[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,6,50,2721,[13,34,46,54,62,71,79,91,103,115,127,139,151,169,184,198,206,221,233,245,257,272,287,302,315,326,336,348,360,372,384,398,410,422,431,443,455,467,475,487,498,510,522,534,546,556,568,583,596,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1140669,1,"单选题","某项目由于关键设备采购延误导致总体工程进度延误，项目经理部研究决定调整项目采购负责人以解决问题，该措施属于项目目标控制的（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","经济措施",false,{"key":24,"text":25,"correct":22},"B","管理措施",{"key":27,"text":28,"correct":29},"C","组织措施",true,{"key":31,"text":32,"correct":22},"D","技术措施","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1140670,"调整任务分工、管理职能分工和项目管理班子人员等属于项目目标动态控制纠偏措施的（ ）措施。",[38,40,42,44],{"key":20,"text":39,"correct":29},"组织",{"key":24,"text":41,"correct":22},"管理",{"key":27,"text":43,"correct":22},"经济",{"key":31,"text":45,"correct":22},"技术",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1140671,"对项目进度管理的方法和手段进行调整，是项目目标动态控制的（ ）措施。",[50,51,52,53],{"key":20,"text":43,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":45,"correct":22},{"key":31,"text":39,"correct":22},{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":24,"analysis":33},1140672,"某工程项目通过调整进度管理的方法和手段来对项目目标进行纠偏，属于纠偏措施中的（ ）措施。",[58,59,60,61],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":39,"correct":22},{"key":31,"text":43,"correct":22},{"id":63,"libraryId":5,"type":15,"typeLabel":16,"stem":64,"options":65,"answer":20,"analysis":33},1140673,"在应用动态控制原理控制建设工程项目目标时，调整项目管理班子人员属于（ ）措施。",[66,67,69,70],{"key":20,"text":39,"correct":29},{"key":24,"text":68,"correct":22},"合同",{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":72,"libraryId":5,"type":15,"typeLabel":16,"stem":73,"options":74,"answer":31,"analysis":33},1140674,"某项目专业性强且技术复杂，开工后，由于专业原因该项目的项目经理不能胜任该项目，为了保证项目目标的实现，企业更换了项目经理。企业的此项行为属于项目目标动态控制的（ ）。",[75,76,77,78],{"key":20,"text":25,"correct":22},{"key":24,"text":21,"correct":22},{"key":27,"text":32,"correct":22},{"key":31,"text":28,"correct":29},{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":27,"analysis":33},1140675,"项目目标动态控制的首要工作程序是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"收集项目目标的实际值",{"key":24,"text":86,"correct":22},"定期进行项目目标的计划值和实际值的比较",{"key":27,"text":88,"correct":29},"项目目标的分解",{"key":31,"text":90,"correct":22},"采取纠偏措施进行纠偏",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},1140676,"在项目目标动态控制的工作程序中，第一步工作内容是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"项目决策策划",{"key":24,"text":98,"correct":22},"制定纠偏措施",{"key":27,"text":100,"correct":29},"目标分解",{"key":31,"text":102,"correct":22},"收集实际数据",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1140677,"施工项目经理检查施工进度时，发现施工进度滞后是由于其自身材料采购的原因造成的，则为纠正进度偏差可以采取的组织措施是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":29},"调整采购部门管理人员",{"key":24,"text":110,"correct":22},"调整材料采购价格",{"key":27,"text":112,"correct":22},"增加材料采购的资金投入",{"key":31,"text":114,"correct":22},"变更材料采购合同",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1140678,"项目管理最基本的方法论是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"项目目标的策划",{"key":24,"text":122,"correct":29},"项目目标的动态控制",{"key":27,"text":124,"correct":22},"项目管理的目标",{"key":31,"text":126,"correct":22},"项目管理的信息化",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1140679,"建设工程项目目标动态控制的核心是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"合理确定计划值",{"key":24,"text":134,"correct":22},"认真收集实际值",{"key":27,"text":136,"correct":22},"适当调整工程项目目标",{"key":31,"text":138,"correct":29},"比较分析，采取纠偏措施",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},1140680,"下列项目目标动态控制的纠偏措施中，属于组织措施的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"调整进度管理方法",{"key":24,"text":146,"correct":22},"改变施工管理方法",{"key":27,"text":148,"correct":22},"强化合同管理",{"key":31,"text":150,"correct":29},"调整工作流程组织",{"id":152,"libraryId":5,"type":153,"typeLabel":154,"stem":155,"options":156,"answer":168,"analysis":33},1140682,2,"多选题","下列项目目标动态控制的纠偏措施中，属于技术措施的有（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":29},"改进施工方法",{"key":24,"text":160,"correct":22},"调整项目管理工作流程组织",{"key":27,"text":162,"correct":22},"调整进度控制的方法和手段",{"key":31,"text":164,"correct":29},"选择高效的施工机具",{"key":166,"text":167,"correct":22},"E","调整项目管理任务分工","AD",{"id":170,"libraryId":5,"type":153,"typeLabel":154,"stem":171,"options":172,"answer":183,"analysis":33},1140683,"应用动态控制原理进行目标控制时，用于纠偏的组织措施包括（ ）等。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"调整进度管理的方法",{"key":24,"text":176,"correct":29},"调整招标工作的管理职能分工",{"key":27,"text":178,"correct":29},"调整投资控制工作流程",{"key":31,"text":180,"correct":22},"更换不同的软件编制施工进度计划",{"key":166,"text":182,"correct":29},"调整合同管理任务分工","BCE",{"id":185,"libraryId":5,"type":153,"typeLabel":154,"stem":186,"options":187,"answer":197,"analysis":33},1140684,"应用动态控制原理控制建设工程项目进度时，可采取的组织措施包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":29},"调整项目任务分工",{"key":24,"text":191,"correct":22},"改进进度控制手段",{"key":27,"text":193,"correct":29},"调整项目管理职能分工",{"key":31,"text":195,"correct":29},"改进工作流程",{"key":166,"text":158,"correct":22},"ACD",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1140685,"在某大型工程项目的实施过程中，由于“下情不能上传，上情不能下达”，导致项目经理不能及时作出正确决策，拖延了工期。为了加快实施进度，项目经理修正了信息传递工作流程。这种纠偏措施属于动态控制的（ ）。",[202,203,204,205],{"key":20,"text":32,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":21,"correct":22},{"key":31,"text":28,"correct":29},{"id":207,"libraryId":5,"type":153,"typeLabel":154,"stem":208,"options":209,"answer":220,"analysis":33},1140687,"下列具体情况中，施工组织设计应及时进行修改或补充的有（）。2018真题",[210,212,214,216,218],{"key":20,"text":211,"correct":29},"由于施工规范发生变更导致需要调整预应力钢筋施工工艺",{"key":24,"text":213,"correct":29},"由于国际钢材市场价格大涨导致进口钢材无法及时供料，严重影响工程施工",{"key":27,"text":215,"correct":29},"由于自然灾害导致工期严重滞后",{"key":31,"text":217,"correct":22},"设计单位应业主要求对工程设计图纸进行了细微修改",{"key":166,"text":219,"correct":29},"施工单位发现设计图纸存在严重错误，无法继续施工","ABCE",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},1140689,"应用动态控制原理控制项目投资时，若将工程合同价作为投资实际值，则可作投资计划值的是（）",[225,227,229,231],{"key":20,"text":226,"correct":22},"工程概算的工程款支付值",{"key":24,"text":228,"correct":22},"工程概算和工程决算",{"key":27,"text":230,"correct":22},"工程决算和工程款支付值",{"key":31,"text":232,"correct":29},"工程概算和工程预算",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1140690,"应用动态控制原理控制建设工程项目施工成本时，若将工程进度款作为实际值，则可作为计划值的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":29},"工程合同价",{"key":24,"text":240,"correct":22},"工程变更款",{"key":27,"text":242,"correct":22},"工程索赔款",{"key":31,"text":244,"correct":22},"工程结算价",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},1140691,"运用动态控制原理进行建设过程项目投资控制，首先进行的工作是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"分析投资构成，确定投资控制的重点",{"key":24,"text":252,"correct":22},"分析并确定影响投资控制的因素",{"key":27,"text":254,"correct":29},"进行投资目标分解，确定投资控制的计划值",{"key":31,"text":256,"correct":22},"收集经验数据，为投资控制提供参考值",{"id":258,"libraryId":5,"type":153,"typeLabel":154,"stem":259,"options":260,"answer":271,"analysis":33},1140692,"建设工程项目施工过程中，投资的实际值和计划值的的比较包括（ ）的比较。