[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":648},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,47,50,2721,[13,38,53,67,79,94,106,117,124,133,145,157,169,184,199,207,219,233,248,263,275,290,304,315,323,337,348,360,368,383,395,407,422,435,449,460,471,485,497,509,521,533,545,557,572,584,596,611,626,638],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1143047,2,"多选题","某工程双代号网络计划如下图，已标出各项工作的最早开始时间（ESi-j）、最迟开始时间（LSi-j）和持续时间（Di-j）。（2018年真题）该网络计划表明（）。（2018年真题）",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","工作C和工作E均为关键工作",false,{"key":24,"text":25,"correct":26},"B","工作B的总时差和自由时差相等",true,{"key":28,"text":29,"correct":26},"C","工作D的总时差和自由时差相等",{"key":31,"text":32,"correct":26},"D","工作G的总时差、自由时差分别为2天和0天",{"key":34,"text":35,"correct":26},"E","工作J的总时差和自由时差相等","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1143049,"网络进度计划的工期调整可通过（）来实现。（2018年真题）",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"调整关键工作持续时间",{"key":24,"text":45,"correct":22},"缩短非关键工作的持续时间",{"key":28,"text":47,"correct":22},"增加非关键工作的时差",{"key":31,"text":49,"correct":26},"增减工作项目",{"key":34,"text":51,"correct":26},"调整工作间的逻辑关系","ADE",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":28,"analysis":37},1143051,1,"单选题","某工程网络计划中，工作M的自由时差为2天，总时差为5天。进度检查时发现该工作的持续时间延长了4天，则工作M的实际进度（）。（2018年真题）",[59,61,63,65],{"key":20,"text":60,"correct":22},"既不影响总工期，也不影响其紧后工作的正常进行",{"key":24,"text":62,"correct":22},"将使其紧后工作的开始时间推迟4天，并使总工期延长2天",{"key":28,"text":64,"correct":26},"不影响总工期，但其紧后工作的最早开始时间推迟2天",{"key":31,"text":66,"correct":22},"将使总工期延长4天，但不影响其紧后工作的正常进行",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":28,"analysis":37},1143053,"某网路计划中，工作N的持续时间为6天，最迟完成时间为第25天，该工作三项紧前工作的最早完成时间分别为第10天，第12天和第13天，则工作N的总时差是（）天。（2018年真题）",[71,73,75,77],{"key":20,"text":72,"correct":22},"12",{"key":24,"text":74,"correct":22},"8",{"key":28,"text":76,"correct":26},"6",{"key":31,"text":78,"correct":22},"4",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1143055,"某双代号网络计划如下图，绘图的错误有（）。（2018年真题）",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"有多个终点节点",{"key":24,"text":86,"correct":26},"有多个起点节点",{"key":28,"text":88,"correct":22},"存在循环回路",{"key":31,"text":90,"correct":26},"有多余虚工作",{"key":34,"text":92,"correct":26},"节点编号有误","BDE",{"id":95,"libraryId":5,"type":55,"typeLabel":56,"stem":96,"options":97,"answer":28,"analysis":37},1143057,"（2018年真题）某双代号时标网络计划如下图，工作 