[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-43":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":632},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,43,50,2721,[13,34,46,58,70,82,93,105,123,135,147,159,171,186,198,210,222,235,247,262,274,286,296,308,322,334,347,359,374,386,397,409,423,437,449,461,473,485,497,509,521,530,539,551,563,578,590,602,612,624],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1142748,1,"单选题","（2014年真题）建设工程管理工作的核心任务是（）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","项目的目标控制",false,{"key":24,"text":25,"correct":22},"B","为项目建设的决策和实施增值",{"key":27,"text":28,"correct":22},"C","实现工程项目实施阶段的建设目标",{"key":30,"text":31,"correct":32},"D","为工程建设和使用增值",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1142749,"（2014年真题）建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"管理现代化",{"key":24,"text":41,"correct":22},"施工机械化",{"key":27,"text":43,"correct":22},"生产高效化",{"key":30,"text":45,"correct":32},"组织集成化",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1142750,"（2018年真题）根据国际设施管理协会的界定，下列设施管理的内容中，属于物业运行管理的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"财务管理",{"key":24,"text":53,"correct":22},"空间管理",{"key":27,"text":55,"correct":22},"用户管理",{"key":30,"text":57,"correct":32},"维修管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1142751,"（2013年真题） 工程管理信息化有利于提高建设工程项目的经济效益和社会效益，以达到（ ）的目的。",[62,64,66,68],{"key":20,"text":63,"correct":32},"为项目建设增值",{"key":24,"text":65,"correct":22},"实现项目建设目标",{"key":27,"text":67,"correct":22},"实现项目管理目标",{"key":30,"text":69,"correct":22},"提高项目建设综合治理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1142752,"（2019年真题）根据《建设工程质量管理条例》，监理工程师应当按照（）的要求，采取旁站、巡视和平行检验等形式，对建设工程实施监理。",[74,76,78,80],{"key":20,"text":75,"correct":22},"建设工程强制性标准条文",{"key":24,"text":77,"correct":22},"委托监理合同",{"key":27,"text":79,"correct":32},"工程监理规范",{"key":30,"text":81,"correct":22},"工程技术标准",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1142753,"（2013年真题） 建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ）。",[86,88,89,91],{"key":20,"text":87,"correct":22},"组织柔性化",{"key":24,"text":45,"correct":32},{"key":27,"text":90,"correct":22},"组织扁平化",{"key":30,"text":92,"correct":22},"组织高效化",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},1142754,"按建设工程项目成本构成编制施工成本计划时，将施工成本分解为()等。",[97,99,101,103],{"key":20,"text":98,"correct":22},"直接费、间接费、利润、税金",{"key":24,"text":100,"correct":22},"单位工程施工成本及分部分项施工成本",{"key":27,"text":102,"correct":32},"人工费、材料费、施工机具使用费、措施项目费、企业管理费",{"key":30,"text":104,"correct":22},"分部分项工程费、其他项目费、规费",{"id":106,"libraryId":5,"type":107,"typeLabel":108,"stem":109,"options":110,"answer":122,"analysis":33},1142755,2,"多选题","施工成本计划的编制方式有（ ）。2017",[111,113,115,117,119],{"key":20,"text":112,"correct":32},"按施工进度编制施工成本计划",{"key":24,"text":114,"correct":32},"按施工成本组成编制施工成本计划",{"key":27,"text":116,"correct":22},"按施工质量编制施工成本计划",{"key":30,"text":118,"correct":22},"按施工合同编制施工成本计划",{"key":120,"text":121,"correct":32},"E","按施工项目组成编制施工成本计划","ABE",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":24,"analysis":33},1142756,"编制成本计划时，施工成本可以按成本构成分解为（ ）。 (2013)",[127,129,131,133],{"key":20,"text":128,"correct":22},"人工费、材料费、施工机具使用费、规费和企业管理费",{"key":24,"text":130,"correct":32},"人工费、材料费、施工机具使用费、企业管理费",{"key":27,"text":132,"correct":22},"人工费、材料费、施工机具使用费、规费和间接费",{"key":30,"text":134,"correct":22},"人工费、材料费、施工机具使用费、间接费、利润和税金",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":27,"analysis":33},1142757,"编制实施性成本计划的主要依据是（ ）。