[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":647},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,45,50,2721,[13,34,52,64,76,88,100,112,123,134,146,158,170,185,197,209,224,236,248,260,272,284,296,308,320,332,342,357,371,383,395,407,419,434,446,458,473,484,496,506,518,533,545,554,569,581,596,608,620,632],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1142849,1,"单选题","建设工程项目施工成本管理涉及的时间范围是（ ）。（2016）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","从工程投标报价开始至项目保证金返还为止",true,{"key":24,"text":25,"correct":26},"B","从施工图预算开始至项目运用为止",false,{"key":28,"text":29,"correct":26},"C","从工程投标报价开始至项目竣工结算完成为止",{"key":31,"text":32,"correct":26},"D","从施工准备开始至项目竣工结算完成为止","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1142850,2,"多选题","施工成本分析是在成本形成过程中，将施工项目的成本核算资料与（ ）进行比较，以了解成本变动情况。（2016）",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"类似施工项目的预算成本",{"key":24,"text":43,"correct":26},"本施工项目的实际成本",{"key":28,"text":45,"correct":22},"本施工项目的目标成本",{"key":31,"text":47,"correct":22},"本施工项目的预算成本",{"key":49,"text":50,"correct":22},"E","类似施工项目的实际成本","CDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1142851,"施工成本核算要求的归集“三同步”是指（ ）的取值范围应当一致。（2015）",[56,58,60,62],{"key":20,"text":57,"correct":22},"形象进度、产值统计、实际成本",{"key":24,"text":59,"correct":26},"成本预测、成本计划、成本分析",{"key":28,"text":61,"correct":26},"目标成本、预算成本、实际成本",{"key":31,"text":63,"correct":26},"人工成本、材料成本、机械成本",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},1142852,"关于施工成本及其管理的说法，正确的是()。（2013）",[68,70,72,74],{"key":20,"text":69,"correct":26},"施工成本是指施工消耗的构成工程实体的各项费用支出。",{"key":24,"text":71,"correct":22},"施工成本管理就是在保证工期和满足质量要求的情况下，采取相应措施把成本控制在计划范围内，并最大限度的节约成本。",{"key":28,"text":73,"correct":26},"施工成本预测是以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率及降低成本措施的书面方案",{"key":31,"text":75,"correct":26},"施工成本考核是在施工成本核算的基础上，对成本形成过程和影响成本升降的因素进行分析，以寻求进一不降低成本的途径。",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":31,"analysis":33},1142853,"关于建设工程项目施工成本的说法，正确的是（ ）。（2016）",[80,82,84,86],{"key":20,"text":81,"correct":26},"施工成本计划是对未来的成本水平和发展趋势作出估计",{"key":24,"text":83,"correct":26},"施工成本核算是通过实际成本与计划的对比，评定成本计划的完成情况",{"key":28,"text":85,"correct":26},"施工成本考核是通过成本的归集和分配，计算施工项目的实际成本",{"key":31,"text":87,"correct":22},"施工成本管理是通过采取措施，把成本控制在计划范围内，并最大程度的节约成本",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1142854,"下列施工成本管理的措施中，属于组织措施的是（）。 （2014）",[92,94,96,98],{"key":20,"text":93,"correct":26},"选用合适的分包项目合同结构",{"key":24,"text":95,"correct":22},"确定合理的施工成本控制工作流程",{"key":28,"text":97,"correct":26},"确定合适的施工机械，设备使用方案",{"key":31,"text":99,"correct":26},"对施工成本管理目标进行风险分析，并制定防范性对策",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":28,"analysis":33},1142855,"关于施工成本分析的说法，正确的是（ ）。（2014）",[104,106,108,110],{"key":20,"text":105,"correct":26},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":107,"correct":26},"施工成本分析是科学的预测成本水平及其发展趋势",{"key":28,"text":109,"correct":22},"施工成本分析贯穿于施工成本管理的全过程",{"key":31,"text":111,"correct":26},"施工成本分析是预测成本控制的薄弱环节",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":20,"analysis":33},1142856,"下列施工成本管理的措施中，属于组织措施的是( )。