[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":624},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,46,50,2721,[13,38,53,68,83,97,109,124,136,148,160,171,183,195,209,221,233,246,254,266,278,290,304,313,325,337,345,354,368,376,391,405,417,429,441,453,461,476,491,503,512,519,527,537,545,557,569,581,596,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1142911,2,"多选题","某工程双代号网络计划如下图所示(时间单位：天)，图中已标出各项工作的最早开始时间ES和最迟开始时间LS。该计划表明( )。（2012）",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","工作1-3的总时差和自由时差相等",true,{"key":24,"text":25,"correct":22},"B","工作2-6的总时差和自由时差相等",{"key":27,"text":28,"correct":22},"C","工作3-5的总时差和自由时差分别为2和0天",{"key":30,"text":31,"correct":22},"D","工作5-7的总时差和自由时差相等",{"key":33,"text":34,"correct":35},"E","工作2-4和工作3-6均为关键工作",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1142915,"下图所示的双代号时标网络计划，执行到第4周末及第10周末时，检查其进度如图前锋线所示，检查结果表明( )。（2012）",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"第4周末检查时工作B拖后1周，但不影响工期",{"key":24,"text":45,"correct":22},"第4周末检查时工作A拖后1周，影响工期1周",{"key":27,"text":47,"correct":35},"第10周末检查时工作I提前1周，可使工期提前1周",{"key":30,"text":49,"correct":22},"第10周末检查时工作G拖后1周，但不影响工期",{"key":33,"text":51,"correct":35},"在第5周到第10周内，工作F和工作I的实际进度正常","BD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1142918,"某工程网络计划中，工作N的自由时差为5天，计划执行过程中检查发现，工作N的工作时间延后了3天，其他工作均正常，此时（ ）。2017",[57,59,61,63,65],{"key":20,"text":58,"correct":35},"工作N的总时差不变，自由时差减少3天",{"key":24,"text":60,"correct":22},"总工期不会延长",{"key":27,"text":62,"correct":22},"工作N的总时差减少3天",{"key":30,"text":64,"correct":22},"工作N的最早完成时间推迟3天",{"key":33,"text":66,"correct":35},"工作N将会影响紧后工作","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1142922,"在项目实施阶段，项目总进度应包括（ ）。2017",[72,74,76,78,80],{"key":20,"text":73,"correct":35},"项目建议书编制进度",{"key":24,"text":75,"correct":22},"设计工程进度",{"key":27,"text":77,"correct":22},"招标工作进度",{"key":30,"text":79,"correct":35},"项目投产运行工作进度",{"key":33,"text":81,"correct":22},"工程施工和设备安装进度","BCE",{"id":84,"libraryId":5,"type":85,"typeLabel":86,"stem":87,"options":88,"answer":20,"analysis":37},1142925,1,"单选题","根据《工程网络计划技术规程》JQJ\u002FT121-2015，网络图存在的绘图错误是（ ）。2017",[89,91,93,95],{"key":20,"text":90,"correct":22},"编号相同的工作",{"key":24,"text":92,"correct":35},"多个起点节点",{"key":27,"text":94,"correct":35},"相同的节点编号",{"key":30,"text":96,"correct":35},"无箭尾节点的箭线",{"id":98,"libraryId":5,"type":85,"typeLabel":86,"stem":99,"options":100,"answer":30,"analysis":37},1142928,"某工程双代号网络计划如下图，其计算工期是（ ）天。",[101,103,105,107],{"key":20,"text":102,"correct":35},"11",{"key":24,"text":104,"correct":35},"13",{"key":27,"text":106,"correct":35},"15",{"key":30,"text":108,"correct":22},"22",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1142932,"某工程工作逻辑关系如下表，C工作的紧后工作有（ ）。