[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":657},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,40,50,2721,[13,38,52,64,76,91,103,117,129,144,156,168,183,195,206,218,230,242,254,266,277,289,301,313,323,335,350,362,374,386,398,410,425,437,452,464,476,491,506,519,531,543,554,569,581,595,605,616,631,643],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1142597,2,"多选题","下列组织论基本内容中，属于相对静态的组织关系的有（ ）。（2016）",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","组织分工",true,{"key":24,"text":25,"correct":26},"B","物质流程组织",false,{"key":28,"text":29,"correct":26},"C","信息处理工作流租组织",{"key":31,"text":32,"correct":26},"D","管理工作流程组织",{"key":34,"text":35,"correct":22},"E","组织结构模式","AE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":24,"analysis":37},1142598,1,"单选题","关于管理职能分工表的说法，错误的是（ ）。（2016）",[44,46,48,50],{"key":20,"text":45,"correct":26},"是用表的形式反映项目管理班子内部项目经理、各工作部门和各工作岗位对各项工作任务的项目管理职能分工",{"key":24,"text":47,"correct":22},"管理职能分工表示无法暴露仅用岗位描述书时所掩盖的矛盾",{"key":28,"text":49,"correct":26},"可辅以管理职能分工描述书来明确每个工作部门的管理职能",{"key":31,"text":51,"correct":26},"可以用管理职能分工表来区分业主方方和代表业主利益的项目管理方和工程建设监理方等的管理职能",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":31,"analysis":37},1142599,"承包商就已完工，经检验合格的工程提出支付申请，监理工程师复核后，业主批准支付申请，此工作程序属于（ ）流程。 （2015）",[56,58,60,62],{"key":20,"text":57,"correct":26},"物资采购工作",{"key":24,"text":59,"correct":26},"信息处理工作",{"key":28,"text":61,"correct":26},"设计工作",{"key":31,"text":63,"correct":22},"管理工作",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":28,"analysis":37},1142600,"（2019年真题）关于组织论及组织工具的说法，正确的是（）。",[68,70,72,74],{"key":20,"text":69,"correct":26},"管理职能分工反映的是一种动态组织关系",{"key":24,"text":71,"correct":26},"工作流程图是反映工作间静态逻辑关系的工具",{"key":28,"text":73,"correct":22},"组织结构模式和组织分工都是一种相对的静态组织关系",{"key":31,"text":75,"correct":26},"组织结构模式反映一个组织系统中的工作任务分工和管理职能分工",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":90,"analysis":37},1142601,"（2019年真题）关于工作任务分工和管理职能分工的说法,正确的有（）",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"管理职能是由管理过程的多个工作环节组成",{"key":24,"text":83,"correct":22},"在一个项目实施的全过程中,应视具体情况对工作任务分工进行调整",{"key":28,"text":85,"correct":22},"项目职能分工表即可用于项目管理,也可用于企业管理",{"key":31,"text":87,"correct":26},"项目各参与方应编制统一的工作任务分工表和管理职能分工表",{"key":34,"text":89,"correct":22},"编制任务分工表前应对项目实施各阶段的具体管理工作进行详细分解","ABCE",{"id":92,"libraryId":5,"type":40,"typeLabel":41,"stem":93,"options":94,"answer":24,"analysis":37},1142602,"（2018年真题）关于项目结构分析的说法，正确的是（）。",[95,97,99,101],{"key":20,"text":96,"correct":26},"同一个建设工程项目只有一个项目结构的分解方法",{"key":24,"text":98,"correct":22},"居住建筑开发项目可根据建设的时间对项目结构进行逐层分解",{"key":28,"text":100,"correct":26},"群体项目最多可进行到第二层次的分解",{"key":31,"text":102,"correct":26},"单体工程不应再进行项目结构分解",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":90,"analysis":37},1142603,"（2018年真题）每一个建设项目根据其特点，应确定的工作流程有（）。",[107,109,111,113,115],{"key":20,"text":108,"correct":22},"设计准备工作的流程",