[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":649},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,36,50,2721,[13,34,46,58,70,82,100,112,127,141,155,169,184,199,209,223,238,253,265,277,289,301,313,325,337,349,359,374,389,403,418,431,446,461,474,486,496,508,518,526,538,549,561,573,585,595,604,613,625,637],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1142382,1,"单选题","某建设工程项目施工单位在施工中发生如下费用：完成业主要求的合同外工作花费3万元；由于业主原因导致工效降低，使人工费增加2万元；施工机械故障造成人员窝工损失1万元。则施工单位可向业主索赔的人工费为（ ）万元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","6",false,{"key":24,"text":25,"correct":26},"B","5",true,{"key":28,"text":29,"correct":22},"C","4",{"key":31,"text":32,"correct":22},"D","3","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1142383,"建设工程索赔报告的关键部分是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"论证部分",{"key":24,"text":41,"correct":22},"证据部分",{"key":28,"text":43,"correct":22},"总述部分",{"key":31,"text":45,"correct":22},"索赔款项计算部分",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1142384,"索赔按照当事人分类不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"承包人与发包人之间的索赔",{"key":24,"text":53,"correct":22},"承包人与分包人之间的索赔",{"key":28,"text":55,"correct":26},"分包人和发包人之间的索赔",{"key":31,"text":57,"correct":22},"承包人和保险人之间的索赔",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1142385,"下列事件中属于特殊风险索赔的事件是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"洪涝灾害",{"key":24,"text":65,"correct":22},"百年不遇的暴风雪",{"key":28,"text":67,"correct":26},"暴动",{"key":31,"text":69,"correct":22},"海啸",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1142386,"下列工程资料中，可以作为承包人向业主索赔依据的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"合同履行中发包人和承包人洽商形成的协议",{"key":24,"text":77,"correct":22},"承包人与发包人签订的分包合同",{"key":28,"text":79,"correct":22},"承包人安全交底会议纪要",{"key":31,"text":81,"correct":22},"承包人技术交底纪要",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":99,"analysis":33},1142387,2,"多选题","对建设工程索赔证据的基本要求包括（ ）。",[88,90,92,94,96],{"key":20,"text":89,"correct":22},"可靠性",{"key":24,"text":91,"correct":26},"及时性",{"key":28,"text":93,"correct":26},"关联性",{"key":31,"text":95,"correct":26},"全面性",{"key":97,"text":98,"correct":26},"E","有效性","BCDE",{"id":101,"libraryId":5,"type":84,"typeLabel":85,"stem":102,"options":103,"answer":111,"analysis":33},1142388,"索赔证据应该具有（ ）。",[104,106,107,108,110],{"key":20,"text":105,"correct":26},"真实性",{"key":24,"text":91,"correct":26},{"key":28,"text":95,"correct":26},{"key":31,"text":109,"correct":22},"独立性",{"key":97,"text":98,"correct":26},"ABCE",{"id":113,"libraryId":5,"type":84,"typeLabel":85,"stem":114,"options":115,"answer":126,"analysis":33},1142389,"索赔的成立，应该同时具备的前提条件是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"与合同对照，事件已造成了承包人工程项目成本的额外支出，或直接工期损失",{"key":24,"text":119,"correct":26},"造成费用增加或工期损失的原因，按照合同约定不属于承包人的行为责任或风险责任",{"key":28,"text":121,"correct":22},"索赔文件已经工程师签认",{"key":31,"text":123,"correct":22},"提供的索赔证据充分",{"key":97,"text":125,"correct":26},"承包人按合同规定的程序和时间提交索赔意向通知和索赔报告","ABE",{"id":128,"libraryId":5,"type":84,"typeLabel":85,"stem":129,"options":130,"answer":140,"analysis":33},1142390,"建设工程索赔成立的前提条件有