2017",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"工作H",{"key":24,"text":116,"correct":35},"工作G",{"key":27,"text":118,"correct":22},"工作F",{"key":30,"text":120,"correct":22},"工作E",{"key":33,"text":122,"correct":35},"工作D","ACD",{"id":125,"libraryId":5,"type":85,"typeLabel":86,"stem":126,"options":127,"answer":20,"analysis":37},1142935,"某网络计划如下图，逻辑关系正确的是（ ）。（2015）",[128,130,132,134],{"key":20,"text":129,"correct":22},"E的紧前工作是BD",{"key":24,"text":131,"correct":35},"A完成后同时进行CF",{"key":27,"text":133,"correct":35},"AB均完成后进行E",{"key":30,"text":135,"correct":35},"F的紧前工作是DE",{"id":137,"libraryId":5,"type":85,"typeLabel":86,"stem":138,"options":139,"answer":20,"analysis":37},1142938,"根据《工程网络计划技术规程》JQJ\u002FT121-2015，直接法绘制时标网络计划的第一步工作是（ ）。2017",[140,142,144,146],{"key":20,"text":141,"correct":22},"将起点节点定位在时标计划表的起始刻度线上",{"key":24,"text":143,"correct":35},"绘制时标网络计划",{"key":27,"text":145,"correct":35},"计算各工作的最早时间",{"key":30,"text":147,"correct":35},"确定各节点的位置号",{"id":149,"libraryId":5,"type":85,"typeLabel":86,"stem":150,"options":151,"answer":27,"analysis":37},1142941,"某单代号网络计划如下图，工作 A、D之间的时间间隔是（ ）天。",[152,154,156,158],{"key":20,"text":153,"correct":35},"0",{"key":24,"text":155,"correct":35},"1",{"key":27,"text":157,"correct":22},"2",{"key":30,"text":159,"correct":35},"3",{"id":161,"libraryId":5,"type":85,"typeLabel":86,"stem":162,"options":163,"answer":24,"analysis":37},1142943,"某单代号网络计划如下图（时间单位：天），其计算工期为（ ）天。（2016）",[164,166,168,169],{"key":20,"text":165,"correct":35},"20",{"key":24,"text":167,"correct":22},"26",{"key":27,"text":108,"correct":35},{"key":30,"text":170,"correct":35},"24",{"id":172,"libraryId":5,"type":85,"typeLabel":86,"stem":173,"options":174,"answer":24,"analysis":37},1142945,"关于施工进度计划调整的说法，正确的是（ ）。（2015）",[175,177,179,181],{"key":20,"text":176,"correct":35},"当资源供应发生异常时，可调整工作的工艺关系",{"key":24,"text":178,"correct":22},"当实际进度计划拖后时，可缩短关键工作持续时间",{"key":27,"text":180,"correct":35},"为充分利用资源、降低成本，应减少资源的投入",{"key":30,"text":182,"correct":35},"任何情况下均不允许增减工作项目",{"id":184,"libraryId":5,"type":85,"typeLabel":86,"stem":185,"options":186,"answer":20,"analysis":37},1142947,"双代号时标网络计划中，当某工作之后有虚工作时，则该工作的自由时差为( )。（2013）",[187,189,191,193],{"key":20,"text":188,"correct":22},"该工作的波形线的水平长度",{"key":24,"text":190,"correct":35},"本工作与紧后工作间波形线水平长度和的最大值",{"key":27,"text":192,"correct":35},"本工作与紧后工作间波形线水平长度和的最小值",{"key":30,"text":194,"correct":35},"后续所有线路段中波形线中水平长度和的最小值",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":208,"analysis":37},1142951,"某工程双代号时标网络计划执行到第 4周末和第 10周末时，检查其实际进度如下图前锋线所示，检查结果表明()。（2015）",[199,201,203,205,207],{"key":20,"text":200,"correct":35},"第4周末检查时工作B拖后1周，但不影响总工期",{"key":24,"text":202,"correct":22},"第4周末检查时工作A拖后1周，影响总工期1周",{"key":27,"text":204,"correct":22},"第10周末检查时工作G拖后1周，但不影响总工期",{"key":30,"text":206,"correct":35},"第10周末检查时工作I提前1周，可使总工期提前1周",{"key":33,"text":51,"correct":35},"BC",{"id":210,"libraryId":5,"type":85,"typeLabel":86,"stem":211,"options":212,"answer":27,"analysis":37},1142955,"某双代号时标网络计划如下图，如 B、 D、I工作共用同一台施工机械且按B-D-I顺序施工，则对网络计划可能造成的影响是（ ）。