[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-41":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":648},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,41,50,2721,[13,34,46,58,70,82,100,112,124,139,151,163,175,190,204,219,231,242,254,266,278,290,300,315,328,340,352,361,376,387,400,415,427,439,449,458,472,484,496,508,520,535,546,558,570,585,597,612,624,636],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1142648,1,"单选题","根据《建设工程项目管理规范》(GB\u002FT50326-2006),项目管理规范应包括项目管理规划大纲和()两类文件。（2013）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","项目管理计划",false,{"key":24,"text":25,"correct":22},"B","项目管理实施细则",{"key":27,"text":28,"correct":22},"C","项目管理操作规则",{"key":30,"text":31,"correct":32},"D","项目管理实施规划",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1142649,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），项目管理规划包括（ ）。（2015）",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目管理规划原则和内容",{"key":24,"text":41,"correct":22},"项目管理规划大纲和配套措施",{"key":27,"text":43,"correct":22},"项目管理规划大纲和实施大纲",{"key":30,"text":45,"correct":32},"项目管理规划大纲和实施规划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1142650,"关于设计阶段项目管理的说法，错误的是（ ）。（2016）",[50,52,54,56],{"key":20,"text":51,"correct":22},"设计阶段的项目管理是建设工程项目管理的一个非常重要的组成部分",{"key":24,"text":53,"correct":32},"由于设计费占建设总投资的比例小，业主方可以忽略对其进行管理",{"key":27,"text":55,"correct":22},"设计的质量直接影响项目实施的投资、进度和质量",{"key":30,"text":57,"correct":22},"设计的进度直接影响工程的进展",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1142651,"根据《建设工程项目管理规范》(GB\u002FT50326―2006)，项目管理实施规划应由( )组织编制。（2012）",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目技术负责人",{"key":24,"text":65,"correct":22},"企业生产经营负责人",{"key":27,"text":67,"correct":32},"项目经理",{"key":30,"text":69,"correct":22},"企业技术负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1142652,"项目管理实施规划的编制过程包括：①熟悉相关法规和文件；②分析项目条件和环境；③履行报批手续；④组织编制。根据《建设工程项目管理规范》（GB\u002FT50326―2006），正确的编制程序是（）（2014）",[74,76,78,80],{"key":20,"text":75,"correct":22},"①→②→③→④",{"key":24,"text":77,"correct":32},"②→①→④→③",{"key":27,"text":79,"correct":22},"①→②→④→③",{"key":30,"text":81,"correct":22},"②→①→③→④",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":99,"analysis":33},1142653,2,"多选题","关于建设工程项目管理规划的说法，正确的有( )。（2012）",[88,90,92,94,96],{"key":20,"text":89,"correct":22},"建设工程项目管理规划仅涉及项目的施工阶段和保修期",{"key":24,"text":91,"correct":32},"除业主方以外，建设项目的其他参与单位也需要编制项目管理规划",{"key":27,"text":93,"correct":32},"如果采用工程总承包模式，业主委托总承包方编制建设工程项目管理规划",{"key":30,"text":95,"correct":22},"建设工程项目管理规划编制完成后不需调整",{"key":97,"text":98,"correct":32},"E","建设工程项目管理规划内容涉及的范围和深度，应视项目的特点而定","BCE",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":20,"analysis":33},1142654,"（2019年真题）项目管理实施规划的编制工作包括:①分析项目具体特点和环境条件；②熟悉相关的法规和文件；③了解相关方的要求；④履行报批手续；⑤实施編制活动。正确的工作程序是（）。",[104,106,108,110],{"key":20,"text":105,"correct":32},"③①②⑤④",{"key":24,"text":107,"correct":22},"①②③④⑤",{"key":27,"text":109,"correct":22},"①③②⑤④",{"key":30,"text":111,"correct":22},"③②①④⑤",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1142655,"（2018年真题）建设工程项目管理规划属于（）项目管理的范畴。",[116,118,120,122],{"key":20,"text":117,"correct":22},"工程总承包方",{"key":24,"text":119,"correct":32},"业主方",{"key":27,"text":121,"correct":22},"工程总承包管理方",{"key":30,"text":123,"correct":22},"工程咨询方",{"id":125,"libraryId":5,"type":84,"typeLabel":85,"stem":126,"options":127,"answer":138,"analysis":33},1142656,"项目施工过程中，对施工组织设计进行修改或补充的情形有（ ）。