[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,7,50,2721,[13,38,53,67,81,92,104,116,125,133,142,154,162,177,189,204,216,228,240,251,263,275,287,298,310,325,336,347,359,368,380,394,406,420,432,444,456,468,478,490,502,513,525,536,546,555,568,579,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1140725,2,"多选题","施工项目经理的职责包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","确保项目建设资金的落实到位",false,{"key":24,"text":25,"correct":26},"B","贯彻执行有关的法律法规",true,{"key":28,"text":29,"correct":26},"C","确保工程质量",{"key":31,"text":32,"correct":22},"D","预防重大工程质量安全事故的发生",{"key":34,"text":35,"correct":26},"E","确保工程工期","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1140726,"根据我国相关规定，下列各项中属于项目经理的权限的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"确定物资供应单位",{"key":24,"text":45,"correct":22},"选择工程分包商",{"key":28,"text":47,"correct":22},"决定项目范围内资金的投入和使用",{"key":31,"text":49,"correct":26},"制定内部计酬办法",{"key":34,"text":51,"correct":26},"主持项目经理部工作","DE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1140727,"项目经理应履行的职责有（ ）。",[57,59,61,63,64],{"key":20,"text":58,"correct":26},"进行授权范围内的利益分配",{"key":24,"text":60,"correct":26},"建立各种专业管理体系，并组织实施",{"key":28,"text":62,"correct":26},"对资源进行动态管理",{"key":31,"text":51,"correct":22},{"key":34,"text":65,"correct":22},"参与选择物资供应单位","ABC",{"id":68,"libraryId":5,"type":69,"typeLabel":70,"stem":71,"options":72,"answer":20,"analysis":37},1140728,1,"单选题","建设施工企业项目经理在承担工程项目施工管理工作中，行使的管理权力有（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":26},"调配并管理进入工程项目的各种生产要素",{"key":24,"text":76,"correct":22},"负责组建项目经理部",{"key":28,"text":78,"correct":22},"执行项目合同承包约定的应由项目经理负责履行的各项条款",{"key":31,"text":80,"correct":22},"负责选择并使用具有相应资质的分包人",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":66,"analysis":37},1140729,"根据《建设工程项目管理规范》(GB\u002FT50326—2006),项目经理的职责有（ ）。2014",[85,87,88,89,90],{"key":20,"text":86,"correct":26},"主持编制项目管理实施规划",{"key":24,"text":62,"correct":26},{"key":28,"text":58,"correct":26},{"key":31,"text":51,"correct":22},{"key":34,"text":91,"correct":22},"在授权范围内协调与项目有关的内外部关系",{"id":93,"libraryId":5,"type":69,"typeLabel":70,"stem":94,"options":95,"answer":24,"analysis":37},1140732,"（2020年真题）根据《建设工程项目管理规范》,项目管理实施规划应由（ ）组织编制。",[96,98,100,102],{"key":20,"text":97,"correct":22},"项目技术负责人",{"key":24,"text":99,"correct":26},"项目经理",{"key":28,"text":101,"correct":22},"企业技术负责人",{"key":31,"text":103,"correct":22},"企业负责人",{"id":105,"libraryId":5,"type":69,"typeLabel":70,"stem":106,"options":107,"answer":20,"analysis":37},1140733,"下列沟通过程中的诸要素中，处于主导地位的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"沟通主体",{"key":24,"text":111,"correct":22},"沟通客体",{"key":28,"text":113,"correct":22},"沟通环境",{"key":31,"text":115,"correct":22},"沟通渠道",{"id":117,"libraryId":5,"type":69,"typeLabel":70,"stem":118,"options":119,"answer":31,"analysis":37},1140734,"沟通过程的要素中，包括沟通内容和沟通方法的是（ ）。",[120,121,122,123],{"key":20,"text":109,"correct":22},{"key":24,"text":111,"correct":22},{"key":28,"text":115,"correct":22},{"key":31,"text":124,"correct":26},"沟通介体",{"id":126,"libraryId":5,"type":69,"typeLabel":70,"stem":127,"options":128,"answer":24,"analysis":37},1140735,"沟通过程要素中，（ ）即沟通对象，包括个体沟通对象和团体沟通对象。",[129,130,131,132],{"key":20,"text":109,"correct":22},{"key":24,"text":111,"correct":26},{"key":28,"text":124,"correct":22},{"key":31,"text":113,"correct":22},{"id":134,"libraryId":5,"type":69,"typeLabel":70,"stem":135,"options":136,"answer":24,"analysis":37},1140736,"沟通过程的要素中，（ ）是沟通过程的出发点和落脚点，并且在沟通过程中具有积极的能的作用。",[137,138,140,141],{"key":20,"text":109,"correct":22},{"key":24,"text":139,"correct":26},"沟通对象",{"key":28,"text":113,"correct":22},{"key":31,"text":115,"correct":22},{"id":143,"libraryId":5,"type":69,"typeLabel":70,"stem":144,"options":145,"answer":20,"analysis":37},1140737,"下列项目各参与方的沟通障碍中，属于组织沟通障碍的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"机构组织庞大",{"key":24,"text":149,"correct":22},"知识、经验水平的差距导致的障碍",{"key":28,"text":151,"correct":22},"对信息的看法不同造成的障碍",{"key":31,"text":153,"correct":22},"下属对上级的恐惧心理而形成的障碍",{"id":155,"libraryId":5,"type":69,"typeLabel":70,"stem":156,"options":157,"answer":31,"analysis":37},1140738,"实施沟通过程和提高沟通功效的重要环节是（ ）。",[158,159,160,161],{"key":20,"text":109,"correct":22},{"key":24,"text":139,"correct":22},{"key":28,"text":113,"correct":22},{"key":31,"text":115,"correct":26},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":176,"analysis":37},1140739,"个人的沟通障碍由（ ）原因造成。",[166,168,170,172,174],{"key":20,"text":167,"correct":26},"个性因素所引起的障碍",{"key":24,"text":169,"correct":22},"信息传递不及时或不适时和知识经验的局限",{"key":28,"text":171,"correct":26},"对信息的态度不同所造成的障碍",{"key":31,"text":173,"correct":26},"知识、经验水平的差距所导致的障碍",{"key":34,"text":175,"correct":26},"沟通者的畏惧感以及个人心理品质也会造成沟通障碍","ACDE",{"id":178,"libraryId":5,"type":69,"typeLabel":70,"stem":179,"options":180,"answer":31,"analysis":37},1140740,"项目人力资源管理的目的是（ ）。2014",[181,183,185,187],{"key":20,"text":182,"correct":22},"提高员工的业务水平",{"key":24,"text":184,"correct":22},"建立广泛的人际关系",{"key":28,"text":186,"correct":22},"降低项目的人力成本",{"key":31,"text":188,"correct":26},"调动所有项目参与人的积极性",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":203,"analysis":37},1140741,"关于沟通障碍的说法，正确的有（ ）。( 2015真题 )",[193,195,197,199,201],{"key":20,"text":194,"correct":22},"从信息发送者的角度看，影响信息沟通的因素可能是信息译码不准确",{"key":24,"text":196,"correct":26},"沟通障碍来自发送者的障碍、接受者的障碍和沟通通道的障碍",{"key":28,"text":198,"correct":22},"沟通障碍包括组织的沟通障碍和能力的沟通障碍两种形式",{"key":31,"text":200,"correct":26},"从信息接受者的角度看，影响信息沟通的因素可能是心理上的障碍",{"key":34,"text":202,"correct":26},"选择沟通媒介不当是沟通通道障碍的一个方面","BDE",{"id":205,"libraryId":5,"type":69,"typeLabel":70,"stem":206,"options":207,"answer":20,"analysis":37},1140742,"一般来说，沟通者的沟通能力包含（ ）。2014",[208,210,212,214],{"key":20,"text":209,"correct":26},"表达能力、争辩能力、倾听能力和设计能力",{"key":24,"text":211,"correct":22},"思维能力、表达能力、倾听能力和说服能力",{"key":28,"text":213,"correct":22},"思维能力、表达能力、把控能力和说服能力",{"key":31,"text":215,"correct":22},"想象能力、表达能力、说服能力和设计能力",{"id":217,"libraryId":5,"type":69,"typeLabel":70,"stem":218,"options":219,"answer":20,"analysis":37},1140743,"沟通过程的五要素包括（ ）。