[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":654},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,48,50,2721,[13,34,46,58,70,82,94,106,124,136,151,163,178,192,204,216,228,240,252,267,279,291,302,314,325,340,352,366,378,390,401,416,428,443,454,466,478,490,502,514,526,541,553,567,579,591,606,618,630,642],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1143145,1,"单选题","影响建设项目施工质量的环境因素是（）。（2018年真题）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工现场自然环境、施工作业环境和施工质量管理环境",true,{"key":24,"text":25,"correct":26},"B","施工现场自然环境、施工作业环境和技术环境",false,{"key":28,"text":29,"correct":26},"C","施工现场自然环境、技术环境和施工质量管理环境",{"key":31,"text":32,"correct":26},"D","施工作业环境、技术环境和施工质量管理环境","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1143147,"某投标人在内部投标评审会中发现招标人公布的招标控制价不合理，因此决定放弃此次投标，该风险应对策略为（）。（2018年真题）",[38,40,42,44],{"key":20,"text":39,"correct":26},"风险减轻",{"key":24,"text":41,"correct":26},"风险自留",{"key":28,"text":43,"correct":26},"风险转移",{"key":31,"text":45,"correct":22},"风险规避",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1143149,"根据《建设工程质量管理条例》，未经（）签字，建设单位不拨付工程款，不进行竣工验收。（2018年真题）",[50,52,54,56],{"key":20,"text":51,"correct":26},"专业监理工程师",{"key":24,"text":53,"correct":26},"建设单位现场工程师",{"key":28,"text":55,"correct":26},"政府质量管理部门",{"key":31,"text":57,"correct":22},"总监理工程师",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1143151,"我国实行建筑企业资质管理制度、建造师执业资格注册制度、管理人员持证上岗制度，都是对建筑工程项目质量影响因素中（）的控制。（2018年真题）",[62,64,66,68],{"key":20,"text":63,"correct":22},"人的因素",{"key":24,"text":65,"correct":26},"管理因素",{"key":28,"text":67,"correct":26},"环境因素",{"key":31,"text":69,"correct":26},"技术因素",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1143153,"（2020年真题）下列项目质量风险中，属于管理风险的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"项目采用了不够成熟的新材料",{"key":24,"text":77,"correct":22},"项目组织结构不合理",{"key":28,"text":79,"correct":26},"项目场地周边发生滑坡",{"key":31,"text":81,"correct":26},"项目现场存在严重的水污染",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1143155,"（2020年真题）质量控制活动包括：①设定目标；②纠正偏差；③测量检查；④评价分析。正确的顺序是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"①-②-③-④",{"key":24,"text":89,"correct":22},"①-③-④-②",{"key":28,"text":91,"correct":26},"③-①-②-④",{"key":31,"text":93,"correct":26},"③-④-①-②",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1143157,"企业获准质量管理体系认证后，维持与监督管理活动中的自愿行为是（ ）。2017",[98,100,102,104],{"key":20,"text":99,"correct":26},"监督检查",{"key":24,"text":101,"correct":26},"企业通报",{"key":28,"text":103,"correct":26},"认证暂停",{"key":31,"text":105,"correct":22},"认证注销",{"id":107,"libraryId":5,"type":108,"typeLabel":109,"stem":110,"options":111,"answer":123,"analysis":33},1143159,2,"多选题","在企业质量管理体系的运行中，开展内部质量审核活动的主要目的有（ ）。2017",[112,114,116,118,120],{"key":20,"text":113,"correct":22},"检查质量体系运行的信息",{"key":24,"text":115,"correct":26},"评价质量管理程序的完整性",{"key":28,"text":117,"correct":22},"为质量改进提供证据",{"key":31,"text":119,"correct":26},"减少社会重复检验费用",{"key":121,"text":122,"correct":22},"E","向外部审核单位提供体系有效的证据","ACE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":28,"analysis":33},1143161,"项目质量控制体系得以运行的基础条件是（ ）。