2017",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"设计单位应业主要求对楼梯部分进行局部修改",{"key":24,"text":131,"correct":32},"某桥梁工程由于新规范的实施而需要重新调整施工工艺",{"key":27,"text":133,"correct":32},"由于自然灾害导致施工资源的配置有重大变更",{"key":30,"text":135,"correct":32},"施工单位发现设计图纸存在重大错误需要修改工程设计",{"key":97,"text":137,"correct":22},"某钢结构工程施工期间，钢材价格上涨","BCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1142657,"根据《建筑施工组织设计规范》GB\u002FT50502-2009，“合理安排施工顺序”属于施工组织设计中（ ）的内容。",[143,145,147,149],{"key":20,"text":144,"correct":32},"施工部署和施工方案",{"key":24,"text":146,"correct":22},"施工进度计划",{"key":27,"text":148,"correct":22},"施工平面图",{"key":30,"text":150,"correct":22},"施工准备工作计划",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1142658,"编制施工组织总设计时，在施工总进度计划确定之后，才可以进行的工作是()。（2013）",[155,157,159,161],{"key":20,"text":156,"correct":22},"拟定施工方案",{"key":24,"text":158,"correct":22},"确定施工的总体部署",{"key":27,"text":160,"correct":32},"编制资源需要量计划",{"key":30,"text":162,"correct":22},"计算主要工种工程的工程量",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1142659,"某施工企业编制某建设项目施工组织总设计，先后进行了相关的资料的收集和调研、主要工种工程量的计算 、施工总体部署的确定等工作，接下来应进行的工作是( )。（2012）",[167,169,171,173],{"key":20,"text":168,"correct":32},"施工总进度计划的编制",{"key":24,"text":170,"correct":22},"施工方案的拟订",{"key":27,"text":172,"correct":22},"资源需求量计划的编制",{"key":30,"text":174,"correct":22},"施工总平面图的设计",{"id":176,"libraryId":5,"type":84,"typeLabel":85,"stem":177,"options":178,"answer":189,"analysis":33},1142660,"编制施工组织总设计时，必须遵循的顺序有( )。（2012）",[179,181,183,185,187],{"key":20,"text":180,"correct":32},"确定施工部署后，才能制定施工方案",{"key":24,"text":182,"correct":22},"撰写施工方案后，才能编制进度计划",{"key":27,"text":184,"correct":22},"计算完工程量后，才能确定施工部署",{"key":30,"text":186,"correct":22},"确定资源需求量计划后，才能编制施工准备工作计划",{"key":97,"text":188,"correct":32},"编制进度计划后，才能编制资源需求量计划","AE",{"id":191,"libraryId":5,"type":84,"typeLabel":85,"stem":192,"options":193,"answer":203,"analysis":33},1142661,"下列施工组织设计内容中，属于专项施工方案的有（ ）。（2016）",[194,196,197,199,201],{"key":20,"text":195,"correct":32},"施工安排",{"key":24,"text":146,"correct":32},{"key":27,"text":198,"correct":22},"施工现场平面布置",{"key":30,"text":200,"correct":32},"施工方法及工艺要求",{"key":97,"text":202,"correct":32},"资源配置计划","ABDE",{"id":205,"libraryId":5,"type":84,"typeLabel":85,"stem":206,"options":207,"answer":218,"analysis":33},1142662,"单位工程施工组织设计和分部（分项）工程施工组织设计均应包括的内容有（ ），（2013）",[208,210,212,214,216],{"key":20,"text":209,"correct":22},"施工安全管理计划",{"key":24,"text":211,"correct":32},"工程概况",{"key":27,"text":213,"correct":22},"施工特点分析",{"key":30,"text":215,"correct":32},"各项资源需求量计划",{"key":97,"text":217,"correct":22},"主要技术经济指标","BD",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":30,"analysis":33},1142663,"某项目专业性强且技术复杂，开工后，由于专业原因该项目的项目经理不能胜任该项目，为了保证项目目标的实现，企业更换了项目经理。企业的此项行为属于项目目标动态控制的()（2013）",[223,225,227,229],{"key":20,"text":224,"correct":22},"管理措施",{"key":24,"text":226,"correct":22},"经济措施",{"key":27,"text":228,"correct":22},"技术措施",{"key":30,"text":230,"correct":32},"组织措施",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1142664,"根据施工组织设计的管理要求，重点、难点分部（分项）工程施工方案的批准人是（ ）。