( 2015真题 )",[220,222,224,226],{"key":20,"text":221,"correct":26},"沟通主体、沟通客体、沟通介体、沟通环境和沟通渠道",{"key":24,"text":223,"correct":22},"沟通主体、沟通客体、沟通介体、沟通内容和沟通渠道",{"key":28,"text":225,"correct":22},"沟通主体、沟通客体、沟通介体、沟通环境和沟通方法",{"key":31,"text":227,"correct":22},"沟通主体、沟通客体、沟通介体、沟通内容和沟通方法",{"id":229,"libraryId":5,"type":69,"typeLabel":70,"stem":230,"options":231,"answer":31,"analysis":37},1140744,"沟通的两个层面是指（ ）。 2016",[232,234,236,238],{"key":20,"text":233,"correct":22},"信息的发送者和接受者",{"key":24,"text":235,"correct":22},"沟通内容和沟通方法",{"key":28,"text":237,"correct":22},"信息传递和交换",{"key":31,"text":239,"correct":26},"思维交流和语言交流",{"id":241,"libraryId":5,"type":69,"typeLabel":70,"stem":242,"options":243,"answer":20,"analysis":37},1140746,"项目人力资源管理的目的是（ ）。",[244,246,247,249],{"key":20,"text":245,"correct":26},"调动项目参与人的积极性",{"key":24,"text":184,"correct":22},{"key":28,"text":248,"correct":22},"招聘或解聘员工",{"key":31,"text":250,"correct":22},"对项目参与人员进行绩效考核",{"id":252,"libraryId":5,"type":69,"typeLabel":70,"stem":253,"options":254,"answer":20,"analysis":37},1140747,"关于建筑施工企业劳动用工的说法，错误的是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":26},"建筑施工企业与劳动者应当自试用期满后，按照劳动合同法规的规定签订书面劳动合同",{"key":24,"text":258,"correct":22},"建筑施工企业应当按照相关规定办理工手续，不得使用零散工",{"key":28,"text":260,"correct":22},"建筑施工企业应当将每个工程项目中的施工管理，作业人员劳务档案中有关情况在当地建筑业企业信息管理系统中按规定如实填报",{"key":31,"text":262,"correct":22},"劳动合同应一式三份，双方当事人各持一份，劳动者所在工地保留一份备查",{"id":264,"libraryId":5,"type":69,"typeLabel":70,"stem":265,"options":266,"answer":20,"analysis":37},1140748,"施工企业人力资源管理的任务包括（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":26},"团队建设",{"key":24,"text":270,"correct":22},"信息发布",{"key":28,"text":272,"correct":22},"变更控制",{"key":31,"text":274,"correct":22},"沟通规划",{"id":276,"libraryId":5,"type":69,"typeLabel":70,"stem":277,"options":278,"answer":28,"analysis":37},1140749,"建筑施工企业应当将每个工程项目中的施工管理、作业人员劳务档案中有关情况在当地建筑业企业信息管理系统中按规定如实填报。如果人员发生变更的，应当在变更后（ ）个工作日内，在建筑业企业信息管理系统中作相应变更。",[279,281,283,285],{"key":20,"text":280,"correct":22},"3",{"key":24,"text":282,"correct":22},"5",{"key":28,"text":284,"correct":26},"7",{"key":31,"text":286,"correct":22},"10",{"id":288,"libraryId":5,"type":69,"typeLabel":70,"stem":289,"options":290,"answer":20,"analysis":37},1140750,"建设工程项目人力资源管理的目的是（ ）。",[291,292,294,296],{"key":20,"text":188,"correct":26},{"key":24,"text":293,"correct":22},"减少项目管理班子人员数量",{"key":28,"text":295,"correct":22},"降低项目管理人工成本",{"key":31,"text":297,"correct":22},"组建项目管理班子",{"id":299,"libraryId":5,"type":69,"typeLabel":70,"stem":300,"options":301,"answer":20,"analysis":37},1140751,"以下关于项目人力资源管理的说法中正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"人力资源管理的工作步骤中包括通过解聘减少员工",{"key":24,"text":305,"correct":22},"人力资源管理不包括员工的绩效考评",{"key":28,"text":307,"correct":22},"人力资源管理的目的是提高员工业务水平",{"key":31,"text":309,"correct":22},"人力资源管理的目的是减少人才流动",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},1140752,"在建设工程项目施工管理中，项目人力资源管理的任务包括（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"编制项目沟通计划",{"key":24,"text":317,"correct":22},"明确项目参与各方职责",{"key":28,"text":319,"correct":26},"建立健全项目管理团队",{"key":31,"text":321,"correct":26},"项目管理人员绩效考评",{"key":34,"text":323,"correct":22},"建立健全信息传输渠道","CD",{"id":326,"libraryId":5,"type":69,"typeLabel":70,"stem":327,"options":328,"answer":31,"analysis":37},1140756,"根据政府主管部门有关建设工程劳动用工管理规定，建筑施工企业应将项目作业人员有关情况在当地建筑业企业信息管理系统中如实填报，人员发生变更的，应在变更后（）个工作日内做相应变更。