（2012）",[116,118,120,121],{"key":20,"text":117,"correct":22},"加强施工定额管理和施工任务单管理，控制活劳动和物化劳动消耗",{"key":24,"text":119,"correct":26},"确定最佳的施工方案",{"key":28,"text":99,"correct":26},{"key":31,"text":122,"correct":26},"选用合适的合同结构",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},1142857,"（2019年真题）建设工程项目施工成本控制涉及的时间范围是( )。",[127,129,131,132],{"key":20,"text":128,"correct":26},"从施工准备开始至项目交付使用为止",{"key":24,"text":130,"correct":26},"从工程投标开始至项目竣工结算完成为止",{"key":28,"text":32,"correct":26},{"key":31,"text":133,"correct":22},"从工程投标开始至项目保证金返还为止",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":28,"analysis":33},1142858,"（2019年真题）建设工程项目施工成本管理是指在保证工期和质量要求的情况下,采用相应管理措施（）",[138,140,142,144],{"key":20,"text":139,"correct":26},"全面分析实际成本的变动状态",{"key":24,"text":141,"correct":26},"严格控制计划成本的变动范围",{"key":28,"text":143,"correct":22},"将实际成本控制在计划范围内",{"key":31,"text":145,"correct":26},"把计划成本控制在目标范围内",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":28,"analysis":33},1142859,"结合项目的施工组织设计及自然地理条件，降低材料的库存成本和运输成本，属于成本管理的（）措施。（2018年真题）",[150,152,154,156],{"key":20,"text":151,"correct":26},"组织",{"key":24,"text":153,"correct":26},"经济",{"key":28,"text":155,"correct":22},"技术",{"key":31,"text":157,"correct":26},"合同",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":31,"analysis":33},1142860,"竣工工程进行现场成本、完全成本核算的目的是分别考核（）。（2018年真题）",[162,164,166,168],{"key":20,"text":163,"correct":26},"企业经营效益、企业社会效益",{"key":24,"text":165,"correct":26},"项目管理绩效、项目管理责任",{"key":28,"text":167,"correct":26},"项目管理责任、企业经营效益",{"key":31,"text":169,"correct":22},"项目管理绩效、企业经营效益",{"id":171,"libraryId":5,"type":36,"typeLabel":37,"stem":172,"options":173,"answer":184,"analysis":33},1142861,"（2020年真题）下列建设工程项目施工生产费用中，属于直接成本的有（ ）",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"支付给生产工人的奖金",{"key":24,"text":177,"correct":22},"周转材料租赁费",{"key":28,"text":179,"correct":26},"管理人员的办公费",{"key":31,"text":181,"correct":26},"管理人员的差旅交通费",{"key":49,"text":183,"correct":22},"施工机具使用费","ABE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},1142862,"（2020年真题）下列施工成本管理措施中，不需要增加额外费用的是（ ）",[189,191,193,195],{"key":20,"text":190,"correct":22},"组织措施",{"key":24,"text":192,"correct":26},"合同措施",{"key":28,"text":194,"correct":26},"技术措施",{"key":31,"text":196,"correct":26},"优化措施",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":33},1142863,"（2020年真题）项目管理机构进行成本核算。核算周期按（ ）确定。",[201,203,205,207],{"key":20,"text":202,"correct":26},"业主方的具体指示",{"key":24,"text":204,"correct":26},"合同约定的核算周期",{"key":28,"text":206,"correct":22},"规定的会计周期",{"key":31,"text":208,"correct":26},"项目实际施工周期",{"id":210,"libraryId":5,"type":36,"typeLabel":37,"stem":211,"options":212,"answer":223,"analysis":33},1142864,"建设工程项目总进度目标论证时，调查研究和收集资料工作包括()",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"收集类似项目进度资料",{"key":24,"text":216,"correct":22},"收集与进度有关的该项组织资料",{"key":28,"text":218,"correct":22},"了解该项目的总体部署",{"key":31,"text":220,"correct":26},"了解有关前期该项目进度目标的确定资料",{"key":49,"text":222,"correct":26},"了解项目的工作编码资料","ABC",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1142865,"某项目部按施工总进度计划、主体工程施工计划、钢筋工程施工计划，构建了承包项目的进度计划系统，则该进度计划系统是按不同（ ）组成的计划系统。",[228,230,232,234],{"key":20,"text":229,"correct":26},"计划功能",{"key":24,"text":231,"correct":26},"项目参与方",{"key":28,"text":233,"correct":22},"计划深度",{"key":31,"text":235,"correct":26},"计划周期",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1142866,"建设工程施工进度控制中，业主方的任务是控制整个项目( )的进度。