（2016）",[235,236,238,240],{"key":20,"text":63,"correct":22},{"key":24,"text":237,"correct":32},"施工单位技术责任人",{"key":27,"text":239,"correct":22},"项目负责人",{"key":30,"text":241,"correct":22},"总监理工程师",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1142665,"下列项目目标动态控制的流程中，正确的是（）（2014）",[246,248,250,252],{"key":20,"text":247,"correct":32},"收集项目目标的实际值→实际值与计划值比较→找出偏差→采取纠偏措施",{"key":24,"text":249,"correct":22},"收集项目目标的实际值→实际值与计划值比较→找出偏差→进行目标调整",{"key":27,"text":251,"correct":22},"收集项目目标的实际值→实际值与计划值比较→采取控制措施→进行目标调整",{"key":30,"text":253,"correct":22},"实际值与计划值比较→找出偏差→采取控制措施→收集项目目标的实际值",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1142666,"根据项目目标动态控制的工作程序，第一步工作是()（2013）",[258,260,262,264],{"key":20,"text":259,"correct":32},"进行项目目标分解",{"key":24,"text":261,"correct":22},"收集项目目标的实际值",{"key":27,"text":263,"correct":22},"进行目标的计划值与实际值比较",{"key":30,"text":265,"correct":22},"确定各种资源投入量",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1142667,"根据动态控制原理，项目目标动态控制的第一步工作是（ ）。（2016）",[270,272,274,276],{"key":20,"text":271,"correct":22},"调整项目目标",{"key":24,"text":273,"correct":32},"分解项目目标",{"key":27,"text":275,"correct":22},"制定纠偏措施",{"key":30,"text":277,"correct":22},"收集项目目标实际值",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":30,"analysis":33},1142668,"下列施工组织设计的内容中，属于施工部署及施工方案的是（ ）。（2015）",[282,284,286,288],{"key":20,"text":283,"correct":22},"施工资源的需求计划",{"key":24,"text":285,"correct":22},"施工资源的优化配置",{"key":27,"text":287,"correct":22},"投入材料的堆场设计",{"key":30,"text":289,"correct":32},"施工机械的分析选择",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1142669,"根据《建筑施工组织设计规范》（GB\u002FT50502―2009） ，施工组织设计应由（）主持编制（2014）",[294,296,297,298],{"key":20,"text":295,"correct":22},"施工单位技术负责人",{"key":24,"text":239,"correct":32},{"key":27,"text":63,"correct":22},{"key":30,"text":299,"correct":22},"项目质量负责人",{"id":301,"libraryId":5,"type":84,"typeLabel":85,"stem":302,"options":303,"answer":314,"analysis":33},1142670,"下列项目目标动态控制的纠偏措施中，属于技术措施的有（）（2014）",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"调整工作流程组织",{"key":24,"text":307,"correct":22},"调整进度管理的方法和手段",{"key":27,"text":309,"correct":32},"改变施工机具",{"key":30,"text":311,"correct":32},"改进施工方法",{"key":97,"text":313,"correct":22},"调整项目管理职能分工","CD",{"id":316,"libraryId":5,"type":84,"typeLabel":85,"stem":317,"options":318,"answer":314,"analysis":33},1142671,"下列项目目标动态控制的纠偏措施中，属于技术措施的有( )。（2012）",[319,321,323,324,326],{"key":20,"text":320,"correct":22},"调整项目管理工作流程组织",{"key":24,"text":322,"correct":22},"调整进度控制的方法和手段",{"key":27,"text":311,"correct":32},{"key":30,"text":325,"correct":32},"选择高效的施工机具",{"key":97,"text":327,"correct":22},"调整项目管理任务分工",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1142672,"项目投资的动态控制中，相对于工程合同价，可作为投资计划值的是（）。（2014）",[332,334,336,338],{"key":20,"text":333,"correct":32},"工程预算",{"key":24,"text":335,"correct":22},"工程支付款",{"key":27,"text":337,"correct":22},"工程决算",{"key":30,"text":339,"correct":22},"项目估算",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1142673,"应用动态控制原理控制项目投资时，若将工程合同价作为投资的实际值，则可作为投资计划值的是( )。