[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-54":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":651},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,54,50,2721,[13,34,46,58,76,88,100,112,127,142,153,165,177,189,204,216,228,243,255,270,281,289,304,318,329,341,353,365,377,389,401,413,428,440,452,462,477,489,501,513,521,533,547,562,574,586,601,613,627,639],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1143715,1,"单选题","下列干扰事件中，承包商不能提出工其索赔的是( )。（2012）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程师指示承包商加快施工进度",true,{"key":24,"text":25,"correct":26},"B","开工商业主未能及时交付施工图纸",false,{"key":28,"text":29,"correct":26},"C","异常恶劣的气候条件",{"key":31,"text":32,"correct":26},"D","业主未能及时支付工程款造成工期延误","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1143717,"某工程项目总价值为1000万元，合同工期为18个月，现因建设条件发生变化而加额外工程费用500万元，则承包方可提出的工期索赔为（ ）。2017",[38,40,42,44],{"key":20,"text":39,"correct":26},"27",{"key":24,"text":41,"correct":26},"24",{"key":28,"text":43,"correct":22},"9",{"key":31,"text":45,"correct":26},"6",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1143719,"施工过程中，工程师下令暂停部分工程，而暂停的起因并非承包商违约或其他意外风险，承包商向业主提出索赔，则（ ）。2017",[50,52,54,56],{"key":20,"text":51,"correct":22},"工期和费用索赔均能成立",{"key":24,"text":53,"correct":26},"工期和费用索赔均不能成立",{"key":28,"text":55,"correct":26},"工期索赔成立，费用索赔不能成立",{"key":31,"text":57,"correct":26},"工期索赔不能成立，费用索赔能成立",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},1143721,2,"多选题","在建设工程项目施工过程中，施工机具使用费的索赔款项包括（ ）。2017",[64,66,68,70,72],{"key":20,"text":65,"correct":22},"因监理工程师指令错误导致机械停工的窝工费",{"key":24,"text":67,"correct":26},"因机械故障停工维修而导致的窝工费",{"key":28,"text":69,"correct":22},"非承包商责任导致工效降低增加的机械使用费",{"key":31,"text":71,"correct":22},"由于完成额外工作增加的机械使用费",{"key":73,"text":74,"correct":26},"E","因机械操作工患病停工而导致的机械窝工费","ACD",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":31,"analysis":33},1143723,"某工程施工过程中，由于供货商提供的设备(施工单位采购)质量存在缺陷，导致返工并造成损失。施工单位应向( )索赔，以补偿自己的损失。（2012）",[80,82,84,86],{"key":20,"text":81,"correct":26},"业主",{"key":24,"text":83,"correct":26},"工程师",{"key":28,"text":85,"correct":26},"设备生产商",{"key":31,"text":87,"correct":22},"设备供货商",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":20,"analysis":33},1143724,"工期延误划分为单一延误、共同延误及交叉延误的依据是（）（2014）",[92,94,96,98],{"key":20,"text":93,"correct":22},"延误时间之间的关联性",{"key":24,"text":95,"correct":26},"延误的原因",{"key":28,"text":97,"correct":26},"索赔要求和结果",{"key":31,"text":99,"correct":26},"延误工作所在工程网络计划的线路性质",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":28,"analysis":33},1143726,"某工程的时标网络计划如下图，下列工期延误事件中，属于共同延误的是（ ）。