（2016）",[213,215,217,219],{"key":20,"text":214,"correct":35},"总工期不会延长，但施工机械会在现场闲置1周",{"key":24,"text":216,"correct":35},"总工期会延长1周，但施工机械在现场不会闲置",{"key":27,"text":218,"correct":22},"总工期不会延长，且施工机械在现场不会闲置",{"key":30,"text":220,"correct":35},"总工期会延长1周，且施工机械会在现场闲置1周",{"id":222,"libraryId":5,"type":85,"typeLabel":86,"stem":223,"options":224,"answer":27,"analysis":37},1142958,"关于单代号搭接网络计划时距的说法，正确的是（）。（2014）",[225,227,229,231],{"key":20,"text":226,"correct":35},"时距是某工作具有的特殊时间参数",{"key":24,"text":228,"correct":35},"相邻工作间只能有一种时距的限制",{"key":27,"text":230,"correct":22},"时距一般标注在箭头的上方",{"key":30,"text":232,"correct":35},"时距是时间间隔的特殊形式",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":82,"analysis":37},1142961,"某分部工程双代号网络划如下图所示，其存在的绘图错误有( )。（2013）",[237,239,240,242,244],{"key":20,"text":238,"correct":35},"多个终点节点",{"key":24,"text":92,"correct":22},{"key":27,"text":241,"correct":22},"节点编号有误",{"key":30,"text":243,"correct":35},"存在循环回路",{"key":33,"text":245,"correct":22},"有多余虚工作",{"id":247,"libraryId":5,"type":85,"typeLabel":86,"stem":248,"options":249,"answer":24,"analysis":37},1142964,"某工程双代号时标网络计划如下图（时间单位：天），工作A的总时差为（ ）天。（2015）",[250,251,252,253],{"key":20,"text":153,"correct":35},{"key":24,"text":155,"correct":22},{"key":27,"text":157,"correct":35},{"key":30,"text":159,"correct":35},{"id":255,"libraryId":5,"type":85,"typeLabel":86,"stem":256,"options":257,"answer":20,"analysis":37},1142967,"关于关键工作和关键线路的说法正确的是（）。（2014）",[258,260,262,264],{"key":20,"text":259,"correct":22},"关键线路上的工作全部是关键工作",{"key":24,"text":261,"correct":35},"关键工作不能再非关键线路上",{"key":27,"text":263,"correct":35},"关键线路上不允许出现虚工作",{"key":30,"text":265,"correct":35},"关键线路上的工作总时差均为零",{"id":267,"libraryId":5,"type":85,"typeLabel":86,"stem":268,"options":269,"answer":20,"analysis":37},1142969,"某双代号网络计划中，工作M的自由时差3天，总时差5天。在进度计划实施检查中发现工作M实际进度落后，且影响总工期2天。在其他工作均正常的前提下，工作M的实际进度落后（ ）天。（2016）",[270,272,274,276],{"key":20,"text":271,"correct":22},"7",{"key":24,"text":273,"correct":35},"5",{"key":27,"text":275,"correct":35},"6",{"key":30,"text":277,"correct":35},"8",{"id":279,"libraryId":5,"type":85,"typeLabel":86,"stem":280,"options":281,"answer":30,"analysis":37},1142972,"某双代号网络计划中，工作A有两项紧后工作B和 C，工作B和工作C的最早开始时间分别为第13天和第15天，最迟开始时间分别为第19天和第21天；工作A与工作B和工作C的间隔时间分别为0天和2天。如果工作A实际进度拖延7天，则（ ）。（2016）",[282,284,286,288],{"key":20,"text":283,"correct":35},"对工期没有影响",{"key":24,"text":285,"correct":35},"总工期延长2天",{"key":27,"text":287,"correct":35},"总工期延长3天",{"key":30,"text":289,"correct":22},"总工期延长1天",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":52,"analysis":37},1142974,"关于工作总时差、自由时差及相邻两工作间间隔时间关系的说法，正确的有（ ）。