[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-44":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":657},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,44,50,2721,[13,34,52,64,79,91,103,118,130,142,154,169,181,196,210,222,234,246,260,275,287,299,311,323,337,349,363,375,387,399,407,415,427,439,453,466,480,492,504,518,532,544,558,570,579,589,600,615,630,642],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1142799,1,"单选题","（2019年真题）某分项工程月计划完成工程量为3200m2，计划单价为15元\u002Fm2，月底承包商实际完成工程量为2800m2，实际单价为20元\u002Fm2 ，则该工程当月的计划工作预算费用(BCWS)为（）元",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","42000",false,{"key":24,"text":25,"correct":26},"B","48000",true,{"key":28,"text":29,"correct":22},"C","56000",{"key":31,"text":32,"correct":22},"D","64000","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1142800,2,"多选题","（2019年真题）某分项工程采用嬴得值法分析得到:已完工作预算费用(BCWP)>计划工作预算费用(BCWS)> 已完工作实际费用(ACWP)，则该工程（）。",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"费用节余",{"key":24,"text":43,"correct":26},"进度提前",{"key":28,"text":45,"correct":22},"费用超支",{"key":31,"text":47,"correct":22},"进度延误",{"key":49,"text":50,"correct":26},"E","费用绩效指数大于1","ABE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1142801,"（2018年真题）项目成本指标控制的工作包括：①采集成本数据，监测成本形成过程；②制定对策，纠正偏差；③找出偏差，分析原因；④确定成本管理分层次目标。其正确的工作程序是（）。",[56,58,60,62],{"key":20,"text":57,"correct":26},"④→①→③→②",{"key":24,"text":59,"correct":22},"①→②→③→④",{"key":28,"text":61,"correct":22},"①→③→②→④",{"key":31,"text":63,"correct":22},"②→④→③→①",{"id":65,"libraryId":5,"type":36,"typeLabel":37,"stem":66,"options":67,"answer":78,"analysis":33},1142802,"（2018年真题）某混凝土工程的清单综合单价1000元\u002Fm3，按月结算，进度数据如下表。按赢得值法计算，3月末已完工作实际费用（ACWP）是9790千元。该工程3月末参数或指标正确的有（）。",[68,70,72,74,76],{"key":20,"text":69,"correct":26},"已完工作预算费用（BCWP）是9100千元",{"key":24,"text":71,"correct":26},"进度偏差（SV）是－1600千元",{"key":28,"text":73,"correct":26},"费用绩效指数（CPI）是0.93",{"key":31,"text":75,"correct":26},"计划工作预算费用（BCWS）是10700千元",{"key":49,"text":77,"correct":22},"费用偏差（CV）是690千元","ABCD",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":28,"analysis":33},1142803,"（2018年真题）某项目地面铺贴的清单工程量为1000m2，预算费用单价60元\u002Fm2，计划每天施工100m2。（2018年真题）第6天检查时发现，实际完成800m2，实际费用为5万元。（2018年真题）根据上述情况，预计项目完工时的费用偏差（ACV）是（）元。",[83,85,87,89],{"key":20,"text":84,"correct":22},"2500",{"key":24,"text":86,"correct":22},"2000",{"key":28,"text":88,"correct":26},"－2500",{"key":31,"text":90,"correct":22},"－2000",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1142804,"（2020年真题）某混凝上工程施工情况如下图，清单综合单价为1000元\u002Fm3，按月结算，根据赢得值法，该工程6月末进度偏差（SV）是（ ）万元。",[95,97,99,101],{"key":20,"text":96,"correct":26},"-215",{"key":24,"text":98,"correct":22},"-200",{"key":28,"text":100,"correct":22},"-125",{"key":31,"text":102,"correct":22},"-60",{"id":104,"libraryId":5,"type":36,"typeLabel":37,"stem":105,"options":106,"answer":117,"analysis":33},1142805,"（2020年真题）下列施工机械使用费控制措施中，属于控制台班数量的有（ ）。",[107,109,111,113,115],{"key":20,"text":108,"correct":26},"加强施工机械设备内部调配",{"key":24,"text":110,"correct":22},"加强机械设备配件管理",{"key":28,"text":112,"correct":26},"加强设备租赁计划管理",{"key":31,"text":114,"correct":26},"提高机械设备利用率",{"key":49,"text":116,"correct":22},"按油料消耗定额控制油料消耗","ACD",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1142806,"（2020年真题）某工程第三个月末时的已完工作实际费用（ACWP）为1200万元、已完工作预算费用（BCWP）为1000万元、计划工作预算费用（BCWS）为1500万元，根据赢得值法判断分析应采取的措施是（）",[122,124,126,128],{"key":20,"text":123,"correct":22},"迅速增加人员投入",{"key":24,"text":125,"correct":26},"增加高效人员投入",{"key":28,"text":127,"correct":22},"抽出部分人员，增加少量骨干人员",{"key":31,"text":129,"correct":22},"用工作效率高的人员更换一批工作效率低的人员",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1142807,"（2019年真题）某工程项目进行月(季)度成本分析时，发现属于预算定额规定的“政策性”亏损，则应采取的措施是（）",[134,136,138,140],{"key":20,"text":135,"correct":26},"从控制支出着手，把超支额压缩到最低限度",{"key":24,"text":137,"correct":22},"增加变更收入，弥补政策亏损",{"key":28,"text":139,"correct":22},"将亏损成本转入下一月(季)度",{"key":31,"text":141,"correct":22},"停止施工生产，并报告业主方",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1142808,"（2019年真题）在项目成本分析的依据中,既可对已经发生的经济活动进行核算,又可对尚未发生的经济活动进行核算的方式是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"会计核算",{"key":24,"text":149,"correct":22},"成本核算",{"key":28,"text":151,"correct":26},"业务核算",{"key":31,"text":153,"correct":22},"统计核算",{"id":155,"libraryId":5,"type":36,"typeLabel":37,"stem":156,"options":157,"answer":168,"analysis":33},1142809,"（2019年真题）施工项目专项成本分析包括（）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"月度成本分析",{"key":24,"text":161,"correct":22},"年度成本分析",{"key":28,"text":163,"correct":26},"成本盈亏异常分析",{"key":31,"text":165,"correct":26},"工期成本分析",{"key":49,"text":167,"correct":26},"资金成本分析","CDE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":28,"analysis":33},1142810,"关于施工项目或成本核算方法的说法，正确的是（）。（2018年真题）",[173,175,177,179],{"key":20,"text":174,"correct":22},"表格核算法的优点是覆盖面较大",{"key":24,"text":176,"correct":22},"会计核算法不核算工程项目在施工过程中出现的债权债务",{"key":28,"text":178,"correct":26},"表格核算法可用于工程项目施工各岗位成本的责任核算",{"key":31,"text":180,"correct":22},"会计核算法不能用于整个企业的生产经营核算",{"id":182,"libraryId":5,"type":36,"typeLabel":37,"stem":183,"options":184,"answer":195,"analysis":33},1142811,"根据《财政部关于印发的通知》（财会[2013]17号），建筑业企业可设置的成本项目有（）。（2018年真题）",[185,187,189,191,193],{"key":20,"text":186,"correct":26},"直接人工",{"key":24,"text":188,"correct":22},"借款费用",{"key":28,"text":190,"correct":22},"相关税费",{"key":31,"text":192,"correct":26},"其他直接费用",{"key":49,"text":194,"correct":26},"分包成本","ADE",{"id":197,"libraryId":5,"type":36,"typeLabel":37,"stem":198,"options":199,"answer":168,"analysis":33},1142812,"下列施工费用中，可直接计入直接成本的有（）。（2018年真题）",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"周转材料购置费",{"key":24,"text":203,"correct":22},"管理人员差旅交通费",{"key":28,"text":205,"correct":26},"人工费",{"key":31,"text":207,"correct":26},"施工机械使用费",{"key":49,"text":209,"correct":26},"材料采购保管费",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1142813,"工程成本应当包括（）所发生的，与执行合同有关的直接费用和间接费用。