[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":634},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,5,50,2721,[13,34,46,58,70,82,100,115,130,144,155,167,179,191,199,212,227,239,249,262,276,287,299,311,323,332,344,358,372,384,396,410,420,432,444,456,471,484,496,504,516,526,538,552,563,575,586,598,610,622],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1140613,1,"单选题","根据《建设工程项目管理规范》，项目管理实施规划应包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","项目管理目标规划",false,{"key":24,"text":25,"correct":22},"B","项目采购与资源管理规划",{"key":27,"text":28,"correct":22},"C","项目招标和发包工作程序",{"key":30,"text":31,"correct":32},"D","职业健康安全和环境管理计划",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1140614,"按照《建设工程项目管理规范》（GB\u002FT50326-2006），项目管理规划分为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目管理规划策划和项目管理实施规划",{"key":24,"text":41,"correct":22},"项目管理决策大纲和项目管理实施策划",{"key":27,"text":43,"correct":32},"项目管理规划大纲和项目管理实施规划",{"key":30,"text":45,"correct":22},"项目管理决策策划和项目管理实施策划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1140615,"建设工程项目管理规划是指导项目管理工作的（ ）文件。",[50,52,54,56],{"key":20,"text":51,"correct":22},"标准性",{"key":24,"text":53,"correct":22},"操作性",{"key":27,"text":55,"correct":22},"示范性",{"key":30,"text":57,"correct":32},"纲领性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1140616,"建设项目价值不高的原因不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"工程进度要求过分宽松",{"key":24,"text":65,"correct":22},"思想保守",{"key":27,"text":67,"correct":22},"设计方与业主方及项目的各参与方沟通欠缺",{"key":30,"text":69,"correct":22},"设计人员习惯性思维",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1140617,"建设工程项目管理规划涉及项目整个实施阶段，它属于（ ）的项目管理范畴。",[74,76,78,80],{"key":20,"text":75,"correct":32},"业主方",{"key":24,"text":77,"correct":22},"设计方",{"key":27,"text":79,"correct":22},"施工方",{"key":30,"text":81,"correct":22},"供货方",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":99,"analysis":33},1140618,2,"多选题","建设工程项目管理规划的内容包括（ ）。",[88,90,92,94,96],{"key":20,"text":89,"correct":32},"价值工程的应用",{"key":24,"text":91,"correct":22},"招标的工作程序",{"key":27,"text":93,"correct":32},"设计过程的管理",{"key":30,"text":95,"correct":32},"进度控制的方法和手段",{"key":97,"text":98,"correct":32},"E","项目管理的组织","ACDE",{"id":101,"libraryId":5,"type":84,"typeLabel":85,"stem":102,"options":103,"answer":114,"analysis":33},1140619,"关于建设工程项目管理规划的说法，正确的有（ ）。",[104,106,108,110,112],{"key":20,"text":105,"correct":22},"建设工程项目管理规划仅涉及项目的施工阶段和保修期",{"key":24,"text":107,"correct":22},"建设工程项目管理规划完成以后不需要调整",{"key":27,"text":109,"correct":32},"除业主方以外，建设项目的其他参与单位也需要编制项目管理规划",{"key":30,"text":111,"correct":32},"如果采用工程总承包模式，业主方可以委托总承包方编著建设工程项目管理规划",{"key":97,"text":113,"correct":32},"建设工程项目管理规划内容涉及的范围和深度，应视项目的特点而定","CDE",{"id":116,"libraryId":5,"type":84,"typeLabel":85,"stem":117,"options":118,"answer":129,"analysis":33},1140620,"项目管理规划大纲的内容主要包括（ ）。",[119,121,123,125,127],{"key":20,"text":120,"correct":32},"项目概况",{"key":24,"text":122,"correct":22},"总体工作计划",{"key":27,"text":124,"correct":32},"项目进度管理归划",{"key":30,"text":126,"correct":22},"成本计划",{"key":97,"text":128,"correct":32},"项目风险管理规划","ACE",{"id":131,"libraryId":5,"type":84,"typeLabel":85,"stem":132,"options":133,"answer":143,"analysis":33},1140621,"建设工程项目管理规划中，施工方项目管理规划的内容一般包括（ ）。",[134,136,137,139,141],{"key":20,"text":135,"correct":32},"质量控制的方法和手段",{"key":24,"text":95,"correct":32},{"key":27,"text":138,"correct":22},"成本控制的方法和手段",{"key":30,"text":140,"correct":32},"安全健康与环境管理的策略",{"key":97,"text":142,"correct":32},"风险管理的策略","ABDE",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":24,"analysis":33},1140622,"建设工程项目管理规划属于（）项目管理的范畴。2018真题",[148,150,151,153],{"key":20,"text":149,"correct":22},"工程总承包方",{"key":24,"text":75,"correct":32},{"key":27,"text":152,"correct":22},"工程总承包管理方",{"key":30,"text":154,"correct":22},"工程咨询方",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":30,"analysis":33},1140623,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），项目管理规划包括（ ）。( 2015真题 )",[159,161,163,165],{"key":20,"text":160,"correct":22},"项目管理规划原则和内容",{"key":24,"text":162,"correct":22},"项目管理规划大纲和配套措施",{"key":27,"text":164,"correct":22},"项目管理规划大纲和实施大纲",{"key":30,"text":166,"correct":32},"项目管理规划大纲和实施规划",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":27,"analysis":33},1140624,"项目管理实施规划时，熟悉相关法规和文件之后的工作是（ ）。",[171,173,175,177],{"key":20,"text":172,"correct":22},"分析项目条件和环境",{"key":24,"text":174,"correct":22},"了解项目相关各方的要求",{"key":27,"text":176,"correct":32},"组织编制",{"key":30,"text":178,"correct":22},"履行报批手续",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":27,"analysis":33},1140625,"按照我国现行规定，项目管理实施规划应由（ ）组织编制。",[183,185,187,189],{"key":20,"text":184,"correct":22},"组织的管理层",{"key":24,"text":186,"correct":22},"组织委托的项目管理单位",{"key":27,"text":188,"correct":32},"项目经理",{"key":30,"text":190,"correct":22},"组织委托的代建单位",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":24,"analysis":33},1140627,"建设工程项目管理实施规划应由（ ）组织编制，并邀请项目管理班子的主要人员参加。",[195,196,197,198],{"key":20,"text":77,"correct":22},{"key":24,"text":188,"correct":32},{"key":27,"text":75,"correct":22},{"key":30,"text":79,"correct":22},{"id":200,"libraryId":5,"type":84,"typeLabel":85,"stem":201,"options":202,"answer":211,"analysis":33},1140628,"对于采用建设项目总承包模式的某建设工程项目，其项目管理规划可以由（ ）编制。",[203,204,206,207,209],{"key":20,"text":75,"correct":32},{"key":24,"text":205,"correct":32},"业主方的项目管理单位",{"key":27,"text":77,"correct":22},{"key":30,"text":208,"correct":22},"施工监理方",{"key":97,"text":210,"correct":32},"项目总承包方","ABE",{"id":213,"libraryId":5,"type":84,"typeLabel":85,"stem":214,"options":215,"answer":226,"analysis":33},1140629,"项目管理实施规划的编制依据有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":32},"项目条件和环境分析资料",{"key":24,"text":219,"correct":32},"同类项目的相关资料",{"key":27,"text":221,"correct":32},"项目管理实施规划大纲",{"key":30,"text":223,"correct":32},"工程合同及相关文件",{"key":97,"text":225,"correct":22},"可行性研究报告","ABCD",{"id":228,"libraryId":5,"type":84,"typeLabel":85,"stem":229,"options":230,"answer":238,"analysis":33},1140630,"建设工程项目管理规划大纲可由（ ）编制。",[231,232,233,234,236],{"key":20,"text":188,"correct":22},{"key":24,"text":184,"correct":32},{"key":27,"text":186,"correct":32},{"key":30,"text":235,"correct":22},"业主",{"key":97,"text":237,"correct":22},"设计单位","BC",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":27,"analysis":33},1140631,"项目管理规划大纲的编制依据不包括（ ）。",[243,245,246,247],{"key":20,"text":244,"correct":22},"招标文件及有关合同文件",{"key":24,"text":225,"correct":22},{"key":27,"text":217,"correct":32},{"key":30,"text":248,"correct":22},"设计文件、标准、规范与有关规定",{"id":250,"libraryId":5,"type":84,"typeLabel":85,"stem":251,"options":252,"answer":261,"analysis":33},1140632,"在编制项目管理实施规划时，可依据的资料包括（ ）。",[253,255,256,258,260],{"key":20,"text":254,"correct":32},"项目管理规划大纲",{"key":24,"text":225,"correct":22},{"key":27,"text":257,"correct":22},"招标文件",{"key":30,"text":259,"correct":32},"工程合同",{"key":97,"text":219,"correct":32},"ADE",{"id":263,"libraryId":5,"type":84,"typeLabel":85,"stem":264,"options":265,"answer":275,"analysis":33},1140633,"根据《建设工程项目管理规定》（GB\u002FT50326-2006），项目管理规划大纲的编制依据包括（ ）。",[266,268,270,272,274],{"key":20,"text":267,"correct":32},"项目可行性研究报告",{"key":24,"text":269,"correct":32},"相关市场和环境信息",{"key":27,"text":271,"correct":32},"设计文件、标准、规范",{"key":30,"text":273,"correct":22},"项目建议书",{"key":97,"text":244,"correct":32},"ABCE",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":24,"analysis":33},1140635,"（ ）是对施工活动实行科学管理的重要手段，它具有战略部署和战术安排的双重作用。",[280,282,284,285],{"key":20,"text":281,"correct":22},"项目管理实施规划",{"key":24,"text":283,"correct":32},"施工组织设计",{"key":27,"text":254,"correct":22},{"key":30,"text":286,"correct":22},"项目合同文件",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},1140636,"工程项目施工组织设计中，一般将施工顺序的安排写入（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"施工进度计划",{"key":24,"text":294,"correct":22},"施工总平面图",{"key":27,"text":296,"correct":32},"施工部署和施工方案",{"key":30,"text":298,"correct":22},"工程概况",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":27,"analysis":33},1140638,"编制施工组织总设计时，在施工总进度计划确定之后，才可以进行的工作是（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"拟定施工方案",{"key":24,"text":306,"correct":22},"确定施工的总体部署",{"key":27,"text":308,"correct":32},"编制资源需求量计划",{"key":30,"text":310,"correct":22},"计算主要工种工程的工程量",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1140639,"施工平面图是（ ）及施工进度计划在空间上的全面安排。",[315,317,319,321],{"key":20,"text":316,"correct":32},"施工方案",{"key":24,"text":318,"correct":22},"施工部署",{"key":27,"text":320,"correct":22},"工程结构",{"key":30,"text":322,"correct":22},"施工管理计划",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":27,"analysis":33},1140640,"在施工组织设计的基本内容中，能反映最佳施工方案在时间上的安排的是（ ）。",[327,328,329,330],{"key":20,"text":318,"correct":22},{"key":24,"text":316,"correct":22},{"key":27,"text":292,"correct":32},{"key":30,"text":331,"correct":22},"施工平面图",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1140641,"某施工企业承接了某住宅小区中10#楼的土建施工任务，项目经理部针对该10#楼编制的施工组织设计属于（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"施工组织总设计",{"key":24,"text":339,"correct":22},"单项工程施工组织设计",{"key":27,"text":341,"correct":32},"单位工程施工组织设计",{"key":30,"text":343,"correct":22},"分部工程施工组织设计",{"id":345,"libraryId":5,"type":84,"typeLabel":85,"stem":346,"options":347,"answer":357,"analysis":33},1140643,"单位工程施工组织设计和分部（分项）工程施工组织设计均应包括的内容有（ ）。",[348,349,351,353,355],{"key":20,"text":298,"correct":32},{"key":24,"text":350,"correct":22},"施工方案的选择",{"key":27,"text":352,"correct":22},"施工方法和施工机械的选择",{"key":30,"text":354,"correct":22},"主要技术经济指标",{"key":97,"text":356,"correct":32},"施工特点分析","AE",{"id":359,"libraryId":5,"type":84,"typeLabel":85,"stem":360,"options":361,"answer":114,"analysis":33},1140644,"关于施工组织设计中施工平面图的说法中，正确的有（ ）。( 2015真题 )",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"反映了最佳施工方案在时间上的安排",{"key":24,"text":365,"correct":22},"反映了施工机具等资源的供应情况",{"key":27,"text":367,"correct":32},"反映了施工方案在空间上的全面安排",{"key":30,"text":369,"correct":32},"反映了施工进度计划在空间上的全面安排",{"key":97,"text":371,"correct":32},"使整个现场能有组织地进行文明施工",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":27,"analysis":33},1140645,"不属于施工组织总设计中主要技术经济指标的是( )。",[376,378,380,382],{"key":20,"text":377,"correct":22},"项目施工质量",{"key":24,"text":379,"correct":22},"劳动生产率",{"key":27,"text":381,"correct":32},"资源消耗的均衡性",{"key":30,"text":383,"correct":22},"项目施工安全",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1140646,"建设工程项目的施工组织方案中需要决定和安排( )。",[388,390,392,394],{"key":20,"text":389,"correct":32},"施工程序和工艺顺序",{"key":24,"text":391,"correct":22},"施工工艺和施工方法",{"key":27,"text":393,"correct":22},"工艺顺序和施工方法",{"key":30,"text":395,"correct":22},"施工流向和施工工艺",{"id":397,"libraryId":5,"type":84,"typeLabel":85,"stem":398,"options":399,"answer":409,"analysis":33},1140647,"单位工程施工组织设计的内容包括（ ）。",[400,402,404,405,407],{"key":20,"text":401,"correct":32},"工程概况及施工特点",{"key":24,"text":403,"correct":22},"作业区施工平面布置设计",{"key":27,"text":316,"correct":32},{"key":30,"text":406,"correct":32},"单位工程施工准备工作计划",{"key":97,"text":408,"correct":22},"施工总进度计划","ACD",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},1140648,"分部（分项）工程施工组织设计的主要内容不包括( )。",[414,415,416,418],{"key":20,"text":350,"correct":32},{"key":24,"text":352,"correct":22},{"key":27,"text":417,"correct":22},"各项资源需求量计划",{"key":30,"text":419,"correct":22},"作业区施工平面布置图设计",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1140649,"关于设计阶段项目管理的说法，错误的是（ ）。 2016",[424,426,428,430],{"key":20,"text":425,"correct":22},"设计阶段的项目管理是建设工程项目管理的一个非常重要的组成部分",{"key":24,"text":427,"correct":32},"由于设计费占建设总投资的比例小，业主方可以忽略对其进行管理",{"key":27,"text":429,"correct":22},"设计的质量直接影响项目实施的投资、进度和质量",{"key":30,"text":431,"correct":22},"设计的进度直接影响工程的进展",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1140650,"项目管理实施计划的编制过程包括：①熟悉相关法规和文件；②分析项目条件和环境；③履行报批手续；④组织编制。2014根据《建设工程项目管理规范》（GB\u002FT50326—2006），正确的编制程序是（ ）。