项目施工准备阶段，监理机构的主要工作任务是（ ）。",[301,303,305,307,308],{"key":20,"text":302,"correct":22},"参与设计交底",{"key":24,"text":304,"correct":35},"签署单位工程质量评定表",{"key":27,"text":306,"correct":35},"审查施工组织设计",{"key":30,"text":294,"correct":22},{"key":33,"text":309,"correct":22},"审查工程开工条件，签发开工令","ADE",{"id":312,"libraryId":5,"type":40,"typeLabel":41,"stem":313,"options":314,"answer":30,"analysis":37},1140813,"对中型及中型以上或专业性较强的工程项目，项目监理机构应编制工程建设监理实施细则，并必须经（ ）批准后执行。",[315,317,319,320],{"key":20,"text":316,"correct":35},"政府主管部门负责人",{"key":24,"text":318,"correct":35},"施工单位技术负责人",{"key":27,"text":222,"correct":35},{"key":30,"text":145,"correct":22},{"id":322,"libraryId":5,"type":40,"typeLabel":41,"stem":323,"options":324,"answer":24,"analysis":37},1140814,"根据《建设工程监理规范》，对中型及以上或专业性比较强的工程项目，项目监理机构应编制工程建设监理实施细则，并必须经（ ）批准后执行。",[325,326,327,328],{"key":20,"text":219,"correct":35},{"key":24,"text":145,"correct":22},{"key":27,"text":222,"correct":35},{"key":30,"text":329,"correct":35},"业主代表",{"id":331,"libraryId":5,"type":40,"typeLabel":41,"stem":332,"options":333,"answer":27,"analysis":37},1140815,"工程建设监理规划编制完成后，必须经（ ）审核批准。",[334,335,336,337],{"key":20,"text":147,"correct":35},{"key":24,"text":145,"correct":35},{"key":27,"text":219,"correct":22},{"key":30,"text":222,"correct":35},{"id":339,"libraryId":5,"type":40,"typeLabel":41,"stem":340,"options":341,"answer":24,"analysis":37},1140816,"工程建设监理实施细则应在工程施工开始前编制完成，并必须经（ ）批准。",[342,344,345,346],{"key":20,"text":343,"correct":35},"专项监理工程师",{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":35},{"key":30,"text":347,"correct":35},"建设单位",{"id":349,"libraryId":5,"type":40,"typeLabel":41,"stem":350,"options":351,"answer":24,"analysis":37},1140817,"编制工程建设监理实施细则的依据有（ ）。",[352,354,355,357],{"key":20,"text":353,"correct":35},"项目的合同文件",{"key":24,"text":201,"correct":22},{"key":27,"text":356,"correct":35},"项目的招标文件",{"key":30,"text":358,"correct":35},"工程建设监理规划大纲",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":373,"analysis":37},1140818,"根据《建设工程监理规范》（GB 50319-2000），编制工程建设监理规划应遵循的程序和依据是（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"在收到设计文件后开始编制",{"key":24,"text":366,"correct":35},"在签定委托监理合同前编制完成",{"key":27,"text":368,"correct":22},"完成后必须经监理单位技术负责人审核批准",{"key":30,"text":370,"correct":22},"应由总监理工程师主持编制",{"key":33,"text":372,"correct":22},"依据项目审批文件编制","ACDE",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":388,"analysis":37},1140819,"工程建设监理实施细则包括的内容有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"专业工程的特点",{"key":24,"text":381,"correct":22},"监理工作的流程",{"key":27,"text":383,"correct":35},"监理工作的性质",{"key":30,"text":385,"correct":22},"监理工作的方法",{"key":33,"text":387,"correct":22},"监理工作的控制要点及目标值","ABDE",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":239,"analysis":37},1140820,"根据《建设工程监理规范》（GB 50319-2000），属于工程建设监理规划内容的有（ ）。",[393,395,396,398,400],{"key":20,"text":394,"correct":22},"建设工程概况",{"key":24,"text":387,"correct":35},{"key":27,"text":397,"correct":22},"监理工作制度",{"key":30,"text":399,"correct":35},"监理工程进度计划",{"key":33,"text":401,"correct":22},"监理设施",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":310,"analysis":37},1140821,"根据《建设工程监理规范》（GB\u002FT50319-2013），编制工程建设监理实施细则的依据有（ ）。( 2015真题 )",[406,408,410,412,413],{"key":20,"text":407,"correct":22},"工程建设标准",{"key":24,"text":409,"correct":35},"监理大纲",{"key":27,"text":411,"correct":35},"监理委托合同",{"key":30,"text":201,"correct":22},{"key":33,"text":414,"correct":22},"工程设计文件",{"id":416,"libraryId":5,"type":40,"typeLabel":41,"stem":417,"options":418,"answer":24,"analysis":37},1140822,"根据《建设工程监理规范》（GB\u002FT 50319－2013），工程建设监理实施细则必须经（ ）批准。 