（2016）",[294,296,298,300,302],{"key":20,"text":295,"correct":35},"工作的自由时差一定不超过其紧后工作的总时差",{"key":24,"text":297,"correct":22},"工作的自由时差一定不超过其相应的总时差",{"key":27,"text":299,"correct":35},"工作的总时差一定不超过其紧后工作的自由时差",{"key":30,"text":301,"correct":22},"工作的自由时差一定不超过其紧后工作之间的间隔时间",{"key":33,"text":303,"correct":35},"工作的总时差一定不超过其紧后工作之间的间隔时间",{"id":305,"libraryId":5,"type":85,"typeLabel":86,"stem":306,"options":307,"answer":27,"analysis":37},1142978,"某双代号网络计划中。工作M的最早开始时间和最迟开始时间分别为第12天和第15天，其持续时间为5天。工作M有3项紧后工作，它们的最早开始时间分别为第21天、第24天和第28天，则工作M的自由时差为（ ）天。（2016）",[308,309,310,312],{"key":20,"text":155,"correct":35},{"key":24,"text":159,"correct":35},{"key":27,"text":311,"correct":22},"4",{"key":30,"text":273,"correct":35},{"id":314,"libraryId":5,"type":85,"typeLabel":86,"stem":315,"options":316,"answer":27,"analysis":37},1142981,"一般情况下，横道图能反映出工作的（ ）。 （2015）",[317,319,321,323],{"key":20,"text":318,"correct":35},"总时差",{"key":24,"text":320,"correct":35},"最迟开始时间",{"key":27,"text":322,"correct":22},"持续时间",{"key":30,"text":324,"correct":35},"自由时差",{"id":326,"libraryId":5,"type":85,"typeLabel":86,"stem":327,"options":328,"answer":27,"analysis":37},1142985,"某双代号网络图如下图所示，正确的是（）。 （2014）",[329,331,333,335],{"key":20,"text":330,"correct":35},"工作 C、D应同时完成",{"key":24,"text":332,"correct":35},"工作B的紧后工作只有工作 C、D",{"key":27,"text":334,"correct":22},"工作D完成后即可进行工作G",{"key":30,"text":336,"correct":35},"工作完成后即可进行工作F",{"id":338,"libraryId":5,"type":85,"typeLabel":86,"stem":339,"options":340,"answer":27,"analysis":37},1142987,"下列双代号时标网络计划中，关键线路有（ ）条。 （2015）",[341,342,343,344],{"key":20,"text":273,"correct":35},{"key":24,"text":311,"correct":35},{"key":27,"text":159,"correct":22},{"key":30,"text":157,"correct":35},{"id":346,"libraryId":5,"type":85,"typeLabel":86,"stem":347,"options":348,"answer":27,"analysis":37},1142991,"已知工作F有且仅有两项并行的紧后工作G和 H，G工作的最迟开始时间为第12天，最早开始时间为第8天；H工作的最迟完成时间为第14天，最早完成时间为第12天；工作F与 G、H的时间间隔分别为4天和5天，则F工作的总时差为（ ）天。 （2015）",[349,350,351,352],{"key":20,"text":153,"correct":35},{"key":24,"text":273,"correct":35},{"key":27,"text":271,"correct":22},{"key":30,"text":353,"correct":35},"9",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":82,"analysis":37},1142995,"在双代号网络图中，虚箭线的作用有（ ）。（2015）",[358,360,362,364,366],{"key":20,"text":359,"correct":35},"指向",{"key":24,"text":361,"correct":22},"联系",{"key":27,"text":363,"correct":22},"区分",{"key":30,"text":365,"correct":35},"过桥",{"key":33,"text":367,"correct":22},"断路",{"id":369,"libraryId":5,"type":85,"typeLabel":86,"stem":370,"options":371,"answer":27,"analysis":37},1142998,"某工作有且仅有两个紧后工作 C、D其中C工作最早开始时间为10（计算机坐标系，下同）最迟完成时间18，持续时间为5天；D工作最早开始时间为10，最迟完成时间20，持续时间为6天；该工作与C工作时间的时间间隔为2天，与D工作的时间间隔为4天。则该工作时间的总时差为（）天。