[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":645},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,4,50,2721,[13,34,46,55,67,79,91,109,124,139,154,169,184,198,212,223,234,246,258,270,282,294,306,315,327,335,347,362,375,387,399,414,426,438,453,466,478,490,502,514,526,534,547,560,573,584,599,611,623,633],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1140556,1,"单选题","建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","组织柔性化",false,{"key":24,"text":25,"correct":26},"B","组织集成化",true,{"key":28,"text":29,"correct":22},"C","组织扁平化",{"key":31,"text":32,"correct":22},"D","组织高效化","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1140557,"建设项目工程总承包方的工作程序中，进行项目策划、编制项目计划属于项目（ ）阶段的工作。",[38,40,42,44],{"key":20,"text":39,"correct":22},"启动",{"key":24,"text":41,"correct":26},"初始",{"key":28,"text":43,"correct":22},"设计",{"key":31,"text":45,"correct":22},"施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1140558,"建设工程项目总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ），以克服由于设计和施工不协调而影响建设进度。",[50,51,52,53],{"key":20,"text":29,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":21,"correct":22},{"key":31,"text":54,"correct":22},"组织标准化",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":28,"analysis":33},1140559,"某建设工程项目业主委托工程咨询单位为其提供全过程项目管理服务，并委托工程监理单位实施监理，若采用建设工程项目总承包模式，则设计阶段项目质量目标的决策者应是（ ）。",[59,61,63,65],{"key":20,"text":60,"correct":22},"工程咨询单位",{"key":24,"text":62,"correct":22},"工程监理单位",{"key":28,"text":64,"correct":26},"项目总承包单位",{"key":31,"text":66,"correct":22},"业主",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":28,"analysis":33},1140560,"在国际上，民用建筑项目工程总承包的招标多数采用（ ）描述的方式。",[71,73,75,77],{"key":20,"text":72,"correct":22},"公开招标",{"key":24,"text":74,"correct":22},"邀请招标",{"key":28,"text":76,"correct":26},"功能招标",{"key":31,"text":78,"correct":22},"构造招标",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1140561,"国际建设项目工程总承包的组织形式应该不包括（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"由一个既有设计力量又有施工力量的企业独立地承担建设项目工程总承包的任务",{"key":24,"text":86,"correct":22},"由设计单位和施工单位组成一个联合体承担建设项目工程总承包的任务",{"key":28,"text":88,"correct":22},"由施工单位承接建设项目工程总承包的任务，设计单位作为施工单位的分包承担设计任务",{"key":31,"text":90,"correct":26},"由施工单位和监理单位组成一个联合体承担建设项目工程总承包的任务",{"id":92,"libraryId":5,"type":93,"typeLabel":94,"stem":95,"options":96,"answer":108,"analysis":33},1140562,2,"多选题","国际建设项目中，可以承担建设工程项目总承包任务的组织有（ ）。",[97,99,101,103,105],{"key":20,"text":98,"correct":22},"为业主提供服务的一个工程咨询单位与一个施工单位组成的联合体",{"key":24,"text":100,"correct":22},"实施监理的一个工程监理单位与一个施工单位组成的联合体",{"key":28,"text":102,"correct":26},"设计单位和施工单位为一个特定的项目组成的联合体或合作体",{"key":31,"text":104,"correct":26},"一个施工单位",{"key":106,"text":107,"correct":26},"E","一个设计单位","CDE",{"id":110,"libraryId":5,"type":93,"typeLabel":94,"stem":111,"options":112,"answer":123,"analysis":33},1140563,"关于建设项目工程总承包的内涵，下列说法中正确的是（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":26},"工程总承包企业受业主委托，按照合同约定可以对建设项目的勘察、设计、采购、施工、试运行等实行全过程承包或若干阶段的承包",{"key":24,"text":116,"correct":26},"工程总承包企业可以依法将所承包工程的部分工作发包给具有相应资质的分包企业",{"key":28,"text":118,"correct":22},"工程总承包企业对设计单位和业主负责",{"key":31,"text":120,"correct":26},"建设项目工程总承包的核心是达到为建设项目增值的目的",{