（2016）",[104,106,108,110],{"key":20,"text":105,"correct":26},"工作C因发包人原因和工作G因承包人原因各延误2周",{"key":24,"text":107,"correct":26},"工作D因发包人原因和工作F因承包人原因各延误2周",{"key":28,"text":109,"correct":22},"工作A因发包人原因和工作B因承包人原因各延误2周",{"key":31,"text":111,"correct":26},"工作E因发包人原因和工作F因承包人原因各延误2周",{"id":113,"libraryId":5,"type":60,"typeLabel":61,"stem":114,"options":115,"answer":126,"analysis":33},1143728,"下列工程索赔证据中，属于书证的有（ ）。（2016）",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"工程现场照片",{"key":24,"text":119,"correct":22},"合同协议书",{"key":28,"text":121,"correct":26},"质量责任鉴定",{"key":31,"text":123,"correct":22},"往来信件",{"key":73,"text":125,"correct":22},"司法判决书","BDE",{"id":128,"libraryId":5,"type":60,"typeLabel":61,"stem":129,"options":130,"answer":141,"analysis":33},1143730,"建设工程索赔成立的前提条件有( )。（2013）",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"与合同对照，事件已造成了承包人工程项目成本的额外支出或直接工期",{"key":24,"text":134,"correct":22},"造成费用增加或工期损失的原田，按合同约定不属于承包人的行为责任险责任",{"key":28,"text":136,"correct":22},"承包人按合同规定的程序和时间提交索赔意向通知和索赔报告",{"key":31,"text":138,"correct":26},"造成费用增加或工期损失额度巨大，超出了正常的承受范围",{"key":73,"text":140,"correct":26},"索赔费用计算正确，并且容易分析","ABC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1143732,"某基础工程合同价为2000万元，合同总工期为20个月，施工过程中因设计变更，导致增加额外工程400万元，业主同意工期顺延。则承包商按造价比例法可索赔工期（ ）个月。（2015）",[146,148,149,151],{"key":20,"text":147,"correct":26},"8",{"key":24,"text":45,"correct":26},{"key":28,"text":150,"correct":22},"4",{"key":31,"text":152,"correct":26},"2",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1143734,"某工程因发包人原因造成承包人自有施工机械窝工10天，该机械市场租赁费为1200\u002F天，进出厂费2000元，台班费400元\u002F台班，其中台班折旧费160\u002F台班；计划每天工作1台班，共使用40天，则承包人索赔成立的费用是（ ）元。（2016）",[157,159,161,163],{"key":20,"text":158,"correct":26},"4000",{"key":24,"text":160,"correct":22},"1600",{"key":28,"text":162,"correct":26},"12000",{"key":31,"text":164,"correct":26},"12500",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":28,"analysis":33},1143736,"工程施工过程中发生索赔事件以后，承包人首先要做出工作是()（2013）",[169,171,173,175],{"key":20,"text":170,"correct":26},"向监理工程师提出索赔证据",{"key":24,"text":172,"correct":26},"提交索赔报告",{"key":28,"text":174,"correct":22},"提出索赔意向通知",{"key":31,"text":176,"correct":26},"与业主就索赔事项进行谈判",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1143737,"当发生索赔事件时，对于承包商自有的施工机械，其费用索赔通常按照( )进行计算。（2013）",[181,183,185,187],{"key":20,"text":182,"correct":22},"台班折日费",{"key":24,"text":184,"correct":26},"台班费",{"key":28,"text":186,"correct":26},"设备使用费",{"key":31,"text":188,"correct":26},"进自场费用",{"id":190,"libraryId":5,"type":60,"typeLabel":61,"stem":191,"options":192,"answer":203,"analysis":33},1143739,"关于建设工程反索赔的说法，正确的有( )。（2012）",[193,195,197,199,201],{"key":20,"text":194,"correct":22},"反索赔是双向的",{"key":24,"text":196,"correct":22},"工程师对索赔文件的审核是反索赔的工作内容之一",{"key":28,"text":198,"correct":26},"反索赔工作就是反击或反驳对方的索赔要求",{"key":31,"text":200,"correct":22},"审核索赔报告的时限性是反索赔的要点之一",{"key":73,"text":202,"correct":22},"调查分析并确定索赔事件的原因和责任，是反索赔的工作内容之一","ABDE",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},1143741,"某国际工程合同额为5000000万元人民币，合同实施天数为300天；由国内某承包商总承包施工，该承包商同期总合同额为50亿人民币，同期内公司的总管理费为1500万元；因为业主修改设计，承包商要求工期延期30天。