（2013）",[240,242,244,246],{"key":20,"text":241,"correct":22},"实施阶段",{"key":24,"text":243,"correct":26},"决策阶段",{"key":28,"text":245,"correct":26},"项目全寿命周期",{"key":31,"text":247,"correct":26},"使用阶段",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1142867,"在进行建设工程项目总进度目标控制前，首先应分析和认证（ ）。（2016）",[252,254,256,258],{"key":20,"text":253,"correct":22},"进度目标实现的可能性",{"key":24,"text":255,"correct":26},"进度计划系统的完整性",{"key":28,"text":257,"correct":26},"进度计划方法的适用性",{"key":31,"text":259,"correct":26},"进度控制方法的合理性",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1142868,"关于大型建设工程项目总进度目标论证的说法，正确的是（ ）。（2015）",[264,266,268,270],{"key":20,"text":265,"correct":26},"大型建设工程项目总进度目标论证的核心工作是编制总进度纲要",{"key":24,"text":267,"correct":22},"大型建设工程项目总进度目标论证首先开展的工作是调查研究和收集资料",{"key":28,"text":269,"correct":26},"大型建设工程项目总进度目标的确定应在项目的实施阶段进行",{"key":31,"text":271,"correct":26},"若编制的总进度计划不符合项目的总进度目标，应调整总进度目标",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1142869,"建设工程项目进度控制的过程包括：①收集资料和调查研究；②进度计划的跟踪检查；③编制进度计划；④根据进度偏差情况纠偏或调整进度计划，其正确的工作步骤是（ ）。（2016）",[276,278,280,282],{"key":20,"text":277,"correct":22},"①-③-②-④",{"key":24,"text":279,"correct":26},"①-②-③-④",{"key":28,"text":281,"correct":26},"①-③-④-②",{"key":31,"text":283,"correct":26},"③-①-②-④",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1142870,"建设工程项目在施工时盲目赶工，会导致（ ）。（2015）",[288,290,292,294],{"key":20,"text":289,"correct":26},"安全事故发生的概率减小",{"key":24,"text":291,"correct":26},"施工成本增加的概率减小",{"key":28,"text":293,"correct":26},"文明施工实现的概率增加",{"key":31,"text":295,"correct":22},"质量事故发生的概率增加",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1142871,"关于大型建设工程项目结构分析的说法，正确的是（）（2014）",[300,302,304,306],{"key":20,"text":301,"correct":26},"项目结构分析是将整个项目逐层分解，并确立工作编码",{"key":24,"text":303,"correct":26},"项目结构分析是将项目计划逐层分解，并确立工作目录",{"key":28,"text":305,"correct":26},"项目结构分析是将项目计划逐层分解，并确立工作编码",{"key":31,"text":307,"correct":22},"项目结构分析是将整个项目逐层分解，并确立工作目录",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1142872,"将一个子项目进度计划分解为若干个工作项，属于项目总进度目标论证工作的。( )。（2012）",[312,314,316,318],{"key":20,"text":313,"correct":26},"项目的结构分析",{"key":24,"text":315,"correct":22},"进度计划系统的结构分析",{"key":28,"text":317,"correct":26},"项目的工作编码",{"key":31,"text":319,"correct":26},"各层进度计划的关系协调",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1142873,"为业主方格工作部门和项目个参与方协同工作，可利用（）（2014）",[324,326,328,330],{"key":20,"text":325,"correct":26},"P3项目管理软件",{"key":24,"text":327,"correct":22},"项目信息门户",{"key":28,"text":329,"correct":26},"MSproject",{"key":31,"text":331,"correct":26},"MSVisio",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1142874,"根据建设工程项目总进度目标论证的工作步骤，在完成“项目结构分析”工作之后应立即进行的工作是()。