"key":106,"text":122,"correct":22},"建设项目工程总承包的主要意义就是总价包干","ABD",{"id":125,"libraryId":5,"type":93,"typeLabel":94,"stem":126,"options":127,"answer":138,"analysis":33},1140564,"项目建设纲要或设计纲要包括的内容有：（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":26},"设计原则和设计要求",{"key":24,"text":131,"correct":22},"技术标准和规范的应用",{"key":28,"text":133,"correct":26},"项目定义",{"key":31,"text":135,"correct":26},"材料和设施的技术要求",{"key":106,"text":137,"correct":26},"项目实施的技术大纲和技术要求","ACDE",{"id":140,"libraryId":5,"type":93,"typeLabel":94,"stem":141,"options":142,"answer":153,"analysis":33},1140565,"关于建设项目工程总承包的说法，正确的有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":26},"工程总承包企业应向项目业主负责",{"key":24,"text":146,"correct":26},"总承包企业可依法将所承包工程中的部分工作发包给具有相应资质的分包企业",{"key":28,"text":148,"correct":26},"总承包企业可按照合同约定对项目勘察、设计、采购、施工、试运转等实行全过程或若干阶段的承包",{"key":31,"text":150,"correct":22},"工程分包企业应向总承包企业和业主负责",{"key":106,"text":152,"correct":22},"建设项目工程总承包的主要意义在于总价包干和“交钥匙”","ABC",{"id":155,"libraryId":5,"type":93,"typeLabel":94,"stem":156,"options":157,"answer":168,"analysis":33},1140566,"根据《建设项目工程总承包管理规范》（GB\u002FT 50358-2005），工程总承包方项目管理的主要内容有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"编写和报批项目建议书、可行性研究报告",{"key":24,"text":161,"correct":26},"任命项目经理，组建项目部",{"key":28,"text":163,"correct":22},"确定和落实项目建设的资金",{"key":31,"text":165,"correct":26},"实施设计管理",{"key":106,"text":167,"correct":26},"编制项目计划","BDE",{"id":170,"libraryId":5,"type":93,"typeLabel":94,"stem":171,"options":172,"answer":183,"analysis":33},1140567,"建设项目工程总承包方的工作中，属于施工阶段的工作有（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"移交工程资料",{"key":24,"text":176,"correct":26},"进行竣工决算",{"key":28,"text":178,"correct":22},"办理决算手续",{"key":31,"text":180,"correct":22},"进行项目总结",{"key":106,"text":182,"correct":22},"对项目部人员进行考核评价","AB",{"id":185,"libraryId":5,"type":93,"typeLabel":94,"stem":186,"options":187,"answer":108,"analysis":33},1140568,"建设工程项目总承包方式的核心是（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"实行总价包干",{"key":24,"text":191,"correct":22},"业主可得到“交钥匙工程”",{"key":28,"text":193,"correct":26},"实现设计单位和施工单位的相互融合",{"key":31,"text":195,"correct":26},"实现设计与施工过程的组织集成",{"key":106,"text":197,"correct":26},"为项目建设增值",{"id":199,"libraryId":5,"type":93,"typeLabel":94,"stem":200,"options":201,"answer":183,"analysis":33},1140569,"关于项目施工总承包模式特点的说法，正确的有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"项目质量好坏在很大程度上取决于总承包单位的管理水平和技术水平",{"key":24,"text":205,"correct":26},"开工日期不可能太早，建设周期会较长",{"key":28,"text":207,"correct":22},"不利于投资控制",{"key":31,"text":209,"correct":22},"与平行发包模式相比，组织协调工作量大",{"key":106,"text":211,"correct":22},"业主选择承包方范围小",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1140570,"一般情况下，当采用施工总承包管理模式时，分包合同由（）与分包单位签约。2018真题",[216,218,220,222],{"key":20,"text":217,"correct":22},"施工总承包管理单位",{"key":24,"text":219,"correct":22},"施工总承包单位",{"key":28,"text":221,"correct":22},"项目咨询单位",{"key":31,"text":66,"correct":26},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1140571,"建设项目工程总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的（ ）。