[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-55":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":299},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,55,50,2721,[13,38,52,64,79,94,109,121,136,148,160,175,187,199,207,219,234,246,261,273,285],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1143810,2,"多选题","关于合同谈判中工期和维修期的说法，正确的有()此题的正确答案是？",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","对于具有较多单项工程的建设项目工程，可在合同中明确允许分部位或分提交业主验收",true,{"key":24,"text":25,"correct":22},"B","由于工程变更原因对工期产生不利影响时，应该给予承包人要求合理延长工期的权利",{"key":27,"text":28,"correct":22},"C","承包人只应该承担由于材料和施工方法及操作工艺等不符合合同规定而产生的缺陷",{"key":30,"text":31,"correct":32},"D","承包人不能用维修保函来代替业主扣留的保留金",false,{"key":34,"text":35,"correct":22},"E","业主和承包人应当根据项目情况、施工环境因素等商定适当的开工时间","ABCE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":30,"analysis":37},1143812,1,"单选题","（2019年真题）建设工程施工招投标程序中，评标阶段初步评审环节对商务标的审查内容是（）",[44,46,48,50],{"key":20,"text":45,"correct":32},"标书的计价方式",{"key":24,"text":47,"correct":32},"标书的优惠条件",{"key":27,"text":49,"correct":32},"报价的构成和取费标准",{"key":30,"text":51,"correct":22},"报价计算的正确性",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":24,"analysis":37},1143814,"（2019年真题）关于建设工程合同订立程序的说法，正确的是（）",[56,58,60,62],{"key":20,"text":57,"correct":32},"招标人通过媒体发布招标公告，称为承诺",{"key":24,"text":59,"correct":22},"招标人向符合条件的投标人发出招标文件，称为要约邀请",{"key":27,"text":61,"correct":32},"投标人冋招标人提交投标文件，称为承诺",{"key":30,"text":63,"correct":32},"招标人向中标人发出中标通知书，称为要约邀请",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":78,"analysis":37},1143815,"（2019年真题）根据《中华人民共和国招标投标法》，下列项目宜采用公开招标方式确定承包人的有（）。",[68,70,72,74,76],{"key":20,"text":69,"correct":32},"技术复杂且潜在投标人较少的项目",{"key":24,"text":71,"correct":22},"大型基础设施项目",{"key":27,"text":73,"correct":22},"部分使用国有资金投资的项目",{"key":30,"text":75,"correct":22},"使用国际组织援助资金的项目",{"key":34,"text":77,"correct":22},"关系公众安全的公共事业项目","BCDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1143817,"关于世界银行贷款项目工程和货物采购方式的说法，正确的有（）。（2018年真题）",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"可以采用直接签订合同的方式",{"key":24,"text":86,"correct":22},"国际竞争性招标方式属于公开招标",{"key":27,"text":88,"correct":32},"首选国际竞争性招标方式",{"key":30,"text":90,"correct":22},"有限国际招标方式相当于邀请招标",{"key":34,"text":92,"correct":32},"不允许采用自营工程和询价采购的方式","ABD",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1143819,"（2020年真题）关于正式投标及投标文件的说法，正确的有（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":32},"标书密封不满足要求，经甲方同意投标是有效的",{"key":24,"text":101,"correct":32},"项目经理部组织投标时不需要企业法人对于投标项目经理的授权书",{"key":27,"text":103,"correct":32},"通常情况下投标不需要提交投标担保",{"key":30,"text":105,"correct":22},"在招标文件要求提交的截止时间后送达的投标文件，招标人可以拒收",{"key":34,"text":107,"correct":22},"标书提交的基本要求是签章、密封","DE",{"id":110,"libraryId":5,"type":40,"typeLabel":41,"stem":111,"options":112,"answer":27,"analysis":37},1143821,"（2020年真题）关于招标信息发布的说法，正确的是（）。",[113,115,117,119],{"key":20,"text":114,"correct":32},"投资1000万的工程施工招标可以采用不公开的方式发布信息",{"key":24,"text":116,"correct":32},"招标公告只能在中国招标投标公共服务平台发布",{"key":27,"text":118,"correct":22},"自招标文件出售之日起至停止出售之日止，最短不得少于5天",{"key":30,"text":120,"correct":32},"投标人必须自费购买相关招标或资格预审文件，未中标时予以退还",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":135,"analysis":37},1143823,"关于总价合同的说法中正确的有（ ）。