（2013）",[336,338,339,340],{"key":20,"text":337,"correct":26},"调查研究和收集资料",{"key":24,"text":315,"correct":22},{"key":28,"text":317,"correct":26},{"key":31,"text":341,"correct":26},"编制各层进度计划",{"id":343,"libraryId":5,"type":36,"typeLabel":37,"stem":344,"options":345,"answer":356,"analysis":33},1142875,"建设工程项目总进度纲要的主要内容包括( )。（2012）",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"项目实施的总体部署",{"key":24,"text":349,"correct":26},"项目结构分析",{"key":28,"text":351,"correct":22},"总进度规划",{"key":31,"text":353,"correct":22},"确定里程碑事件的计划进度目标",{"key":49,"text":355,"correct":22},"总进度目标实现的条件","ACDE",{"id":358,"libraryId":5,"type":36,"typeLabel":37,"stem":359,"options":360,"answer":223,"analysis":33},1142876,"建设工程项目总进度目标论证的主要任务有（ ） （2015）",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"总进度规划编制",{"key":24,"text":364,"correct":22},"工程实施条件分析",{"key":28,"text":366,"correct":22},"工程实施策划",{"key":31,"text":368,"correct":26},"项目总进度目标确定",{"key":49,"text":370,"correct":26},"项目经济评价",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},1142877,"关于建设工程项目总进度目标论证的说法，正确的是（）。 （2014）",[375,377,379,381],{"key":20,"text":376,"correct":26},"建设工程项目总进度目标指的是整个工程项目的施工进度目标",{"key":24,"text":378,"correct":22},"建设工程项目总进度目标的论证应分析项目实施阶段各项工作的进度和关系",{"key":28,"text":380,"correct":26},"大型建设工程项目总进度目标论证的核心工作是编制项目进度计划",{"key":31,"text":382,"correct":26},"建设工程项目总进度纲要应包含各子系统中的单项工程进度规划",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":28,"analysis":33},1142878,"如果一个进度计划系统由总进度计划、项目子系统进度计划、项目子系统的单项工程进度计划组成。该进度计划系统是由( )的计划组成的计划系统。（2013）",[387,389,391,393],{"key":20,"text":388,"correct":26},"不同功能",{"key":24,"text":390,"correct":26},"不同项目参与方",{"key":28,"text":392,"correct":22},"不同深度",{"key":31,"text":394,"correct":26},"不同周期",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1142879,"建设工程项目进度控制工作包括：1编制进度计划;2调整进度计划;3进度目标的分析和论证;4跟踪检查计划的执行情况。其正确的工作程序是( )。（2012）",[399,401,403,405],{"key":20,"text":400,"correct":22},"3-1-4-2",{"key":24,"text":402,"correct":26},"1-2-3-4",{"key":28,"text":404,"correct":26},"3-1-2-4",{"key":31,"text":406,"correct":26},"4-2-3-1",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1142880,"项目进度控制的主要工作环节中，首先应进行的工作是()（2013）",[411,413,415,417],{"key":20,"text":412,"correct":26},"编制进度计划",{"key":24,"text":414,"correct":22},"分析和论证进度目标",{"key":28,"text":416,"correct":26},"定期跟踪进度计划的执行情况",{"key":31,"text":418,"correct":26},"采取纠偏措施",{"id":420,"libraryId":5,"type":36,"typeLabel":37,"stem":421,"options":422,"answer":433,"analysis":33},1142881,"关于建设工程项目进度控制的说法，正确的有（）（2013）",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"进度控制的过程，就是随着项目的进展，进度计划不断调整的过程",{"key":24,"text":426,"correct":26},"施工方进度控制的目的就是尽量缩短工期",{"key":28,"text":428,"correct":26},"项目各参与方进度控制的目标和时间范畴是相同的",{"key":31,"text":430,"correct":22},"施工进度控制直接关系到过程的质量和成本",{"key":49,"text":432,"correct":22},"进度控制的目的是通过控制以实现过程的进度目的","ADE",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},1142882,"在项目实施过程中，设计方编制的设计工作进度应尽可能与招标、施工和( )等工作进度相协调。