（2012）",[344,346,348,350],{"key":20,"text":345,"correct":32},"工程概算和工程预算",{"key":24,"text":347,"correct":22},"工程概算和工程款支付值",{"key":27,"text":349,"correct":22},"工程概算和工程决算",{"key":30,"text":351,"correct":22},"工程决算和工程款支付值",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1142674,"工程项目施工组织设计中，一般将施工顺序的安排写入()（2013）",[356,357,359,360],{"key":20,"text":146,"correct":22},{"key":24,"text":358,"correct":22},"施工总平面图",{"key":27,"text":144,"correct":32},{"key":30,"text":211,"correct":22},{"id":362,"libraryId":5,"type":84,"typeLabel":85,"stem":363,"options":364,"answer":375,"analysis":33},1142675,"关于施工组织设计中施工平面图的说法中，正确的有（ ）。 （2015）",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"反映了最佳施工方案在时间上的安排",{"key":24,"text":368,"correct":22},"反映了施工机具等资源的供应情况",{"key":27,"text":370,"correct":32},"反映了施工方案在空间上的全面安排",{"key":30,"text":372,"correct":32},"反映了施工进度计划在空间上的全面安排",{"key":97,"text":374,"correct":32},"使整个现场能有组织地进行文明施工","CDE",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":30,"analysis":33},1142676,"下列项目目标动态控制的纠偏措施中，属于组织措施的是( )。（2012）",[380,382,384,386],{"key":20,"text":381,"correct":22},"调整进度管理方法",{"key":24,"text":383,"correct":22},"改变施工管理方法",{"key":27,"text":385,"correct":22},"强化合同管理",{"key":30,"text":305,"correct":32},{"id":388,"libraryId":5,"type":84,"typeLabel":85,"stem":389,"options":390,"answer":399,"analysis":33},1142677,"根据《建筑施工组织设计规范》（GB\u002FT50502-2009)，以分部（分项）工程或专项工程为主要对象编制的施工方案，其主要内容包括（）。 （2014）",[391,392,394,396,398],{"key":20,"text":211,"correct":32},{"key":24,"text":393,"correct":22},"施工部署",{"key":27,"text":395,"correct":32},"施工方法和工艺要求",{"key":30,"text":397,"correct":32},"施工准备与资源配置计划",{"key":97,"text":198,"correct":22},"ACD",{"id":401,"libraryId":5,"type":84,"typeLabel":85,"stem":402,"options":403,"answer":414,"analysis":33},1142678,"（2019年真题）根据《建筑施工组织设计规范》,施工管理计划包括（）",[404,406,408,410,412],{"key":20,"text":405,"correct":32},"进度管理计划",{"key":24,"text":407,"correct":32},"质量管理计划",{"key":27,"text":409,"correct":32},"安全管理计划",{"key":30,"text":411,"correct":22},"运营管理计划",{"key":97,"text":413,"correct":32},"环境管理计划","ABCE",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},1142679,"某施工企业针对建筑主体钢结构工程编制专项施工方案，该施工方案应由（）进行审批。（2018年真题）",[419,421,423,425],{"key":20,"text":420,"correct":22},"总包单位项目技术负责人",{"key":24,"text":422,"correct":22},"专业分包单位技术负责人",{"key":27,"text":424,"correct":32},"总包单位技术负责人",{"key":30,"text":426,"correct":22},"专业分包单位项目技术负责人",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":30,"analysis":33},1142680,"（2020年真题）根据《建筑施工组织设计规范》,关于施工组织设计审批的说法,正确的是（）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"专项施工方案应由项目技术负责人审批",{"key":24,"text":434,"correct":22},"施工方案应由项目总监理工程师审批",{"key":27,"text":436,"correct":22},"施工组织总设计应由建设单位技术负责人审批",{"key":30,"text":438,"correct":32},"单位工程施工组织设计应由承包单位技术负责人审批",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},1142681,"应用动态控制原理进行建设工程项目投资控制时，相对于工程合同价，投资的计划值是（ ）。