{"key":24,"text":110,"correct":22},"施工招标工作的流程",{"key":28,"text":112,"correct":22},"施工作业的流程",{"key":31,"text":114,"correct":26},"工作任务分工的流程",{"key":34,"text":116,"correct":22},"信息处理的流程",{"id":118,"libraryId":5,"type":40,"typeLabel":41,"stem":119,"options":120,"answer":31,"analysis":37},1142604,"（2020年真题）关于项目管理职能分工表的说法，正确的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":26},"业主方和项目各参与方应编制统一的项目管理职能分工表",{"key":24,"text":124,"correct":26},"管理职能分工表不适用于企业管理",{"key":28,"text":126,"correct":26},"可以用管理职能分工描述书代替管理职能分工表",{"key":31,"text":128,"correct":22},"管理职能分工表可以表示项目各参与方的管理职能分工",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":143,"analysis":37},1142605,"（2020年真题）下列工作流程组织中，属于管理工作流程组织的有（ ）",[133,135,137,139,141],{"key":20,"text":134,"correct":26},"基坑开挖施工流程",{"key":24,"text":136,"correct":22},"设计变更工作流程",{"key":28,"text":138,"correct":22},"投资控制工作流程",{"key":31,"text":140,"correct":26},"房屋装修施工流程",{"key":34,"text":142,"correct":26},"装配式构件深化设计流程","BC",{"id":145,"libraryId":5,"type":40,"typeLabel":41,"stem":146,"options":147,"answer":31,"analysis":37},1142606,"下列策划内容中，属于建设工程项目实施阶段策划的是（ ）。2017",[148,150,152,154],{"key":20,"text":149,"correct":26},"编制项目实施期合同结构总体方案",{"key":24,"text":151,"correct":26},"确立项目实施期管理总体方案",{"key":28,"text":153,"correct":26},"确定关键技术分析和论证",{"key":31,"text":155,"correct":22},"进行项目目标的分析和再论证",{"id":157,"libraryId":5,"type":40,"typeLabel":41,"stem":158,"options":159,"answer":31,"analysis":37},1142607,"下列建设工程项目决策阶段的工作内容中，属于组织策划的是( )。（2013）",[160,162,164,166],{"key":20,"text":161,"correct":26},"业主方项目管理的组织结构",{"key":24,"text":163,"correct":26},"生产运营期经营管理总体方案",{"key":28,"text":165,"correct":26},"编码体系的建立",{"key":31,"text":167,"correct":22},"实施期组织总体方案",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1142608,"下列建设工程项目实施阶段策划的工作中，属于项目目标分析和再论证工作内容的有()（2013）",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"编制项目投资总体规划",{"key":24,"text":175,"correct":22},"编制项目建设总进度规划",{"key":28,"text":177,"correct":22},"项目功能分解",{"key":31,"text":179,"correct":22},"建筑面积分配",{"key":34,"text":181,"correct":26},"项目实施环境调查","ABCD",{"id":184,"libraryId":5,"type":40,"typeLabel":41,"stem":185,"options":186,"answer":31,"analysis":37},1142609,"下列工程项目策划工作中，属于项目决策阶段合同策划的是（ ）。（2015）",[187,189,191,193],{"key":20,"text":188,"correct":26},"组织方案设计竞赛",{"key":24,"text":190,"correct":26},"确定项目设计合同结构方案",{"key":28,"text":192,"correct":26},"拟定施工合同文本",{"key":31,"text":194,"correct":22},"确定实施期合同结构总体方案",{"id":196,"libraryId":5,"type":40,"typeLabel":41,"stem":197,"options":198,"answer":31,"analysis":37},1142610,"下列建设工程项目策划工作中，属于实施阶段策划的是（ ）。（2016）",[199,201,203,204],{"key":20,"text":200,"correct":26},"编制项目实施期组织总体方案",{"key":24,"text":202,"correct":26},"编制项目实施期管理总体方案",{"key":28,"text":149,"correct":26},{"key":31,"text":205,"correct":22},"制订项目风险管理与工程保险方案",{"id":207,"libraryId":5,"type":40,"typeLabel":41,"stem":208,"options":209,"answer":28,"analysis":37},1142611,"下列工程项目策划工作中，属于建设工程项目实施阶段管理策划的是（ ）。