F、工作H的最迟完成时间分别为（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"第8天、第11天",{"key":24,"text":101,"correct":22},"第8天、第9天",{"key":28,"text":103,"correct":26},"第7天、第11天",{"key":31,"text":105,"correct":22},"第7天、第9天",{"id":107,"libraryId":5,"type":55,"typeLabel":56,"stem":108,"options":109,"answer":24,"analysis":37},1143058,"（2018年真题）双代号网络计划如下图，其关键线路有（）条。",[110,111,113,115],{"key":20,"text":78,"correct":22},{"key":24,"text":112,"correct":26},"3",{"key":28,"text":114,"correct":22},"2",{"key":31,"text":116,"correct":22},"1",{"id":118,"libraryId":5,"type":55,"typeLabel":56,"stem":119,"options":120,"answer":24,"analysis":37},1143060,"（2018年真题）某双代号网络计划如下图（单位：天），则工作E的自由时差为（）天。",[121,122,123],{"key":20,"text":112,"correct":22},{"key":24,"text":114,"correct":26},{"key":28,"text":78,"correct":22},{"id":125,"libraryId":5,"type":55,"typeLabel":56,"stem":126,"options":127,"answer":28,"analysis":37},1143062,"（2018年真题）某工作有三项紧后工作，持续时间分为4天、5天、6天，对应的最迟完成时间分别为第18天、第16天、第14天，则该工作的最迟完成时间是第（）天。",[128,130,131,132],{"key":20,"text":129,"correct":22},"14",{"key":24,"text":72,"correct":22},{"key":28,"text":74,"correct":26},{"key":31,"text":76,"correct":22},{"id":134,"libraryId":5,"type":55,"typeLabel":56,"stem":135,"options":136,"answer":20,"analysis":37},1143064,"（2020年真题）关于建设工程项目总进度目标论证工作顺序的说法，正确的是（ ）。",[137,139,141,143],{"key":20,"text":138,"correct":26},"先进行计划系统结构分析，后进行项目工作编码",{"key":24,"text":140,"correct":22},"先进行项目工作编码，后进行项目结构分析",{"key":28,"text":142,"correct":22},"先编制总进度计划，后编制各层进度计划",{"key":31,"text":144,"correct":22},"先进行项目结构分析，后进行资料收集",{"id":146,"libraryId":5,"type":55,"typeLabel":56,"stem":147,"options":148,"answer":24,"analysis":37},1143066,"（2020年真题）关于双代号时标网络计划的说法，正确的是（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"时间坐标系方向可以垂直向上",{"key":24,"text":152,"correct":26},"节点中心必须对准相应时标位置",{"key":28,"text":154,"correct":22},"可以用水平虚箭线表示虚工作",{"key":31,"text":156,"correct":22},"时间坐标必须是日历坐标体系",{"id":158,"libraryId":5,"type":55,"typeLabel":56,"stem":159,"options":160,"answer":20,"analysis":37},1143068,"（2020年真题）双代号网络计划中，某工作最早第3天开始，工作持续时间2天，有且仅有2个紧后工作，紧后工作最早开始时间分别是第5天和第6天，对应总时差是4天和2天。该工作的总时差和自由时差分别是（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":26},"3天，0天",{"key":24,"text":164,"correct":22},"0天，0天",{"key":28,"text":166,"correct":22},"4天，1天",{"key":31,"text":168,"correct":22},"2天，2天",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1143070,"（2020年真题）下列双代号网络图中，存在的绘图错误有（ ）",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"存在多个起点节点",{"key":24,"text":176,"correct":26},"箭线交叉的方式错误",{"key":28,"text":178,"correct":22},"存在相同节点编号的工作",{"key":31,"text":180,"correct":22},"存在没有箭尾节点的箭线",{"key":34,"text":182,"correct":26},"存在多余的虚工作","ABE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1143072,"（2020年真题）某双代号网络计划如下图，关于工作时间参数的说法，正确的有（ ）",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"工作B的最迟完成时间是第8天",{"key":24,"text":191,"correct":22},"工作C的最迟开始时间是第7天",{"key":28,"text":193,"correct":22},"工作F的自由时差是1天",{"key":31,"text":195,"correct":26},"工作G的总时差是2天",{"key":34,"text":197,"correct":22},"工作H的最早开始时间是第13天","AD",{"id":200,"libraryId":5,"type":55,"typeLabel":56,"stem":201,"options":202,"answer":20,"analysis":37},1143074,"（2020年真题）某双代号网络计划如下图，关键线路有（ ）条。",[203,204,205,206],{"key":20,"text":112,"correct":26},{"key":24,"text":116,"correct":22},{"key":28,"text":114,"correct":22},{"key":31,"text":78,"correct":22},{"id":208,"libraryId":5,"type":55,"typeLabel":56,"stem":209,"options":210,"answer":24,"analysis":37},1143076,"（2020年真题）各工作间逻辑关系表及相应双代号网图如下图。