2017",[125,127,129,131,133],{"key":20,"text":126,"correct":22},"当施工内容及有关条件未发生变化时，业主付给承包商的价款总额不变",{"key":24,"text":128,"correct":22},"采用总价合同的前提是施工图设计完成，施工任务和范围比较明确",{"key":27,"text":130,"correct":32},"总价合同中业主风险较大、承包人风险较小",{"key":30,"text":132,"correct":22},"总价合同中可约定在发生设计变更时对合同价格进行调整",{"key":34,"text":134,"correct":22},"总价合同在施工进度上能够调动承包人的积极性","ABDE",{"id":137,"libraryId":5,"type":40,"typeLabel":41,"stem":138,"options":139,"answer":27,"analysis":37},1143825,"根据FIDIC《施工合同条件》，对投标书中明显数字计算错误的修正，正确的是（ ）。（2014）",[140,142,144,146],{"key":20,"text":141,"correct":32},"业主应征求投标人意见后才能进行评标",{"key":24,"text":143,"correct":32},"当总价和单价计算结果不一致时，以总价为准调整单价",{"key":27,"text":145,"correct":22},"当总价和单价计算结果不一致时，以单价为准调整总价",{"key":30,"text":147,"correct":32},"投标人有一次修改报价的机会",{"id":149,"libraryId":5,"type":40,"typeLabel":41,"stem":150,"options":151,"answer":20,"analysis":37},1143827,"某按变动单价计价的建筑施工合同中，投标时约定的工程量为10000m3，其中人工费占比30%，工程量变化不调整单价，中标合同价为30万元；施工期间人工费平均上涨15%，竣工结算工程量为20000m3，其他条件均无变化，则竣工结算价为（ ）万元。（2016）",[152,154,156,158],{"key":20,"text":153,"correct":22},"62.7",{"key":24,"text":155,"correct":32},"31.35",{"key":27,"text":157,"correct":32},"60",{"key":30,"text":159,"correct":32},"69",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":174,"analysis":37},1143829,"下列成本加酬金合同的优点中，对业主有利的有（ ）。（2015）",[164,166,168,170,172],{"key":20,"text":165,"correct":32},"可以确定工程内容，工程量及合同终止时间",{"key":24,"text":167,"correct":22},"可以通过分段施工缩短工期",{"key":27,"text":169,"correct":32},"可以通过最高限价约束工程成本，转移全部风险",{"key":30,"text":171,"correct":22},"可以利用承包商的施工技术专家帮助改进设计的不足",{"key":34,"text":173,"correct":22},"可以较深入介入和控制工程施工和管理","BDE",{"id":176,"libraryId":5,"type":40,"typeLabel":41,"stem":177,"options":178,"answer":20,"analysis":37},1143831,"关于成本加酬金合同的说法，正确的是（ ）。（2016）",[179,181,183,185],{"key":20,"text":180,"correct":22},"当实行风险型CM模式时，适宜采用最大成本加费用合同",{"key":24,"text":182,"correct":32},"成本加固定费用的合同，承包商的酬金不可调整",{"key":27,"text":184,"correct":32},"成本加固定比例费用的合同，有利于缩短工期",{"key":30,"text":186,"correct":32},"当设计深度达到可以报总价的深度时，适宜采用成本加奖金合同",{"id":188,"libraryId":5,"type":40,"typeLabel":41,"stem":189,"options":190,"answer":30,"analysis":37},1143833,"当工程项目实行施工总承包管理模式时，业主与施工总承包管理单位的合同一般采用( )。（2013）",[191,193,195,197],{"key":20,"text":192,"correct":32},"单价合同",{"key":24,"text":194,"correct":32},"固定总价合同",{"key":27,"text":196,"correct":32},"变动总价合同",{"key":30,"text":198,"correct":22},"成本加酬金合同",{"id":200,"libraryId":5,"type":40,"typeLabel":41,"stem":201,"options":202,"answer":30,"analysis":37},1143835,"采用工程总承包模式的大型建设工程项目，建设周期三年，其合同计价方式一般采用（ ）。 （2015）",[203,204,205,206],{"key":20,"text":194,"correct":32},{"key":24,"text":192,"correct":32},{"key":27,"text":198,"correct":32},{"key":30,"text":196,"correct":22},{"id":208,"libraryId":5,"type":40,"typeLabel":41,"stem":209,"options":210,"answer":30,"analysis":37},1143837,"采用固定总价合同，承包商需承担一定风险，下列风险中，属于承包商价格风险的是（ ）。 （2015）",[211,213,215,217],{"key":20,"text":212,"correct":32},"设计深度不够造成的误差",{"key":24,"text":214,"correct":32},"工程量计算错误",{"key":27,"text":216,"correct":32},"工程范围不确定",{"key":30,"text":218,"correct":22},"漏报计价项目",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":233,"analysis":37},1143839,"根据《建设项目工程总承包合同示范文本（试行）》（GF—2011—0216），承包人主要权利和义务有（ ）。 （2015）",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"根据合同约定，自费修复竣工后试验中发现的缺陷",{"key":24,"text":226,"correct":22},"按照合同约定和发包人的要求，提出相关报表",{"key":27,"text":228,"correct":22},"根据合同约定，以书面形式向发包人发出暂停通知",{"key":30,"text":230,"correct":22},"根据合同约定，对因发包人原因带来的损失要求赔偿",{"key":34,"text":232,"correct":32},"负责办理项目审批，核准或备案手续，取得项目用地的使用权","ABCD",{"id":235,"libraryId":5,"type":40,"typeLabel":41,"stem":236,"options":237,"answer":27,"analysis":37},1143841,"在非代理型施工管理模式（CM模式）的合同中，通常采用（）合同（2014）",[238,240,242,244],{"key":20,"text":239,"correct":32},"成本加固定费用",{"key":24,"text":241,"correct":32},"成本价固定比例费用",{"key":27,"text":243,"correct":22},"最大成本加费用",{"key":30,"text":245,"correct":32},"成本价奖金",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":260,"analysis":37},1143843,"对建设周期一年半以上的工程项目，采用变动总价合同时，应考虑引起价格变化的因素有（）（2014）",[250,252,254,256,258],{"key":20,"text":251,"correct":32},"银行利率的调整",{"key":24,"text":253,"correct":22},"材料费的上涨",{"key":27,"text":255,"correct":22},"人工工资的上涨",{"key":30,"text":257,"correct":22},"国家政策改变引起的工程费用上涨",{"key":34,"text":259,"correct":32},"设计变更引起的费用变化","BCD",{"id":262,"libraryId":5,"type":40,"typeLabel":41,"stem":263,"options":264,"answer":30,"analysis":37},1143845,"某单价合同的投标报价单中，投标人的投标书出现了明显的数字计算错误，导致总价和单价计算结果不一致，下列行为中，属于业主权利的是（ ）。（2015）",[265,267,269,271],{"key":20,"text":266,"correct":32},"业主有权先做修改再评价，以总价作为最终报价结果",{"key":24,"text":268,"correct":32},"业主没有权利先修改后评价，可以宣布该投标人废标",{"key":27,"text":270,"correct":32},"业主没有权利修改再评标，可以请该投标人再报价",{"key":30,"text":272,"correct":22},"业主有权利先作修改在评标，以单价为准调整的总价作为最终报价结果",{"id":274,"libraryId":5,"type":40,"typeLabel":41,"stem":275,"options":276,"answer":30,"analysis":37},1143847,"对于采用单价合同招标的工程，如投标书中有明显的数字计算错误业主有权先做出修改在评标。当总价和早价的计算结果不一致时，正确的做法( )。（2013）",[277,279,281,283],{"key":20,"text":278,"correct":32},"按市场价调整早价",{"key":24,"text":280,"correct":32},"分别调整单价和总价",{"key":27,"text":282,"correct":32},"以总价为准调整单价",{"key":30,"text":284,"correct":22},"以单价为准调整总价",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":233,"analysis":37},1143849,"关于固定总价合同的说法，正确的有（ ）。（2016）",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"合同总价一次包死，业主不承担投资风险",{"key":24,"text":292,"correct":22},"图纸和工程内容明确是使用这种合同的前提之一",{"key":27,"text":294,"correct":22},"固定总价合同也有调整合同总价的可能",{"key":30,"text":296,"correct":22},"合同双方结算比较简单",{"key":34,"text":298,"correct":32},"在国际上很少采用固定总价合同",[300,303,306,309,312,315],{"id":40,"name":301,"category":7,"favorite":302},"领导干部任职前廉政法规知识测试题",92,{"id":304,"name":305,"category":7,"favorite":40},595,"建筑结构与设备",{"id":307,"name":308,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":310,"name":311,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":313,"name":314,"category":7,"favorite":8},534,"BIM工程师",{"id":316,"name":314,"category":7,"favorite":8},535]