（2015）",[210,212,214,216],{"key":20,"text":211,"correct":26},"确定项目实施期管理总体方案",{"key":24,"text":213,"correct":26},"确定生产运营期设施管理总体方案",{"key":28,"text":215,"correct":22},"确定项目风险管理与工程保险方案",{"key":31,"text":217,"correct":26},"确定生产运营期经营管理总体方案",{"id":219,"libraryId":5,"type":40,"typeLabel":41,"stem":220,"options":221,"answer":20,"analysis":37},1142612,"下列项目策划工作中，属于实施阶段管理策划的是（）（2014）",[222,224,226,228],{"key":20,"text":223,"correct":22},"项目实施各阶段项目管理的工作内容策划",{"key":24,"text":225,"correct":26},"项目实施期管理总体方案策划",{"key":28,"text":227,"correct":26},"生产运营期设施管理总体方案策划",{"key":31,"text":229,"correct":26},"生产运营期经营管理总体方案策划",{"id":231,"libraryId":5,"type":40,"typeLabel":41,"stem":232,"options":233,"answer":24,"analysis":37},1142613,"关于项目实施阶段策划的说法，正确的是( )。（2012）",[234,236,238,240],{"key":20,"text":235,"correct":26},"策划是一个封闭性的、专业性较强的工作过程",{"key":24,"text":237,"correct":22},"项目目标的分析和再论证是其基本内容之一",{"key":28,"text":239,"correct":26},"项目实施阶段策划的主要任务是进行项目实施的管理策划",{"key":31,"text":241,"correct":26},"实施阶段策划的范围和深度有明确的统一规定",{"id":243,"libraryId":5,"type":40,"typeLabel":41,"stem":244,"options":245,"answer":24,"analysis":37},1142614,"关于建设工程项目策划的说法，正确的是（）。 （2014）",[246,248,250,252],{"key":20,"text":247,"correct":26},"工程项目策划只针对建设工程项目的决策和实施",{"key":24,"text":249,"correct":22},"旨在为项目建设的决策和实施增值",{"key":28,"text":251,"correct":26},"工程项目策划师一个封闭性的工作过程",{"key":31,"text":253,"correct":26},"其实质就是知识组合的过程",{"id":255,"libraryId":5,"type":40,"typeLabel":41,"stem":256,"options":257,"answer":28,"analysis":37},1142615,"（2019年真题）下列工程项目策划工作中，属于决策阶段经济策划的是（）",[258,260,262,264],{"key":20,"text":259,"correct":26},"项目总投资规划",{"key":24,"text":261,"correct":26},"项目总投资目标的分解",{"key":28,"text":263,"correct":22},"项目建设成本分析",{"key":31,"text":265,"correct":26},"技术方案分析和论证",{"id":267,"libraryId":5,"type":40,"typeLabel":41,"stem":268,"options":269,"answer":31,"analysis":37},1142616,"（2019年真题）下列工程项目策划工作中，属于实施阶段管理策划的是（)",[270,272,274,275],{"key":20,"text":271,"correct":26},"项目实施期管理总体方案",{"key":24,"text":273,"correct":26},"生产运营期设施管理总体方案",{"key":28,"text":163,"correct":26},{"key":31,"text":276,"correct":22},"项目风险管理与工程保险方案",{"id":278,"libraryId":5,"type":40,"typeLabel":41,"stem":279,"options":280,"answer":24,"analysis":37},1142617,"施工总承包管理模式与施工总承包模式相比，在合同价方面的特点是（）。（2018年真题）",[281,283,285,287],{"key":20,"text":282,"correct":26},"合同总价可以一次确定",{"key":24,"text":284,"correct":22},"分包合同价对业主相对透明",{"key":28,"text":286,"correct":26},"不利于业主节约投资",{"key":31,"text":288,"correct":26},"确定建设项目合同总额的依据不足",{"id":290,"libraryId":5,"type":40,"typeLabel":41,"stem":291,"options":292,"answer":28,"analysis":37},1142618,"下列项目策划的工作内容中，属于项目决策阶段合同策划的是（）。