（2012）",[438,440,442,444],{"key":20,"text":439,"correct":26},"项目选址",{"key":24,"text":441,"correct":26},"可行性研究",{"key":28,"text":443,"correct":22},"物资采购",{"key":31,"text":445,"correct":26},"竣工验收",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},1142883,"（2019年真题）关于项目进度计划和进度计划系统的说法，正确的是( )。",[450,452,454,456],{"key":20,"text":451,"correct":22},"进度计划系统由多个进度计划组成，是逐步形成的",{"key":24,"text":453,"correct":26},"进度计划是实施性的，进度计划系统是控制性的",{"key":28,"text":455,"correct":26},"业主方编制的进度计划是控制性的，施工方编制的进度计划是实施性的",{"key":31,"text":457,"correct":26},"进度计划是项目参与方编制的，进度计划系统是业主方编制的",{"id":459,"libraryId":5,"type":36,"typeLabel":37,"stem":460,"options":461,"answer":472,"analysis":33},1142884,"（2019年真题）下列工程进度计划系统的构成内容中，属于由不同功能进度计划组成的有（）。",[462,464,466,468,470],{"key":20,"text":463,"correct":26},"施工总进度计划、主体工程施工进度计划、钢结构工程施工计划",{"key":24,"text":465,"correct":26},"设计进度计划、物资采购进度计划、施工管理机构的操作性进度计划",{"key":28,"text":467,"correct":22},"业主方的控制性进度计划、项目部的月度进度计划",{"key":31,"text":469,"correct":26},"企业的年度进度计划、项目部的月度进度计划",{"key":49,"text":471,"correct":22},"企业投标的指导性进度计划、项目部的实施性进度计划","CE",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1142885,"（2018年真题）某建设工程项目按施工总进度计划、各单位工程进度计划及相应分部工程计划组成了计划系统，该计划系统是由多个相互关联的不同（）的进度组成。",[477,479,480,482],{"key":20,"text":478,"correct":22},"深度",{"key":24,"text":231,"correct":26},{"key":28,"text":481,"correct":26},"功能",{"key":31,"text":483,"correct":26},"周期",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1142886,"（2018年真题）建设项目管理供货进度计划应包括的供货环节是（）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"采购、制造、运输",{"key":24,"text":491,"correct":26},"采购、制造、安装",{"key":28,"text":493,"correct":26},"选型、制造、运输",{"key":31,"text":495,"correct":26},"选型、供货、存储",{"id":497,"libraryId":5,"type":36,"typeLabel":37,"stem":498,"options":499,"answer":51,"analysis":33},1142887,"建设工程项目总进度目标认证时，在进行项目的工作编码前应完成的工作有（ ）。（2016）",[500,501,503,504,505],{"key":20,"text":341,"correct":26},{"key":24,"text":502,"correct":26},"协调各层进度计划的关系",{"key":28,"text":337,"correct":22},{"key":31,"text":315,"correct":22},{"key":49,"text":349,"correct":22},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1142888,"（2020年真题）某项目施工横道图进度计划如下表，如果第二层支设模板需要在第一层浇筑混凝土完成1天后才能开始，则有1天的层间技术间歇，正确的层间间隙是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":26},"Z1",{"key":24,"text":513,"correct":22},"Z3",{"key":28,"text":515,"correct":26},"Z2",{"key":31,"text":517,"correct":26},"Z4",{"id":519,"libraryId":5,"type":36,"typeLabel":37,"stem":520,"options":521,"answer":532,"analysis":33},1142889,"（2020年真题）下列建设工程项目计划中,存在关联关系的进度计划有（ ）",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"施工总进度计划和主体工程进度计划",{"key":24,"text":525,"correct":26},"主体钢结构施工进度计划和设备安装进度计划",{"key":28,"text":527,"correct":26},"设计进度计划和维修进度计划",{"key":31,"text":529,"correct":22},"项目月度计划和周计划",{"key":49,"text":531,"correct":26},"土建施工进度计划和主材供货进度计划","AD",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1142890,"（2020年真题）关于横道图进度计划特点的说法，正确的是（）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"可以识别计划的关键工作",{"key":24,"text":540,"correct":26},"不能表达工作逻辑关系",{"key":28,"text":542,"correct":22},"调整计划的工作量较大",{"key":31,"text":544,"correct":26},"可以计算工作时差",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1142891,"（2019年真题）根据项目总进度目标论证的工作步骤,进度计划系统结构分析的紧后工作是（ ）。",[549,550,551,552],{"key":20,"text":349,"correct":26},{"key":24,"text":341,"correct":26},{"key":28,"text":317,"correct":22},{"key":31,"text":553,"correct":26},"编制总进度计划",{"id":555,"libraryId":5,"type":36,"typeLabel":37,"stem":556,"options":557,"answer":568,"analysis":33},1142892,"（2019年真题）在项目的实施阶段,项目总进度包括（）。