图中虛箭线的作用是（）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"联系",{"key":24,"text":214,"correct":26},"区分",{"key":28,"text":216,"correct":22},"断路",{"key":31,"text":218,"correct":22},"指向",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":36,"analysis":37},1143078,"（2020年真题）某项目时标网络计划第2、4周末实际进度前锋线如下图,关于该项目进度情况的说法,正确的有（）。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"第2周末,工作C提前1周,工期提前1周",{"key":24,"text":226,"correct":26},"第2周末,工作A拖后2周,但不影响工期",{"key":28,"text":228,"correct":26},"第2周末,工作B拖后1周,但不影响工期",{"key":31,"text":230,"correct":26},"第4周末,工作D拖后1周,但不影响工期",{"key":34,"text":232,"correct":26},"第4周末,工作E提前1周,工期提前1周",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":247,"analysis":37},1143080,"（2020年真题）关于建设工程项目总进度目标论证的说法，正确的有（）。",[237,239,241,243,245],{"key":20,"text":238,"correct":26},"总进度目标的论证涉及工程实施条件分析",{"key":24,"text":240,"correct":22},"总进度目标的论证是项目决策阶段的策划工作",{"key":28,"text":242,"correct":26},"总进度目标的论证应分析实施阶段各项工作之间的逻辑关系",{"key":31,"text":244,"correct":26},"论证前宜收集类似项目的进度资料",{"key":34,"text":246,"correct":22},"分析论证总进度目标实现的可能性应在项目实施过程中进行","ACD",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":262,"analysis":37},1143082,"下建设工程项目进度控制的措施中，属于管理措施的有（ ）。2017",[252,254,256,258,260],{"key":20,"text":253,"correct":26},"采用工程网络计划实现进度控制科学化",{"key":24,"text":255,"correct":22},"明确进度控制管理职能分工",{"key":28,"text":257,"correct":26},"选择合理的工程物资采购模式",{"key":31,"text":259,"correct":22},"编制资源需求计划",{"key":34,"text":261,"correct":26},"重视信息技术在进度控制中的应用","ACE",{"id":264,"libraryId":5,"type":55,"typeLabel":56,"stem":265,"options":266,"answer":28,"analysis":37},1143084,"建设工程项目进度控制的措施中，“定义项目进度计划系统的组成”属于（ ）措施。",[267,269,271,273],{"key":20,"text":268,"correct":22},"管理",{"key":24,"text":270,"correct":22},"经济",{"key":28,"text":272,"correct":26},"组织",{"key":31,"text":274,"correct":22},"技术",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":289,"analysis":37},1143086,"下列进度控制的措施中，属于组织措施的有( )。（2013）",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"选择承发包模式",{"key":24,"text":282,"correct":22},"进行工程进度的风险分析",{"key":28,"text":284,"correct":26},"编制项目进度控制的工作流程",{"key":31,"text":286,"correct":22},"落实资金供应的条件",{"key":34,"text":288,"correct":26},"进行有关进度控制会议的组织设计","CE",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":93,"analysis":37},1143088,"关于建设工程项目进度控制措施的说法，正确的有（ ）。