（2018年真题）",[293,295,297,299],{"key":20,"text":294,"correct":26},"项目管理委托的合同结构方案",{"key":24,"text":296,"correct":26},"方案设计竞赛的组织",{"key":28,"text":298,"correct":22},"实施期合同结构总体方案",{"key":31,"text":300,"correct":26},"项目物资采购的合同结构方案",{"id":302,"libraryId":5,"type":40,"typeLabel":41,"stem":303,"options":304,"answer":28,"analysis":37},1142619,"（2020年真题）下列工程项目决策阶段策划工作内容中，属于组织策划的是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":26},"设计项目管理组织结构",{"key":24,"text":308,"correct":26},"制定项目管理工作流程",{"key":28,"text":310,"correct":22},"确定项目实施期组织总体方案",{"key":31,"text":312,"correct":26},"进行项目管理职能分工",{"id":314,"libraryId":5,"type":40,"typeLabel":41,"stem":315,"options":316,"answer":24,"analysis":37},1142620,"（2020年真题）下列工程项目策划工作中，属于实施阶段策划的是（）。",[317,318,320,322],{"key":20,"text":225,"correct":26},{"key":24,"text":319,"correct":22},"项目实施的风险策划",{"key":28,"text":321,"correct":26},"实施期合同结构总体方案策划",{"key":31,"text":229,"correct":26},{"id":324,"libraryId":5,"type":40,"typeLabel":41,"stem":325,"options":326,"answer":28,"analysis":37},1142621,"物资采购管理程序中，完成编制采购计划后下一步应进行的工作是（ ）。2017",[327,329,331,333],{"key":20,"text":328,"correct":26},"进行采购合同谈判，签订采购合同",{"key":24,"text":330,"correct":26},"选择材料设备的采购单位",{"key":28,"text":332,"correct":22},"进行市场调查，选择合格的产品供应单位并建立名录",{"key":31,"text":334,"correct":26},"明确釆购产品的基本要求、采购分工和有关责任",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":349,"analysis":37},1142622,"与施工总承包模式相比，施工总承包管理模式的优点有（ ）。2017",[339,341,343,345,347],{"key":20,"text":340,"correct":22},"整个建设项目合同总额的确定较有依据",{"key":24,"text":342,"correct":26},"能为分包单位提供更好的管理和服务",{"key":28,"text":344,"correct":22},"对业主节约投资较为有利",{"key":31,"text":346,"correct":26},"施工现场的总体管理与协调较为有利",{"key":34,"text":348,"correct":22},"缩短建设周期，进度控制较为有利","ACE",{"id":351,"libraryId":5,"type":40,"typeLabel":41,"stem":352,"options":353,"answer":31,"analysis":37},1142623,"关于施工总承包模式特点的说法，正确的是（ ）。2017",[354,356,358,360],{"key":20,"text":355,"correct":26},"招标和合同管理工作量大",{"key":24,"text":357,"correct":26},"业主组织与协调的工作量大",{"key":28,"text":359,"correct":26},"分包合同价对业主是透明的",{"key":31,"text":361,"correct":22},"开工前就有较明确的合同价",{"id":363,"libraryId":5,"type":40,"typeLabel":41,"stem":364,"options":365,"answer":28,"analysis":37},1142624,"根据《建设项目工程总承包管理规范》（GB\u002FT50358—2005），下列项目总承包方的工作中，首先应进行的是（ ）。（2016）",[366,368,370,372],{"key":20,"text":367,"correct":26},"进行项目策划",{"key":24,"text":369,"correct":26},"召开开工会议",{"key":28,"text":371,"correct":22},"任命项目经理",{"key":31,"text":373,"correct":26},"施工开工准备",{"id":375,"libraryId":5,"type":40,"typeLabel":41,"stem":376,"options":377,"answer":24,"analysis":37},1142625,"采用施工总承包管理模式时，对各分包单位的质量控制由()进行。（2013）",[378,380,382,384],{"key":20,"text":379,"correct":26},"施工总承包单位",{"key":24,"text":381,"correct":22},"施工总承包管理单位",{"key":28,"text":383,"correct":26},"业主方",{"key":31,"text":385,"correct":26},"监理方",{"id":387,"libraryId":5,"type":40,"typeLabel":41,"stem":388,"options":389,"answer":24,"analysis":37},1142626,"建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的()。（2013）",[390,392,394,396],{"key":20,"text":391,"correct":26},"组织柔性化",{"key":24,"text":393,"correct":22},"组织集成化",{"key":28,"text":395,"correct":26},"组织扁平化",{"key":31,"text":397,"correct":26},"组织高效化",{"id":399,"libraryId":5,"type":40,"typeLabel":41,"stem":400,"options":401,"answer":28,"analysis":37},1142627,"与施工总承包模式相比，施工总承包管理模式具有的优势是（ ）。（2016）",[402,404,406,408],{"key":20,"text":403,"correct":26},"业主方招标及合同管理工作量小",{"key":24,"text":405,"correct":26},"工程款项支付便捷",{"key":28,"text":407,"correct":22},"缩短建设周期",{"key":31,"text":409,"correct":26},"简化管理流程",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},1142628,"关于建设工程物资采购管理的说法，正确的有（ ）。（2016）",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"物资采购结束后应将采购资料归档",{"key":24,"text":417,"correct":22},"物资采购应符合工程进度、安全和成本管理等要求",{"key":28,"text":419,"correct":26},"工程建设物资由工程承包单位采购的，发包单位可以指定生产厂或供应商",{"key":31,"text":421,"correct":22},"物资采购应明确采购产品或服务的基本要求、采购分工及有关责任",{"key":34,"text":423,"correct":22},"物资采购应符合有关合同和设计文件规定的数量、技术要求和质量标准","ABDE",{"id":426,"libraryId":5,"type":40,"typeLabel":41,"stem":427,"options":428,"answer":24,"analysis":37},1142629,"根据物资采购管理程序，物资采购首先应（）。 （2014）",[429,431,433,435],{"key":20,"text":430,"correct":26},"进行采购策划，编制采购计划",{"key":24,"text":432,"correct":22},"明确采购产品或服务的基本要求",{"key":28,"text":434,"correct":26},"进行市场调查，选择合格的产品供应单位",{"key":31,"text":436,"correct":26},"采用招标或协商等方式确定供应单位",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},1142630,"关于施工总承包管理模式特点的说法，正确的有( )。（2013）",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"业主方的招标及合同管理工作量较大",{"key":24,"text":444,"correct":22},"分包工程任务符合质量控制的“他人控制”原则，对质量控制有利",{"key":28,"text":446,"correct":22},"各分包工程之间的关系由施工总承包管理单位负责协调，这样可以减轻业主方的管理的工作量",{"key":31,"text":448,"correct":26},"在开工前有较明确的合同价，有利于业主的总投资控制",{"key":34,"text":450,"correct":26},"多数情况下，由业主方与分包人直接签约，这样有可能减少业主方的风险","ABC",{"id":453,"libraryId":5,"type":40,"typeLabel":41,"stem":454,"options":455,"answer":24,"analysis":37},1142631,"关于施工总承包和施工总承包管理的说法，正确的是( )。（2012）",[456,458,460,462],{"key":20,"text":457,"correct":26},"施工总承包招标和施工总承包管理招标均可以不依赖完整的施工图",{"key":24,"text":459,"correct":22},"施工总承包管理模式下，分包合同阶段对业主是透明的",{"key":28,"text":461,"correct":26},"业主在施工总承包和施工总承包管理模式下，对分包单位的选择和认可权限是相同的",{"key":31,"text":463,"correct":26},"施工总承包管理单位负责施工现场的总体管理和协调，对项目目标控制不承担责任",{"id":465,"libraryId":5,"type":40,"typeLabel":41,"stem":466,"options":467,"answer":31,"analysis":37},1142632,"关于建设工程项目施工总承包管理模式的说法，正确的是（ ）。（2015）",[468,470,472,474],{"key":20,"text":469,"correct":26},"施工总承包管理单位应参与全部具体工程的施工",{"key":24,"text":471,"correct":26},"业主进行施工总承包管理单位招标时，应先确定工程总造价",{"key":28,"text":473,"correct":26},"施工总承包管理单位负责所有分包合同的招标投标工作",{"key":31,"text":475,"correct":22},"业主不需要等待施工图设计完成后再进行施工总承包管理单位的招标",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":490,"analysis":37},1142633,"施工总承包管理模式与施工总承包模式相比，其优点有（）。