2016",[419,420,421,422],{"key":20,"text":219,"correct":35},{"key":24,"text":145,"correct":22},{"key":27,"text":222,"correct":35},{"key":30,"text":423,"correct":35},"监理单位法定代表人",{"id":425,"libraryId":5,"type":40,"typeLabel":41,"stem":426,"options":427,"answer":27,"analysis":37},1140823,"根据《建设工程监理规范》（GBT50319-2013），工程建设监理实施细则应在工程施工开始前编制完成并必须经（ ）批准。2014",[428,429,431,432],{"key":20,"text":222,"correct":35},{"key":24,"text":430,"correct":35},"发包人代表",{"key":27,"text":145,"correct":22},{"key":30,"text":433,"correct":35},"总监理工程师代表",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":36,"analysis":37},1140824,"根据《建设工程监理规范》，工程建设监理实施细则应包括的内容有（）。2018真题",[438,439,440,442,444],{"key":20,"text":379,"correct":22},{"key":24,"text":381,"correct":22},{"key":27,"text":441,"correct":22},"监理工作的控制要点",{"key":30,"text":443,"correct":22},"监理工作的目标值",{"key":33,"text":445,"correct":35},"监理的工作范围",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":460,"analysis":37},1140825,"根据《建设工程监理规范》(GB\u002FT50319—2013)，工程建设监理规划应在（ ）后开始编制。 2016",[450,452,454,456,458],{"key":20,"text":451,"correct":35},"第一次工地会议",{"key":24,"text":453,"correct":35},"建设单位指定日期",{"key":27,"text":455,"correct":22},"签订委托监理合同",{"key":30,"text":457,"correct":35},"施工单位进场",{"key":33,"text":459,"correct":22},"收到设计文件","CE",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":284,"analysis":37},1140827,"根据《建筑法》，工程监理人员认为工程施工不符合（ ）的，有权要求建筑施工企业改正。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"工程设计要求",{"key":24,"text":468,"correct":22},"合同约定",{"key":27,"text":470,"correct":35},"监理规划",{"key":30,"text":472,"correct":22},"施工技术标准",{"key":33,"text":474,"correct":35},"监理实施细则",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":239,"analysis":37},1140828,"根据《建设工程监理规范》（GB\u002FT50319—2013），工程建设监理实施细则除应反应专业工程的特点外，还应包括（ ）等内容。2014",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"监理工作流程",{"key":24,"text":482,"correct":35},"项目监理机构的组织形式",{"key":27,"text":484,"correct":22},"监理工作的方法和措施",{"key":30,"text":486,"correct":35},"监理工作依据",{"key":33,"text":488,"correct":22},"监理工作的控制点及目标值",{"id":490,"libraryId":5,"type":40,"typeLabel":41,"stem":491,"options":492,"answer":30,"analysis":37},1140830,"按国际工程惯例，当采用指定分包商时，应对分包合同规定的工期和质量目标向业主负责的是（ ）。",[493,494,496,498],{"key":20,"text":147,"correct":35},{"key":24,"text":495,"correct":35},"监理方",{"key":27,"text":497,"correct":35},"指定分包商",{"key":30,"text":499,"correct":22},"施工总承包管理方",{"id":501,"libraryId":5,"type":40,"typeLabel":41,"stem":502,"options":503,"answer":24,"analysis":37},1140831,"按照建设工程项目不同参与方的工作性质和组织特征划分的项目管理类型，施工方的项目管理不包括（ ）的项目管理。",[504,506,508,509],{"key":20,"text":505,"correct":35},"施工总承包方",{"key":24,"text":507,"correct":22},"建设项目总承包方",{"key":27,"text":499,"correct":35},{"key":30,"text":510,"correct":35},"施工分包方",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":525,"analysis":37},1140832,"施工方作为项目建设的一个重要参与方，其项目管理应服务于（ ）利益。",[515,517,519,521,523],{"key":20,"text":516,"correct":35},"业主方的",{"key":24,"text":518,"correct":22},"施工方本身的",{"key":27,"text":520,"correct":22},"项目的整体",{"key":30,"text":522,"correct":35},"社会公共的",{"key":33,"text":524,"correct":35},"监理方的","BC",{"id":527,"libraryId":5,"type":40,"typeLabel":41,"stem":528,"options":529,"answer":20,"analysis":37},1140833,"关于施工方项目管理的说法，正确的是（）。