（2016）",[294,296,298,300,302],{"key":20,"text":295,"correct":22},"对于工程项目的进度开展风险管理属于经济措施",{"key":24,"text":297,"correct":26},"各类进度计划的编制、审批程序属于组织措施",{"key":28,"text":299,"correct":22},"进度控制会议的组织设计属于技术措施",{"key":31,"text":301,"correct":26},"进度控制的管理措施涉及管理的思想、方法、和手段、承发包模式等",{"key":34,"text":303,"correct":26},"应用信息技术进行进度控制属于管理措施",{"id":305,"libraryId":5,"type":55,"typeLabel":56,"stem":306,"options":307,"answer":20,"analysis":37},1143090,"下列建设工程项目进度控制的措施中，属于经济措施的是（ ）。（2016）",[308,310,312,313],{"key":20,"text":309,"correct":26},"落实资金供应条件",{"key":24,"text":311,"correct":22},"选择发承包模式",{"key":28,"text":282,"correct":22},{"key":31,"text":314,"correct":22},"优选工程项目的设计、施工方案",{"id":316,"libraryId":5,"type":55,"typeLabel":56,"stem":317,"options":318,"answer":24,"analysis":37},1143092,"运用建设工程的项目信息门户辅助施工项目进度控制，属于进度控制的（ ）措施。（2015）",[319,320,321,322],{"key":20,"text":274,"correct":22},{"key":24,"text":268,"correct":26},{"key":28,"text":270,"correct":22},{"key":31,"text":272,"correct":22},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":36,"analysis":37},1143094,"项目进度控制时，进度控制会议的组织设计的内容有（）。（2014）",[327,329,331,333,335],{"key":20,"text":328,"correct":22},"会议的具体流程",{"key":24,"text":330,"correct":26},"会议的类型",{"key":28,"text":332,"correct":26},"会议的支持人",{"key":31,"text":334,"correct":26},"会议的召开时间",{"key":34,"text":336,"correct":26},"会议文件的整理",{"id":338,"libraryId":5,"type":55,"typeLabel":56,"stem":339,"options":340,"answer":31,"analysis":37},1143096,"下列进度控制措施中，属于组织措施的是（）。 （2014）",[341,343,344,346],{"key":20,"text":342,"correct":22},"编制工程网络进度计划",{"key":24,"text":259,"correct":22},{"key":28,"text":345,"correct":22},"编制先进完整的施工方案",{"key":31,"text":347,"correct":26},"编制进度控制的工作流程",{"id":349,"libraryId":5,"type":55,"typeLabel":56,"stem":350,"options":351,"answer":31,"analysis":37},1143098,"为了实现项目的进度目标，应选择合理的合同结构，以避免过多的合同交界面而影响工程的进展。这属于进度控制的()（2013）",[352,354,356,358],{"key":20,"text":353,"correct":22},"组织措施",{"key":24,"text":355,"correct":22},"经济措施",{"key":28,"text":357,"correct":22},"技术措施",{"key":31,"text":359,"correct":26},"管理措施",{"id":361,"libraryId":5,"type":55,"typeLabel":56,"stem":362,"options":363,"answer":31,"analysis":37},1143100,"为赶上已拖延的施工进度，项目部决定采用混凝土泵代替原来的塔吊运输混凝土。该纠偏措施属于（ ）。 （2015）",[364,365,366,367],{"key":20,"text":359,"correct":22},{"key":24,"text":353,"correct":22},{"key":28,"text":355,"correct":22},{"key":31,"text":357,"correct":26},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1143102,"下列进度控制的措施中，属于经济措施的有( )。（2012）",[372,374,376,378,380],{"key":20,"text":373,"correct":26},"按时支付工程款项",{"key":24,"text":375,"correct":26},"设立提前完工奖",{"key":28,"text":377,"correct":26},"拖延完工予以处罚",{"key":31,"text":379,"correct":22},"编制进度控制工作流程",{"key":34,"text":381,"correct":22},"选用恰当的承发包形式","ABC",{"id":384,"libraryId":5,"type":55,"typeLabel":56,"stem":385,"options":386,"answer":28,"analysis":37},1143104,"为实现进度目标面采取的经济激励措施所需要的费用，应在( )中考虑。