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"工程概算与投资规划",{"key":24,"text":264,"correct":22},"工程预算与工程概算",{"key":27,"text":266,"correct":29},"工程合同价与工程概算",{"key":31,"text":268,"correct":29},"工程款支付与工程概算",{"key":166,"text":270,"correct":29},"工程决算与工程概算","CDE",{"id":273,"libraryId":5,"type":153,"typeLabel":154,"stem":274,"options":275,"answer":286,"analysis":33},1140693,"运用动态控制原理控制建设工程项目投资，可以采取的纠偏措施有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"调整施工进度计划",{"key":24,"text":279,"correct":29},"调整投资控制的方法和手段",{"key":27,"text":281,"correct":29},"应用价值工程的方法",{"key":31,"text":283,"correct":29},"制定节约投资的奖励措施",{"key":166,"text":285,"correct":29},"优化施工方法","BCDE",{"id":288,"libraryId":5,"type":153,"typeLabel":154,"stem":289,"options":290,"answer":301,"analysis":33},1140694,"应用动态控制原理进行建设工程项目投资控制时，相对于工程合同价而言，投资的计划值有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":29},"投资规划",{"key":24,"text":294,"correct":29},"工程概算",{"key":27,"text":296,"correct":29},"工程预算",{"key":31,"text":298,"correct":22},"工程进度款",{"key":166,"text":300,"correct":22},"工程决算","ABC",{"id":303,"libraryId":5,"type":153,"typeLabel":154,"stem":304,"options":305,"answer":314,"analysis":33},1140695,"在施工过程中投资的计划值和实际值的比较包括（ ）。",[306,307,309,311,313],{"key":20,"text":266,"correct":29},{"key":24,"text":308,"correct":29},"工程合同价与工程款的支付",{"key":27,"text":310,"correct":29},"工程决算与工程预算",{"key":31,"text":312,"correct":29},"工程决算与工程合同价",{"key":166,"text":264,"correct":22},"ABCD",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},1140696,"应用动态控制原理控制项目投资时，属于设计过程中投资的计划值与实际值比较的是（）。2018真题",[319,321,323,324],{"key":20,"text":320,"correct":22},"工程概算与工程合同价",{"key":24,"text":322,"correct":22},"工程预算与工程合同价",{"key":27,"text":264,"correct":29},{"key":31,"text":325,"correct":22},"工程概算与工程决算",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},1140697,"项目投资的动态控制中，相对于工程合同价，可作为投资计划值的是（ ）。2014",[330,331,333,334],{"key":20,"text":296,"correct":29},{"key":24,"text":332,"correct":22},"工程支付款",{"key":27,"text":300,"correct":22},{"key":31,"text":335,"correct":22},"项目估算",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1140699,"下列各项中属于施工过程中的投资的计划值和实际值的比较的是( )。",[340,342,344,346],{"key":20,"text":341,"correct":22},"工程概算和投资规划的比较",{"key":24,"text":343,"correct":22},"工程预算和投资规划的比较",{"key":27,"text":345,"correct":22},"工程概算和预算的比较",{"key":31,"text":347,"correct":29},"合同价与工程概算的比较",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},1140701,"运用动态控制原理控制建设工程项目进度时，第一步工作是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"收集工程进度实际值",{"key":24,"text":355,"correct":22},"进行进度目标的调整",{"key":27,"text":357,"correct":22},"进行工程进度的计划值和实际值的比较",{"key":31,"text":359,"correct":29},"进行项目目标分解，确定目标控制的计划值",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1140702,"运用动态控制原理实施工程项目的进度控制，下列各项工作中应首先进行的工作是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":29},"对工程进度的总目标进行逐层分解",{"key":24,"text":367,"correct":22},"定期对工程进度计划值和值进行对比",{"key":27,"text":369,"correct":22},"分析进度偏差的原因及其影响",{"key":31,"text":371,"correct":22},"按照进度控制的要求，收集工程进度实际值",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1140703,"根据施工组织设计的管理要求，重点、难点分部（分项）工程施工方案的批准人是（ ）。 