（2014）",[372,373,374,375],{"key":20,"text":159,"correct":35},{"key":24,"text":311,"correct":35},{"key":27,"text":273,"correct":22},{"key":30,"text":275,"correct":35},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":390,"analysis":37},1143000,"某工程双代号时标网络计划，在第 5 天末进行检查得到的实际进度前锋线如下图所示，正确的有( ) （2014）",[380,382,384,386,388],{"key":20,"text":381,"correct":35},"H工作还剩1天机动时间",{"key":24,"text":383,"correct":35},"总工期缩短1天",{"key":27,"text":385,"correct":35},"H工作影响总工期1天",{"key":30,"text":387,"correct":22},"E工作提前1天完成",{"key":33,"text":389,"correct":22},"G工作进度落后1天","DE",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":404,"analysis":37},1143003,"某单代号网络如下图所示，存在的错误有（）。（2014）",[395,396,398,400,402],{"key":20,"text":92,"correct":22},{"key":24,"text":397,"correct":22},"有多余虚箭线",{"key":27,"text":399,"correct":22},"有交叉箭线",{"key":30,"text":401,"correct":35},"没有终点节点",{"key":33,"text":403,"correct":35},"出现循环回路","ABC",{"id":406,"libraryId":5,"type":85,"typeLabel":86,"stem":407,"options":408,"answer":27,"analysis":37},1143009,"关于虚工作的说法，正确的说法是（ ）。 （2015）",[409,411,413,415],{"key":20,"text":410,"correct":35},"虚工作只在双代号网络计划中存在",{"key":24,"text":412,"correct":35},"虚工作一般不消耗资源单占用时间",{"key":27,"text":414,"correct":22},"虚工作可以正确表达工作间逻辑关系",{"key":30,"text":416,"correct":35},"双代号时标网络计划中虚工作用波形表示",{"id":418,"libraryId":5,"type":85,"typeLabel":86,"stem":419,"options":420,"answer":20,"analysis":37},1143011,"某工程网络计划中，工作M的自由时差为2天，总时差为5天。实施中进度检查时发现该工作的持续时间延长了4天，则工作M的实际进度( )。（2012）",[421,423,425,427],{"key":20,"text":422,"correct":22},"不影响总工期，但将其紧后工作的最早开始时间推迟2天",{"key":24,"text":424,"correct":35},"既不影响总工期，也不影响其后结工作的正常进行",{"key":27,"text":426,"correct":35},"将使总工期延长4天，但不影响期后续工作的正常进行",{"key":30,"text":428,"correct":35},"将其后续工作的开始时间推迟4天，并使总工期延长1天",{"id":430,"libraryId":5,"type":85,"typeLabel":86,"stem":431,"options":432,"answer":30,"analysis":37},1143014,"关于进度计划调整的说法，正确的是( )。（2012）",[433,435,437,439],{"key":20,"text":434,"correct":35},"网络计划中某项工作进度超前，不需要进行计划的调整",{"key":24,"text":436,"correct":35},"非关键线路上的工作不需进行调整",{"key":27,"text":438,"correct":35},"当某项工作实际进度拖延的时间超过其总时差时，只需考虑总工期的限制条件",{"key":30,"text":440,"correct":22},"根据计划检查的结果在必要时进行计划的调整",{"id":442,"libraryId":5,"type":85,"typeLabel":86,"stem":443,"options":444,"answer":24,"analysis":37},1143016,"根据下列逻辑关系表绘制的双代号网络图如下图所示，其存在的错误是( )。（2012）",[445,447,449,451],{"key":20,"text":446,"correct":35},"节点编号不对",{"key":24,"text":448,"correct":22},"有多个终点节点",{"key":27,"text":450,"correct":35},"逻辑关系不对",{"key":30,"text":452,"correct":35},"有多个起点节点",{"id":454,"libraryId":5,"type":85,"typeLabel":86,"stem":455,"options":456,"answer":24,"analysis":37},1143018,"某双代号时标网络计划如下图，工作G的最迟开始时间是第（ ）天。",[457,458,459,460],{"key":20,"text":311,"correct":35},{"key":24,"text":273,"correct":22},{"key":27,"text":275,"correct":35},{"key":30,"text":271,"correct":35},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":475,"analysis":37},1143020,"关于判别网络计划关键线路的说法，正确的有( )(2016一级建造师考试真题)",[465,467,469,471,473],{"key":20,"text":466,"correct":35},"相邻两工作间的间隔时间均为零的线路",{"key":24,"text":468,"correct":35},"双代号网络计划中无虚箭线的线路",{"key":27,"text":470,"correct":22},"总持续时间最长的线路",{"key":30,"text":472,"correct":35},"双代号网络计划中由关键节点组成的线路",{"key":33,"text":474,"correct":22},"时标网络计划中无波形线的线路","CE",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":490,"analysis":37},1143022,"某双代号网络计划如下图（图中粗实线为关键工作），若计划工期等于计算工期，则自由时差一定等于总时差且不为零的工作有（ ）。