（2012）",[387,389,391,393],{"key":20,"text":388,"correct":22},"投标报价",{"key":24,"text":390,"correct":22},"投资估算",{"key":28,"text":392,"correct":26},"工程预算",{"key":31,"text":394,"correct":22},"工程概算",{"id":396,"libraryId":5,"type":55,"typeLabel":56,"stem":397,"options":398,"answer":28,"analysis":37},1143106,"下列建设工程项目进度控制的措施中，属于技术措施的是( )。（2012）",[399,401,403,405],{"key":20,"text":400,"correct":22},"确定各类进度计划的审批程序",{"key":24,"text":402,"correct":22},"选择合理的合同结构",{"key":28,"text":404,"correct":26},"优选工程项目施工方案",{"key":31,"text":406,"correct":22},"选择工程承发包模式",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":421,"analysis":37},1143108,"下列建设工程项目进度控制措施中，属于管理措施的有（ ）。（2015）",[411,413,415,417,419],{"key":20,"text":412,"correct":26},"选择合同结构",{"key":24,"text":414,"correct":26},"分析工程风险",{"key":28,"text":416,"correct":22},"建立管理组织体系",{"key":31,"text":418,"correct":26},"确定物资采购模式",{"key":34,"text":420,"correct":22},"明确管理职能","ABD",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":93,"analysis":37},1143110,"（2019年真题）下列项目进度控制的措施中，属于经济措施的有（）。",[426,428,429,431,433],{"key":20,"text":427,"correct":22},"编制工程网络计划",{"key":24,"text":259,"correct":26},{"key":28,"text":430,"correct":22},"分析影响进度的资源风险",{"key":31,"text":432,"correct":26},"采取激励措施",{"key":34,"text":434,"correct":26},"分析资金供应条件",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":198,"analysis":37},1143112,"下列建设工程项目进度控制措施中，属于技术措施的有（）。（2018年真题）",[439,441,443,445,447],{"key":20,"text":440,"correct":26},"深化设计，选用对实现目标有利的设计方案",{"key":24,"text":442,"correct":22},"建立图纸审查、工程变更管理制度",{"key":28,"text":444,"correct":22},"编制与进度计划相适应的资金保证计划",{"key":31,"text":446,"correct":26},"优化施工方案，合理选用机械设备",{"key":34,"text":448,"correct":22},"优化工作之间的逻辑关系，缩短持续时间",{"id":450,"libraryId":5,"type":55,"typeLabel":56,"stem":451,"options":452,"answer":28,"analysis":37},1143114,"下列建设工程项目进度控制的措施中，属于经济措施的是（）。（2018年真题）",[453,454,456,458],{"key":20,"text":261,"correct":22},{"key":24,"text":455,"correct":22},"分析设计方案对工程进度的影响，优化设计方案",{"key":28,"text":457,"correct":26},"编制与进度计划相适应的资源需求计划",{"key":31,"text":459,"correct":22},"分析影响工程进度的风险，减少进度失控的风险量",{"id":461,"libraryId":5,"type":55,"typeLabel":56,"stem":462,"options":463,"answer":24,"analysis":37},1143116,"（2020年真题）下列建设工程项目进度控制措施中，属于经济措施的是（ ）。",[464,466,467,469],{"key":20,"text":465,"correct":22},"增加进度控制的岗位和人员",{"key":24,"text":259,"correct":26},{"key":28,"text":468,"correct":22},"比较分析工程物资的采购模式",{"key":31,"text":470,"correct":22},"分析施工技术的先进性和经济合理性",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":52,"analysis":37},1143118,"（2020年真题）下列建设工程项目进度控制措施中，属于技术措施的有（ ）",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"分析装配式混凝土结构和现浇混凝土结构对施工进度的影响",{"key":24,"text":478,"correct":22},"采用网络计划技术优化工程施工工期",{"key":28,"text":480,"correct":22},"分析无粘结预应力混凝土结构的技术风险",{"key":31,"text":482,"correct":26},"通过比较钢网架高空散装法和高空滑移法的优缺点选择施工方案",{"key":34,"text":484,"correct":26},"通过变更落地钢管脚手架为外爬式脚手架缩短工期",{"id":486,"libraryId":5,"type":55,"typeLabel":56,"stem":487,"options":488,"answer":31,"analysis":37},1143120,"下列质量风险对策中,属“减轻”对策的是（ ）。