[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":632},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,39,50,2721,[13,34,46,58,69,87,102,113,126,137,150,164,177,187,199,211,223,237,248,262,274,286,300,312,323,335,347,361,373,387,399,411,421,433,444,455,467,479,487,499,508,522,534,544,556,568,583,595,606,618],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1142547,1,"单选题","项目管理信息系统的进度控制功能不包括（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","合同基本数据查询",true,{"key":24,"text":25,"correct":26},"B","编制资源需求量计划",false,{"key":28,"text":29,"correct":26},"C","进度计划执行情况的比较分析",{"key":31,"text":32,"correct":26},"D","根据工程的进展进行工程进度预测","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1142548,"项目管理信息系统是基于计算机的项目管理的信息系统，主要用于项目的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"信息检索和查询",{"key":24,"text":41,"correct":22},"目标控制",{"key":28,"text":43,"correct":26},"人、财、物的管理",{"key":31,"text":45,"correct":26},"信息收集和存储",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1142549,"建设工程项目管理信息系统（PMIS）是利用计算机辅助进行项目管理的信息系统，它（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"主要用于项目的人、财、物的管理",{"key":24,"text":53,"correct":26},"主要用于企业的产、供、销的管理",{"key":28,"text":55,"correct":22},"是项目进展的跟踪和控制系统",{"key":31,"text":57,"correct":26},"是项目信息门户（PIP）的一种方式",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1142550,"项目管理信息系统中进度控制的功能包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"计算和分析投标估算数据",{"key":24,"text":65,"correct":26},"编制投资使用计划",{"key":28,"text":67,"correct":26},"查询和统计合同执行情况",{"key":31,"text":25,"correct":22},{"id":70,"libraryId":5,"type":71,"typeLabel":72,"stem":73,"options":74,"answer":86,"analysis":33},1142551,2,"多选题","应用建设工程项目管理信息系统的主要意义包括（ ）。",[75,77,79,81,83],{"key":20,"text":76,"correct":22},"可方便地形成各种项目管理需要的报表",{"key":24,"text":78,"correct":22},"有利于项目管理数据的检索和查询",{"key":28,"text":80,"correct":22},"提高项目管理数据处理的效率",{"key":31,"text":82,"correct":26},"确保项目管理数据处理的程序性",{"key":84,"text":85,"correct":26},"E","实现项目管理数据的分散存储","ABC",{"id":88,"libraryId":5,"type":71,"typeLabel":72,"stem":89,"options":90,"answer":101,"analysis":33},1142552,"项目管理信息系统的功能主要有（ ）。",[91,93,95,97,99],{"key":20,"text":92,"correct":22},"投资控制",{"key":24,"text":94,"correct":22},"成本控制",{"key":28,"text":96,"correct":22},"合同管理",{"key":31,"text":98,"correct":26},"质量控制",{"key":84,"text":100,"correct":22},"进度控制","ABCE",{"id":103,"libraryId":5,"type":71,"typeLabel":72,"stem":104,"options":105,"answer":112,"analysis":33},1142553,"20世纪70年代末期和80年代初期，国际上已有项目管理信息系统的商业软件，项目管理信息系统现已被广泛地用于业主方和施工方的项目管理。应用项目管理信息系统的主要意义有（ ）。",[106,107,108,109,111],{"key":20,"text":85,"correct":26},{"key":24,"text":78,"correct":22},{"key":28,"text":80,"correct":22},{"key":31,"text":110,"correct":22},"确保项目管理数据处理的准确性",{"key":84,"text":76,"correct":22},"BCDE",{"id":114,"libraryId":5,"type":71,"typeLabel":72,"stem":115,"options":116,"answer":101,"analysis":33},1142554,"下列工程项目管理系统的功能中，属于成本控制功能的有（ ）。 