2017",[480,482,484,486,488],{"key":20,"text":481,"correct":22},"①－②",{"key":24,"text":483,"correct":35},"③－⑤",{"key":27,"text":485,"correct":35},"②－⑦",{"key":30,"text":487,"correct":22},"④－⑤",{"key":33,"text":489,"correct":22},"⑥－⑧","ADE",{"id":492,"libraryId":5,"type":85,"typeLabel":86,"stem":493,"options":494,"answer":27,"analysis":37},1143024,"某双代号网络计划中，假设计划工期等于计算工期，且工作M的开始节点和完成节点均为关键节点。关于工作M的说法，正确的是（ ）。（2016）",[495,497,499,501],{"key":20,"text":496,"correct":35},"工作M是关键工作",{"key":24,"text":498,"correct":35},"工作M的自由时差为零",{"key":27,"text":500,"correct":22},"工作M的总时差等于自由时差",{"key":30,"text":502,"correct":35},"工作M的总时差大于自由时差",{"id":504,"libraryId":5,"type":85,"typeLabel":86,"stem":505,"options":506,"answer":24,"analysis":37},1143026,"某工作间逻辑关系如下图，则正确的是（ ）。2017 A: A、B均完成后同时进行 C、D B: A、B均完成后进行D C: A、",[507,509,510],{"key":20,"text":508,"correct":35},"C均完成后同时进行",{"key":24,"text":33,"correct":22},{"key":27,"text":511,"correct":35},"C完成后进行E",{"id":513,"libraryId":5,"type":85,"typeLabel":86,"stem":514,"options":515,"answer":37,"analysis":37},1143027,"由分部工程双代号网络计划如下图所示，则工作C的自由时差为（ ）天。 （2013）",[516,517,518],{"key":20,"text":155,"correct":35},{"key":24,"text":157,"correct":35},{"key":27,"text":159,"correct":35},{"id":520,"libraryId":5,"type":85,"typeLabel":86,"stem":521,"options":522,"answer":30,"analysis":37},1143029,"（2019年真题）某工程网络计划图如下，工作D的最迟开始时间是第（）天。",[523,524,525,526],{"key":20,"text":159,"correct":35},{"key":24,"text":273,"correct":35},{"key":27,"text":275,"correct":35},{"key":30,"text":277,"correct":22},{"id":528,"libraryId":5,"type":85,"typeLabel":86,"stem":529,"options":530,"answer":20,"analysis":37},1143031,"（2019年真题）某装饰工程共有墙纸裱糊、墙面软包两项相互独立的施工过程,每项施工过程包括备料、运输、现场施工三项工作,墙纸裱糊各项工作的持续时间分别为2、1、6天，墙面软包各项工作的时间分别是3、2、4天;由于运输工具的限制,每天只能运输一项施工过程的材料，该装饰工程的最短施工工期是（）。",[531,532,534,535],{"key":20,"text":353,"correct":22},{"key":24,"text":533,"correct":35},"10",{"key":27,"text":102,"correct":35},{"key":30,"text":536,"correct":35},"12",{"id":538,"libraryId":5,"type":85,"typeLabel":86,"stem":539,"options":540,"answer":27,"analysis":37},1143033,"（2019年真题）某工程持续时间2天，有两项紧前工作和三项紧后工作，紧前工作的最早开始时间分别是第3天、第6天（计算坐标系），对应的持续时间分别是5天、1天；紧后工作的最早开始时间分别是第15天、第17天、第19天，对应的总时差分别是3天、2天、0天。