2018真题",[329,331,333,335],{"key":20,"text":330,"correct":22},"30",{"key":24,"text":332,"correct":22},"15",{"key":28,"text":334,"correct":22},"14",{"key":31,"text":284,"correct":26},{"id":337,"libraryId":5,"type":69,"typeLabel":70,"stem":338,"options":339,"answer":20,"analysis":37},1140757,"建筑施工企业因暂时生产经营困难无法按劳动合同约定的日期支付工资的，应当向劳动者说明情况，并经与工会或职工代表协商一致后，可以延期支付工资，但最长不得超过（ ）日。 2016",[340,341,343,345],{"key":20,"text":330,"correct":26},{"key":24,"text":342,"correct":22},"60",{"key":28,"text":344,"correct":22},"90",{"key":31,"text":346,"correct":22},"120",{"id":348,"libraryId":5,"type":69,"typeLabel":70,"stem":349,"options":350,"answer":20,"analysis":37},1140758,"下列项目目标动态控制的流程中，正确的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":26},"收集项目目标的实际值&rarr;实际值与计划值比较&rarr;找出偏差&rarr;采取纠偏措施",{"key":24,"text":354,"correct":22},"收集项目目标的实际值&rarr;实际值与计划值比较&rarr;找出偏差&rarr;进行目标调整",{"key":28,"text":356,"correct":22},"收集项目目标的实际值&rarr;实际值与计划值比较&rarr;采取控制措施&rarr;进行目标调整",{"key":31,"text":358,"correct":22},"实际值与计划值比较&rarr;找出偏差&rarr;采取控制措施&rarr;收集项目目标的实际值",{"id":360,"libraryId":5,"type":69,"typeLabel":70,"stem":361,"options":362,"answer":31,"analysis":37},1140759,"根据《建设工程项目管理规范》（GB\u002FT 50326-2006），项目管理实施规划应由（ ）组织编制。",[363,364,366,367],{"key":20,"text":97,"correct":22},{"key":24,"text":365,"correct":22},"企业生产负责人",{"key":28,"text":101,"correct":22},{"key":31,"text":99,"correct":26},{"id":369,"libraryId":5,"type":69,"typeLabel":70,"stem":370,"options":371,"answer":24,"analysis":37},1140760,"下列选项中，不是编制项目管理目标责任书依据的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"项目合同文件",{"key":24,"text":375,"correct":26},"项目管理实施规划",{"key":28,"text":377,"correct":22},"组织的管理制度",{"key":31,"text":379,"correct":22},"组织的经营方针和目标",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":36,"analysis":37},1140761,"国际工程施工中的质量管理由（ ）主管。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"发包人",{"key":24,"text":387,"correct":26},"承包人的项目经理",{"key":28,"text":389,"correct":26},"承包人指定的技术副经理",{"key":31,"text":391,"correct":22},"工程师",{"key":34,"text":393,"correct":26},"承包人指定的总工程师",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":66,"analysis":37},1140762,"项目管理目标责任书包括的内容有（ ）。",[398,400,402,404,405],{"key":20,"text":399,"correct":26},"项目管理实施目标",{"key":24,"text":401,"correct":26},"项目需用资源的提供方式和核算办法",{"key":28,"text":403,"correct":26},"项目经理部应承担的风险",{"key":31,"text":377,"correct":22},{"key":34,"text":379,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":176,"analysis":37},1140763,"项目经理在承担项目施工管理过程中，需履行的职责有（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":26},"贯彻执行国家和工程所在地政府的有关法律、法规和政策",{"key":24,"text":413,"correct":22},"确定项目部和企业之间的利益分配",{"key":28,"text":415,"correct":26},"对工程项目施工进行有效控制",{"key":31,"text":417,"correct":26},"严格财务制度，加强财务管理",{"key":34,"text":419,"correct":26},"确保工程质量和工期，实现安全、文明生产",{"id":421,"libraryId":5,"type":69,"typeLabel":70,"stem":422,"options":423,"answer":31,"analysis":37},1140765,"在企业法定代表人授权范围内，