2016",[117,119,121,123,124],{"key":20,"text":118,"correct":22},"投标估算的数据计算和分析",{"key":24,"text":120,"correct":22},"计划施工成本",{"key":28,"text":122,"correct":22},"计算实际成本",{"key":31,"text":25,"correct":26},{"key":84,"text":125,"correct":22},"计划成本与实际成本的比较分析",{"id":127,"libraryId":5,"type":71,"typeLabel":72,"stem":128,"options":129,"answer":136,"analysis":33},1142555,"下列工程项目管理信息属于成本控制的功能有（ ）。 2016",[130,131,132,133,134],{"key":20,"text":118,"correct":22},{"key":24,"text":120,"correct":22},{"key":28,"text":122,"correct":22},{"key":31,"text":125,"correct":22},{"key":84,"text":135,"correct":26},"设计概算","ABCD",{"id":138,"libraryId":5,"type":71,"typeLabel":72,"stem":139,"options":140,"answer":149,"analysis":33},1142556,"工程项目管理信息系统的成本控制功能包括（）。2018真题",[141,143,144,146,148],{"key":20,"text":142,"correct":26},"进行项目的估算、概预算的比较分析",{"key":24,"text":125,"correct":22},{"key":28,"text":145,"correct":26},"合同执行情况的查询和统计分析",{"key":31,"text":147,"correct":22},"根据工程进展进行成本预测",{"key":84,"text":122,"correct":22},"BDE",{"id":151,"libraryId":5,"type":71,"typeLabel":72,"stem":152,"options":153,"answer":163,"analysis":33},1142557,"工程项目管理信息系统中，合同管理子系统的功能有（ ）。( 2015真题 )",[154,155,157,159,161],{"key":20,"text":21,"correct":22},{"key":24,"text":156,"correct":22},"合同执行情况统计分析",{"key":28,"text":158,"correct":26},"合同通用条件的编写",{"key":31,"text":160,"correct":26},"合同结构的选择",{"key":84,"text":162,"correct":22},"合同辅助起草","ABE",{"id":165,"libraryId":5,"type":71,"typeLabel":72,"stem":166,"options":167,"answer":176,"analysis":33},1142558,"工程项目管理信息系统中，进度控制的功能有（ ）。2014",[168,169,171,172,174],{"key":20,"text":25,"correct":22},{"key":24,"text":170,"correct":26},"根据工程进展进行施工成本预测",{"key":28,"text":29,"correct":22},{"key":31,"text":173,"correct":26},"项目估算的数据计算",{"key":84,"text":175,"correct":22},"确定关键工作和关键路线","ACE",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1142559,"（2020年真题）工程项目管理信息系统中，属于进度控制功能的是（ ）。",[181,183,184,186],{"key":20,"text":182,"correct":26},"合同执行情况的查询和分析",{"key":24,"text":25,"correct":22},{"key":28,"text":185,"correct":26},"根据工程进展进行投资预测",{"key":31,"text":170,"correct":26},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1142560,"（2019年真题）根据《项目管理知识体系指南(PMBOK指南)》，项目经理应具备的技能包括（）",[191,193,195,197],{"key":20,"text":192,"correct":26},"决策能力、领导能力和组织协调能力",{"key":24,"text":194,"correct":26},"项目管理技术、应变能力和生产管理技能",{"key":28,"text":196,"correct":26},"管理能力、应变能力、社交与谈判能力和项目管理经验",{"key":31,"text":198,"correct":22},"项目管理技术、领导力、商业管理技能和战略管理技能",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1142561,"（2019年真题）业主方项目管理的目标中，进度目标是指（）的时间目标。",[203,205,207,209],{"key":20,"text":204,"correct":22},"项目动用",{"key":24,"text":206,"correct":26},"竣工验收",{"key":28,"text":208,"correct":26},"联动试车",{"key":31,"text":210,"correct":26},"保修期结束",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},1142562,"（2012年真题）按照国际工程惯例，当采用指定分包商时，应对分包合同规定的工期和质量目标向业主负责的是( )",[215,217,219,221],{"key":20,"text":216,"correct":26},"业主",{"key":24,"text":218,"correct":26},"监理方",{"key":28,"text":220,"correct":26},"指定分包商",{"key":31,"text":222,"correct":22},"施工总承包管理方",{"id":224,"libraryId":5,"type":71,"typeLabel":72,"stem":225,"options":226,"answer":101,"analysis":33},1142563,"（2014年真题）根据《建设项目工程总承包管理规范》 （GB\u002FT50358―2005），工程总承包项目管理的主要内容包括（）",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"任命项目经理，组建项目部",{"key":24,"text":230,"correct":22},"实施设计管理",{"key":28,"text":232,"correct":22},"实施采购管理",{"key":31,"text":234,"correct":26},"进行项目可行性研究并批报",{"key":84,"text":236,"correct":22},"进行项目管理范围",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1142564,"（2012年真题）根据《建设项目工程总承包管理规范》(GB\u002FT50358―2005)，不属于工程总承包方项目管理内容的是( )",[241,243,245,247],{"key":20,"text":242,"correct":26},"任命项目经理",{"key":24,"text":244,"correct":26},"组建项目部",{"key":28,"text":246,"correct":22},"确定项目建设资金",{"key":31,"text":230,"correct":26},{"id":249,"libraryId":5,"type":71,"typeLabel":72,"stem":250,"options":251,"answer":261,"analysis":33},1142565,"（2017年真题）根据《建设项目工程总承包管理规范》GB\u002FT50358-2005，工程总承包项目管理的主要内容有（ ）。",[252,253,255,257,259],{"key":20,"text":228,"correct":22},{"key":24,"text":254,"correct":26},"编制和报批项目可行性研究报告",{"key":28,"text":256,"correct":26},"落实项目建设资金",{"key":31,"text":258,"correct":22},"进行项目策划，编制项目计划",{"key":84,"text":260,"correct":26},"实施项目运行管理","AD",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1142566,"（2015年真题）关于施工方项目管理目标和任务的说法，正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"施工方项目管理仅服务于施工方本身的利益",{"key":24,"text":269,"correct":26},"施工方项目管理不涉及动用前准备阶段",{"key":28,"text":271,"correct":22},"施工方成本目标由施工企业根据其生产和经营情况自行确定",{"key":31,"text":273,"correct":26},"施工方不对业主方指定分包承担的目标和任务负责",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1142567,"（2016年真题）关于业主方项目管理目标和任务的说法，正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"业主方的进度目标指项目交付使用的时间目标",{"key":24,"text":281,"correct":26},"业主方的投资目标指项目的施工成本目标",{"key":28,"text":283,"correct":26},"投资控制是业主方项目管理任务中最重要的任务",{"key":31,"text":285,"correct":26},"业主方项目管理任务不包括设计阶段的信息管理",{"id":287,"libraryId":5,"type":71,"typeLabel":72,"stem":288,"options":289,"answer":176,"analysis":33},1142568,"（2015年真题）关于业主方项目管理目标和任务的说法中，正确的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"关于业主方项目管理是建设工程项目管理的核心",{"key":24,"text":293,"correct":26},"关于业主方项目管理工作不涉及施工阶段的安全管理工作",{"key":28,"text":295,"correct":22},"关于业主方项目管理目标包括项目的投资目标、进度目标和质量目标",{"key":31,"text":297,"correct":26},"关于业主方项目管理目标不包括影响项目运行的环境质量",{"key":84,"text":299,"correct":22},"关于业主方项目管理工作涉及项目实施阶段的全过程",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1142569,"（2014年真题）建设工程项目总承包方项目管理工作涉及（）的全过程。",[304,306,308,310],{"key":20,"text":305,"correct":26},"决策阶段",{"key":24,"text":307,"correct":22},"实施阶段",{"key":28,"text":309,"correct":26},"使用阶段",{"key":31,"text":311,"correct":26},"全寿命阶段",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1142570,"（2013年真题）建设项目工程总承包的项目管理工作主要在项目的()。",[316,318,319,321],{"key":20,"text":317,"correct":26},"决策阶段、实施阶段、使用阶段",{"key":24,"text":307,"correct":22},{"key":28,"text":320,"correct":26},"设计阶段、施工阶段、保修阶段",{"key":31,"text":322,"correct":26},"施工阶段",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":31,"analysis":33},1142571,"（2014年真题）在建设工程项目管理的基本概念中，“进度目标”对业主而言是（）的时间目标。",[327,329,331,333],{"key":20,"text":328,"correct":26},"竣工",{"key":24,"text":330,"correct":26},"调试",{"key":28,"text":332,"correct":26},"试生产",{"key":31,"text":334,"correct":22},"动用",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1142572,"（2017年真题）编制设计任务书是项目（ ）阶段的工作。",[339,341,343,345],{"key":20,"text":340,"correct":22},"设计准备",{"key":24,"text":342,"correct":26},"决策",{"key":28,"text":344,"correct":26},"设计",{"key":31,"text":346,"correct":26},"施工",{"id":348,"libraryId":5,"type":71,"typeLabel":72,"stem":349,"options":350,"answer":163,"analysis":33},1142573,"（2016年真题）关于建设工程项目管理的说法，正确的有（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"业主方是建设工程项目生产过程的总组织者",{"key":24,"text":354,"correct":22},"建设工程项目各参与方的工作性质和工作任务不尽相同",{"key":28,"text":356,"correct":26},"建设工程项目管理的核心任务是项目的费用控制",{"key":31,"text":358,"correct":26},"施工方的项目管理是项目管理的核心",{"key":84,"text":360,"correct":22},"实施建设工程项目管理需要有明确的投资、进度和质量目标",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":28,"analysis":33},1142574,"（2016年真题）关于设计阶段项目管理的说法，错误的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":26},"设计阶段的项目管理是建设工程项目管理的一个非常重要的组成部分",{"key":24,"text":368,"correct":26},"设计的质量直接影响项目实施的投资、进度和质量",{"key":28,"text":370,"correct":22},"由于设计费占建设总投资的比例小，业主方可以忽略对其进行管理",{"key":31,"text":372,"correct":26},"设计的进度直接影响工程的进展",{"id":374,"libraryId":5,"type":71,"typeLabel":72,"stem":375,"options":376,"answer":163,"analysis":33},1142575,"（2012年真题）关于建设工程项目管理的说法，正确的有( )。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"建设工程管理工作的核心任务是为工程的建设各使用增值",{"key":24,"text":380,"correct":22},"业主方的项目管理工作涉及项目实施阶段的全过程",{"key":28,"text":382,"correct":26},"建造师的业务范围只限于项目实施阶段的项目管理工作",{"key":31,"text":384,"correct":26},"只有施工企业对项目的管理，才能称为施工方的项目管理",{"key":84,"text":386,"correct":22},"项目决策阶段项目管理工作的任务之一是进行项目定义",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},1142576,"（2018年真题）关于《项目管理知识体系指南（PMBOK）指南》中项目集和项目组合的说法，正确的是（）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"项目组合的管理包括识别、排序、管理和控制项目等",{"key":24,"text":394,"correct":26},"项目组合中的项目一定彼此依赖或有直接关系",{"key":28,"text":396,"correct":26},"项目集指的是为有效管理，实现战略业务目标而组合在一起的项目",{"key":31,"text":398,"correct":26},"项目集中不包括各单个项目范围之外的相关工作",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1142577,"（2018年真题）关于施工方项目管理的说法，正确的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"可以采用工程施工总承包管理模式",{"key":24,"text":406,"correct":26},"项目的整体利益和施工方本身的利益是对立关系",{"key":28,"text":408,"correct":26},"施工方项目管理工作涉及项目实施阶段的全过程",{"key":31,"text":410,"correct":26},"施工方项目管理的目标应根据其生产和经营的情况确定",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1142578,"（2013年真题）建设工程施工进度控制中，业主方的任务是控制整个项目（ ）的进度。",[415,416,418,420],{"key":20,"text":307,"correct":22},{"key":24,"text":417,"correct":26},"诀策阶段",{"key":28,"text":419,"correct":26},"项目全寿命周期",{"key":31,"text":309,"correct":26},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},1142579,"（2020年真题）根据《建设项目工程总承包管理规范》，项目总承包方项目管理工作涉及（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":26},"项目决策管理、设计管理、施工管理和试运行管理",{"key":24,"text":428,"correct":26},"项目设计管理、施工管理、试运行管理和项目收尾",{"key":28,"text":430,"correct":26},"项目决策管理、设计管理、施工管理、试运行管理和项目收尾",{"key":31,"text":432,"correct":22},"项目设计管理，采购管理，施工管理、试运行管理和项目收尾",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},1142580,"（2020年真题）建设工程管理工作的核心任务是（ ）。",[437,439,441,442],{"key":20,"text":438,"correct":26},"质量管理",{"key":24,"text":440,"correct":26},"安全管理",{"key":28,"text":41,"correct":26},{"key":31,"text":443,"correct":22},"增值服务",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1142581,"（2020年真题）对建设工程项目整个实施阶段的进度进行控制是（）的任务。",[448,450,452,453],{"key":20,"text":449,"correct":22},"投资方",{"key":24,"text":451,"correct":26},"DB总承包方",{"key":28,"text":222,"correct":26},{"key":31,"text":454,"correct":26},"项目使用方",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},1142582,"下列组织工具图，表示的是( )。 （2012）",[459,461,463,465],{"key":20,"text":460,"correct":22},"项目结构图",{"key":24,"text":462,"correct":26},"工作流程图",{"key":28,"text":464,"correct":26},"组织结构图",{"key":31,"text":466,"correct":26},"合同结构图",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1142583,"施工单位编制项目管理任务分工表前，应完成的工作是（ ）。2017",[471,473,475,477],{"key":20,"text":472,"correct":26},"明确各项管理工作的流程",{"key":24,"text":474,"correct":22},"详细分解项目实施各阶段的工作",{"key":28,"text":476,"correct":26},"落实各工作部门的具体人员",{"key":31,"text":478,"correct":26},"检查各项管理工作的执行情况",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1142584,"某住宅小区施工前，施工项目管理机构对项目分析后形成结果如下图，该图是（ ）。2017",[483,484,485,486],{"key":20,"text":464,"correct":26},{"key":24,"text":460,"correct":22},{"key":28,"text":462,"correct":26},{"key":31,"text":466,"correct":26},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},1142585,"下列影响建设工程项目管理目标实现的因素中，起决定性作用的是()。（2013）",[491,493,495,497],{"key":20,"text":492,"correct":26},"人",{"key":24,"text":494,"correct":26},"方法",{"key":28,"text":496,"correct":26},"工具",{"key":31,"text":498,"correct":22},"组织",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},1142586,"用来表示组织系统中各子系统或各元素间指令关系的工具是（ ）。 （2015）",[503,504,505,506],{"key":20,"text":460,"correct":26},{"key":24,"text":462,"correct":26},{"key":28,"text":464,"correct":22},{"key":31,"text":507,"correct":26},"职能分工表",{"id":509,"libraryId":5,"type":71,"typeLabel":72,"stem":510,"options":511,"answer":163,"analysis":33},1142587,"关于组织结构模式、组织分工和工作流程组织的说法，正确的有（ ）。（2015）",[512,514,516,518,520],{"key":20,"text":513,"correct":22},"组织结构模式反映指令关系",{"key":24,"text":515,"correct":22},"工作流程组织反映工作间逻辑关系",{"key":28,"text":517,"correct":26},"组织分工是指工作任务分工",{"key":31,"text":519,"correct":26},"组织分工和工作流程组织都是动态组织关系",{"key":84,"text":521,"correct":22},"组织结构模式和组织分工是一种相对静态的组织关系",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1142588,"某工程施工检查发现外墙面砖质量不合格，经调查发现是供应商的供货质量问题，项目部决定更换供应商。该措施属于项目目标控制的（ ）。（2015）",[526,528,530,532],{"key":20,"text":527,"correct":26},"管理措施",{"key":24,"text":529,"correct":22},"组织措施",{"key":28,"text":531,"correct":26},"经济措施",{"key":31,"text":533,"correct":26},"技术措施",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1142589,"下列组织工具中，可以用来对项目的结构进行逐层分解，以反映组成该项目的所有工作任务的是（ ）。