改工程项目部在施工索赔中总部管理费的索赔额是（ ）万元。（2015）",[208,210,212,214],{"key":20,"text":209,"correct":26},"50",{"key":24,"text":211,"correct":22},"15",{"key":28,"text":213,"correct":26},"12",{"key":31,"text":215,"correct":26},"10",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1143743,"（2019年真题）某工程签约合同价为2400万元，总工期为24个月，施工过程中业主增加工程200万元，则根据比例分析法承包商可提出的合理工期索赔值为（）。",[220,222,224,226],{"key":20,"text":221,"correct":26},"1个月",{"key":24,"text":223,"correct":22},"2个月",{"key":28,"text":225,"correct":26},"3个月",{"key":31,"text":227,"correct":26},"4个月",{"id":229,"libraryId":5,"type":60,"typeLabel":61,"stem":230,"options":231,"answer":242,"analysis":33},1143745,"（2019年真题）在建设工程项目施工索赔中，可索赔的合理人工费包括（）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"完成合同之外的额外工作所花费的人工费用",{"key":24,"text":235,"correct":22},"超过法定工作时间加班劳动的人工费用",{"key":28,"text":237,"correct":22},"法定人工费增长费用",{"key":31,"text":239,"correct":26},"不可抗力造成的工期延长导致的工资增加费用",{"key":73,"text":241,"correct":22},"非承包商责任工程延期导致的人员窝工费用","ABCE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1143747,"最常用的索赔费用计算方法是（）。（2018年真题）",[247,249,251,253],{"key":20,"text":248,"correct":26},"总费用法",{"key":24,"text":250,"correct":26},"修正总费用法",{"key":28,"text":252,"correct":26},"网络分析法",{"key":31,"text":254,"correct":22},"实际费用法",{"id":256,"libraryId":5,"type":60,"typeLabel":61,"stem":257,"options":258,"answer":269,"analysis":33},1143749,"承包人向发包人索赔成立的前提条件有（）。（2018年真题）",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"按合同规定程序和时间提交了索赔报告",{"key":24,"text":262,"correct":22},"按合同规定程序和时间提交了索赔意向通知",{"key":28,"text":264,"correct":22},"与合同对照，事件已造成了承包人实际损失",{"key":31,"text":266,"correct":22},"索赔原因按合同约定不属于承包人的行为责任",{"key":73,"text":268,"correct":26},"索赔前需进行现场保护","ABCD",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},1143751,"（2018年真题）某工程施工中出现了意外情况，导致工程量由原来的2500m3增加到3000m3,原定工期为30天，合同规定工程量变动10%为承包商应承担风险，则可索赔工期为（）天。",[274,275,277,279],{"key":20,"text":45,"correct":26},{"key":24,"text":276,"correct":26},"5",{"key":28,"text":278,"correct":22},"3",{"key":31,"text":280,"correct":26},"2.5",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1143753,"（2020年真题）某基础工程合同价为3000万元，合同总工期为30个月，施工过程中因设计变更，导致增加额外工程600万元，业主同意工期顺延。根据比例分析法，承包商可索赔工期（ ）个月。",[285,286,287,288],{"key":20,"text":278,"correct":26},{"key":24,"text":150,"correct":26},{"key":28,"text":147,"correct":26},{"key":31,"text":45,"correct":22},{"id":290,"libraryId":5,"type":60,"typeLabel":61,"stem":291,"options":292,"answer":303,"analysis":33},1143754,"（2020年真题）建设工程索赔成立的前提条件有（ ）。