（2018年真题）",[214,216,218,220],{"key":20,"text":215,"correct":22},"从工程投标开始至竣工验收为止",{"key":24,"text":217,"correct":22},"从场地移交开始至项目移交为止",{"key":28,"text":219,"correct":26},"从合同签订开始至合同完成为止",{"key":31,"text":221,"correct":22},"从项目设计开始至竣工投产为止",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1142814,"（2020年真题）关于施工项目成本表格核算法的说法，正确的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"人为控制因素少、精度高",{"key":24,"text":229,"correct":22},"项目财务部门比较常用",{"key":28,"text":231,"correct":26},"方便操作、但覆盖面较小",{"key":31,"text":233,"correct":22},"对核算工作人员的专业水平要求较高",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},1142815,"（2020年真题）根据《财政部关于印发（试行）的通知》，下列工程成本费用中，属于其他直接费用的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"有助于工程形成的其他材料费",{"key":24,"text":241,"correct":22},"为管理工程施工所发生的费用",{"key":28,"text":243,"correct":26},"工程定位复测费",{"key":31,"text":245,"correct":22},"企业管理人员的差旅交通费",{"id":247,"libraryId":5,"type":36,"typeLabel":37,"stem":248,"options":249,"answer":51,"analysis":33},1142816,"（2020年真题）关于工程项目成本核算的说法，正确的有（ ）。",[250,252,254,256,258],{"key":20,"text":251,"correct":26},"成本核算应坚持形象进度、产值统计、成本分析同步的原则",{"key":24,"text":253,"correct":26},"工程成本核算是企业会计核算的重要组成部分",{"key":28,"text":255,"correct":22},"工程项目内各岗位成本责任核算一般采用业务核算法",{"key":31,"text":257,"correct":22},"会计核算法人为控制因素较多、精度不高",{"key":49,"text":259,"correct":26},"施工单位应在项目部设成本会计进行成本核算",{"id":261,"libraryId":5,"type":36,"typeLabel":37,"stem":262,"options":263,"answer":274,"analysis":33},1142817,"某项目成本及成本构成比例数据如下表，正确的有（ ）。（2015）",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"成本增加比例最大额是间接成本",{"key":24,"text":267,"correct":22},"成本降低最多的项目是机械费",{"key":28,"text":269,"correct":26},"成本节约效益最大的是材料费",{"key":31,"text":271,"correct":26},"成本节约做得好的是措施费",{"key":49,"text":273,"correct":26},"直接成本增加比例最大的是人工费","ACDE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":31,"analysis":33},1142818,"某项目施工成本数据如下表，根据差额计算法，成本降低率提高对成本降低额的影响程度为（）万元。（2015）",[279,281,283,285],{"key":20,"text":280,"correct":22},"0.6",{"key":24,"text":282,"correct":22},"0.7",{"key":28,"text":284,"correct":22},"1.1",{"key":31,"text":286,"correct":26},"1.2",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},1142819,"关于施工成本分析依据的说法,正确的是（ ）。2017",[291,293,295,297],{"key":20,"text":292,"correct":26},"统计核算可以用货币计算",{"key":24,"text":294,"correct":22},"业务核算主要是价值核算",{"key":28,"text":296,"correct":22},"统计核算的计量尺度比会计核算窄",{"key":31,"text":298,"correct":22},"会计核算可以对尚未发生的经济活动进行核算",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1142820,"下列成本项目的分析中，属于材料费分析的是（ ）。2017",[303,305,307,309],{"key":20,"text":304,"correct":22},"分析材料节约对劳务分包合同的影响",{"key":24,"text":306,"correct":26},"分析材料储备天数对材料储备金的影响",{"key":28,"text":308,"correct":22},"分析施工机械燃料消耗量对施工成本的影响",{"key":31,"text":310,"correct":22},"分析材料检验试验费占企业管理费的比重",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1142821,"某项目在进行资金成本分析时，其计算期实际工程款收入为220万元，计算期实际成本支出为119万元，计划工期成本为150万元，则该项目成本支出率为（ ）。2017",[315,317,319,321],{"key":20,"text":316,"correct":22},"30.69%",{"key":24,"text":318,"correct":26},"54.09%",{"key":28,"text":320,"correct":22},"68.18%",{"key":31,"text":322,"correct":22},"79.33%",{"id":324,"libraryId":5,"type":36,"typeLabel":37,"stem":325,"options":326,"answer":336,"analysis":33},1142822,"专项成本分析中，工期成本分析一般采取的方法有（ ）。2017",[327,329,330,332,334],{"key":20,"text":328,"correct":22},"构成比率法",{"key":24,"text":163,"correct":22},{"key":28,"text":331,"correct":26},"比较法",{"key":31,"text":333,"correct":26},"因素分析法",{"key":49,"text":335,"correct":22},"成本支出率法","CD",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1142823,"下列施工成本分析方法中，可以用来分析各种因素对成本影响程度的是（ ）。