2014",[227,229,231,233],{"key":20,"text":228,"correct":22},"管理现代化",{"key":24,"text":230,"correct":22},"施工机械化",{"key":28,"text":232,"correct":22},"生产高效化",{"key":31,"text":25,"correct":26},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1140572,"（2019年真题）某土石方工程采用混合计价。其中土方工程采用总价包干14万元，石方工程采用综合单价合同，单价为100元\u002Fm3。该工程有关工程量和价格资料见下表，则该工程结算价款为（ ）万元。",[238,240,242,244],{"key":20,"text":239,"correct":22},"34",{"key":24,"text":241,"correct":26},"39",{"key":28,"text":243,"correct":22},"37",{"key":31,"text":245,"correct":22},"42",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1140574,"根据《建设项目工程总承包管理规范》（GB\u002FT50358—2005），下列项目总承包方的工作中，首先应进行的是（ ）。 2016",[250,252,254,256],{"key":20,"text":251,"correct":22},"进行项目策划",{"key":24,"text":253,"correct":22},"召开开工会议",{"key":28,"text":255,"correct":26},"任命项目经理",{"key":31,"text":257,"correct":22},"施工开工准备",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1140576,"施工总承包模式在投资控制方面的特点不包括（ ）",[262,264,266,268],{"key":20,"text":263,"correct":22},"一般以施工图设计为投标报价的基础，投标人的投标报价较有依据",{"key":24,"text":265,"correct":26},"多数情况下，由业主方与分包人直接签约，这样有可能增加业主方的风险。",{"key":28,"text":267,"correct":22},"若在施工过程中发生设计变更，可能会引发索赔",{"key":31,"text":269,"correct":22},"在开工前就有较明确的合同价，有利于业主的总投资控制",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},1140577,"下列选项中，不属于建设工程项目施工总承包管理模式在质量控制方面特点的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"各分包之间的关系可由施工总承包管理单位负责，这样就可减轻业主方管理的工作量",{"key":24,"text":277,"correct":22},"对分包人的质量控制由施工总承包管理单位进行",{"key":28,"text":279,"correct":22},"分包工程任务符合质量控制的“他人控制”原则，对质量控制有利",{"key":31,"text":281,"correct":26},"建设工程项目质量的好坏在很大程度上取决于施工总承包单位的管理水平和技术水平",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1140578,"建设工程项目在施工总承包管理模式下，分包合同价对（ ）是透明的。",[286,288,290,292],{"key":20,"text":287,"correct":26},"业主方",{"key":24,"text":289,"correct":22},"总承包方",{"key":28,"text":291,"correct":22},"监理方",{"key":31,"text":293,"correct":22},"分包方",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1140579,"施工总承包模式与施工总承包管理模式的相同之处在于（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"对所承包的建设工程承担施工任务执行和组织的总的责任",{"key":24,"text":301,"correct":26},"总包单位对分包单位的管理责任",{"key":28,"text":303,"correct":22},"业主对分包单位的付款方式",{"key":31,"text":305,"correct":22},"业主对分包单位的选择和认可权限",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},1140580,"在施工总承包管理模式下，施工项目总体管理和目标控制的责任由（ ）承担。",[310,311,313,314],{"key":20,"text":66,"correct":22},{"key":24,"text":312,"correct":22},"分包单位",{"key":28,"text":217,"correct":26},{"key":31,"text":219,"correct":22},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":28,"analysis":33},1140581,"采用施工总承包模式，建设工程项目质量的好坏在很大程度上取决于（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"业主的管理水平",{"key":24,"text":322,"correct":22},"监理单位的管理水平",{"key":28,"text":324,"correct":26},"施工总承包单位的管理水平",{"key":31,"text":326,"correct":22},"政府质量监督部门的管理水平",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1140583,"采用施工总承包管理模式时，对各分包单位的质量控制由（ ）进行。",[331,332,333,334],{"key":20,"text":219,"correct":22},{"key":24,"text":217,"correct":26},{"key":28,"text":287,"correct":22},{"key":31,"text":291,"correct":22},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1140584,"某建设工程项目采用施工总承包管理模式，若施工总承包管理单位想承担部分工程的施工任务，则应（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":26},"通过投标竞争取得施工任务",{"key":24,"text":342,"correct":22},"通过项目业主委托取得施工任务",{"key":28,"text":344,"correct":22},"自行决定便可取得施工任务",{"key":31,"text":346,"correct":22},"通过施工总承包单位委托取得施工任务",{"id":348,"libraryId":5,"type":93,"typeLabel":94,"stem":349,"options":350,"answer":361,"analysis":33},1140585,"关于施工总承包和施工总承包管理的说法，正确的是（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":26},"施工总承包管理模式中，分包合同价对业主是透明的",{"key":24,"text":354,"correct":22},"施工总承包招标和施工总承包管理的招标均可以不依赖完整的施工图",{"key":28,"text":356,"correct":22},"业主在施工总承包和施工总承包管理模式下，对分包单位的选择和认可权是相同的",{"key":31,"text":358,"correct":22},"施工总承包管理单位负责施工现场的总体管理和协调，对项目目标控制不承担责任",{"key":106,"text":360,"correct":26},"施工总承包模式与施工总承管理模式的相同之处在于总包单位对分包单位的管理责任","AE",{"id":363,"libraryId":5,"type":93,"typeLabel":94,"stem":364,"options":365,"answer":168,"analysis":33},1140586,"关于施工总承包管理模式特点的说法，正确的有（ ）。",[366,368,370,372,373],{"key":20,"text":367,"correct":22},"在开工之前有较明确的合同价，有利于业主的总投资控制",{"key":24,"text":369,"correct":26},"业主方的招标及合同管理工作量较大",{"key":28,"text":371,"correct":22},"多数情况下，由业主方与分包人直接签约，这样有可能减少业主的风险",{"key":31,"text":279,"correct":26},{"key":106,"text":374,"correct":26},"各分包工程之间的关系由施工总承包管理单位负责协调，这样可以减轻业主方的管理的工作量",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},1140587,"业主采用施工总承包管理模式的基本出发点是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"缩短项目建设周期",{"key":24,"text":382,"correct":22},"加强对分包人的质量控制",{"key":28,"text":384,"correct":26},"减轻业主方在组织与协调方面的工作量",{"key":31,"text":386,"correct":22},"加强对质量的控制",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":31,"analysis":33},1140588,"关于建设工程项目施工总承包管理模式的说法，正确的是（ ）。( 2015真题 )",[391,393,395,397],{"key":20,"text":392,"correct":22},"施工总承包管理单位应参与全部具体工程的施工",{"key":24,"text":394,"correct":22},"业主进行施工总承包管理单位招标时，应先确定工程总造价",{"key":28,"text":396,"correct":22},"施工总承包管理单位负责所有分包合同的招标投标工作",{"key":31,"text":398,"correct":26},"业主不需要等待施工图设计完成后再进行施工总承包管理单位的招标",{"id":400,"libraryId":5,"type":93,"typeLabel":94,"stem":401,"options":402,"answer":413,"analysis":33},1140589,"在施工总承包管理模式下，对分包单位管理的特点有（ ）。( 2015真题 )",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"一般情况下，分包合同由施工总承包管理单位与分包单位签订",{"key":24,"text":406,"correct":26},"分包工程款可以通过施工总承包管理单位，也可以由业主直接支付",{"key":28,"text":408,"correct":26},"分包合同价对业主是透明的，有利于业主方控制投资",{"key":31,"text":410,"correct":26},"施工总承包管理单位有责任对分包人的质量和进度进行控制",{"key":106,"text":412,"correct":22},"施工总承包管理单位有义务免费向分包人提供脚手架等设施","BCD",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},1140590,"与施工总承包模式相比，施工总承包管理模式具有的优势是（ ）。 2016",[418,420,422,424],{"key":20,"text":419,"correct":22},"业主方招标及合同管理工作量小",{"key":24,"text":421,"correct":22},"工程款项支付便捷",{"key":28,"text":423,"correct":26},"缩短建设周期",{"key":31,"text":425,"correct":22},"简化管理流程",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1140591,"关于施工总承包模式与施工总承包管理模式相同之处的说法，正确的是（ ）。2014",[430,432,434,436],{"key":20,"text":431,"correct":22},"与分包单位的合同关系相同",{"key":24,"text":433,"correct":22},"对分包单位的付款方式相同",{"key":28,"text":435,"correct":22},"业主对分包单位的选择和认可权限相同",{"key":31,"text":437,"correct":26},"对分包单位的管理责任和服务相同",{"id":439,"libraryId":5,"type":93,"typeLabel":94,"stem":440,"options":441,"answer":452,"analysis":33},1140592,"施工总承包管理模式与施工总承包模式相比，其优点有（ ）。