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"与合同对照，事件已造成了承包人工程项目成本的额外支出或直接工期损失",{"key":24,"text":296,"correct":22},"造成费用增加或工期损失的原因,按合同约定不属于承包人的行为责任或风险责任",{"key":28,"text":298,"correct":26},"造成费用增加或工期损失额度巨大,超出了正常的承受范围",{"key":31,"text":300,"correct":26},"索赔费用计算正确,并且容易分析",{"key":73,"text":302,"correct":22},"承包人按合同规定的程序和时间提交了索赔意向通知和索赔报告","ABE",{"id":305,"libraryId":5,"type":60,"typeLabel":61,"stem":306,"options":307,"answer":303,"analysis":33},1143757,"（2020年真题）下列影响工程进度因素中,属于承包人可以要求合理延长工期的有（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":22},"业主在工程实施中增減工程量对工期产生不利影响",{"key":24,"text":311,"correct":22},"业主在工程实施中改变工程设计对工期产生不利影响",{"key":28,"text":313,"correct":26},"因进场材料不合格而对工期产生不利影响",{"key":31,"text":315,"correct":26},"因施工操作工艺不规范而对工期产生不利影响",{"key":73,"text":317,"correct":22},"突发的极端恶劣的气候对工期产生不利影响",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},1143759,"（2020年真题）下列事件中，承包人不能提出工期索赔的是（）。",[322,324,326,327],{"key":20,"text":323,"correct":26},"开工前业主未能及时交付施工图纸",{"key":24,"text":325,"correct":26},"异营常恶劣的气候条件",{"key":28,"text":32,"correct":26},{"key":31,"text":328,"correct":22},"因工期拖延，工程师指示承包人加快施工进度",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},1143761,"美国建造师学会（AI A）合同文件中，A系列的合同类型主要是用于（ ）。2017",[333,335,337,339],{"key":20,"text":334,"correct":26},"业主与建筑师之间",{"key":24,"text":336,"correct":26},"建筑师与咨询机构之间",{"key":28,"text":338,"correct":22},"业主与承包人之间",{"key":31,"text":340,"correct":26},"国际工程项目",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1143762,"在解决国际工程承包合同争议的时候，应首选（ ）的方式。",[345,347,349,351],{"key":20,"text":346,"correct":26},"仲裁",{"key":24,"text":348,"correct":22},"协商",{"key":28,"text":350,"correct":26},"DAB",{"key":31,"text":352,"correct":26},"DRB",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1143764,"关于DAB(争端裁决委员会)方式解决争议的说法，正确的是（ ）。（2016）",[357,359,361,363],{"key":20,"text":358,"correct":22},"DAB的成员一般是工程技术和管理方面的专家",{"key":24,"text":360,"correct":26},"DAB提出的裁决具有终局性",{"key":28,"text":362,"correct":26},"特聘争端裁决委员会的任期与合同期限一致",{"key":31,"text":364,"correct":26},"DAB由合同一方当事人聘请",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1143766,"美国的AIA合同条件在美洲地区具有较高的权威性，其主要用于（ ）工程。（2016）",[369,371,373,375],{"key":20,"text":370,"correct":26},"市政公用",{"key":24,"text":372,"correct":26},"石油化工",{"key":28,"text":374,"correct":22},"房屋建筑",{"key":31,"text":376,"correct":26},"水利水电",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1143768,"关于FIDIC《永久设备和设计——建造合同条件》内容的说法，正确的是（ ）。（2015）",[381,383,385,387],{"key":20,"text":382,"correct":22},"业主委派工程师管理合同",{"key":24,"text":384,"correct":26},"承包商仅需负责提供设备和建造工作",{"key":28,"text":386,"correct":26},"合同计价采用单价合同方式，某些子项采用包干价格",{"key":31,"text":388,"correct":26},"合同计价采用总价合同方式，合同价格不能调整",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":28,"analysis":33},1143770,"在FIDIC系列合同中，《EPC交钥匙项目合同条件》的合同计价采用（ ）。