（2016）",[341,343,345,347],{"key":20,"text":342,"correct":26},"连环置换法",{"key":24,"text":344,"correct":22},"相关比率法",{"key":28,"text":346,"correct":22},"比重分析法",{"key":31,"text":348,"correct":22},"动态比率法",{"id":350,"libraryId":5,"type":36,"typeLabel":37,"stem":351,"options":352,"answer":195,"analysis":33},1142824,"关于分部分项工程成本分析，下列说法正确的有（ ）。（2016）",[353,355,357,359,361],{"key":20,"text":354,"correct":26},"分部分项成本分析是施工项目成本分析的基础",{"key":24,"text":356,"correct":22},"必须对施工项目所有的分部分项进行成本分析",{"key":28,"text":358,"correct":22},"分部分项成本分析的方法是进行实际成本与目标成本比较",{"key":31,"text":360,"correct":26},"分部分项成本分析的对象为已完分部分项工程",{"key":49,"text":362,"correct":26},"对主要的分部分项工程要做到从开工到竣工进行系统的成本分析",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},1142825,"施工项目年度成本分析的重点是( )。（2013）",[367,369,371,373],{"key":20,"text":368,"correct":22},"通过实际成本与目标成本的对比，分析目标成本落实情况",{"key":24,"text":370,"correct":22},"通过对技术组织措施执行效果的分析，寻求更加有效的节约途径",{"key":28,"text":372,"correct":22},"通过实际成本与计划成本的对比，分析成本降低水平",{"key":31,"text":374,"correct":26},"针对下一年度进展情况，规划坷实可行的成本管理措施",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},1142826,"在进行月(季)度成本分析时，如果存在“政策性”亏损，则应（ ）。（2016）",[379,381,383,385],{"key":20,"text":380,"correct":22},"增加收入，弥补亏损",{"key":24,"text":382,"correct":22},"降低标准，防止再超支",{"key":28,"text":384,"correct":22},"暂停生产，等待政策调整",{"key":31,"text":386,"correct":26},"控制支出，压缩超支额",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1142827,"在建设工程项目施工成本分析中，成本盈亏异常分析属于（ ）方法。（2015）",[391,393,395,397],{"key":20,"text":392,"correct":22},"因素分析",{"key":24,"text":394,"correct":22},"综合成本分析",{"key":28,"text":396,"correct":26},"专项成本分析",{"key":31,"text":398,"correct":22},"成本项目分析",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1142828,"下列施工成本分析方法中，用来分析各种因素对成本影响程度的是（）。（2014）",[403,404,405,406],{"key":20,"text":344,"correct":22},{"key":24,"text":342,"correct":26},{"key":28,"text":346,"correct":22},{"key":31,"text":348,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1142829,"下列施工成本分析方法中，可以用来分析各种因素对成本影响程度的是( )。（2012）",[411,412,413,414],{"key":20,"text":342,"correct":26},{"key":24,"text":344,"correct":22},{"key":28,"text":346,"correct":22},{"key":31,"text":348,"correct":22},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1142830,"某施工项目某月的成本数据如下表，应用差额计算法得到预算成本增加对成本的影响是（ ）万元。（2014）",[419,421,423,425],{"key":20,"text":420,"correct":22},"12.0",{"key":24,"text":422,"correct":22},"8.0",{"key":28,"text":424,"correct":22},"6.4",{"key":31,"text":426,"correct":26},"1.6",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1142831,"分部分项工程成本分析“三算”对比分析，是指( )的比较。（2013）",[431,433,435,437],{"key":20,"text":432,"correct":26},"预算成本、目标成本、实际成本",{"key":24,"text":434,"correct":22},"概算成本、预算成本、决算成本",{"key":28,"text":436,"correct":22},"月度成本、季度成本、年度成本",{"key":31,"text":438,"correct":22},"预算成本、计划成本、目标成本",{"id":440,"libraryId":5,"type":36,"typeLabel":37,"stem":441,"options":442,"answer":452,"analysis":33},1142832,"单位工程竣工成本分析的内容包括（）。（2014）",[443,444,446,448,450],{"key":20,"text":396,"correct":22},{"key":24,"text":445,"correct":26},"竣工成本分析",{"key":28,"text":447,"correct":22},"成本总量构成比例分析",{"key":31,"text":449,"correct":26},"主要资源节超对比分析",{"key":49,"text":451,"correct":26},"主要技术节约措施及经济效果分析","BDE",{"id":454,"libraryId":5,"type":36,"typeLabel":37,"stem":455,"options":456,"answer":465,"analysis":33},1142833,"单位工程竣工成本分析的内容包括( )。