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"与合同对照，事件已造成了承包人工程项目的额外支出或直接工期损失",{"key":24,"text":134,"correct":22},"造成费用增加或工期损失额度巨大，超出了正常承受范围",{"key":28,"text":136,"correct":22},"索赔费用计算正确，并且容易分析",{"key":31,"text":138,"correct":26},"造成费用增加或工期损失的原因，按合同约定不属于承包人的行为责任或风险责任",{"key":97,"text":125,"correct":26},"ADE",{"id":142,"libraryId":5,"type":84,"typeLabel":85,"stem":143,"options":144,"answer":111,"analysis":33},1142391,"建设工程索赔资料准备阶段的主要工作有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"损失或损害调查分析与计算，确定工期索赔和费用索赔值",{"key":24,"text":148,"correct":26},"跟踪和调查干扰事件，掌握事件产生的详细经过",{"key":28,"text":150,"correct":26},"分析干扰事件产生的原因，划清各方责任，确定索赔根据",{"key":31,"text":152,"correct":22},"提交索赔文件",{"key":97,"text":154,"correct":26},"搜集证据",{"id":156,"libraryId":5,"type":84,"typeLabel":85,"stem":157,"options":158,"answer":126,"analysis":33},1142393,"在材料费的索赔中，承包商为证明材料费上涨而应提供的资料有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"可靠的订货单",{"key":24,"text":162,"correct":26},"采购单",{"key":28,"text":164,"correct":22},"企业材料价格统计资料",{"key":31,"text":166,"correct":22},"经验调整指数",{"key":97,"text":168,"correct":26},"官方公布的材料价格调整指数",{"id":170,"libraryId":5,"type":84,"typeLabel":85,"stem":171,"options":172,"answer":183,"analysis":33},1142394,"按照当事人之间的关系对索赔进行分类，可能有（ ）之间的索赔。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"发包人与承包人",{"key":24,"text":176,"correct":22},"发包人与分包人",{"key":28,"text":178,"correct":26},"承包人与分包人",{"key":31,"text":180,"correct":22},"承包人与监理人",{"key":97,"text":182,"correct":22},"分包人与监理人","AC",{"id":185,"libraryId":5,"type":84,"typeLabel":85,"stem":186,"options":187,"answer":198,"analysis":33},1142395,"某工程实行施工总承包模式，承包人将基础工程中的打桩工程分包给某专业分包单位施工，施工过程中发现地质情况与勘察报告不符而导致打桩施工工期拖延。在此情况下，（ ）可以提出索赔。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"承包人向发包人",{"key":24,"text":191,"correct":22},"承包人向勘察单位",{"key":28,"text":193,"correct":22},"分包人向发包人",{"key":31,"text":195,"correct":26},"分包人向承包人",{"key":97,"text":197,"correct":22},"发包人向监理","AD",{"id":200,"libraryId":5,"type":84,"typeLabel":85,"stem":201,"options":202,"answer":198,"analysis":33},1142396,"某工程实行施工总承包，承包人将基础工程中的打桩工程分包给专业分包单位施工，施工过程中发现地质情况与勘察报告不符而导致打桩施工工期拖延。在此情况下，（ ）可以提出索赔。",[203,204,205,206,207],{"key":20,"text":189,"correct":26},{"key":24,"text":191,"correct":22},{"key":28,"text":193,"correct":22},{"key":31,"text":195,"correct":26},{"key":97,"text":208,"correct":22},"发包人向监理单位",{"id":210,"libraryId":5,"type":84,"typeLabel":85,"stem":211,"options":212,"answer":126,"analysis":33},1142397,"下列事件中，承包商可以向业主提出费用索赔的有（ ）。",[213,215,217,219,221],{"key":20,"text":214,"correct":26},"工程量发生变化，引起承包商费用的增加",{"key":24,"text":216,"correct":26},"货币出现贬值，导致承包商实际费用的增加",{"key":28,"text":218,"correct":22},"业主延期支付应付工程款，造成利润损失",{"key":31,"text":220,"correct":22},"由于不可抗力，造成停工损失",{"key":97,"text":222,"correct":26},"施工中出现了承包商难以预计的地下暗河，导致费用增加",{"id":224,"libraryId":5,"type":84,"typeLabel":85,"stem":225,"options":226,"answer":237,"analysis":33},1142399,"下列工程索赔证据中，属于书证的有（ ）。 