（2014）",[393,395,397,399],{"key":20,"text":394,"correct":26},"固定单价",{"key":24,"text":396,"correct":26},"变动单价",{"key":28,"text":398,"correct":22},"固定总价",{"key":31,"text":400,"correct":26},"变动总价",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1143772,"关于FIDIC《EPC交钥匙项目合同条件》特点的说法，正确的是（ ）。（2015）",[405,407,409,411],{"key":20,"text":406,"correct":26},"适用于承包商作大部分设计的工程项目，承包商要按照业主的要求进行设计设备以及建造其他工程",{"key":24,"text":408,"correct":22},"合同采用固定总价，只有在特定风险出现时才调整价格",{"key":28,"text":410,"correct":26},"业主委派工程师管理合同，监督工程进度质量",{"key":31,"text":412,"correct":26},"承包商承担的风险较小",{"id":414,"libraryId":5,"type":60,"typeLabel":61,"stem":415,"options":416,"answer":427,"analysis":33},1143774,"在国际工程承包合同中，采用DAB(争端裁决委员会)方式解决争端的优点有( )。（2012）",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"DAB委员可以在项目开始时就介入，了解项目管理情况及存在的问题",{"key":24,"text":420,"correct":26},"DAB委员由行政主管部门指派，裁决具有公正性、中立性",{"key":28,"text":422,"correct":26},"DAB的裁决具有终局性，避免二次纠纷",{"key":31,"text":424,"correct":22},"DAB解决纠纷的周期较短",{"key":73,"text":426,"correct":22},"DAB的费用低","ADE",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1143776,"在国际工程承包合同中，根据工程项目的规模和复杂程度. DAB争端裁决委员会的任命有多种方式，只在发生争端时任命的是( )。（2013）",[432,434,436,438],{"key":20,"text":433,"correct":26},"常任争端裁决委员会",{"key":24,"text":435,"correct":22},"特聘争端裁决委员会",{"key":28,"text":437,"correct":26},"工程师兼任的委员会",{"key":31,"text":439,"correct":26},"业主指定争端裁决委员会",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1143778,"关于国际工程施工承包合同争议解决的说法，正确的是（）。 （2014）",[444,446,448,450],{"key":20,"text":445,"correct":26},"国际工程施工承包合同中，仲裁实行一裁终局制",{"key":24,"text":447,"correct":26},"国际工程施工承包合同中，应首选诉讼作为解决争议的方式",{"key":28,"text":449,"correct":22},"国际工程施工承包合同争议解决最有效的方式是协商",{"key":31,"text":451,"correct":26},"FIDIC合同中，DAB提出的裁决是强制性的",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1143780,"国际工程施工承包合同争议解决的方式中，最常用、最有效、也是应该首选的方式是( )。（2012）",[456,457,459,460],{"key":20,"text":346,"correct":26},{"key":24,"text":458,"correct":26},"调解",{"key":28,"text":348,"correct":22},{"key":31,"text":461,"correct":26},"诉讼",{"id":463,"libraryId":5,"type":60,"typeLabel":61,"stem":464,"options":465,"answer":476,"analysis":33},1143781,"关于FIDIC《土木工程施工合同条件》的说法，正确的有（）（2013）",[466,468,470,472,474],{"key":20,"text":467,"correct":22},"该合同主要用于发包人设计的或咨询工程师设计的房屋建筑工程和土木工程的施工项目",{"key":24,"text":469,"correct":22},"一般情况下，单价可随各类物价的波动而调整",{"key":28,"text":471,"correct":26},"合同计价方式属于单价合同，不包含任何包干价格",{"key":31,"text":473,"correct":22},"由业主委派工程师管理合同",{"key":73,"text":475,"correct":26},"由业主监督工程进度、质量，签发支付证书、接受证书和履约证书，处理合同中的有关事项","ABD",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1143783,"（2019年真题）关于FIDIC施工合同条件中采用DAB（争端裁决委员会）方式解决争议的说法，正确的是（）",[481,483,485,487],{"key":20,"text":482,"correct":26},"特聘争端裁决委员会的任期与合同一致",{"key":24,"text":484,"correct":26},"业主应按支付条件支付DAB报酬的70%",{"key":28,"text":486,"correct":22},"DAB成员一般是工程技术和管理方面的专家",{"key":31,"text":488,"correct":26},"DAB提出的裁决具有强制性",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1143785,"关于FIDIC《永久设备和设计—建造合同条件》的说法，正确的是（）。