2016",[376,378,380,382],{"key":20,"text":377,"correct":22},"项目技术负责人",{"key":24,"text":379,"correct":29},"施工单位技术责任人",{"key":27,"text":381,"correct":22},"项目负责人",{"key":31,"text":383,"correct":22},"总监理工程师",{"id":385,"libraryId":5,"type":153,"typeLabel":154,"stem":386,"options":387,"answer":286,"analysis":33},1140704,"在工程项目施工过程中，运用动态控制原理进行投资控制，投资的计划值和实际值比较是指（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"工程预算与工程概算的比较",{"key":24,"text":391,"correct":29},"工程合同价与工程预算的比较",{"key":27,"text":393,"correct":29},"工程合同价与工程概算的比较",{"key":31,"text":395,"correct":29},"工程款支付与工程合同价的比较",{"key":166,"text":397,"correct":29},"工程款支付与工程预算的比较",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1140705,"按照我国现行管理体制，施工方项目经理（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"是施工企业法定代表人",{"key":24,"text":405,"correct":29},"是施工企业法定代表人在工程项目上的代表人",{"key":27,"text":407,"correct":22},"是一个技术岗位，而不是管理岗位",{"key":31,"text":409,"correct":22},"须在企业项目管理领导下主持项目管理工作",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1140706,"下列关于建造师和项目经理关系的表述中，正确的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"取得建造师注册证书的人员即可成为施工项目经理",{"key":24,"text":417,"correct":29},"大、中型工程项目施工的项目经理必须由取得建造师注册证书的人员担任",{"key":27,"text":419,"correct":22},"建造师是管理岗位，项目经理是技术岗位",{"key":31,"text":421,"correct":22},"取得建造师注册证书的人员只能担任施工项目经理",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},1140707,"下列关于建造师和项目经理关系的表述中正确的是（ ）。",[426,427,428,430],{"key":20,"text":415,"correct":22},{"key":24,"text":419,"correct":22},{"key":27,"text":429,"correct":29},"建造师经注册后，有权以建造师名义担任项目经理",{"key":31,"text":421,"correct":22},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},1140708,"在建设工程项目施工中处于中心地位，对建设工程项目施工负有全面管理责任的是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"项目总监理工程师",{"key":24,"text":438,"correct":22},"派驻施工现场的业主代表",{"key":27,"text":440,"correct":29},"施工企业项目经理",{"key":31,"text":442,"correct":22},"施工现场技术负责人",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":27,"analysis":33},1140709,"施工项目经理在承担工程项目施工的管理过程中，是以（ ）身份处理与所承担的工程项目有关的外部关系。",[447,449,451,453],{"key":20,"text":448,"correct":22},"施工企业决策者",{"key":24,"text":450,"correct":22},"施工企业法定代表人",{"key":27,"text":452,"correct":29},"施工企业法定代表人的代表",{"key":31,"text":454,"correct":22},"建设单位项目管理者",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1140710,"取得建造师注册证书的人员是否担任工程项目施工的项目经理，应由（ ）决定。",[459,461,463,465],{"key":20,"text":460,"correct":22},"政府主管部门",{"key":24,"text":462,"correct":22},"业主",{"key":27,"text":464,"correct":29},"施工企业",{"key":31,"text":466,"correct":22},"行业协会",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1140711,"关于建造师和项目经理的说法，正确的是（ ）。",[471,472,473,474],{"key":20,"text":415,"correct":22},{"key":24,"text":417,"correct":29},{"key":27,"text":419,"correct":22},{"key":31,"text":421,"correct":22},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},1140712,"建筑施工企业项目经理是指受企业（ ）委托对工程项目过程全面负责的项目管理者。",[479,481,483,485],{"key":20,"text":480,"correct":22},"董事会",{"key":24,"text":482,"correct":22},"总工程师",{"key":27,"text":484,"correct":29},"法定代表人",{"key":31,"text":486,"correct":22},"股东代表大会",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1140713,"根据动态控制原理，项目目标动态控制的第一步工作是（ ）。 2016",[491,493,495,496],{"key":20,"text":492,"correct":22},"调整项目目标",{"key":24,"text":494,"correct":29},"分解项目目标",{"key":27,"text":98,"correct":22},{"key":31,"text":497,"correct":22},"收集项目目标实际值",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},1140714,"根据《建设工程施工合同（示范文本）》（GF-2013-0201），承包人应在首次收到发包人要求更换项目经理的书面通知后（ ）天内向发包人提出书面改进报告。