2017",[139,141,143,145],{"key":20,"text":140,"correct":22},"施工图预算",{"key":24,"text":142,"correct":22},"投资估算",{"key":27,"text":144,"correct":32},"施工预算",{"key":30,"text":146,"correct":22},"设计概算",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":24,"analysis":33},1142758,"绘制时间-成本累积曲线的环节有：①计算单位时间成本；②确定工程项目进度计划；③计算计划累计支出的成本额；④绘制S形曲线。正确的绘制步骤是（ ）。2017",[151,153,155,157],{"key":20,"text":152,"correct":22},"①-②-③-④",{"key":24,"text":154,"correct":32},"②-①-③-④",{"key":27,"text":156,"correct":22},"①-③-②-④",{"key":30,"text":158,"correct":22},"②-③-④-①",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},1142759,"在编制施工成本计划时，通常需要进行“两算”对比分析，“两算”指的是（ ）。（2016）",[163,165,167,169],{"key":20,"text":164,"correct":22},"施工图预算、成本核算",{"key":24,"text":166,"correct":32},"施工图预算、施工预算",{"key":27,"text":168,"correct":22},"施工预算、成本核算",{"key":30,"text":170,"correct":22},"施工预算、施工决算",{"id":172,"libraryId":5,"type":107,"typeLabel":108,"stem":173,"options":174,"answer":185,"analysis":33},1142760,"下列费用按照费用构成要素划分，属于企业管理费的有（ ）。（2016）",[175,177,179,181,183],{"key":20,"text":176,"correct":32},"管理人员工资",{"key":24,"text":178,"correct":32},"检验试验费",{"key":27,"text":180,"correct":32},"固定资产使用费",{"key":30,"text":182,"correct":32},"工具使用费",{"key":120,"text":184,"correct":22},"材料费","ABCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":30,"analysis":33},1142761,"某项目按施工进度编制的施工成本计划入下图，则4月份计划成本是（ ）万元。（2015）",[190,192,194,196],{"key":20,"text":191,"correct":22},"300",{"key":24,"text":193,"correct":22},"750",{"key":27,"text":195,"correct":22},"1150",{"key":30,"text":197,"correct":32},"400",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":30,"analysis":33},1142762,"施工企业在工程投标及签订合同阶段编制的估算成本计划，属于（ ）成本计划。（2016）",[202,204,206,208],{"key":20,"text":203,"correct":22},"指导性",{"key":24,"text":205,"correct":22},"实施性",{"key":27,"text":207,"correct":22},"作业性",{"key":30,"text":209,"correct":32},"竞争性",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1142763,"编制施工项目成本计划，关键是确定项目的()（2013）",[214,216,218,220],{"key":20,"text":215,"correct":22},"概算成本",{"key":24,"text":217,"correct":22},"成本构成",{"key":27,"text":219,"correct":32},"目标成本",{"key":30,"text":221,"correct":22},"实际成本",{"id":223,"libraryId":5,"type":107,"typeLabel":108,"stem":224,"options":225,"answer":234,"analysis":33},1142764,"某施工项目为实现成本管理收集可以下资料，其中可以作为编制施工成本计划依据的有（）（2014）",[226,227,229,231,232],{"key":20,"text":144,"correct":32},{"key":24,"text":228,"correct":32},"签订的工程合同",{"key":27,"text":230,"correct":32},"分包合同",{"key":30,"text":140,"correct":22},{"key":120,"text":233,"correct":32},"资源市场价格","ABCE",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},1142765,"某施工承包企业将其承接的调整公路项目的目标总成本，分解为桥梁工程成本、隧道工程成本、道路工程成本等子项，并编制相应的成本计划。这是按( )编制成本计划。（2012）",[239,241,243,245],{"key":20,"text":240,"correct":22},"成本组成",{"key":24,"text":242,"correct":22},"工程类别",{"key":27,"text":244,"correct":22},"工程性质",{"key":30,"text":246,"correct":32},"项目组成",{"id":248,"libraryId":5,"type":107,"typeLabel":108,"stem":249,"options":250,"answer":261,"analysis":33},1142766,"某项目实施过程中，绘制了下图所示的时间一成本累计曲线，该图反映的项目程度的正确信息有()（2013）",[251,253,255,257,259],{"key":20,"text":252,"correct":22},"I阶段进度慢",{"key":24,"text":254,"correct":22},"III阶段进度慢",{"key":27,"text":256,"correct":32},"II阶段进度慢",{"key":30,"text":258,"correct":32},"IV阶段进度慢",{"key":120,"text":260,"correct":22},"工程施工连续","CD",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},1142767,"实施性成本计划是在项目施工准备阶段，采用（）编制的施工成本计划。（2014）",[266,268,270,272],{"key":20,"text":267,"correct":22},"估算指标",{"key":24,"text":269,"correct":22},"概算定额",{"key":27,"text":271,"correct":32},"施工定额",{"key":30,"text":273,"correct":22},"预算定额",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1142768,"关于施工预算、施工图预算，两算对比的说法，正确的是（ ）。 （2015）",[278,280,282,284],{"key":20,"text":279,"correct":22},"施工预算的编制以预算定额为依据，施工图预算的编制以施工定额为依据",{"key":24,"text":281,"correct":32},"两算对比的方法包括实物对比法",{"key":27,"text":283,"correct":22},"一般情况下，施工图预算的人工数量及人工费比施工预算低",{"key":30,"text":285,"correct":22},"一般情况下,施工图预算的材料消耗量及材料费比施工预算低",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1142769,"编制施工项目成本计划的关键是确定( )。（2012）",[290,292,294,295],{"key":20,"text":291,"correct":22},"预算成本",{"key":24,"text":293,"correct":22},"平均成本",{"key":27,"text":219,"correct":32},{"key":30,"text":221,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},1142770,"（2019年真题）建设工程项目施工成本按构成要素可分解为（ ）",[300,302,304,306],{"key":20,"text":301,"correct":22},"直接费、间接费、利润、税金等",{"key":24,"text":303,"correct":22},"单位工程施工成本、分部工程施工成本、分项工程施工成本等",{"key":27,"text":305,"correct":22},"人工费、材料费、施工机具使用费、措施项目费等",{"key":30,"text":307,"correct":32},"人工费、材料费、施工机具使用费、企业管理费等",{"id":309,"libraryId":5,"type":107,"typeLabel":108,"stem":310,"options":311,"answer":185,"analysis":33},1142771,"（2019年真题）关于按工程实施阶段编制施工成本计划的说法，正确的有（）。",[312,314,316,318,320],{"key":20,"text":313,"correct":32},"可在网络图的基础上进一步扩充得到",{"key":24,"text":315,"correct":32},"可以用成本计划直方图的方式表示",{"key":27,"text":317,"correct":32},"可以用时间--成本累积曲线表示",{"key":30,"text":319,"correct":32},"可根据资金筹措情况在“香蕉图”内调整S形曲线",{"key":120,"text":321,"correct":22},"按最早时间安排工作可节约资金贷款利息",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},1142773,"（2018年真题）将已汇总的人工、材料、机械台班消耗数量分别乘以所在地区的人工工资标准、材料预算价格、机械台班单价，计算出人料机费的表格是（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"工程量计算汇总表",{"key":24,"text":329,"correct":22},"施工预算工料分析表",{"key":27,"text":331,"correct":32},"施工预算表",{"key":30,"text":333,"correct":22},"项目造价取费表",{"id":335,"libraryId":5,"type":107,"typeLabel":108,"stem":336,"options":337,"answer":234,"analysis":33},1142774,"（2018年真题）下列建筑安装工程费用中，属于企业管理费用的有（）。",[338,339,341,343,345],{"key":20,"text":178,"correct":32},{"key":24,"text":340,"correct":32},"劳动保护费",{"key":27,"text":342,"correct":32},"城市维护建设税",{"key":30,"text":344,"correct":22},"增值税",{"key":120,"text":346,"correct":32},"教育费附加",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},1142775,"（2018年真题）某项目施工成本计划如下图，则5月末计划累积成本支出为（）万元。",[351,353,355,357],{"key":20,"text":352,"correct":22},"325",{"key":24,"text":354,"correct":32},"270",{"key":27,"text":356,"correct":22},"180",{"key":30,"text":358,"correct":22},"75",{"id":360,"libraryId":5,"type":107,"typeLabel":108,"stem":361,"options":362,"answer":373,"analysis":33},1142776,"（2020年真题）施工项目竞争性成本计划是（ ）的估算成本计划。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"选派项目经理阶段",{"key":24,"text":366,"correct":32},"投标阶段",{"key":27,"text":368,"correct":22},"施工准备阶段",{"key":30,"text":370,"correct":32},"签订合同阶段",{"key":120,"text":372,"correct":22},"制定企业年度计划阶段","BD",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1142777,"（2020年真题）下列成本计划中，用于确定责任总成本目标的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":32},"指导性成本计划",{"key":24,"text":381,"correct":22},"竞争性成本计划",{"key":27,"text":383,"correct":22},"响应性成本计划",{"key":30,"text":385,"correct":22},"实施性成本计划",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1142778,"（2020年真题）在编制施工成本计划时通常需要进行“两算”对比，“两算”指的是（）。",[390,392,393,395],{"key":20,"text":391,"correct":22},"设计概算、施工图预算",{"key":24,"text":166,"correct":32},{"key":27,"text":394,"correct":22},"设计概算、投资估算",{"key":30,"text":396,"correct":22},"设计概算、施工预算",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1142779,"某工程项目截至8月末的有关费用数据为：BCWP为980万元，BCWS为820万元，ACWP为1050万元，则其SV为（ ）万元。",[401,403,405,407],{"key":20,"text":402,"correct":22},"-160",{"key":24,"text":404,"correct":32},"160",{"key":27,"text":406,"correct":22},"70",{"key":30,"text":408,"correct":22},"-70",{"id":410,"libraryId":5,"type":107,"typeLabel":108,"stem":411,"options":412,"answer":122,"analysis":33},1142780,"某工作横道图费用偏差分析如下图，正确的有（ ）。