2014",[436,438,440,442],{"key":20,"text":437,"correct":22},"①→②→③→④",{"key":24,"text":439,"correct":32},"②→①→④→③",{"key":27,"text":441,"correct":22},"①→②→④→③",{"key":30,"text":443,"correct":22},"②→①→③→④",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},1140651,"下列施工组织设计的内容中，属于施工部署及施工方案的是（ ）。 ( 2015真题 )",[448,450,452,454],{"key":20,"text":449,"correct":22},"施工资源的需求计划",{"key":24,"text":451,"correct":22},"施工资源的优化配置",{"key":27,"text":453,"correct":22},"投入材料的堆场设计",{"key":30,"text":455,"correct":32},"施工机械的分析选择",{"id":457,"libraryId":5,"type":84,"typeLabel":85,"stem":458,"options":459,"answer":470,"analysis":33},1140652,"下列项目目标动态控制的纠偏措施中，属于技术措施的有（ ）",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"调整工作流程组织",{"key":24,"text":463,"correct":22},"调整进度管理的方法和手段",{"key":27,"text":465,"correct":32},"改变施工机具",{"key":30,"text":467,"correct":32},"改变施工方法",{"key":97,"text":469,"correct":22},"调整项目管理职能分工","CD",{"id":472,"libraryId":5,"type":84,"typeLabel":85,"stem":473,"options":474,"answer":143,"analysis":33},1140653,"下列施工组织设计内容中，属于专项施工方案的有（ ）。 2016",[475,477,478,480,482],{"key":20,"text":476,"correct":32},"施工安排",{"key":24,"text":292,"correct":32},{"key":27,"text":479,"correct":22},"施工现场平面布置",{"key":30,"text":481,"correct":32},"施工方法及工艺要求",{"key":97,"text":483,"correct":32},"资源配置计划",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1140655,"单位工程施工组织设计的编制依据主要有（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":32},"工程的施工图纸及标准图",{"key":24,"text":491,"correct":22},"合同文件",{"key":27,"text":493,"correct":22},"建设地区基础资料",{"key":30,"text":495,"correct":22},"设计文件",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},1140656,"编辑工程项目施工组织设计时，一般将施工段的划分、施工顺序的安排列入施工组织设计的（ ）部分。",[500,501,502,503],{"key":20,"text":292,"correct":22},{"key":24,"text":294,"correct":22},{"key":27,"text":296,"correct":32},{"key":30,"text":298,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1140657,"施工组织总设计的工作内容包括①计算主要工种工程的工程量、②拟定施工方案、③编制施工总进度计划、④编制资源需求量计划，他们的正确次序是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":32},"①②③④",{"key":24,"text":511,"correct":22},"②①③④",{"key":27,"text":513,"correct":22},"②①④③",{"key":30,"text":515,"correct":22},"①③②④",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1140658,"下列不属于施工组织总设计编制依据的是（ ）。",[520,522,524,525],{"key":20,"text":521,"correct":22},"计划文件",{"key":24,"text":523,"correct":32},"资源配置情况",{"key":27,"text":491,"correct":22},{"key":30,"text":493,"correct":22},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1140659,"某施工企业编制某建设项目施工组织总设计，先后进行了相关资料的收集和调研、主要工种工程量的计算、施工总体部署的确定等工作，接下来应进行的工作是（ ）",[530,532,534,536],{"key":20,"text":531,"correct":22},"施工总进度计划的编制",{"key":24,"text":533,"correct":32},"施工方案的拟定",{"key":27,"text":535,"correct":22},"资源需求量计划的编制",{"key":30,"text":537,"correct":22},"施工总平面图的设计",{"id":539,"libraryId":5,"type":84,"typeLabel":85,"stem":540,"options":541,"answer":409,"analysis":33},1140660,"在编制施工组织设计时，宜考虑的原则有（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":32},"重视工程施工的目标控制",{"key":24,"text":545,"correct":22},"重视设计文件的要求",{"key":27,"text":547,"correct":32},"重视管理创新和技术创新",{"key":30,"text":549,"correct":32},"提高施工的工业化程度",{"key":97,"text":551,"correct":22},"充分考虑施工的主要技术经济指标",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1140661,"编制施工组织总设计时，确定了施工的总体部署之后应进行的工作是（ ）。",[556,558,560,561],{"key":20,"text":557,"correct":32},"拟订施工方案",{"key":24,"text":559,"correct":22},"编制施工总进度计划",{"key":27,"text":308,"correct":22},{"key":30,"text":562,"correct":22},"编制施工准备工作计划",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1140662,"根据 《建筑施工组织设计规范》（GB\u002FT50502-2009），施工组织设计应由 （ ）组织编制。2014",[567,569,571,573],{"key":20,"text":568,"correct":22},"施工单位技术负责人",{"key":24,"text":570,"correct":32},"项目负责人",{"key":27,"text":572,"correct":22},"施工单位负责人",{"key":30,"text":574,"correct":22},"项目技术负责人",{"id":576,"libraryId":5,"type":84,"typeLabel":85,"stem":577,"options":578,"answer":409,"analysis":33},1140663,"根据《建筑施工组织设计规范》（GB\u002FT50502-2009），以分部（分项）工程或专项工程为主要对象编制的施工方案，其主要内容包括（ ）。2014",[579,580,581,583,585],{"key":20,"text":298,"correct":32},{"key":24,"text":318,"correct":22},{"key":27,"text":582,"correct":32},"施工方法和工艺要求",{"key":30,"text":584,"correct":32},"施工准备与资源配置计划",{"key":97,"text":479,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":27,"analysis":33},1140664,"某施工企业针对建筑主体钢结构工程编制专项施工方案，该施工方案应由（）进行审批。2018真题",[590,592,594,596],{"key":20,"text":591,"correct":22},"总包单位项目技术负责人",{"key":24,"text":593,"correct":22},"专业分包单位技术负责人",{"key":27,"text":595,"correct":32},"总包单位技术负责人",{"key":30,"text":597,"correct":22},"专业分包单位项目技术负责人",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},1140665,"（2020年真题）根据《建筑施工组织设计规范》,关于施工组织设计审批的说法,正确的是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"专项施工方案应由项目技术负责人审批",{"key":24,"text":605,"correct":22},"施工方案应由项目总监理工程师审批",{"key":27,"text":607,"correct":22},"施工组织总设计应由建设单位技术负责人审批",{"key":30,"text":609,"correct":32},"单位工程施工组织设计应由承包单位技术负责人审批",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":30,"analysis":33},1140667,"对项目施工方法进行改进,，这种纠偏措施属于动态控制纠偏措施的（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":22},"组织措施",{"key":24,"text":617,"correct":22},"管理措施",{"key":27,"text":619,"correct":22},"经济措施",{"key":30,"text":621,"correct":32},"技术措施",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":20,"analysis":33},1140668,"根据项目目标动态控制的工作程序，第一步工作是（ ）。",[626,628,630,632],{"key":20,"text":627,"correct":32},"进行项目目标分解",{"key":24,"text":629,"correct":22},"收集项目目标的实际值",{"key":27,"text":631,"correct":22},"进行目标的计划值与实际值比较",{"key":30,"text":633,"correct":22},"确定各种资源投入量",[635,638,641,644,647,650],{"id":15,"name":636,"category":7,"favorite":637},"领导干部任职前廉政法规知识测试题",92,{"id":639,"name":640,"category":7,"favorite":15},595,"建筑结构与设备",{"id":642,"name":643,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":645,"name":646,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":648,"name":649,"category":7,"favorite":8},534,"BIM工程师",{"id":651,"name":649,"category":7,"favorite":8},535]