2017",[489,491,493,495],{"key":20,"text":490,"correct":22},"设立质量事故风险基金",{"key":24,"text":492,"correct":22},"正确进行项目规划选址",{"key":28,"text":494,"correct":22},"依法实行联合体承包",{"key":31,"text":496,"correct":26},"制定并落实施工质量保证措施",{"id":498,"libraryId":5,"type":55,"typeLabel":56,"stem":499,"options":500,"answer":31,"analysis":37},1143122,"根据《中华人民共和国建筑法》和《建设工程质量管理条例》，设计单位的质量责任和义务是（ ）。2017",[501,503,505,507],{"key":20,"text":502,"correct":22},"按设计要求检验商品混凝土质量",{"key":24,"text":504,"correct":22},"将施工图设计文件上报有关部门审查",{"key":28,"text":506,"correct":22},"向施工单位提供设计原始资料",{"key":31,"text":508,"correct":26},"参与建设工程质量事故分析",{"id":510,"libraryId":5,"type":55,"typeLabel":56,"stem":511,"options":512,"answer":20,"analysis":37},1143124,"下列影响项目质量的环境因素中，属于管理环境因素的是（ ）。（2016）",[513,515,517,519],{"key":20,"text":514,"correct":26},"项目现场施工组织系统",{"key":24,"text":516,"correct":22},"项目所在地建筑市场规范程度",{"key":28,"text":518,"correct":22},"项目所在地政府的工程质量监督",{"key":31,"text":520,"correct":22},"项目咨询公司的服务水平",{"id":522,"libraryId":5,"type":55,"typeLabel":56,"stem":523,"options":524,"answer":31,"analysis":37},1143126,"下列项目质量风险中，属于管理风险的是（）（2014）",[525,527,529,531],{"key":20,"text":526,"correct":22},"项目实施人员对工程技术的应用不当",{"key":24,"text":528,"correct":22},"社会上的腐败现象和违法现象",{"key":28,"text":530,"correct":22},"采用不够成熟的新结构、新技术、新工艺",{"key":31,"text":532,"correct":26},"工程质量责任单位的质量管理体系存在缺陷",{"id":534,"libraryId":5,"type":55,"typeLabel":56,"stem":535,"options":536,"answer":20,"analysis":37},1143128,"某施工总承包单位依法将自己没有足够把握实施的防水工程分包给有经验的分包单位，属于质量风险应对的（ ）策略。（2015）",[537,539,541,543],{"key":20,"text":538,"correct":26},"转移",{"key":24,"text":540,"correct":22},"规避",{"key":28,"text":542,"correct":22},"减轻",{"key":31,"text":544,"correct":22},"自留",{"id":546,"libraryId":5,"type":55,"typeLabel":56,"stem":547,"options":548,"answer":24,"analysis":37},1143130,"关于工程项目质量风险识别的说法，正确的是（ ）。（2016）",[549,551,553,555],{"key":20,"text":550,"correct":22},"从风险产生的原因分析，质量风险分为自然风险、施工风险、设计风险",{"key":24,"text":552,"correct":26},"可按风险责任单位和项目实施阶段分别进行风险识别",{"key":28,"text":554,"correct":22},"因项目实施人员自身技术水平局限造成错误的质量风险属于管理风险",{"key":31,"text":556,"correct":22},"风险识别的步骤是，分析每种风险的促发因素→画出质量风险结构层次图→将结果汇总成质量风险识别报告",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":571,"analysis":37},1143131,"关于风险对策的说法，正确的有（ ） （2015）",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"编制生产安全事故应急预案是生产者安全风险规避策略",{"key":24,"text":564,"correct":22},"招标人要求中标人提交履约担保是招标人合同风险减轻策略",{"key":28,"text":566,"correct":26},"承包商设立质量缺陷风险基金是承包商的质量风险自留策略",{"key":31,"text":568,"correct":26},"承包商合理安排施工工期，进度计划，避开可能发生的自然灾害是承包商质量风险规避策略",{"key":34,"text":570,"correct":26},"依法组成联合体承接大型工程项目是承包商的风险转移策略","CDE",{"id":573,"libraryId":5,"type":55,"typeLabel":56,"stem":574,"options":575,"answer":31,"analysis":37},1143134,"“建设工程项目法人决策的理性化程度以及建筑企业经营者的经营管理理念”属于影响建设工程质量的（ ）。