建设工程施工方项目经理的管理权力包括（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"调配企业人力及机械设备",{"key":24,"text":427,"correct":22},"调整项目投资目标",{"key":28,"text":429,"correct":22},"审定危险性较大的工程专项施工方案",{"key":31,"text":431,"correct":26},"调整项目技术负责人",{"id":433,"libraryId":5,"type":69,"typeLabel":70,"stem":434,"options":435,"answer":28,"analysis":37},1140766,"建设工程项目风险可分为组织风险、经济与管理风险、工程环境风险和技术风险等，下列风险因素中属于技术风险的是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"事故防范计划",{"key":24,"text":439,"correct":22},"现场防火设施",{"key":28,"text":441,"correct":26},"工程设计文件",{"key":31,"text":443,"correct":22},"一般技工的能力",{"id":445,"libraryId":5,"type":69,"typeLabel":70,"stem":446,"options":447,"answer":31,"analysis":37},1140767,"下列风险因素中，属于组织风险的是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"工程资金供应的条件",{"key":24,"text":451,"correct":22},"现场防火设施的可用性",{"key":28,"text":453,"correct":22},"施工方案",{"key":31,"text":455,"correct":26},"业主方人员的能力",{"id":457,"libraryId":5,"type":69,"typeLabel":70,"stem":458,"options":459,"answer":20,"analysis":37},1140768,"下列建设工程项目的风险中，属于经济与管理风险的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":26},"人身安全控制计划",{"key":24,"text":463,"correct":22},"工作流程组织",{"key":28,"text":465,"correct":22},"工程施工方案",{"key":31,"text":467,"correct":22},"组织结构模式",{"id":469,"libraryId":5,"type":69,"typeLabel":70,"stem":470,"options":471,"answer":20,"analysis":37},1140769,"建设工程项目风险可分为组织风险、经济与管理风险、工程环境和技术风险，下列风险因素中属于组织风险的是（ ）。",[472,474,475,477],{"key":20,"text":473,"correct":26},"安全管理人员的能力",{"key":24,"text":461,"correct":22},{"key":28,"text":476,"correct":22},"引起火灾和爆炸的因素",{"key":31,"text":465,"correct":22},{"id":479,"libraryId":5,"type":69,"typeLabel":70,"stem":480,"options":481,"answer":28,"analysis":37},1140770,"用事故发生的频率和事故后果的严重程度来判断安全风险的等级时，若事故发生的频率极小，事故后果的严重程度为重大损失（严重伤害），则安全风险所属的等级为（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"I——可忽略风险",{"key":24,"text":485,"correct":22},"II——可容许风险",{"key":28,"text":487,"correct":26},"III——中度风险",{"key":31,"text":489,"correct":22},"IV——重大风险",{"id":491,"libraryId":5,"type":69,"typeLabel":70,"stem":492,"options":493,"answer":31,"analysis":37},1140771,"现场与公用防火设施的可用性及其数量属于建设工程项目风险中的（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"工程环境风险",{"key":24,"text":497,"correct":22},"组织风险",{"key":28,"text":499,"correct":22},"技术风险",{"key":31,"text":501,"correct":26},"经济与管理风险",{"id":503,"libraryId":5,"type":69,"typeLabel":70,"stem":504,"options":505,"answer":24,"analysis":37},1140772,"风险对于工程项目管理而言，是指可能出现的影响项目（ ）的不确定因素。",[506,508,510,512],{"key":20,"text":507,"correct":22},"组织建设",{"key":24,"text":509,"correct":26},"目标实现",{"key":28,"text":511,"correct":22},"风险控制",{"key":31,"text":268,"correct":22},{"id":514,"libraryId":5,"type":69,"typeLabel":70,"stem":515,"options":516,"answer":24,"analysis":37},1140773,"在建设工程项目的风险类型中，承包商和一般技工的能力方面的风险属于（ ）风险类型。",[517,519,521,523],{"key":20,"text":518,"correct":22},"经济和管理",{"key":24,"text":520,"correct":26},"组织",{"key":28,"text":522,"correct":22},"工程环境",{"key":31,"text":524,"correct":22},"技术",{"id":526,"libraryId":5,"type":69,"typeLabel":70,"stem":527,"options":528,"answer":20,"analysis":37},1140774,"下列影响建设工程项目实施的风险因素中，属于技术风险的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":26},"工程勘查资料",{"key":24,"text":532,"correct":22},"气象条件",{"key":28,"text":534,"correct":22},"公用防火设施的数量",{"key":31,"text":461,"correct":22},{"id":537,"libraryId":5,"type":69,"typeLabel":70,"stem":538,"options":539,"answer":24,"analysis":37},1140775,"根据《建设工程项目管理规范》（GB\u002FT50326—2006）条文中的风险等级评价估表，如果某个风险事件将对项目造成中度损失，且发生的可能性很大。