（2013）",[457,458,460,461,463],{"key":20,"text":445,"correct":26},{"key":24,"text":459,"correct":26},"经济效果分析",{"key":28,"text":449,"correct":26},{"key":31,"text":462,"correct":22},"成本指标对比分析",{"key":49,"text":464,"correct":26},"主要技术节约措施分析","ABCE",{"id":467,"libraryId":5,"type":36,"typeLabel":37,"stem":468,"options":469,"answer":452,"analysis":33},1142834,"关于分部分项工程施工成本分析的说法，正确的有( )。（2012）",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"必须对施工项目中的所有分部分项工程进行成本分析",{"key":24,"text":473,"correct":26},"分部分项工程成本分析的对象为已完分部分项工程",{"key":28,"text":475,"correct":22},"分部分项工程成本分析的方法就是进行实际成本与目标成本比较",{"key":31,"text":477,"correct":26},"分部分项工程成本分析是施工项目成本分析的基础",{"key":49,"text":479,"correct":26},"对主要分部分项工程要做到从开工到竣工进行系统的成本分析",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1142835,"（2019年真题）某施工单位为订立某工程项目建造合同共发生差旅费、投标费50万元。该项目工程完工时共发生人工费600万元,差旅费5万元,管理人员工资98万元,材料采购及保管费15万元,根据《企业会计准则第15号-建造合同),间接费用是( )万元。",[484,486,488,490],{"key":20,"text":485,"correct":22},"50",{"key":24,"text":487,"correct":26},"103",{"key":28,"text":489,"correct":22},"55",{"key":31,"text":491,"correct":22},"70",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},1142836,"（2019年真题）施工项目成本核算的程序中，将每个月应计入工程成本的生产费用，在各个成本对象之间进行分配和归集，计算各工程成本后需进行的工作是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":26},"对未完成工程进行盘点，确定本期已完工程实际成本",{"key":24,"text":499,"correct":22},"对所发生的费用进行审核，确定应计入成本的费用和期间费用",{"key":28,"text":501,"correct":22},"将应计入工程成本的各项费用，区分计入本月或其他月份的工程成本",{"key":31,"text":503,"correct":22},"将已完成工程成本转入工程结算成本",{"id":505,"libraryId":5,"type":36,"typeLabel":37,"stem":506,"options":507,"answer":517,"analysis":33},1142837,"（2019年真题）下列建设工程项目施工费用中，属于直接费用的有（）。",[508,509,511,513,515],{"key":20,"text":205,"correct":26},{"key":24,"text":510,"correct":26},"材料费",{"key":28,"text":512,"correct":22},"管理人员工资",{"key":31,"text":514,"correct":26},"机械费",{"key":49,"text":516,"correct":22},"差旅交通费","ABD",{"id":519,"libraryId":5,"type":36,"typeLabel":37,"stem":520,"options":521,"answer":51,"analysis":33},1142838,"（2019年真题）关于成本核算方法的说法，正确的有（ ）。",[522,524,526,528,530],{"key":20,"text":523,"correct":26},"表格核算法的基础是施工项目内部各环节的成本核算",{"key":24,"text":525,"correct":26},"会计核算法科学严密,覆盖面较大",{"key":28,"text":527,"correct":22},"项目财务部门一般采用表格法进行成本核算",{"key":31,"text":529,"correct":22},"会计核算法适用于工程项目内各岗位成本的责任核算",{"key":49,"text":531,"correct":26},"表格核算法精度不高,覆盖面较小",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},1142839,"某工程各门窗安装班组的相关经济指标如下表，按照成本分析的比率法，人均效益最好的班组是（）。（2018年真题）",[536,538,540,542],{"key":20,"text":537,"correct":26},"甲",{"key":24,"text":539,"correct":22},"乙",{"key":28,"text":541,"correct":22},"丙",{"key":31,"text":543,"correct":22},"丁",{"id":545,"libraryId":5,"type":36,"typeLabel":37,"stem":546,"options":547,"answer":452,"analysis":33},1142840,"（2018年真题）下列成本计划指标中，属于数量指标的有（）。