2016",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"工程现场照片",{"key":24,"text":230,"correct":26},"合同协议书",{"key":28,"text":232,"correct":22},"质量责任鉴定",{"key":31,"text":234,"correct":26},"往来信件",{"key":97,"text":236,"correct":26},"司法判决书","BDE",{"id":239,"libraryId":5,"type":84,"typeLabel":85,"stem":240,"options":241,"answer":252,"analysis":33},1142400,"承包人向发包人索赔成立的前提条件有（）。2018真题",[242,244,246,248,250],{"key":20,"text":243,"correct":26},"按合同规定程序和时间提交了索赔报告",{"key":24,"text":245,"correct":26},"按合同规定程序和时间提交了索赔意向通知",{"key":28,"text":247,"correct":26},"与合同对照，事件已造成了承包人实际损失",{"key":31,"text":249,"correct":26},"索赔原因按合同约定不属于承包人的行为责任",{"key":97,"text":251,"correct":22},"索赔前需进行现场保护","ABCD",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},1142402,"（2020年真题）下列事件中，承包人不能提出工期索赔的是（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"开工前业主未能及时交付施工图纸",{"key":24,"text":260,"correct":22},"异营常恶劣的气候条件",{"key":28,"text":262,"correct":22},"业主未能及时支付工程款造成工期延误",{"key":31,"text":264,"correct":26},"因工期拖延，工程师指示承包人加快施工进度",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":28,"analysis":33},1142404,"用实际费用法索赔时，承包商的索赔金额包括（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"直接费和间接费",{"key":24,"text":272,"correct":22},"直接费",{"key":28,"text":274,"correct":26},"直接费、间接费和利润",{"key":31,"text":276,"correct":22},"直接费、规费和税金",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1142405,"下列索赔事件中，承包人可以索赔利润的是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":26},"工程变更",{"key":24,"text":284,"correct":22},"工程暂停",{"key":28,"text":286,"correct":22},"材料价格上涨",{"key":31,"text":288,"correct":22},"工期延期",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":28,"analysis":33},1142406,"建设工程索赔中，承包商计算索赔费用时最常用的方法是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"总费用法",{"key":24,"text":296,"correct":22},"修正的总费用法",{"key":28,"text":298,"correct":26},"实际费用法",{"key":31,"text":300,"correct":22},"修正的实际费用法",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},1142407,"按国际惯例，一般承包商可索赔的间接费不包括（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"现场管理费",{"key":24,"text":308,"correct":22},"保险费",{"key":28,"text":310,"correct":22},"临时设施费",{"key":31,"text":312,"correct":26},"办公费",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1142408,"实际费用法是工程费用索赔中最常用的一种计算方法，该方法的计算原则是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":26},"以承包商为某项索赔工作所支付的实际开支为根据",{"key":24,"text":320,"correct":22},"以承包商为某项索赔工作所支付的含税工程造价为根据",{"key":28,"text":322,"correct":22},"以承包商为某项索赔工作所支付的直接工程费为根据",{"key":31,"text":324,"correct":22},"以承包商为某项索赔工作所支付的直接费为根据",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1142410,"当发生索赔事件时，对于承包商自有的施工机械，其费用索赔通常按照（ ）进行计算。",[329,331,333,335],{"key":20,"text":330,"correct":26},"台班折旧费",{"key":24,"text":332,"correct":22},"台班费",{"key":28,"text":334,"correct":22},"设备使用费",{"key":31,"text":336,"correct":22},"进出场费用",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1142411,"合同履行过程中，业主要求保护施工现场的一棵古树。