2014",[442,444,446,448,450],{"key":20,"text":443,"correct":26},"整个项目合同总额的确定较有依据",{"key":24,"text":445,"correct":22},"投标人的报价较有依据",{"key":28,"text":447,"correct":22},"可以为分包单位提供更好的管理和服务",{"key":31,"text":449,"correct":26},"有利于业主节约投资",{"key":106,"text":451,"correct":26},"可以缩短建设周期","ADE",{"id":454,"libraryId":5,"type":93,"typeLabel":94,"stem":455,"options":456,"answer":168,"analysis":33},1140595,"关于项目施工总承包模式特点的说法，正确的有（）。2018真题",[457,459,460,462,464],{"key":20,"text":458,"correct":22},"项目质量好坏取决于总承包单位的管理水平和技术水平",{"key":24,"text":205,"correct":26},{"key":28,"text":461,"correct":22},"业主择优选择承包方范围小",{"key":31,"text":463,"correct":26},"有利于业主方的总投资控制",{"key":106,"text":465,"correct":26},"与平行发包模式相比，业主组织协调工作量大大减少",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1140596,"某工程项目合同结构图如下所示，则该工程总承包单位采用的发包模式属于（ ）方式。",[470,472,474,476],{"key":20,"text":471,"correct":26},"CM发包",{"key":24,"text":473,"correct":22},"分包",{"key":28,"text":475,"correct":22},"再分包",{"key":31,"text":477,"correct":22},"转包",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1140597,"（2020年真题）与施工总承包模式相比，施工总承包管理模式在合同价格方面的特点是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"合同总价一次性确定，对业主投资控制有利",{"key":24,"text":485,"correct":22},"施工总承包管理合同中确定总承包管理费和建安工程造价",{"key":28,"text":487,"correct":22},"所有分包工程都需要再次进行发包，不利于业主节约投资",{"key":31,"text":489,"correct":26},"分包合同价对业主是透明的",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1140598,"根据我国《建筑法》，合同约定由工程承包单位采购的工程建设物资，建设单位可以（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"指定生产厂",{"key":24,"text":497,"correct":22},"指定供应商",{"key":28,"text":499,"correct":26},"提出质量要求",{"key":31,"text":501,"correct":22},"指定具体品牌",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1140599,"不属于国际上业主方工程建设物资采购模式的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"业主方自行采购",{"key":24,"text":509,"correct":26},"劳务分包商采购",{"key":28,"text":511,"correct":22},"与承包商约定某些物资的指定供货商",{"key":31,"text":513,"correct":22},"承包商采购",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1140600,"按照工程建设项目物资采购管理程序，物资采购首先应（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"拟定物资采购合同",{"key":24,"text":521,"correct":26},"明确采购的要求、采购分工和责任",{"key":28,"text":523,"correct":22},"选择合格的产品供应或服务单位",{"key":31,"text":525,"correct":22},"进行采购策划，编制采购计划",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},1140601,"根据我国《建筑法》对物资采购规定，建筑材料、建筑构配件和设备由工程承包单位采购的，发包单位可以（ ）。",[530,531,532,533],{"key":20,"text":495,"correct":22},{"key":24,"text":497,"correct":22},{"key":28,"text":499,"correct":26},{"key":31,"text":501,"correct":22},{"id":535,"libraryId":5,"type":93,"typeLabel":94,"stem":536,"options":537,"answer":153,"analysis":33},1140602,"国际上业主方工程建设物资采购的模式主要有（ ）。",[538,540,542,543,545],{"key":20,"text":539,"correct":26},"业主自行采购",{"key":24,"text":541,"correct":26},"与承包商约定某些物资的指定供应商",{"key":28,"text":513,"correct":26},{"key":31,"text":544,"correct":22},"业主规定价格、由承包商采购",{"key":106,"text":546,"correct":22},"承包商询价、由业主采购",{"id":548,"libraryId":5,"type":93,"typeLabel":94,"stem":549,"options":550,"answer":123,"analysis":33},1140603,"物资采购工作应符合有关合同和设计文件所规定的数量、技术要求和质量标准，并符合工程进度、安全、环境和成本管理等要求。