2018真题",[530,532,534,536],{"key":20,"text":531,"correct":22},"可以采用工程施工总承包管理模式",{"key":24,"text":533,"correct":35},"项目的整体利益和施工方本身的利益是对立关系",{"key":27,"text":535,"correct":35},"施工方项目管理工作涉及项目实施阶段的全过程",{"key":30,"text":537,"correct":35},"施工方项目管理的目标应根据其生产和经营的情况确定",{"id":539,"libraryId":5,"type":40,"typeLabel":41,"stem":540,"options":541,"answer":27,"analysis":37},1140834,"按照国际工程的惯例，当建设工程采用指定分包时，（ ）应对分包工程的工期目标和质量目标负责。",[542,543,544,545],{"key":20,"text":154,"correct":35},{"key":24,"text":495,"correct":35},{"key":27,"text":505,"correct":22},{"key":30,"text":546,"correct":35},"劳务分包方",{"id":548,"libraryId":5,"type":40,"typeLabel":41,"stem":549,"options":550,"answer":27,"analysis":37},1140835,"根据《建设项目工程总承包管理规范》（GB\u002FT 50358—2005），不属于工程总承包方项目管理内容的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":35},"任命项目经理",{"key":24,"text":554,"correct":35},"组建项目部",{"key":27,"text":556,"correct":22},"确定项目建设资金",{"key":30,"text":558,"correct":35},"实施设计管理",{"id":560,"libraryId":5,"type":40,"typeLabel":41,"stem":561,"options":562,"answer":30,"analysis":37},1140836,"根据《建设项目工程总承包管理规范》(GB\u002FT50358-2005)的规定，工程总承包项目管理的范围应由（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":35},"规范性标准规定",{"key":24,"text":566,"correct":35},"双方约定",{"key":27,"text":568,"correct":35},"法律法规规定",{"key":30,"text":468,"correct":22},{"id":571,"libraryId":5,"type":40,"typeLabel":41,"stem":572,"options":573,"answer":24,"analysis":37},1140837,"建设项目工程总承包方的工作程序中，进行项目策划、编制项目计划属于项目（ ）阶段的工作。",[574,576,578,580],{"key":20,"text":575,"correct":35},"启动",{"key":24,"text":577,"correct":22},"初始",{"key":27,"text":579,"correct":35},"设计",{"key":30,"text":581,"correct":35},"施工",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":596,"analysis":37},1140838,"建设项目工程总承包方的项目管理目标包括（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":35},"施工方的质量目标",{"key":24,"text":589,"correct":22},"工程建设的安全管理目标",{"key":27,"text":591,"correct":22},"项目的总投资目标",{"key":30,"text":593,"correct":22},"工程总承包方的成本目标",{"key":33,"text":595,"correct":22},"工程总承包方的进度目标","BCDE",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":239,"analysis":37},1140839,"根据《建设项目工程总承包管理规范》，在项目管理收尾阶段，建设工程总承包方的工作内容有（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"办理项目资料归档",{"key":24,"text":604,"correct":35},"进行竣工决算",{"key":27,"text":606,"correct":22},"对项目人员进行考核评价",{"key":30,"text":608,"correct":35},"办理管理权移交",{"key":33,"text":610,"correct":22},"解散项目部",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":596,"analysis":37},1140840,"根据（建设项目工程总承包管理规范），工程总承包项目管理的主要内容包括（ ）。",[615,617,619,620,622],{"key":20,"text":616,"correct":35},"办理可行性研究报批",{"key":24,"text":618,"correct":22},"进行项目策划",{"key":27,"text":558,"correct":22},{"key":30,"text":621,"correct":22},"实施采购管理",{"key":33,"text":623,"correct":22},"实施试运行管理",{"id":625,"libraryId":5,"type":40,"typeLabel":41,"stem":626,"options":627,"answer":24,"analysis":37},1140841,"建设项目工程总承包方的项目管理工作主要在项目的（ ）。",[628,630,632,634],{"key":20,"text":629,"correct":35},"决策阶段、实施阶段、使用阶段",{"key":24,"text":631,"correct":22},"实施阶段",{"key":27,"text":633,"correct":35},"设计阶段、施工阶段、保修阶段",{"key":30,"text":635,"correct":35},"施工阶段",[637,640,643,646,649,652],{"id":40,"name":638,"category":7,"favorite":639},"领导干部任职前廉政法规知识测试题",92,{"id":641,"name":642,"category":7,"favorite":40},595,"建筑结构与设备",{"id":644,"name":645,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":647,"name":648,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":650,"name":651,"category":7,"favorite":8},534,"BIM工程师",{"id":653,"name":651,"category":7,"favorite":8},535]