2017",[128,130,132,134],{"key":20,"text":129,"correct":26},"项目合同结构合理",{"key":24,"text":131,"correct":26},"组织制度健全",{"key":28,"text":133,"correct":22},"人员和资源合理配置",{"key":31,"text":135,"correct":26},"程序性文件规范",{"id":137,"libraryId":5,"type":108,"typeLabel":109,"stem":138,"options":139,"answer":150,"analysis":33},1143162,"建设工程项目质量控制系统运行的约束机制，取决于( )。（2013）",[140,142,144,146,148],{"key":20,"text":141,"correct":26},"各质量责任主体对利益的追求",{"key":24,"text":143,"correct":26},"质量信息反馈的及时性和准确性",{"key":28,"text":145,"correct":22},"各主体内部的自我约束能力",{"key":31,"text":147,"correct":22},"外部的监控效力",{"key":121,"text":149,"correct":26},"工程项目管理文化建设的成都","CD",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},1143165,"项目质量控制体系运行的核心机制是（ ）。 （2015）",[155,157,159,161],{"key":20,"text":156,"correct":26},"约束机制",{"key":24,"text":158,"correct":26},"反馈机制",{"key":28,"text":160,"correct":26},"持续改进机制",{"key":31,"text":162,"correct":22},"动力机制",{"id":164,"libraryId":5,"type":108,"typeLabel":109,"stem":165,"options":166,"answer":177,"analysis":33},1143166,"根据建设工程全过程质量管理的要求，质量控制的主要过程包括（ ）。（2016）",[167,169,171,173,175],{"key":20,"text":168,"correct":22},"项目策划与决策过程",{"key":24,"text":170,"correct":22},"设备材料采购过程",{"key":28,"text":172,"correct":22},"施工组织与实施过程",{"key":31,"text":174,"correct":26},"项目运行与维修过程",{"key":121,"text":176,"correct":22},"工程质量的评定过程","ABCE",{"id":179,"libraryId":5,"type":108,"typeLabel":109,"stem":180,"options":181,"answer":123,"analysis":33},1143168,"在大型群体工程项目中，第一层次质量控制体系可由（ ）的项目管理机构负责建立。（2015）",[182,184,186,188,190],{"key":20,"text":183,"correct":22},"建设单位",{"key":24,"text":185,"correct":26},"涉及总责任单位",{"key":28,"text":187,"correct":22},"代建单位",{"key":31,"text":189,"correct":26},"施工总承包单位",{"key":121,"text":191,"correct":22},"工程总承包企业",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},1143171,"建立项目质量控制体系时，首先开展的工作是（ ）。 （2015）",[196,198,200,202],{"key":20,"text":197,"correct":26},"分析质量控制界面",{"key":24,"text":199,"correct":26},"编制质量控制计划",{"key":28,"text":201,"correct":26},"制定质量控制制度",{"key":31,"text":203,"correct":22},"确立系统质量控制网络",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":20,"analysis":33},1143173,"某企业通过质量管理体系认证后，由于管理不善，经认证机构调查作出了撤销认证的决定。则该企业()。（2013）",[208,210,212,214],{"key":20,"text":209,"correct":22},"可以提出申诉，并在一年后可重新提出认证申请",{"key":24,"text":211,"correct":26},"不能提自申诉，不能再重新提出认证申请",{"key":28,"text":213,"correct":26},"不能提自申诉，但在一年后可以重新提出认证申请",{"key":31,"text":215,"correct":26},"可以提自申诉，并在半年后可重新提出认证申请",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},1143174,"关于项目质量控制体系的说法，正确的是（）（2014）",[220,222,224,226],{"key":20,"text":221,"correct":26},"项目质量控制体系需要第三方认证",{"key":24,"text":223,"correct":26},"项目质量控制体系是一个永久性的质量管理体系",{"key":28,"text":225,"correct":26},"项目质量控制体系既适用于特定项目的质量控制，也适用于企业的质量管理",{"key":31,"text":227,"correct":22},"项目质量控制体系涉及项目实施过程所有的质量责任主体",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":28,"analysis":33},1143176,"下列项目质量控制体系中，属于质量控制体系第二层次的是（ ）。