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"设计预算成本计划降低率",{"key":24,"text":551,"correct":26},"工程项目计划总成本指标",{"key":28,"text":553,"correct":22},"责任目标成本计划降低率",{"key":31,"text":555,"correct":26},"按主要生产要素划分的计划成本指标",{"key":49,"text":557,"correct":26},"各单位工程计划成本指标",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1142841,"（2020年真题）施工项目的专项成本分析中，“成本支出率”指标用于分析（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"工期成木",{"key":24,"text":565,"correct":22},"成本盈亏",{"key":28,"text":567,"correct":22},"分部分项工程成本",{"key":31,"text":569,"correct":26},"资金成本",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},1142842,"（2020年真题）下列项目成本分析所依据资料中，可以计算项目当前实际成本，并可以确定变动速度和预测成本发展趋势的是（ ）",[574,575,577,578],{"key":20,"text":153,"correct":26},{"key":24,"text":576,"correct":22},"表格核算",{"key":28,"text":147,"correct":22},{"key":31,"text":151,"correct":22},{"id":580,"libraryId":5,"type":36,"typeLabel":37,"stem":581,"options":582,"answer":195,"analysis":33},1142843,"（2020年真题）下列成本分析工作中，属于综合成本分析的有（ ）。",[583,584,585,586,587],{"key":20,"text":161,"correct":26},{"key":24,"text":165,"correct":22},{"key":28,"text":167,"correct":22},{"key":31,"text":159,"correct":26},{"key":49,"text":588,"correct":26},"分部分项工程成本分析",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},1142844,"根据建设工程项目施工成本的组成，属于直接成本的是（ ）。 （2015）",[593,595,597,599],{"key":20,"text":594,"correct":22},"工具用具使用费",{"key":24,"text":596,"correct":22},"职工教育经费",{"key":28,"text":598,"correct":26},"机械折旧费",{"key":31,"text":512,"correct":22},{"id":601,"libraryId":5,"type":36,"typeLabel":37,"stem":602,"options":603,"answer":614,"analysis":33},1142845,"下列施工成本管理的措施中，属于经济措施的有（ ）。2017",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"对施工方案进行经济效果分析论证",{"key":24,"text":607,"correct":22},"通过生产要素的动态管理控制实际成本",{"key":28,"text":609,"correct":22},"抽检进场的工程材料、构配件质量",{"key":31,"text":611,"correct":26},"对各种变更及时落实业主签证并结算工程款",{"key":49,"text":613,"correct":26},"对施工成本管理目标进行风险分析并制定防范性对策","DE",{"id":616,"libraryId":5,"type":36,"typeLabel":37,"stem":617,"options":618,"answer":629,"analysis":33},1142846,"下列指标中，属于项目部施工成本考核的有（ ）。 （2015）",[619,621,623,625,627],{"key":20,"text":620,"correct":26},"施工成本降低额",{"key":24,"text":622,"correct":26},"施工成本降低率",{"key":28,"text":624,"correct":22},"施工生产总成本",{"key":31,"text":626,"correct":22},"劳动力不均衡系数",{"key":49,"text":628,"correct":22},"生产能力利用率","AB",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":31,"analysis":33},1142847,"下列施工成本管理的措施中，属于技术措施的是( )。（2013）",[634,636,638,640],{"key":20,"text":635,"correct":22},"加强施工任务单的管理",{"key":24,"text":637,"correct":22},"编制施工成本控制工作计划",{"key":28,"text":639,"correct":22},"寻求施工过程中的索赔机会",{"key":31,"text":641,"correct":26},"确定最合适的施工机械方案",{"id":643,"libraryId":5,"type":36,"typeLabel":37,"stem":644,"options":645,"answer":656,"analysis":33},1142848,"工程项目施工成本管理的基础工作包括( )。（2013）",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"及时进行成本核算",{"key":24,"text":649,"correct":26},"建立成本管理责任体系",{"key":28,"text":651,"correct":26},"建立企业内部施工定额",{"key":31,"text":653,"correct":22},"编制项目成本计划",{"key":49,"text":655,"correct":26},"科学实际成本核算账册","BCE",[658,661,664,667,670,673],{"id":15,"name":659,"category":7,"favorite":660},"领导干部任职前廉政法规知识测试题",92,{"id":662,"name":663,"category":7,"favorite":15},595,"建筑结构与设备",{"id":665,"name":666,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":668,"name":669,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":671,"name":672,"category":7,"favorite":8},534,"BIM工程师",{"id":674,"name":672,"category":7,"favorite":8},535]