（2018年真题）",[493,495,497,499],{"key":20,"text":494,"correct":26},"适用于由发包人负责设计的工程项目",{"key":24,"text":496,"correct":22},"业主委派工程师负责合同管理",{"key":28,"text":498,"correct":26},"合同计价采用单价合同方式",{"key":31,"text":500,"correct":26},"承包商只负责提供设备及工程建造",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1143787,"关于国际工程施工承包合同争议解决的说法，正确的是（）。（2018年真题）",[505,507,509,511],{"key":20,"text":506,"correct":26},"国际工程施工承包合同争议解决中，仲裁实行一裁终局制",{"key":24,"text":508,"correct":26},"国际工程施工承包合同争议解决中，诉讼是首选方式",{"key":28,"text":510,"correct":22},"国际工程施工承包合同争议最有效的解决方式是协商",{"key":31,"text":512,"correct":26},"FIDIC合同中，DAB作出的裁决是强制性的",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1143789,"（2020年真题）国际工程施工承包合同争议解决的方式中，最常用、最有效，也是应该首选的是（ ）。",[517,518,519,520],{"key":20,"text":346,"correct":26},{"key":24,"text":348,"correct":22},{"key":28,"text":458,"correct":26},{"key":31,"text":461,"correct":26},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1143791,"关于投标文件的说法，正确的是（ ）。2017",[525,527,529,531],{"key":20,"text":526,"correct":22},"通常投标文件中需要提交投标担保",{"key":24,"text":528,"correct":26},"投标文件在对招标文件的实质性要求作出响应后，可另外提出新的要求",{"key":28,"text":530,"correct":26},"投标书只需要盖有投标企业公章或企业法定代表人名章",{"key":31,"text":532,"correct":26},"投标书可由项目所在地的企业项目经理部组织投标，不需要授权委托书",{"id":534,"libraryId":5,"type":60,"typeLabel":61,"stem":535,"options":536,"answer":269,"analysis":33},1143792,"依据《中华人民共和国招标投标法实施条例》，招标人以不合理条件限制、排斥投标人的行为有（ ）。2017",[537,539,541,543,545],{"key":20,"text":538,"correct":22},"就同一招标项目向投标人提供有差别的项目信息",{"key":24,"text":540,"correct":22},"就同一招标项目对投标人采取不同的资格审查标准",{"key":28,"text":542,"correct":22},"招标项目以获得鲁班奖工程业绩作为加分条件",{"key":31,"text":544,"correct":22},"招标项目指定特定的专利作为中标条件",{"key":73,"text":546,"correct":26},"依照招标项目的总体特点设定专门的技术条件",{"id":548,"libraryId":5,"type":60,"typeLabel":61,"stem":549,"options":550,"answer":561,"analysis":33},1143795,"下列合同条款中，与合同支付方式有关的条款有（ ）。（2016）",[551,553,555,557,559],{"key":20,"text":552,"correct":26},"工程量清单错误的修正",{"key":24,"text":554,"correct":26},"市场价格波动引起的调整",{"key":28,"text":556,"correct":22},"预付款比例",{"key":31,"text":558,"correct":22},"工程进度款支付审批程序",{"key":73,"text":560,"correct":22},"质量保证金的扣留与退还","CDE",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},1143797,"在签订合同的谈判中，为了防范货币贬值或者通货膨胀的风险，招标人和中标人一般通过()约定风险分担方式（2013）",[566,568,570,572],{"key":20,"text":567,"correct":22},"确定价格调整条款",{"key":24,"text":569,"correct":26},"确定合同价格条款",{"key":28,"text":571,"correct":26},"调整工程范围",{"key":31,"text":573,"correct":26},"确定合同款支付方式",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1143799,"投标人根据招标文件在约定期限内向招标人提交投标文件的行为，称为（ ）。 （2014）",[578,580,582,584],{"key":20,"text":579,"correct":22},"要约",{"key":24,"text":581,"correct":26},"承诺",{"key":28,"text":583,"correct":26},"要约邀请",{"key":31,"text":585,"correct":26},"合同生效",{"id":587,"libraryId":5,"type":60,"typeLabel":61,"stem":588,"options":589,"answer":600,"analysis":33},1143800,"根据《工程建设项目施工招标投标法》，工程施工项目招标信息发布时，正确的有（）。（2014）",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"指定媒介可以酌情收取额费用",{"key":24,"text":593,"correct":22},"招标文件售出后不予退还",{"key":28,"text":595,"correct":26},"招标人应至少在两家指定的媒介发布招标公告",{"key":31,"text":597,"correct":26},"招标人可以对招标文件所附的设计文件向投标人收取一定费用",{"key":73,"text":599,"correct":22},"自招标文件出售之日起至停止出售之日止，最短不得少于5个工作日","BE",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":24,"analysis":33},1143802,"根据《中华人民共和国招标投标法》及相关法规，对必须招标的项目，招标人行为符合要求的是（ ）。（2016）",[605,607,609,611],{"key":20,"text":606,"correct":26},"就同一招标项目向潜在投标人提供有差别的项目信息",{"key":24,"text":608,"correct":22},"委托两家招标代理机构，设置两处报名点接受投标人报名",{"key":28,"text":610,"correct":26},"以特定行业的业绩、奖项作为加分条件",{"key":31,"text":612,"correct":26},"限定或者指定特定的品牌",{"id":614,"libraryId":5,"type":60,"typeLabel":61,"stem":615,"options":616,"answer":126,"analysis":33},1143804,"投标人须知是招标人向投标人传递的基础信息文件，投标人应特别注意其中的( )。（2013）",[617,619,621,623,625],{"key":20,"text":618,"correct":26},"招标人的责权利",{"key":24,"text":620,"correct":22},"招标工程的范围和详细内容",{"key":28,"text":622,"correct":26},"施工技术说明",{"key":31,"text":624,"correct":22},"投标文件的组成",{"key":73,"text":626,"correct":22},"重要的时间安排",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":20,"analysis":33},1143806,"关于建设工程施工合同谈判与签约的说法，正确的是( )。（2012）",[631,633,635,637],{"key":20,"text":632,"correct":22},"在合同谈判中，双方可以对技术要求进行进一步讨论和确认",{"key":24,"text":634,"correct":26},"在合同谈判阶段形成的所有文件都是合同文件的组成部分",{"key":28,"text":636,"correct":26},"建设工程施工合同由合同双方达成协议并签字后，即受法律保护",{"key":31,"text":638,"correct":26},"双方在合同谈判结束后，即形成正式的合同文件",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":28,"analysis":33},1143808,"在建设工程施工投标过程中，施工方案应由投标人的( )主持制定。（2013）",[643,645,647,649],{"key":20,"text":644,"correct":26},"项目经理",{"key":24,"text":646,"correct":26},"法人代表",{"key":28,"text":648,"correct":22},"技术负责人",{"key":31,"text":650,"correct":26},"分管投标的负责人",[652,655,658,661,664,667],{"id":15,"name":653,"category":7,"favorite":654},"领导干部任职前廉政法规知识测试题",92,{"id":656,"name":657,"category":7,"favorite":15},595,"建筑结构与设备",{"id":659,"name":660,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":662,"name":663,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":665,"name":666,"category":7,"favorite":8},534,"BIM工程师",{"id":668,"name":666,"category":7,"favorite":8},535]