（2016）",[232,234,236,238],{"key":20,"text":233,"correct":26},"建设单位项目管理机构建立的项目质量控制体系",{"key":24,"text":235,"correct":26},"交钥匙工程总承包企业项目管理机构建立的项目质量控制体系",{"key":28,"text":237,"correct":22},"项目设计总负责单位建立的项目质量控制体系",{"key":31,"text":239,"correct":26},"施工设备安装单位建立的现场质量控制体系",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1143178,"建立项目质量控制体系的过程包括：①分析质量控制界面；②确立系统质量控制网络；③制定质量控制制度；④编制质量控制计划。其正确的工作步骤是（ ）。（2016）",[244,246,248,250],{"key":20,"text":245,"correct":22},"②→③→①→④",{"key":24,"text":247,"correct":26},"①→②→③→④",{"key":28,"text":249,"correct":26},"②→①→③→④",{"key":31,"text":251,"correct":26},"①→③→②→④",{"id":253,"libraryId":5,"type":108,"typeLabel":109,"stem":254,"options":255,"answer":266,"analysis":33},1143180,"根据《质量管理体系基础和术语》 （GB\u002FT19000―2006\u002FISO90002005），企业质量管理体系文件由（）构成（2014）",[256,258,260,262,264],{"key":20,"text":257,"correct":22},"质量方针和质量目标",{"key":24,"text":259,"correct":22},"质量记录",{"key":28,"text":261,"correct":26},"质量报告",{"key":31,"text":263,"correct":22},"质量手册",{"key":121,"text":265,"correct":22},"程序文件","ABDE",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},1143182,"根据全面质量管理的思想，工程项目的全面质量管理是指对( )的全面管理。（2012）",[271,273,275,277],{"key":20,"text":272,"correct":26},"工程质量形成过程",{"key":24,"text":274,"correct":26},"工程建设各参与方",{"key":28,"text":276,"correct":22},"工程质量和工作质量",{"key":31,"text":278,"correct":26},"工程建设所需的材料、设备",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1143184,"建设项目各参与方应分别进行不同层次和范围的建设工程项目质量控制体系规划，这是建立建设工程项目质量控制体系时( )原则的体现。（2012）",[283,285,287,289],{"key":20,"text":284,"correct":26},"目标分解",{"key":24,"text":286,"correct":26},"质量责任制",{"key":28,"text":288,"correct":26},"系统有效性",{"key":31,"text":290,"correct":22},"分层次规划",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1143186,"企业质量管理体系运行过程中，落实质量管理体系的内部审核程序，有组织有计划开展内部质量审核活动的目的之一是( )。（2012）",[295,296,298,300],{"key":20,"text":122,"correct":22},{"key":24,"text":297,"correct":26},"记载关键活动的质量参数",{"key":28,"text":299,"correct":26},"反映针对不足所采取的纠正措施及纠正效果",{"key":31,"text":301,"correct":26},"证明产品质量达到合同要求及质量保证的满足程度",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},1143188,"（2019年真题）建设工程项目质量管理的PDCA循环中，质量处置 （A）阶段的主要任务是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"明确质量目并标制定实现目标的行动方案",{"key":24,"text":309,"correct":26},"将质量计划落实到工程项目的施工作业技术活动中",{"key":28,"text":311,"correct":22},"对质量问题进行原因分析，采取措施予以以纠正",{"key":31,"text":313,"correct":26},"对计划实施过程进行科学管理",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1143190,"（2019年真题）根据质量管理体系认证制度，当在认证证书有效期内出现体系认证标准变更，企业可采取的行动是( )。",[318,320,322,323],{"key":20,"text":319,"correct":26},"申请复评",{"key":24,"text":321,"correct":22},"重新换证",{"key":28,"text":103,"correct":26},{"key":31,"text":324,"correct":26},"认证撤销",{"id":326,"libraryId":5,"type":108,"typeLabel":109,"stem":327,"options":328,"answer":339,"analysis":33},1143191,"（2019年真题）施工质量管理的PDCA循环中，检查C（check）包括（）。",[329,331,333,335,337],{"key":20,"text":330,"correct":26},"监理单位的平行检查",{"key":24,"text":332,"correct":22},"作业者的自检",{"key":28,"text":334,"correct":22},"作业者的互检",{"key":31,"text":336,"correct":26},"政府部门的监督检查",{"key":121,"text":338,"correct":22},"专职管理者的专检","BCE",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},1143193,"关于工程项目质量控制体系的说法，正确的是（）。