（2014）",[480,482,484,486,488],{"key":20,"text":481,"correct":22},"整个项目合同总额的确定较有依据",{"key":24,"text":483,"correct":26},"投标人的报价较有依据",{"key":28,"text":485,"correct":26},"可以为分包单位提供更好的管理和服务",{"key":31,"text":487,"correct":22},"有利于业主节约投资",{"key":34,"text":489,"correct":22},"可以缩短建设周期","ADE",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":505,"analysis":37},1142634,"在国际上，工程建设物资采购的常用模式有( )。（2012）",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"业主方自行采购",{"key":24,"text":498,"correct":22},"承包商采购",{"key":28,"text":500,"correct":26},"行政制定采购",{"key":31,"text":502,"correct":26},"行业协会统一采购",{"key":34,"text":504,"correct":22},"与承包商约定指定供应商采购","ABE",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":451,"analysis":37},1142635,"国际上业主方工程建设物资采购的模式主要有( )。（2013）",[510,512,514,515,517],{"key":20,"text":511,"correct":22},"业主自行采购",{"key":24,"text":513,"correct":22},"与承包商约定某些物资的指定供应商",{"key":28,"text":498,"correct":22},{"key":31,"text":516,"correct":26},"业主规定价格、由承包商采购",{"key":34,"text":518,"correct":26},"承包商询价、由业主采购",{"id":520,"libraryId":5,"type":40,"typeLabel":41,"stem":521,"options":522,"answer":28,"analysis":37},1142636,"按国际工程惯例，对工业与民用建筑工程的设计任务委托而言，下列专业设计事务所中，通常起主导作业的是( )。（2012）",[523,525,527,529],{"key":20,"text":524,"correct":26},"测量师事务所",{"key":24,"text":526,"correct":26},"结构工程师事务所",{"key":28,"text":528,"correct":22},"建筑师事务所",{"key":31,"text":530,"correct":26},"水电工程师事务所",{"id":532,"libraryId":5,"type":40,"typeLabel":41,"stem":533,"options":534,"answer":20,"analysis":37},1142637,"根据《建设项目工程总承包管理规范》(GB\u002FT50358―2005)，工程总承包单位可以受业主委托，按合同约定对工程建设项目的( )等实行全过程或若干阶段的承包。（2012）",[535,537,539,541],{"key":20,"text":536,"correct":22},"勘察、设计、施工、采购、试运行",{"key":24,"text":538,"correct":26},"决策、设计、施工",{"key":28,"text":540,"correct":26},"决策、设计、施工、采购",{"key":31,"text":542,"correct":26},"设计、施工、采购、试运行、运行管理",{"id":544,"libraryId":5,"type":40,"typeLabel":41,"stem":545,"options":546,"answer":31,"analysis":37},1142638,"建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ）。 （2014）",[547,549,551,553],{"key":20,"text":548,"correct":26},"管理现代化",{"key":24,"text":550,"correct":26},"施工机械化",{"key":28,"text":552,"correct":26},"生产高效化",{"key":31,"text":393,"correct":22},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":568,"analysis":37},1142639,"在施工总承包管理模式下，对分包单位管理的特点有（ ）。 （2015）",[558,560,562,564,566],{"key":20,"text":559,"correct":26},"一般情况下，分包合同由施工总承包管理单位与分包单位签订",{"key":24,"text":561,"correct":22},"分包工程款可以通过施工总承包管理单位，也可以由业主直接支付",{"key":28,"text":563,"correct":22},"分包合同价对业主是透明的，有利于业主方控制投资",{"key":31,"text":565,"correct":22},"施工总承包管理单位有责任对分包人的质量和进度进行控制",{"key":34,"text":567,"correct":26},"施工总承包管理单位有义务免费向分包人提供脚手架等设施","BCD",{"id":570,"libraryId":5,"type":40,"typeLabel":41,"stem":571,"options":572,"answer":24,"analysis":37},1142640,"（2019年真题）某土石方工程采用混合计价。其中土方工程采用总价包干14万元，石方工程采用综合单价合同，单价为100元\u002Fm3。该工程有关工程量和价格资料见下表，则该工程结算价款为（ ）万元。",[573,575,577,579],{"key":20,"text":574,"correct":26},"34",{"key":24,"text":576,"correct":22},"39",{"key":28,"text":578,"correct":26},"37",{"key":31,"text":580,"correct":26},"42",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":424,"analysis":37},1142642,"关于项目施工总承包模式特点的说法，正确的有（）。