则该事件的风险等级为（ ）级。( 2015真题 )",[540,541,543,544],{"key":20,"text":282,"correct":22},{"key":24,"text":542,"correct":26},"4",{"key":28,"text":280,"correct":22},{"key":31,"text":545,"correct":22},"2",{"id":547,"libraryId":5,"type":69,"typeLabel":70,"stem":548,"options":549,"answer":24,"analysis":37},1140776,"根据《建设工程项目管理规范》GB\u002FT50326-2006条文风险等级划分，下图中风险区A的风险等级为（ ）。2017",[550,551,552,553],{"key":20,"text":284,"correct":22},{"key":24,"text":282,"correct":26},{"key":28,"text":280,"correct":22},{"key":31,"text":554,"correct":22},"1",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":567,"analysis":37},1140777,"下列建设工程项目风险中，属于经济与管理风险的有（ ）。 2016",[559,561,562,564,566],{"key":20,"text":560,"correct":26},"事故防范措施和计划",{"key":24,"text":465,"correct":22},{"key":28,"text":563,"correct":26},"现场与公用防火设施的可用性",{"key":31,"text":565,"correct":22},"承包方管理人员的能力",{"key":34,"text":476,"correct":22},"AC",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":203,"analysis":37},1140778,"下列建设工程项目风险中，属于组织风险的有（ ）。2014",[572,573,574,575,577],{"key":20,"text":461,"correct":22},{"key":24,"text":463,"correct":26},{"key":28,"text":476,"correct":22},{"key":31,"text":576,"correct":26},"任务分工和管理职能分工",{"key":34,"text":578,"correct":26},"设计人员和监理工程师的能力",{"id":580,"libraryId":5,"type":69,"typeLabel":70,"stem":581,"options":582,"answer":24,"analysis":37},1140779,"某施工企业承接了“一带一路”的国际项目，但缺乏具备国际工程施工经验的管理人员和施工人员，这类风险属于建设工程风险类型中的（）。2018真题",[583,584,585,586],{"key":20,"text":501,"correct":22},{"key":24,"text":497,"correct":26},{"key":28,"text":495,"correct":22},{"key":31,"text":499,"correct":22},{"id":588,"libraryId":5,"type":69,"typeLabel":70,"stem":589,"options":590,"answer":20,"analysis":37},1140783,"项目风险管理过程包括：①项目风险响应；②项目风险评估；③项目风险识别；④项目风险控制，其正确的管理流程是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":26},"③ - ② - ① - ④",{"key":24,"text":594,"correct":22},"③ - ② - ④ - ①",{"key":28,"text":596,"correct":22},"② - ③ - ④ - ①",{"key":31,"text":598,"correct":22},"① - ③ - ② - ④",{"id":600,"libraryId":5,"type":69,"typeLabel":70,"stem":601,"options":602,"answer":20,"analysis":37},1140784,"建设工程项目风险评估的工作不包括（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":26},"对项目风险的对策进行风险响应",{"key":24,"text":606,"correct":22},"利用已有数据资料和相关专业方法分析各种风险因素发生的概率",{"key":28,"text":608,"correct":22},"分析各种风险的损失量以及对工程的质量、功能和使用效果等方面的影响",{"key":31,"text":610,"correct":22},"根据各种风险发生的概率和损失量，确定各种风险的风险量和风险等级",[612,615,618,621,624,627],{"id":69,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":69},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":69},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":69},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]