（2018年真题）",[344,346,348,350],{"key":20,"text":345,"correct":26},"目的是用于建筑业企业的质量管理",{"key":24,"text":347,"correct":26},"其控制目标是建筑业企业的质量管理目标",{"key":28,"text":349,"correct":26},"体系有效性要进行第三方审核认证",{"key":31,"text":351,"correct":22},"涉及工程项目实施中所有的质量责任主体",{"id":353,"libraryId":5,"type":108,"typeLabel":109,"stem":354,"options":355,"answer":266,"analysis":33},1143195,"根据《质量管理体系标准基础和术语》，质量管理原则包括（）。（2018年真题）",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"以顾客为关注焦点",{"key":24,"text":359,"correct":22},"循证决策",{"key":28,"text":361,"correct":26},"全要素控制",{"key":31,"text":363,"correct":22},"全员积极参与",{"key":121,"text":365,"correct":22},"关系管理",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1143197,"下列质量管理体系程序性文件中，可视企业质量控制需要而制定，不作统一规定的是（）。（2018年真题）",[370,372,374,376],{"key":20,"text":371,"correct":26},"内部审核程序",{"key":24,"text":373,"correct":26},"质量记录管理程序",{"key":28,"text":375,"correct":26},"纠正措施控制程序",{"key":31,"text":377,"correct":22},"生产过程管理程序",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1143199,"（2020年真题）评价和诊断项目质量控制体系的有效性，一般由（ ）进行。",[382,384,386,388],{"key":20,"text":383,"correct":26},"项目监理单位",{"key":24,"text":385,"correct":22},"项目管理的组织者",{"key":28,"text":387,"correct":26},"项目咨询单位",{"key":31,"text":389,"correct":26},"第三方认证机构",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1143201,"（2020年真题）建设工程项目全面质量管理中的“全面”是指（ ）的管理。",[394,395,397,399],{"key":20,"text":276,"correct":22},{"key":24,"text":396,"correct":26},"决策过程和实施过程",{"key":28,"text":398,"correct":26},"管理岗位和工作岗位",{"key":31,"text":400,"correct":26},"全方位和全流程",{"id":402,"libraryId":5,"type":108,"typeLabel":109,"stem":403,"options":404,"answer":415,"analysis":33},1143203,"（2020年真题）建筑施工企业进行质量管理体系认证的程序包括（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":26},"培训",{"key":24,"text":408,"correct":22},"申请和受理",{"key":28,"text":410,"correct":26},"定期监督检查",{"key":31,"text":412,"correct":22},"审核",{"key":121,"text":414,"correct":22},"审批与注册发证","BDE",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1143205,"施工单位内容的施工作业质量检查包括（ ）。2017",[420,422,424,426],{"key":20,"text":421,"correct":26},"自检、互检和旁站检查",{"key":24,"text":423,"correct":26},"自检、专检和平行检验",{"key":28,"text":425,"correct":22},"自检、互检、专检和交接检查",{"key":31,"text":427,"correct":26},"自检、互检、旁站检查和平行检验",{"id":429,"libraryId":5,"type":108,"typeLabel":109,"stem":430,"options":431,"answer":442,"analysis":33},1143206,"根据《建筑工程施工质量验收统一标准》GB 50300-2013，分项工程的划分依据有（ ）。2017",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"工程部位",{"key":24,"text":435,"correct":22},"工种",{"key":28,"text":437,"correct":22},"材料",{"key":31,"text":439,"correct":22},"施工工艺",{"key":121,"text":441,"correct":22},"设备类别","BCDE",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1143208,"施工单位在工程开工前编制的测量控制方案，需经（ ）批准后方可实施。",[447,449,451,452],{"key":20,"text":448,"correct":22},"项目技术负责人",{"key":24,"text":450,"correct":26},"项目经理",{"key":28,"text":57,"correct":26},{"key":31,"text":453,"correct":26},"项目质量工程师",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1143210,"在施工准备阶段，绘制模板配版图属于( )的质量控制工作。