（2018年真题）",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"项目质量好坏取决于总承包单位的管理水平和技术水平",{"key":24,"text":588,"correct":22},"开工日期不可能太早，建设周期会较长",{"key":28,"text":590,"correct":26},"业主择优选择承包方范围小",{"key":31,"text":592,"correct":22},"有利于业主方的总投资控制",{"key":34,"text":594,"correct":22},"与平行发包模式相比，业主组织协调工作量大大减少",{"id":596,"libraryId":5,"type":40,"typeLabel":41,"stem":597,"options":598,"answer":31,"analysis":37},1142643,"（2018年真题）一般情况下，当采用施工总承包管理模式时，分包合同由（）与分包单位签约。",[599,600,601,603],{"key":20,"text":381,"correct":26},{"key":24,"text":379,"correct":26},{"key":28,"text":602,"correct":26},"项目咨询单位",{"key":31,"text":604,"correct":22},"业主",{"id":606,"libraryId":5,"type":40,"typeLabel":41,"stem":607,"options":608,"answer":31,"analysis":37},1142644,"（2020年真题）与施工总承包模式相比，施工总承包管理模式在合同价格方面的特点是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":26},"合同总价一次性确定，对业主投资控制有利",{"key":24,"text":612,"correct":26},"施工总承包管理合同中确定总承包管理费和建安工程造价",{"key":28,"text":614,"correct":26},"所有分包工程都需要再次进行发包，不利于业主节约投资",{"key":31,"text":359,"correct":22},{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":630,"analysis":37},1142645,"（2020年真题）根据《建设项目工程总承包管理规范》,工程总承包方在项目管理收尾阶段的工作有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"办理决算手续",{"key":24,"text":623,"correct":22},"办理项目资料归档",{"key":28,"text":625,"correct":26},"清理各种债权债务",{"key":31,"text":627,"correct":22},"进行项目总结",{"key":34,"text":629,"correct":22},"考核评价项目部人员","BDE",{"id":632,"libraryId":5,"type":40,"typeLabel":41,"stem":633,"options":634,"answer":28,"analysis":37},1142646,"根据《建设工程项目管理规范》GB\u002FT50326-2006，项目管理规划大纲的编制工作包括：①收集项目的有关资料和信息；②明确项目目标；③确定项目管理组织模式；④明确项目管理内容；⑤编制项目目标计划；⑥报送审批；⑦分析项目环境和条件。正确的编制程序是（ ）。2017",[635,637,639,641],{"key":20,"text":636,"correct":26},"①-②-⑦-④-③-⑤-⑥",{"key":24,"text":638,"correct":26},"①-②-⑦-⑤-①-④-⑥",{"key":28,"text":640,"correct":22},"②-⑦-①-③-④-⑤-⑥",{"key":31,"text":642,"correct":26},"②-①-⑦-④-⑤-③-⑥",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":182,"analysis":37},1142647,"根据《建设工程项目管理规定》(GB\u002FT 50326-2006)，项目管理规划大纲的编制依据包括( )（2013）",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"项目可行性研究报告",{"key":24,"text":650,"correct":22},"相关市场与环境信息",{"key":28,"text":652,"correct":22},"设计文件、标准、规范",{"key":31,"text":654,"correct":22},"招标文件及有关合同文件",{"key":34,"text":656,"correct":26},"项目建议书",[658,661,664,667,670,673],{"id":40,"name":659,"category":7,"favorite":660},"领导干部任职前廉政法规知识测试题",92,{"id":662,"name":663,"category":7,"favorite":40},595,"建筑结构与设备",{"id":665,"name":666,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":668,"name":669,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":671,"name":672,"category":7,"favorite":8},534,"BIM工程师",{"id":674,"name":672,"category":7,"favorite":8},535]