采购管理应遵循的程序有（ ）。",[551,553,554,556,558],{"key":20,"text":552,"correct":26},"明确采购产品或服务的基本要求、采购分工及有关责任",{"key":24,"text":525,"correct":26},{"key":28,"text":555,"correct":22},"进行市场细分，选择合格的产品供应或服务单位，建立名录",{"key":31,"text":557,"correct":26},"采用招标或协商等方式实施评审工作，确定供应或服务单位",{"key":106,"text":559,"correct":22},"签订投标合同",{"id":561,"libraryId":5,"type":93,"typeLabel":94,"stem":562,"options":563,"answer":572,"analysis":33},1140604,"在国际上，工程建设物资采购的常用模式有（ ）。",[564,565,567,568,570],{"key":20,"text":507,"correct":26},{"key":24,"text":566,"correct":22},"行政制定采购",{"key":28,"text":513,"correct":26},{"key":31,"text":569,"correct":26},"与承包商约定制定供应商采购",{"key":106,"text":571,"correct":22},"行业协会统一采购","ACD",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1140606,"根据物资采购管理程序，物资采购首先应（ ）。2014",[577,578,580,582],{"key":20,"text":525,"correct":22},{"key":24,"text":579,"correct":26},"明确采购产品或服务的基本要求",{"key":28,"text":581,"correct":22},"进行市场调查，选择合格的产品供应单位",{"key":31,"text":583,"correct":22},"采用招标或协商等方式确定供应单位",{"id":585,"libraryId":5,"type":93,"typeLabel":94,"stem":586,"options":587,"answer":598,"analysis":33},1140607,"关于建设工程物资采购管理的说法，正确的有（ ）。 2016",[588,590,592,594,596],{"key":20,"text":589,"correct":26},"物资采购结束后应将采购资料归档",{"key":24,"text":591,"correct":26},"物资采购应符合工程进度、安全和成本管理等要求",{"key":28,"text":593,"correct":22},"工程建设物资由工程承包单位采购的，发包单位可以指定生产厂或供应商",{"key":31,"text":595,"correct":26},"物资采购应明确采购产品或服务的基本要求、采购分工及有关责任",{"key":106,"text":597,"correct":26},"物资采购应符合有关合同和设计文件规定的数量、技术要求和质量标准","ABDE",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":28,"analysis":33},1140608,"按照国际惯例，对工业与民用建筑工程的设计任务委托而言，下列专业设计事务所中，通常起主导作用的是（ ）",[603,605,607,609],{"key":20,"text":604,"correct":22},"测量师事务所",{"key":24,"text":606,"correct":22},"结构工程师事务所",{"key":28,"text":608,"correct":26},"建筑师事务所",{"key":31,"text":610,"correct":22},"水电工程师事务所",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":24,"analysis":33},1140609,"我国建设工程的业主方选择设计方案和设计单位的主要方式是（ ）。",[615,617,619,621],{"key":20,"text":616,"correct":22},"设计竞赛",{"key":24,"text":618,"correct":26},"设计招标",{"key":28,"text":620,"correct":22},"直接委托",{"key":31,"text":622,"correct":22},"设计竞赛与设计招标结合",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":20,"analysis":33},1140610,"我国业主方主要通过（ ）的方式选择设计方案和设计单位。",[627,628,630,631],{"key":20,"text":618,"correct":26},{"key":24,"text":629,"correct":22},"设计委托",{"key":28,"text":616,"correct":22},{"key":31,"text":632,"correct":22},"设计比选",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":31,"analysis":33},1140611,"根据《建设工程项目管理规范》（GB\u002FT50326-2006），项目管理规划应包括项目管理大纲和（ ）两类文件。",[637,639,641,643],{"key":20,"text":638,"correct":22},"项目管理计划",{"key":24,"text":640,"correct":22},"项目管理实施细则",{"key":28,"text":642,"correct":22},"项目管理操作规划",{"key":31,"text":644,"correct":26},"项目管理实施规划",[646,649,652,655,658,661],{"id":15,"name":647,"category":7,"favorite":648},"领导干部任职前廉政法规知识测试题",92,{"id":650,"name":651,"category":7,"favorite":15},595,"建筑结构与设备",{"id":653,"name":654,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":656,"name":657,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":659,"name":660,"category":7,"favorite":8},534,"BIM工程师",{"id":662,"name":660,"category":7,"favorite":8},535]