（2013）",[458,460,462,464],{"key":20,"text":459,"correct":26},"计量控制准备",{"key":24,"text":461,"correct":26},"测量控制准备",{"key":28,"text":463,"correct":22},"施工技术准备",{"key":31,"text":465,"correct":26},"施工平面控制",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1143212,"下列施工生产要素的质量控制内容中，属于工艺方案质量控制的是（ ）。（2016）",[470,472,474,476],{"key":20,"text":471,"correct":26},"施工企业坚持执业资格注册制度和作业人员持证上岗制度",{"key":24,"text":473,"correct":26},"施工企业在施工过程中优先采用节能低碳的新型建筑材料和设备",{"key":28,"text":475,"correct":26},"施工企业对施工中使用的模具、脚手架等施工设备进行专项设计",{"key":31,"text":477,"correct":22},"施工企业合理布置施工总平面图和各阶段施工平面图",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1143214,"关于钢筋保护层厚度检测的说法，正确的是（ ）。（2015）",[482,484,486,488],{"key":20,"text":483,"correct":26},"检测机构部位由监理确定",{"key":24,"text":485,"correct":22},"梁类应抽取构件数量的2%且不少于5个构件",{"key":28,"text":487,"correct":26},"板类构件应抽取构件数量的5%且不少于2个构件",{"key":31,"text":489,"correct":26},"必须采用无损检测方法",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1143216,"下列质量控制工作中，属于施工技术准备工作的是（ ）。 （2015）",[494,496,498,500],{"key":20,"text":495,"correct":22},"明确质量控制的重点对象",{"key":24,"text":497,"correct":26},"编制测量控制方案",{"key":28,"text":499,"correct":26},"建立施工现场计量管理的规章制度",{"key":31,"text":501,"correct":26},"正确安装设置施工机械设备",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1143217,"施工技术准备工作的质量控制包括（ ）。（2015）",[506,508,510,512],{"key":20,"text":507,"correct":22},"明确质量控制方法",{"key":24,"text":509,"correct":26},"计量控制",{"key":28,"text":511,"correct":26},"测量控制",{"key":31,"text":513,"correct":26},"施工平面图控制",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1143219,"下列质量管理的内容中，属于施工质量计划基本内容的是( )。（2013）",[518,520,522,524],{"key":20,"text":519,"correct":26},"项目部的组织机构设置",{"key":24,"text":521,"correct":22},"质量控制点的控制要求",{"key":28,"text":523,"correct":26},"质量手册的编制",{"key":31,"text":525,"correct":26},"施工质量体系的认证",{"id":527,"libraryId":5,"type":108,"typeLabel":109,"stem":528,"options":529,"answer":540,"analysis":33},1143221,"下列施工现场质量检查的内容中，属于“三检”制度范围的有( )。（2013）",[530,532,534,536,538],{"key":20,"text":531,"correct":26},"巡视检查",{"key":24,"text":533,"correct":26},"平行检查",{"key":28,"text":535,"correct":22},"自省自查",{"key":31,"text":537,"correct":22},"互检互查",{"key":121,"text":539,"correct":22},"专职管理人员的质量检查","CDE",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1143223,"对于重要的或对工程资料有重大影响的工序，应严格执行（）的“三检”制度。 （2014）",[545,547,549,551],{"key":20,"text":546,"correct":26},"事前检查、事中检查、事后检查",{"key":24,"text":548,"correct":22},"自检、互检、专检",{"key":28,"text":550,"correct":26},"工序检查、分项检查、分部检查",{"key":31,"text":552,"correct":26},"操作者自检、质量员检查、监理工程师检查",{"id":554,"libraryId":5,"type":108,"typeLabel":109,"stem":555,"options":556,"answer":566,"analysis":33},1143225,"根据法律和合同，对施工单位的施工质量行为和效果实施监督控制的相关主体有（）。