为此，承包商自有一台塔吊累计停工2天，后又因工程师指令增加新的工作，需增加塔吊2个台班，台班单价1000元\u002F台班，折旧费200元\u002F台班，则承包商可提出的直接费补偿为（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"2000元",{"key":24,"text":344,"correct":26},"2400元",{"key":28,"text":346,"correct":22},"4000元",{"key":31,"text":348,"correct":22},"4800元",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1142412,"由于非承包商责任造成承包商自有机械设备窝工，其索赔费按（ ）计算。",[353,354,355,357],{"key":20,"text":332,"correct":22},{"key":24,"text":330,"correct":26},{"key":28,"text":356,"correct":22},"折算租金",{"key":31,"text":358,"correct":22},"折算租金乘以规定的降效系数",{"id":360,"libraryId":5,"type":84,"typeLabel":85,"stem":361,"options":362,"answer":373,"analysis":33},1142413,"承包商可以向业主索赔利润的情况有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":26},"工程范围变更",{"key":24,"text":366,"correct":26},"文件有缺陷",{"key":28,"text":368,"correct":22},"分部工程延期施工",{"key":31,"text":370,"correct":26},"文件技术性错误",{"key":97,"text":372,"correct":26},"业主未能提供现场","ABDE",{"id":375,"libraryId":5,"type":84,"typeLabel":85,"stem":376,"options":377,"answer":388,"analysis":33},1142414,"按照国际惯例，承包商可索赔的材料费包括（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":26},"由于索赔事项导致材料实际用量超过计划用量而增加的材料费",{"key":24,"text":381,"correct":26},"由于客观原因造成材料价格大幅上涨而增加的材料费",{"key":28,"text":383,"correct":26},"由于非承包商责任造成工期延误而导致的材料价格上涨和超期储存的费用",{"key":31,"text":385,"correct":22},"由于承包商管理不善，造成材料损坏失效引起的损失费",{"key":97,"text":387,"correct":22},"承包商使用不合格材料引起的损失费用","ABC",{"id":390,"libraryId":5,"type":84,"typeLabel":85,"stem":391,"options":392,"answer":126,"analysis":33},1142415,"在建设工程项目施工索赔中，可索赔的材料费包括（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":26},"非承包商原因导致材料实际用量超过计划用量而增加的费用",{"key":24,"text":396,"correct":26},"因政策调整导致材料价格上涨的费用",{"key":28,"text":398,"correct":22},"因质量原因地行工程返工所增加的材料费",{"key":31,"text":400,"correct":22},"因承包商提前采购材料而发生的超期储存费用",{"key":97,"text":402,"correct":26},"由业主原因造成的材料损耗费",{"id":404,"libraryId":5,"type":84,"typeLabel":85,"stem":405,"options":406,"answer":417,"analysis":33},1142416,"在建设工程项目施工索赔中，可索赔的人工费包括（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"完成合同之外的额外工作所花费的人工费用",{"key":24,"text":410,"correct":22},"施工企业因雨季停工后加班增加的人工费用",{"key":28,"text":412,"correct":26},"法定人工费增长费用",{"key":31,"text":414,"correct":26},"非承包商责任造成的工期延长导致的工资上涨费",{"key":97,"text":416,"correct":22},"不可抗力造成的工期延长导致的工资上涨费","ACD",{"id":419,"libraryId":5,"type":84,"typeLabel":85,"stem":420,"options":421,"answer":430,"analysis":33},1142417,"按国际惯例，承包商可索赔的总部管理费包括（ ）。",[422,423,425,427,429],{"key":20,"text":306,"correct":22},{"key":24,"text":424,"correct":22},"保函手续费",{"key":28,"text":426,"correct":26},"管理人员工资",{"key":31,"text":428,"correct":26},"差旅费",{"key":97,"text":312,"correct":26},"CDE",{"id":432,"libraryId":5,"type":84,"typeLabel":85,"stem":433,"options":434,"answer":445,"analysis":33},1142418,"下列各种情况中，施工单位可索赔施工机械使用费的是（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":26},"完成额外工作而增加的机械使用费",{"key":24,"text":438,"correct":26},"业主方未及时提供施工图纸导致机械停工的窝工费",{"key":28,"text":440,"correct":22},"机械配置原因导致机械工效降低而增加的机械使用费",{"key":31,"text":442,"correct":22},"施工机械故障导致机械停工的窝工费",{"key":97,"text":444,"correct":22},"经监理工程师批准的施工方案不当导致机械停工的窝工费","AB",{"id":447,"libraryId":5,"type":84,"typeLabel":85,"stem":448,"options":449,"answer":460,"analysis":33},1142419,"在建设工程项目施工过程中，施工机械使用费的索赔款项包括（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"因机械故障停工维修而导致的窝工费",{"key":24,"text":453,"correct":26},"因监理工程师指令错误导致机械停工的窝工费",{"key":28,"text":455,"correct":26},"非承包商责任导致工效降低增加的机械使用费",{"key":31,"text":457,"correct":22},"因机械操作工患病停工而导致的机械窝工费",{"key":97,"text":459,"correct":26},"由于完成额外工作增加的机械使用费","BCE",{"id":462,"libraryId":5,"type":84,"typeLabel":85,"stem":463,"options":464,"answer":445,"analysis":33},1142420,"某建设工程项目施工过程中，业主未按合同约定及时供应工程材料，监理工程师考虑到该事件不会影响总工期，故指令施工单位局部工程暂停施工10天，则施工单位可索赔的费用包括（ ）。",[465,467,469,470,472],{"key":20,"text":466,"correct":26},"人员窝工费",{"key":24,"text":468,"correct":26},"机械窝工费",{"key":28,"text":424,"correct":22},{"key":31,"text":471,"correct":22},"施工机械使用费",{"key":97,"text":473,"correct":22},"利润",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1142421,"某国际工程合同额为5000万元人民币，合同实施天数为300天；由国内某承包商总承包施工，该承包商同期总合同额为5亿人民币，同期内公司的总管理费为1500万元；因为业主修改设计，承包商要求工期延期30天。该工程项目部在施工索赔中总部管理费的索赔额是（ ）万元。( 2015真题 )",[478,480,482,484],{"key":20,"text":479,"correct":22},"50",{"key":24,"text":481,"correct":26},"15",{"key":28,"text":483,"correct":22},"12",{"key":31,"text":485,"correct":22},"10",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1142422,"最常用的索赔费用计算方法是（）。2018真题",[490,491,493,495],{"key":20,"text":294,"correct":22},{"key":24,"text":492,"correct":22},"修正总费用法",{"key":28,"text":494,"correct":22},"网络分析法",{"key":31,"text":298,"correct":26},{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1142423,"某工程因发包人原因造成承包人自有施工机械窝工10天，该机械市场租赁费为1200\u002F天，进出厂费2000元，台班费400元\u002F台班，其中台班折旧费160\u002F台班；计划每天工作1台班，共使用40天，则承包人索赔成立的费用是（ ）元。",[500,502,504,506],{"key":20,"text":501,"correct":22},"4000",{"key":24,"text":503,"correct":26},"1600",{"key":28,"text":505,"correct":22},"12000",{"key":31,"text":507,"correct":22},"12500",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},1142424,"某基础工程合同价为2000万元，合同总工期为20个月，施工过程中因设计变更，导致增加额外工程400万元，业主同意工期顺延。则承包商按造价比例法可索赔工期（ ）个月。( 2015真题 )",[512,514,515,516],{"key":20,"text":513,"correct":22},"8",{"key":24,"text":21,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":517,"correct":22},"2",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1142426,"某工程基础施工中出现了意外情况，导致工程量由原来的2 800 m3增加到3 500 m3，原定工期是40天，合同规定工程量增减10%为承包商应承担的风险，则承包商可以提出的工期索赔值是（ ）天。",[522,523,524,525],{"key":20,"text":29,"correct":22},{"key":24,"text":21,"correct":26},{"key":28,"text":513,"correct":22},{"key":31,"text":485,"correct":22},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},1142427,"关于工期索赔，下列说法正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"单一延误是可索赔延误",{"key":24,"text":533,"correct":22},"共同延误是不可索赔延误",{"key":28,"text":535,"correct":26},"交叉延误可能是可索赔延误",{"key":31,"text":537,"correct":22},"非关键线路延误是不可索赔延误",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1142428,"如果某干扰事件仅仅影响某分部分项工程的工期，要分析其对总工期的影响，可以采用的方法是（ ）。",[542,544,546,547],{"key":20,"text":543,"correct":22},"直接法",{"key":24,"text":545,"correct":22},"交叉法",{"key":28,"text":494,"correct":22},{"key":31,"text":548,"correct":26},"比例分析法",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1142429,"非承包商原因导致非关键线路上的某项工作延误，如延误时间小于该项工作的总时差，则对此项延误的补偿是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"业主既应给予工期顺延，也应给予费用补偿",{"key":24,"text":556,"correct":22},"业主一般不会给予工期顺延，但给予费用补偿",{"key":28,"text":558,"correct":22},"业主既不会给予工期顺延，也不给予费用补偿",{"key":31,"text":560,"correct":26},"业主一般不会给予工期顺延，但可能给予费用补偿",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},1142430,"由于承包商原因引起的延误一般是由于其管理不善所引起，比如计划不周密、组织不力、指挥不当等，但不包括（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"施工组织不当，出现窝工或停工待料等现象",{"key":24,"text":568,"correct":22},"质量不符合合同要求而造成返工",{"key":28,"text":570,"correct":22},"资源配置不足",{"key":31,"text":572,"correct":26},"未能及时交付施工图样",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1142431,"某工程项目总价值1000万元，合同工期为18个月，现承包人因建设条件发生变化需增加额外工程费用50万元，则承包方提出工期索赔为（ ）个月。",[577,579,581,583],{"key":20,"text":578,"correct":22},"1.5",{"key":24,"text":580,"correct":26},"0.9",{"key":28,"text":582,"correct":22},"1.2",{"key":31,"text":584,"correct":22},"3.6",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1142432,"下列干扰事件中，承包商不能提出工期索赔的是（ ）。",[589,591,592,594],{"key":20,"text":590,"correct":26},"工程师指示承包商加快施工进度",{"key":24,"text":258,"correct":22},{"key":28,"text":593,"correct":22},"异常恶劣的气候条件",{"key":31,"text":262,"correct":22},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":28,"analysis":33},1142433,"可用于各种干扰事件和多种干扰事件共同作用所引起的工期索赔的计算方法是（ ）。",[599,600,601,602],{"key":20,"text":548,"correct":22},{"key":24,"text":543,"correct":22},{"key":28,"text":494,"correct":26},{"key":31,"text":603,"correct":22},"间接法",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":28,"analysis":33},1142434,"某工程施工中出现了意外情况，导致工程量由原来的2500m3增加到3000m3,原定工期为30天，合同规定工程量变动10%为承包商应承担风险，则可索赔工期为（）天。2018真题",[608,609,610,611],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":32,"correct":26},{"key":31,"text":612,"correct":22},"2.5",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":28,"analysis":33},1142435,"某工程的时标网络计划如下图，下列工期延误事件中，属于共同延误的是（ ）。 2016",[617,619,621,623],{"key":20,"text":618,"correct":22},"工作C因发包人原因和工作G因承包人原因各延误2周",{"key":24,"text":620,"correct":22},"工作D因发包人原因和工作F因承包人原因各延误2周",{"key":28,"text":622,"correct":26},"工作A因发包人原因和工作B因承包人原因各延误2周",{"key":31,"text":624,"correct":22},"工作E因发包人原因和工作F因承包人原因各延误2周",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":20,"analysis":33},1142437,"工期延误划分为单一延误、共同延误及交叉延误的依据是（ ）。2014",[629,631,633,635],{"key":20,"text":630,"correct":26},"延误事件之间的关联性",{"key":24,"text":632,"correct":22},"延误的原因",{"key":28,"text":634,"correct":22},"索赔要求和结果",{"key":31,"text":636,"correct":22},"延误工作所在工程网络计划的线路性质",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":28,"analysis":33},1142441,"工程施工过程中发生索赔事件以后，承包人首先要做的工作是（ ）。",[641,643,645,647],{"key":20,"text":642,"correct":22},"向监理工程师提出索赔证据",{"key":24,"text":644,"correct":22},"提交索赔报告",{"key":28,"text":646,"correct":26},"提出索赔意向通知",{"key":31,"text":648,"correct":22},"与业主就索赔事项进行谈判",[650,653,656,659,662,665],{"id":15,"name":651,"category":7,"favorite":652},"领导干部任职前廉政法规知识测试题",92,{"id":654,"name":655,"category":7,"favorite":15},595,"建筑结构与设备",{"id":657,"name":658,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":660,"name":661,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":663,"name":664,"category":7,"favorite":8},534,"BIM工程师",{"id":666,"name":664,"category":7,"favorite":8},535]