（2016）",[538,539,540,542],{"key":20,"text":460,"correct":22},{"key":24,"text":464,"correct":26},{"key":28,"text":541,"correct":26},"工作任务分工表",{"key":31,"text":543,"correct":26},"管理分工表",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1142590,"关于工作流程组织的说法，正确的是（）。 （2014）",[548,550,552,554],{"key":20,"text":549,"correct":22},"同一项目不同参与方都有工程流程组织任务",{"key":24,"text":551,"correct":26},"工程流程组织不包括物质流程组织",{"key":28,"text":553,"correct":26},"一个工作流程图只能有一个项目参与方",{"key":31,"text":555,"correct":26},"一项管理工作只能有一个工作流程图",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1142591,"关于影响系统目标实现因素的说法，正确的是（ ）。（2015）",[560,562,564,566],{"key":20,"text":561,"correct":22},"组织是影响系统目标实现的决定性因素",{"key":24,"text":563,"correct":26},"系统组织决定了系统目标",{"key":28,"text":565,"correct":26},"增加人员数量一定有助于系统目标的实现",{"key":31,"text":567,"correct":26},"生产方法与工具的选择与系统目标实现无关",{"id":569,"libraryId":5,"type":71,"typeLabel":72,"stem":570,"options":571,"answer":582,"analysis":33},1142592,"施工单位的项目管理任务分工表可用于确定（）的任务。（2014）",[572,574,576,578,580],{"key":20,"text":573,"correct":26},"项目各参与方",{"key":24,"text":575,"correct":22},"项目经理",{"key":28,"text":577,"correct":26},"企业内部各部门",{"key":31,"text":579,"correct":26},"企业内部各工作人员",{"key":84,"text":581,"correct":22},"项目各职能主管工作部门","BE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1142593,"编制项目管理工作任务分工表，首先要做的工作是( )。（2012）",[587,589,591,593],{"key":20,"text":588,"correct":22},"进行项目管理任务的详细分解",{"key":24,"text":590,"correct":26},"绘制工作流程图",{"key":28,"text":592,"correct":26},"明确项目管理工作部门的工作任务",{"key":31,"text":594,"correct":26},"确定项目组织结构",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1142594,"管理是由多个环节组成的过程，为了说明组成管理的这些环节可以使用()。（2013）",[599,601,603,604],{"key":20,"text":600,"correct":26},"项目组织设计文件",{"key":24,"text":602,"correct":26},"项目任务分期表",{"key":28,"text":541,"correct":26},{"key":31,"text":605,"correct":22},"管理职能分工描述书",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},1142595,"关于项目管理职能分工表的说法，正确的是（）。 （2014）",[610,612,614,616],{"key":20,"text":611,"correct":22},"项目管理职能分工表反映项目管理班子内部对各项工作任务的管理职能分工",{"key":24,"text":613,"correct":26},"业主方和项目各参与方应编制统一的项目管理职能分工表",{"key":28,"text":615,"correct":26},"项目管理职能分工表不适用于企业管理",{"key":31,"text":617,"correct":26},"项目管理职能分工表和岗位责任描述书表达的内容完全一样",{"id":619,"libraryId":5,"type":71,"typeLabel":72,"stem":620,"options":621,"answer":261,"analysis":33},1142596,"关于管理职能分工的说法，正确的有( )。（2012）",[622,624,626,628,630],{"key":20,"text":623,"correct":22},"业主方和项目各参与方都应该编制各自的项目管理职能分工表",{"key":24,"text":625,"correct":26},"编制管理职能分工表时，施工质检员只有“执行”职能",{"key":28,"text":627,"correct":26},"项目管理职能分工表只需针对质量控制进行编制",{"key":31,"text":629,"correct":22},"管理职能实际上就是管理过程的多个工作环节",{"key":84,"text":631,"correct":26},"在一个项目施工全过程中，项目管理班子的职能分工应该保持不变",[633,636,639,642,645,648],{"id":15,"name":634,"category":7,"favorite":635},"领导干部任职前廉政法规知识测试题",92,{"id":637,"name":638,"category":7,"favorite":15},595,"建筑结构与设备",{"id":640,"name":641,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":643,"name":644,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":646,"name":647,"category":7,"favorite":8},534,"BIM工程师",{"id":649,"name":647,"category":7,"favorite":8},535]