（2014）",[557,558,560,562,564],{"key":20,"text":183,"correct":22},{"key":24,"text":559,"correct":22},"监理单位",{"key":28,"text":561,"correct":22},"设计单位",{"key":31,"text":563,"correct":22},"政府的工程质量监督部门",{"key":121,"text":565,"correct":26},"材料设备供应商","ABCD",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1143227,"下列现场质量检查方法中，属于无损检测方法的是()（2013）",[571,573,575,577],{"key":20,"text":572,"correct":26},"拖线板挂锤吊线检查",{"key":24,"text":574,"correct":26},"铁锤敲击检查",{"key":28,"text":576,"correct":26},"留置试块试验检查",{"key":31,"text":578,"correct":22},"超声波探伤检查",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1143228,"在施工期间对质量问题严重的单位，政府质量监督机构可根据问题的性质签发()（2013）",[583,585,587,589],{"key":20,"text":584,"correct":26},"质量问题整改通知单",{"key":24,"text":586,"correct":26},"局部暂停施工指令单",{"key":28,"text":588,"correct":22},"临时收缴资质证书通知书",{"key":31,"text":590,"correct":26},"全面停工通知书",{"id":592,"libraryId":5,"type":108,"typeLabel":109,"stem":593,"options":594,"answer":605,"analysis":33},1143230,"施工质量计划的基本内容包括（ ）。（2016）",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"质量总目标及分解目标",{"key":24,"text":598,"correct":26},"工序质量偏差的纠正",{"key":28,"text":600,"correct":22},"质量管理组织机构和职责",{"key":31,"text":602,"correct":22},"施工质量控制点及跟踪控制的方式",{"key":121,"text":604,"correct":22},"质量记录的要求","ACDE",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},1143232,"关于施工质量计划的说法，正确的是（）（2014）",[610,612,614,616],{"key":20,"text":611,"correct":26},"施工质量计划是以施工项目为对象由建设单位编制的计划",{"key":24,"text":613,"correct":22},"施工质量计划应包括施工组织方案",{"key":28,"text":615,"correct":26},"施工质量计划一经审核批准后不得修改",{"key":31,"text":617,"correct":26},"施工总承包单位不对分包单位的施工质量计划进行审核",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":28,"analysis":33},1143234,"下列施工质量控制依据中，属于专用性依据的是（ ）。（2016）",[622,624,626,628],{"key":20,"text":623,"correct":26},"工程建设项目质量检验评定标准",{"key":24,"text":625,"correct":26},"建设工程质量管理条例",{"key":28,"text":627,"correct":22},"设计交底及图纸会审记录",{"key":31,"text":629,"correct":26},"材料验收的技术标准",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":20,"analysis":33},1143236,"关于主体结构工程现场质量检测的说法，正确的是（ ）。（2016）",[634,636,638,640],{"key":20,"text":635,"correct":22},"按照统计方法评定混凝土强度时，同一强度等级试件的留置数量不宜少于10组。按非统计方法评定时，留置数量不宜少于3组",{"key":24,"text":637,"correct":26},"砌体工程中，普通砖5万块，多孔砖10万块各为一检验批，抽检数量为1组",{"key":28,"text":639,"correct":26},"对梁板类构件，应抽取构件数量的1%且不少于5个构件进行钢筋保护层厚度检测",{"key":31,"text":641,"correct":26},"混凝土预制构件结构性能检测应按同一工艺生产的不超过100件且不超过3个月的同类产品为一检验批",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":24,"analysis":33},1143238,"施工质量控制点应选择技术要求高、对工程质量影响大或是发生质量问题时危害大或( )的对象进行设置。（2012）",[646,648,650,652],{"key":20,"text":647,"correct":26},"劳动强度大",{"key":24,"text":649,"correct":22},"施工难度大",{"key":28,"text":651,"correct":26},"施工技术先进",{"key":31,"text":653,"correct":26},"施工管理要求高",[655,658,661,664,667,670],{"id":15,"name":656,"category":7,"favorite":657},"领导干部任职前廉政法规知识测试题",92,{"id":659,"name":660,"category":7,"favorite":15},595,"建筑结构与设备",{"id":662,"name":663,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":665,"name":666,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":668,"name":669,"category":7,"favorite":8},534,"BIM工程师",{"id":671,"name":669,"category":7,"favorite":8},535]