（2015）",[576,578,580,582],{"key":20,"text":577,"correct":22},"管理环境因素",{"key":24,"text":579,"correct":22},"人的因素",{"key":28,"text":581,"correct":22},"方法的因素",{"key":31,"text":583,"correct":26},"社会环境因素",{"id":585,"libraryId":5,"type":55,"typeLabel":56,"stem":586,"options":587,"answer":24,"analysis":37},1143136,"在工程勘察设计、招标采购、施工安装、竣工验收等各个阶转，建设工程项目参与各方的质量控制，均应围绕致力于满足( )的质量总目标而展开。（2013）",[588,590,592,594],{"key":20,"text":589,"correct":22},"法律法规",{"key":24,"text":591,"correct":26},"业主要求",{"key":28,"text":593,"correct":22},"工程建设标准",{"key":31,"text":595,"correct":22},"设计文件",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":610,"analysis":37},1143138,"根据《质量管理体系基础和术语》(GB\u002FT 19000--2008\u002FIS09000：2005)，质量控制室质量管理的一部分，是致力于满足质量要求的一系列相关活动，这些活动主要包括（）（2013）",[600,602,604,606,608],{"key":20,"text":601,"correct":26},"设定目标",{"key":24,"text":603,"correct":22},"质量策划",{"key":28,"text":605,"correct":26},"测量结果",{"key":31,"text":607,"correct":26},"评价",{"key":34,"text":609,"correct":26},"纠偏","ACDE",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":37},1143140,"下列影响建设工程项目质量的环境因素中，属于劳动作业环境因素的有( )。（2012）",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"照明方式",{"key":24,"text":618,"correct":22},"地下水位置",{"key":28,"text":620,"correct":22},"风力等级",{"key":31,"text":622,"correct":22},"验收程序",{"key":34,"text":624,"correct":26},"围挡设施","AE",{"id":627,"libraryId":5,"type":55,"typeLabel":56,"stem":628,"options":629,"answer":28,"analysis":37},1143142,"（2019年真题）下列质量风险应对策略中,属于风险转移策略的是（）。",[630,632,634,636],{"key":20,"text":631,"correct":22},"施工单位合理安排工期,避开可能发生的自然灾害对质量的影响",{"key":24,"text":633,"correct":22},"施工单位在施工中有针对性地制定质量事故应急预案",{"key":28,"text":635,"correct":26},"建设单位在工程发包时,要求承包单位提供履约担保",{"key":31,"text":637,"correct":22},"建设单位在工程预算价格中预留一定比例的不可预见费",{"id":639,"libraryId":5,"type":55,"typeLabel":56,"stem":640,"options":641,"answer":20,"analysis":37},1143143,"（2019年真题）国内实行建筑企业资质管理制度，属于控制建设工程项目质量影响因素的( )。",[642,643,645,646],{"key":20,"text":579,"correct":26},{"key":24,"text":644,"correct":22},"管理因素",{"key":28,"text":581,"correct":22},{"key":31,"text":647,"correct":22},"环境因素",[649,652,655,658,661,664],{"id":55,"name":650,"category":7,"favorite":651},"领导干部任职前廉政法规知识测试题",92,{"id":653,"name":654,"category":7,"favorite":55},595,"建筑结构与设备",{"id":656,"name":657,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":659,"name":660,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":662,"name":663,"category":7,"favorite":8},534,"BIM工程师",{"id":665,"name":663,"category":7,"favorite":8},535]