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"设计工作进度",{"key":24,"text":561,"correct":26},"可行性研究工作进度",{"key":28,"text":563,"correct":22},"招标工作进度",{"key":31,"text":565,"correct":22},"物资采购工作进度",{"key":49,"text":567,"correct":26},"用户管理工作进度","ACD",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1142893,"建设工程项目总进度目标论证的工作包括：①编制各层进度计划；②项目结构分析；③编制总进度计划；④项目的工作编码。其正确的工作程序是（）。（2018年真题）",[573,575,577,579],{"key":20,"text":574,"correct":22},"②→④→①→③",{"key":24,"text":576,"correct":26},"④→③→②→①",{"key":28,"text":578,"correct":26},"②→④→③→①",{"key":31,"text":580,"correct":26},"④→②→①→③",{"id":582,"libraryId":5,"type":36,"typeLabel":37,"stem":583,"options":584,"answer":595,"analysis":33},1142896,"项目总进度目标认证时应调研和收集的资料包括（）。（2018年真题）",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"项目决策阶段有关项目进度目标确定的情况和资料",{"key":24,"text":588,"correct":22},"与进度有关的该项目组织、管理、经济和技术资料",{"key":28,"text":590,"correct":22},"类似项目的进度资料",{"key":31,"text":592,"correct":26},"该项目施工总承包单位的信用等级",{"key":49,"text":594,"correct":22},"该项目的总体部署","ABCE",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},1142899,"（2018年真题）某工程采用建设项目工程总承包的模式，则项目总进度目标的控制是（）的任务。",[600,602,604,606],{"key":20,"text":601,"correct":26},"业主方与监理方",{"key":24,"text":603,"correct":22},"业主方与工程总承包方",{"key":28,"text":605,"correct":26},"监理方与工程总承包方",{"key":31,"text":607,"correct":26},"工程总承包方与设计方",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":20,"analysis":33},1142902,"某双代号网络计划如下图所示（时间单位：天），其关键线路有（ ）条。（2016）",[612,614,616,618],{"key":20,"text":613,"correct":22},"2",{"key":24,"text":615,"correct":26},"3",{"key":28,"text":617,"correct":26},"5",{"key":31,"text":619,"correct":26},"4",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":20,"analysis":33},1142904,"某双代号网络图如下图所示，存在的错误是（ ）。（2014）",[624,626,628,630],{"key":20,"text":625,"correct":22},"工作代号相同",{"key":24,"text":627,"correct":26},"出现无箭头连线",{"key":28,"text":629,"correct":26},"出现无箭头节点箭头",{"key":31,"text":631,"correct":26},"出现多个起点节点",{"id":633,"libraryId":5,"type":36,"typeLabel":37,"stem":634,"options":635,"answer":646,"analysis":33},1142907,"按最早开始时间编制的施工计划及各工作每月成本强度（单位：万元\u002F月）如下图，D工作可以按最早开始时间或最迟开始时间安排。则4月份的施工成本计划值可以是（ ）万元。（2015）",[636,638,640,642,644],{"key":20,"text":637,"correct":26},"60",{"key":24,"text":639,"correct":22},"50",{"key":28,"text":641,"correct":22},"25",{"key":31,"text":643,"correct":26},"15",{"key":49,"text":645,"correct":26},"10","BC",[648,651,654,657,660,663],{"id":15,"name":649,"category":7,"favorite":650},"领导干部任职前廉政法规知识测试题",92,{"id":652,"name":653,"category":7,"favorite":15},595,"建筑结构与设备",{"id":655,"name":656,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":658,"name":659,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":661,"name":662,"category":7,"favorite":8},534,"BIM工程师",{"id":664,"name":662,"category":7,"favorite":8},535]