该工作的总时差是（ ）天。",[541,542,543,544],{"key":20,"text":353,"correct":35},{"key":24,"text":533,"correct":35},{"key":27,"text":277,"correct":22},{"key":30,"text":104,"correct":35},{"id":546,"libraryId":5,"type":85,"typeLabel":86,"stem":547,"options":548,"answer":30,"analysis":37},1143035,"（2019年真题）关于如下横道图进度计划的说法正确的是（）。",[549,551,553,555],{"key":20,"text":550,"correct":35},"如果不要求工程连续，工期可压缩1周",{"key":24,"text":552,"correct":35},"圈梁浇筑和基础回填间的流水步距是2周",{"key":27,"text":554,"correct":35},"所有工作都没有机动时间",{"key":30,"text":556,"correct":22},"圈梁浇筑工作的流水节拍是2周",{"id":558,"libraryId":5,"type":85,"typeLabel":86,"stem":559,"options":560,"answer":27,"analysis":37},1143037,"（2019年真题）关于单代号网络计划绘图规则的说法，正确的是（）。",[561,563,565,567],{"key":20,"text":562,"correct":35},"不允许出现虚工作",{"key":24,"text":564,"correct":35},"箭线不能交叉",{"key":27,"text":566,"correct":22},"不能出现双向箭头的连线",{"key":30,"text":568,"correct":35},"只能有一个起点节点，但可以有多个终点节点",{"id":570,"libraryId":5,"type":85,"typeLabel":86,"stem":571,"options":572,"answer":30,"analysis":37},1143039,"（2019年真题）关于双代号时标网络计划的说法，正确的是( )。",[573,575,577,579],{"key":20,"text":574,"correct":35},"能在图上直接显示各项工作的最迟开始与完成时间",{"key":24,"text":576,"correct":35},"工作间的逻辑关系可以设法表达，但不易表达清楚",{"key":27,"text":578,"correct":35},"没有虚箭线，绘图比较简单",{"key":30,"text":580,"correct":22},"工作的自由时差可以通过比较与其紧后工作间隔时间(取最小值)",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":595,"analysis":37},1143040,"（2019年真题）关于网络计划中工作自由时差（FFi或ij）说法，正确的有（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":35},"自由时差是在不影响工期的前提下，工作所具有的机动时间",{"key":24,"text":588,"correct":22},"FFi=min{LAGij}（LAGij是本工作和紧后工作之间的间隔时间）",{"key":27,"text":590,"correct":35},"FFij=min{ESjk-EFjk}（ESjk是所有紧后工作的最早开始时间）",{"key":30,"text":592,"correct":22},"FFij=min{ETj}-ETi -Dij(ETj是指所有紧后工作开始节点的最早时间)",{"key":33,"text":594,"correct":22},"时标网络计划中，自由时差是该工作与紧后工作间最短波形线的长度","BDE",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":208,"analysis":37},1143042,"（2019年真题）关于双代号网络计划中线路的说法，正确的有（）。",[600,602,604,606,608],{"key":20,"text":601,"correct":35},"长度最短的线路称为非关键线路",{"key":24,"text":603,"correct":22},"一个网络图中可能有一条或多条关键线路",{"key":27,"text":605,"correct":22},"线路中各项工作持续时间之和就是该线路的长度",{"key":30,"text":607,"correct":35},"线路中各节点应从小到大连续编号",{"key":33,"text":609,"correct":35},"没有虚工作的线路称为关键线路",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":67,"analysis":37},1143044,"（2019年真题）关于横道图进度计划的说法，正确的有( )。",[614,616,618,620,622],{"key":20,"text":615,"correct":35},"便于进行资源化和调整",{"key":24,"text":617,"correct":22},"能直接显示工作的开始和完成时间",{"key":27,"text":619,"correct":22},"计划调整工作量大",{"key":30,"text":621,"correct":22},"可将工作简要说明直接放在横道上",{"key":33,"text":623,"correct":35},"有严谨的时间参数计算，可使用电脑自动编制",[625,628,631,634,637,640],{"id":85,"name":626,"category":7,"favorite":627},"领导干部任职前廉政法规知识测试题",92,{"id":629,"name":630,"category":7,"favorite":85},595,"建筑结构与设备",{"id":632,"name":633,"category":7,"favorite":85},715,"招标采购专业知识与法律法规",{"id":635,"name":636,"category":7,"favorite":85},848,"市政方向-通用基础",{"id":638,"name":639,"category":7,"favorite":8},534,"BIM工程师",{"id":641,"name":639,"category":7,"favorite":8},535]