( 2015真题 )",[502,504,506,508],{"key":20,"text":503,"correct":22},"28",{"key":24,"text":505,"correct":22},"21",{"key":27,"text":507,"correct":29},"14",{"key":31,"text":509,"correct":22},"7",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},1140716,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），施工方项目经理的管理控制包括（ ）等。",[514,516,518,520],{"key":20,"text":515,"correct":22},"主持项目的投标工作",{"key":24,"text":517,"correct":22},"组建工程项目经理部",{"key":27,"text":519,"correct":29},"制定内部计酬办法",{"key":31,"text":521,"correct":22},"选择具有相应资质的分包人",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1140717,"编制项目管理目标责任书应依据的资料不包括（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"组织的管理制度项目合同文件",{"key":24,"text":529,"correct":29},"项目招标文件",{"key":27,"text":531,"correct":22},"项目管理规划大纲",{"key":31,"text":533,"correct":22},"组织的经营方针和目标",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1140718,"按照我国现行规定，项目经理的职责包括（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"主持编制项目管理规划大纲，并对项目目标进行系统管理",{"key":24,"text":541,"correct":22},"进行项目范围内的利益分配",{"key":27,"text":543,"correct":22},"主持组织进行项目的检查、鉴定和评奖申报工作",{"key":31,"text":545,"correct":29},"接受审计，处理项目经理部解体的善后工作",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},1140719,"根据《建设工程项目管理规范》（GB \u002F T50326 - 2006），项目管理目标责任书应在项目实施之前，由（ ）制定。",[550,551,552,554],{"key":20,"text":377,"correct":22},{"key":24,"text":484,"correct":22},{"key":27,"text":553,"correct":22},"项目经理与项目承包人协商",{"key":31,"text":555,"correct":29},"法定代表人与项目经理协商",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1140720,"某项目经理在一栋高层建筑的施工中，由于工作失误，致使施工人员伤亡并造成施工项目重大经济损失，施工企业对该项目经理的处理方式是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"追究法律责任",{"key":24,"text":563,"correct":22},"吊销其建造师资格证书",{"key":27,"text":565,"correct":22},"追究社会责任",{"key":31,"text":567,"correct":29},"追究经济责任",{"id":569,"libraryId":5,"type":153,"typeLabel":154,"stem":570,"options":571,"answer":582,"analysis":33},1140721,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），项目经理的权限有（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"签订工程施工承包合同",{"key":24,"text":575,"correct":22},"进行授权范围内的利益分配",{"key":27,"text":577,"correct":29},"参与组建项目经理部",{"key":31,"text":579,"correct":29},"参与选择物资供应单位",{"key":166,"text":581,"correct":22},"参与工程竣工验收","CD",{"id":584,"libraryId":5,"type":153,"typeLabel":154,"stem":585,"options":586,"answer":197,"analysis":33},1140722,"根据《建设工程项目管理规范》（GB\u002FT 50326-2006），项目经理应具有的权限包括（ ）。",[587,589,591,593,594],{"key":20,"text":588,"correct":29},"主持项目经理部工作",{"key":24,"text":590,"correct":22},"代表本企业与业主签订承包合同",{"key":27,"text":592,"correct":29},"制定项目经理部内部计酬办法",{"key":31,"text":579,"correct":29},{"key":166,"text":595,"correct":22},"负责组建项目经理部",{"id":597,"libraryId":5,"type":153,"typeLabel":154,"stem":598,"options":599,"answer":271,"analysis":33},1140723,"根据《建设工程项目管理规范》，项目经理的权限包括（ ）。",[600,602,604,605,606],{"key":20,"text":601,"correct":22},"签订承包合同",{"key":24,"text":603,"correct":22},"自主选择分包单位",{"key":27,"text":579,"correct":29},{"key":31,"text":588,"correct":29},{"key":166,"text":519,"correct":29},{"id":608,"libraryId":5,"type":153,"typeLabel":154,"stem":609,"options":610,"answer":220,"analysis":33},1140724,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），项目经理的职责有（ ）。",[611,613,615,617,619],{"key":20,"text":612,"correct":29},"对资源进行动态管理",{"key":24,"text":614,"correct":29},"建立各种专业管理体系，并组织实施",{"key":27,"text":616,"correct":29},"收集工程资料，准备结算资料，参与工程竣工验收",{"key":31,"text":618,"correct":22},"进行整个项目的利益分配",{"key":166,"text":620,"correct":29},"协助组织进行项目的检查、鉴定和评奖申报工作",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]