2017",[443,444,446,448],{"key":20,"text":333,"correct":32},{"key":24,"text":445,"correct":22},"施工预算",{"key":27,"text":447,"correct":22},"工程进度款",{"key":30,"text":337,"correct":22},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1142682,"（2019年真题）项目目标动态控制工作包括:①确定目标控制的计划值，②分解项目目标，③收集项目目标的实际值，④定期比较计划值和实际值，⑤纠正偏差，正确的工作流程是（）。",[453,454,456,457],{"key":20,"text":109,"correct":22},{"key":24,"text":455,"correct":32},"②①③④⑤",{"key":27,"text":111,"correct":22},{"key":30,"text":107,"correct":22},{"id":459,"libraryId":5,"type":84,"typeLabel":85,"stem":460,"options":461,"answer":414,"analysis":33},1142683,"（2018年真题）下列具体情况中，施工组织设计应及时进行修改或补充的有（）。",[462,464,466,468,470],{"key":20,"text":463,"correct":32},"由于施工规范发生变更导致需要调整预应力钢筋施工工艺",{"key":24,"text":465,"correct":32},"由于国际钢材市场价格大涨导致进口钢材无法及时供料，严重影响工程施工",{"key":27,"text":467,"correct":32},"由于自然灾害导致工期严重滞后",{"key":30,"text":469,"correct":22},"设计单位应业主要求对工程设计图纸进行了细微修改",{"key":97,"text":471,"correct":32},"施工单位发现设计图纸存在严重错误，无法继续施工",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1142684,"（2018年真题）应用动态控制原理控制项目投资时，属于设计过程中投资的计划值与实际值比较的是（）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"工程概算与工程合同价",{"key":24,"text":479,"correct":22},"工程预算与工程合同价",{"key":27,"text":481,"correct":32},"工程预算与工程概算",{"key":30,"text":483,"correct":22},"工程概算与工程决算",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},1142685,"（2020年真题）施工过程中投资的计划值和实际值进行比较时,相对于工程合同价可作为投资计划值的是（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"投资估算",{"key":24,"text":491,"correct":22},"工程结算",{"key":27,"text":493,"correct":32},"施工图预算",{"key":30,"text":495,"correct":22},"竣工决算",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":30,"analysis":33},1142686,"建筑施工企业因暂时生产经营困难无法按劳动合同约定的日期支付工资的，应当向劳动者说明情况，并与工会或职工代表协商一致后，可以延期支付工资，但最长不超过（ ）。2017 天。",[500,502,504,506],{"key":20,"text":501,"correct":22},"7",{"key":24,"text":503,"correct":22},"10",{"key":27,"text":505,"correct":22},"15",{"key":30,"text":507,"correct":32},"30",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":30,"analysis":33},1142687,"关于施工企业劳动用工管理的说法，正确的是（ ）。2017",[512,514,516,518],{"key":20,"text":513,"correct":22},"作业人员变更后的14个工作日内，在当地建筑业企业信息管理系统中变更",{"key":24,"text":515,"correct":22},"施工企业与劳动者者按相关规定可以订立口头劳动合同",{"key":27,"text":517,"correct":22},"劳动合同一式两份，双方当事人各持一份",{"key":30,"text":519,"correct":32},"施工企业不得允许未与企业签订劳动合同的劳动者从事施工活动",{"id":521,"libraryId":5,"type":84,"typeLabel":85,"stem":522,"options":523,"answer":534,"analysis":33},1142688,"根据《建设工程项目管理规范》GB\u002FT50326-2006，施工项目经理的职责有（ ）。2017",[524,526,528,530,532],{"key":20,"text":525,"correct":32},"进行授权范围内的利益分配",{"key":24,"text":527,"correct":32},"对资源进行的动态管理",{"key":27,"text":529,"correct":32},"参与工程竣工验收",{"key":30,"text":531,"correct":22},"确保项目建设资金的落实到位",{"key":97,"text":533,"correct":22},"与建设单位签订承包合同","ABC",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":30,"analysis":33},1142689,"根据《建设工程项目管理规范》(GB\u002FT5036一2006)，项目管理目标责任书应在项目实施之前，由( )制定。（2013）",[539,540,542,544],{"key":20,"text":63,"correct":22},{"key":24,"text":541,"correct":22},"法定代表人",{"key":27,"text":543,"correct":22},"项目经理与项目承包人协商",{"key":30,"text":545,"correct":32},"法定代表人与项目经理协商",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":30,"analysis":33},1142690,"沟通的两个层面是指（ ）。