（2015）",[413,415,417,419,421],{"key":20,"text":414,"correct":32},"费用超支",{"key":24,"text":416,"correct":32},"进度较快",{"key":27,"text":418,"correct":22},"效率较高",{"key":30,"text":420,"correct":22},"可采用抽出部分人员，放慢进度的措施",{"key":120,"text":422,"correct":32},"投入超前",{"id":424,"libraryId":5,"type":107,"typeLabel":108,"stem":425,"options":426,"answer":436,"analysis":33},1142781,"施工成本控制的主要依据包括（ ）。2017",[427,429,431,432,434],{"key":20,"text":428,"correct":32},"工程承包合同",{"key":24,"text":430,"correct":32},"施工成本计划",{"key":27,"text":140,"correct":22},{"key":30,"text":433,"correct":32},"进度报告",{"key":120,"text":435,"correct":32},"工程变更","ABDE",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1142782,"关于建设工程项目施工成本控制的说法。正确的是（ ）。2017",[441,443,445,447],{"key":20,"text":442,"correct":22},"施工成本管理体系由社会有关组织进行评审和认证",{"key":24,"text":444,"correct":22},"管理行为控制程序是进行成本过程控制的重点",{"key":27,"text":446,"correct":32},"施工成本控制可分为事先控制、过程控制和事后控制",{"key":30,"text":448,"correct":22},"管理行为控制程序和指标控制程序是相互独立的",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1142783,"在施工成本的过程控制中，需进行包干控制的材料是（ ）。2017",[453,455,457,459],{"key":20,"text":454,"correct":32},"钢钉",{"key":24,"text":456,"correct":22},"水泥",{"key":27,"text":458,"correct":22},"钢筋",{"key":30,"text":460,"correct":22},"石子",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":30,"analysis":33},1142784,"下列施工成本分析依据中，属于可对已发生，又可对尚未发生或正在发生的经济活动进行核算的是（ ）（2016）",[465,467,469,471],{"key":20,"text":466,"correct":22},"会计核算",{"key":24,"text":468,"correct":22},"统计核算",{"key":27,"text":470,"correct":22},"成本预测",{"key":30,"text":472,"correct":32},"业务核算",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":30,"analysis":33},1142785,"关于施工成本控制程序的说法，正确的是（ ）。（2016）",[477,479,481,483],{"key":20,"text":478,"correct":22},"管理行为控制程序是成本全过程控制的重点",{"key":24,"text":480,"correct":22},"指标控制程序是对成本进行过程控制的基础",{"key":27,"text":482,"correct":22},"管理行为控制程序是项目施工成本结果控制的主要内容",{"key":30,"text":484,"correct":32},"管理行为控制程序和指标控制程序在实施过程中相互制约",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1142786,"某工程每月所需混凝土量相同，混凝土用量为3200m3，计划4个月完成，混凝土综合价格为1000元\u002Fm3；实际混凝土用量为5000m3，用时5个月，从第1个月至第5个月各月混凝土价格指数（%）为100,115,110,105,115。则根据赢得值法，前3个月的费用偏差为（ ）万元。（2015）",[489,491,493,495],{"key":20,"text":490,"correct":22},"-30",{"key":24,"text":492,"correct":32},"-25",{"key":27,"text":494,"correct":22},"-22",{"key":30,"text":496,"correct":22},"-20",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":30,"analysis":33},1142787,"下列施工成本材料费的控制中，可以影响材料价格的因素是( )。（2013）",[501,503,505,507],{"key":20,"text":502,"correct":22},"材料领用的指标",{"key":24,"text":504,"correct":22},"材料的投料计量",{"key":27,"text":506,"correct":22},"材料消耗量的大小",{"key":30,"text":508,"correct":32},"材料的采购运输",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},1142788,"某施工项目部根据以往项目的材料实际耗用情况，结合具体施工项目要求，制定领用材料标准控制发料。这种材料用量控制方法是（ ）。（2015）",[513,515,517,519],{"key":20,"text":514,"correct":22},"定额控制",{"key":24,"text":516,"correct":22},"计量控制",{"key":27,"text":518,"correct":32},"指标控制",{"key":30,"text":520,"correct":22},"包干控制",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1142789,"施工成本计划的编制以成本预算为基础，关键是确定（）（2014）",[525,526,527,529],{"key":20,"text":219,"correct":32},{"key":24,"text":291,"correct":22},{"key":27,"text":528,"correct":22},"固定成本",{"key":30,"text":221,"correct":22},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},1142790,"关于施工成本控制的说法，正确的是（）。 （2014）",[534,535,537,538],{"key":20,"text":442,"correct":22},{"key":24,"text":536,"correct":32},"要做好施工成本的过程控制，必须制定规范化的过程控制程序",{"key":27,"text":444,"correct":22},{"key":30,"text":448,"correct":22},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1142791,"施工成本的过程控制中，人工费的控制实行（）方法（2014）",[543,545,547,549],{"key":20,"text":544,"correct":22},"量化管理",{"key":24,"text":546,"correct":32},"量价分离",{"key":27,"text":548,"correct":22},"弹性管理",{"key":30,"text":550,"correct":22},"指标包干",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1142792,"对总额1000万元的工程项目进行期中检查，截止检查时已完成工作预算费用410万元，计划工作预算费用为400万元，已完工作实际费用为430万元，则其费用绩效指数为( )。（2013）",[555,557,559,561],{"key":20,"text":556,"correct":32},"0.953",{"key":24,"text":558,"correct":22},"0.430",{"key":27,"text":560,"correct":22},"0.930",{"key":30,"text":562,"correct":22},"1.075",{"id":564,"libraryId":5,"type":107,"typeLabel":108,"stem":565,"options":566,"answer":577,"analysis":33},1142793,"关于施工成本偏差分析方法的说法，正确的有（ ）。（2016）",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"横道图法是进行偏差分析最常用的一种方法",{"key":24,"text":570,"correct":32},"横道图法具有形象、直观等优点",{"key":27,"text":572,"correct":22},"曲线法不能用于定量分析",{"key":30,"text":574,"correct":32},"表格法反映的信息量大",{"key":120,"text":576,"correct":32},"表格法具有灵活、适用性强的优点","BDE",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1142794,"某分项工程某月计划工程量为3200m2，计划单价为15元\u002Fm2；月底核定承包商实际完成工程量为2800m2，实际单价为20元\u002Fm2，则该工程的已完成工作实际费用（ACWP）为（ ）元。（2016）",[582,584,586,588],{"key":20,"text":583,"correct":32},"56000",{"key":24,"text":585,"correct":22},"42000",{"key":27,"text":587,"correct":22},"48000",{"key":30,"text":589,"correct":22},"64000",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":27,"analysis":33},1142795,"应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离表示项目进展的（ ）。（2016）",[594,596,598,600],{"key":20,"text":595,"correct":22},"进度累计偏差",{"key":24,"text":597,"correct":22},"进度局部偏差",{"key":27,"text":599,"correct":32},"成本累计偏差",{"key":30,"text":601,"correct":22},"成本局部偏差",{"id":603,"libraryId":5,"type":107,"typeLabel":108,"stem":604,"options":605,"answer":185,"analysis":33},1142796,"建设工程项目施工成本控制的主要依据有( )。（2012）",[606,607,608,609,610],{"key":20,"text":428,"correct":32},{"key":24,"text":433,"correct":32},{"key":27,"text":430,"correct":32},{"key":30,"text":435,"correct":32},{"key":120,"text":611,"correct":22},"施工成本预测资料",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":20,"analysis":33},1142797,"应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离，表示( )。（2012）",[616,618,620,622],{"key":20,"text":617,"correct":32},"成本偏差",{"key":24,"text":619,"correct":22},"进度偏差",{"key":27,"text":621,"correct":22},"进度局偏差",{"key":30,"text":623,"correct":22},"成本局偏差",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":20,"analysis":33},1142798,"（2019年真题）应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离表示（）。",[628,629,630,631],{"key":20,"text":599,"correct":32},{"key":24,"text":595,"correct":22},{"key":27,"text":597,"correct":22},{"key":30,"text":601,"correct":22},[633,636,639,642,645,648],{"id":15,"name":634,"category":7,"favorite":635},"领导干部任职前廉政法规知识测试题",92,{"id":637,"name":638,"category":7,"favorite":15},595,"建筑结构与设备",{"id":640,"name":641,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":643,"name":644,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":646,"name":647,"category":7,"favorite":8},534,"BIM工程师",{"id":649,"name":647,"category":7,"favorite":8},535]