（2016）",[550,552,554,556],{"key":20,"text":551,"correct":22},"信息的发送者和接受者",{"key":24,"text":553,"correct":22},"沟通内容和沟通方法",{"key":27,"text":555,"correct":22},"信息传递和交换",{"key":30,"text":557,"correct":32},"思维交流和语言交流",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},1142691,"下列项目各参与方的沟通障碍中，属于组织沟通障碍的是( )。（2013）",[562,564,566,568],{"key":20,"text":563,"correct":32},"机构组织庞大",{"key":24,"text":565,"correct":22},"知识、经验水平的差距导致的障碍",{"key":27,"text":567,"correct":22},"对信息的看法不同造成的障碍",{"key":30,"text":569,"correct":22},"下属对上级的恐惧心理而形成的障碍",{"id":571,"libraryId":5,"type":84,"typeLabel":85,"stem":572,"options":573,"answer":584,"analysis":33},1142692,"根据《建设工程施工合同》，施工单位任命项目经理需要向建设单位提供哪些证明（ ）。（2016）",[574,576,578,580,582],{"key":20,"text":575,"correct":32},"劳动合同",{"key":24,"text":577,"correct":32},"缴纳的社会保险",{"key":27,"text":579,"correct":22},"项目经理持有的注册执业证书",{"key":30,"text":581,"correct":22},"职称证书",{"key":97,"text":583,"correct":22},"授权范围","AB",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1142693,"沟通过程的五要素包括（ ）。 （2015）",[589,591,593,595],{"key":20,"text":590,"correct":32},"沟通主体、沟通客体、沟通介体、沟通环境和沟通渠道",{"key":24,"text":592,"correct":22},"沟通主体、沟通客体、沟通介体、沟通内容和沟通渠道",{"key":27,"text":594,"correct":22},"沟通主体、沟通客体、沟通介体、沟通环境和沟通方法",{"key":30,"text":596,"correct":22},"沟通主体、沟通客体、沟通介体、沟通内容和沟通方法",{"id":598,"libraryId":5,"type":84,"typeLabel":85,"stem":599,"options":600,"answer":611,"analysis":33},1142694,"关于沟通障碍的说法，正确的有（ ）。 （2015）",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"从信息发送者的角度看，影响信息沟通的因素可能是信息译码不准确",{"key":24,"text":604,"correct":32},"沟通障碍来自发送者的障碍、接受者的障碍和沟通通道的障碍",{"key":27,"text":606,"correct":22},"沟通障碍包括组织的沟通障碍和能力的沟通障碍两种形式",{"key":30,"text":608,"correct":32},"从信息接受者的角度看，影响信息沟通的因素可能是心理上的障碍",{"key":97,"text":610,"correct":32},"选择沟通媒介不当是沟通通道障碍的一个方面","BDE",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":20,"analysis":33},1142695,"一般来说，沟通者的沟通能力包含（）（2014）",[616,618,620,622],{"key":20,"text":617,"correct":32},"表达能力、争辩能力、倾听能力和设计能力",{"key":24,"text":619,"correct":22},"思维能力、表达能力、倾听能力和说服能力",{"key":27,"text":621,"correct":22},"思维能力、表达能力、把控能力和说服能力",{"key":30,"text":623,"correct":22},"想象能力、表达能力、说服能力和设计能力",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":30,"analysis":33},1142696,"项目人力资源管理的目的是（）。 （2014）",[628,630,632,634],{"key":20,"text":629,"correct":22},"提高员工的业务水平",{"key":24,"text":631,"correct":22},"建立广泛的人际关系",{"key":27,"text":633,"correct":22},"降低项目的人力成本",{"key":30,"text":635,"correct":32},"调动所有项目参与人的积极性",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":24,"analysis":33},1142697,"关于建造师和项目经理的说法，正确的是( )。（2012）",[640,642,644,646],{"key":20,"text":641,"correct":22},"取得建造师注册证书的人员即可成为施工项目经理",{"key":24,"text":643,"correct":32},"大、中型工程项目施工的项目经理必须取得建造师注册证书的人员担任",{"key":27,"text":645,"correct":22},"建造师是管理岗位，项目经理是技术岗位",{"key":30,"text":647,"correct":22},"取得建造师注册证书的人员只能担任施工项目经理",[649,652,655,658,661,664],{"id":15,"name":650,"category":7,"favorite":651},"领导干部任职前廉政法规知识测试题",92,{"id":653,"name":654,"category":7,"favorite":15},595,"建筑结构与设备",{"id":656,"name":657,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":659,"name":660,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":662,"name":663,"category":7,"favorite":8},534,"BIM工程师",{"id":665,"name":663,"category":7,"favorite":8},535]