[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":660},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,35,50,2721,[13,34,52,67,79,91,103,115,127,139,151,163,178,193,208,222,237,252,264,275,287,299,311,323,338,353,364,376,388,400,412,424,438,452,466,478,490,502,514,528,540,552,564,576,588,600,612,624,636,648],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1142326,1,"单选题","建设行政主管部门市场诚信信息平台上良好行为记录信息的公布期限一般为（ ）。2014",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","3个月",false,{"key":24,"text":25,"correct":22},"B","6个月",{"key":27,"text":28,"correct":22},"C","1年",{"key":30,"text":31,"correct":32},"D","3年",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1142327,2,"多选题","关于建筑市场诚信行为记录的说法，正确的有（）。2018真题",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"不良行为记录信息的公布期限最短为1年",{"key":24,"text":43,"correct":22},"由地方建设行政主管部门统一公布",{"key":27,"text":45,"correct":32},"良好行为记录信息的公布期限一般为3年",{"key":30,"text":47,"correct":32},"不良行为记录信息公布时间是行政处罚决定做出后7日内",{"key":49,"text":50,"correct":32},"E","不良行为记录信息公布期限可以根据整改审查结果延长","CDE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},1142328,"根据《全国建筑市场各方主体不良行为记录认定标准》，下列不良行为中，属于承揽业务方面的有（ ）。 2016",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"允许其他单位或个人以单位名义承揽工程",{"key":24,"text":59,"correct":32},"不按照与招标人订立的合同履行义务，情节严重",{"key":27,"text":61,"correct":32},"以向招标人或者评标委员会成员行贿的手段谋取中标",{"key":30,"text":63,"correct":32},"将承包的工程转包或者违法分包",{"key":49,"text":65,"correct":22},"按照国家规定需要持证上岗的技术工种的作业人员未取得证书上岗","BCD",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":33},1142330,"施工合同分析中，对工程师权限和责任分析属于（ ）分析的内容。",[71,73,75,77],{"key":20,"text":72,"correct":32},"发包人责任",{"key":24,"text":74,"correct":22},"合同法律基础",{"key":27,"text":76,"correct":22},"承包人主要任务",{"key":30,"text":78,"correct":22},"合同争议解决方式",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},1142331,"在建设工程施工合同分析时，关于承包人任务的说法，正确的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":32},"应明确承包人的合同标的",{"key":24,"text":86,"correct":22},"工程变更补偿合同范围以合同金额的一定百分比表示，百分比值越大，承包人的风险越小",{"key":27,"text":88,"correct":22},"合同实施中，对工程师指令的变更，承包人必须无条件执行",{"key":30,"text":90,"correct":22},"工程变更的索赔有效期越短，对承包人越有利",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},1142332,"在合同分析中，应明确工程变更的补偿范围，工程变更补偿范围通常以合同金额一定的百分比表示，百分比越大，则（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"合同金额越高",{"key":24,"text":98,"correct":22},"承包商利润越高",{"key":27,"text":100,"correct":32},"承包商的风险越大",{"key":30,"text":102,"correct":22},"对承包商的补偿越多",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1142333,"在建设工程合同中，工程变更的补偿范围，通常以（ ）一定的百分比表示。这个百分比越大，承包人的风险越大。",[107,109,111,113],{"key":20,"text":108,"correct":32},"合同金额",{"key":24,"text":110,"correct":22},"合同直接费",{"key":27,"text":112,"correct":22},"合同税费",{"key":30,"text":114,"correct":22},"合同进度款",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":27,"analysis":33},1142334,"对建设工程施工合同中发包人的责任进行分析时，主要分析（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"报批责任",{"key":24,"text":122,"correct":22},"监督责任",{"key":27,"text":124,"correct":32},"合作责任",{"key":30,"text":126,"correct":22},"组织责任",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1142335,"在对合同中质量验收、工程移交和保修条款的分析中，应对重要的验收要求、（ ）以及验收所带来的法律后果作说明。",[131,133,135,137],{"key":20,"text":132,"correct":32},"时间、程序",{"key":24,"text":134,"correct":22},"时间、地点",{"key":27,"text":136,"correct":22},"人员、责任",{"key":30,"text":138,"correct":22},"质量、进度",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":30,"analysis":33},1142336,"关于施工合同分析，下列说法中正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"合同分析就是分析合同中的漏洞，发现索赔的机会",{"key":24,"text":146,"correct":22},"合同分析中对于发包人，主要分析发包人的监督责任",{"key":27,"text":148,"correct":22},"工程变更的补偿范围越大，承包人风险就越小",{"key":30,"text":150,"correct":32},"对于拖欠工程款的合同责任的分析是合同价格分析的重点内容",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1142337,"工程竣工验收合格并办理了移交手续，表明（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"解除了承包人的所有责任",{"key":24,"text":158,"correct":22},"承包人即可获得全部工程价款",{"key":27,"text":160,"correct":32},"承包人工程施工任务的完成",{"key":30,"text":162,"correct":22},"承包人和发包人所有关系的解除",{"id":164,"libraryId":5,"type":36,"typeLabel":37,"stem":165,"options":166,"answer":177,"analysis":33},1142338,"在实施建设工程合同前，对合同价格的分析内容包括（ ）。",[167,169,171,173,175],{"key":20,"text":168,"correct":32},"合同所采用的计价方法",{"key":24,"text":170,"correct":32},"工程计量程序",{"key":27,"text":172,"correct":32},"合同价格的调整",{"key":30,"text":174,"correct":32},"拖欠工程款的合同责任",{"key":49,"text":176,"correct":22},"定额的编制方法","ABCD",{"id":179,"libraryId":5,"type":36,"typeLabel":37,"stem":180,"options":181,"answer":192,"analysis":33},1142339,"承包人在履行和实施合同前进行合同分析，其目的和作用有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":32},"分析合同漏洞，解释有争议的内容",{"key":24,"text":185,"correct":22},"分析签订合同依据的法律法规，了解法律情况",{"key":27,"text":187,"correct":32},"分析合同风险，制定风险对策",{"key":30,"text":189,"correct":22},"分析合同文件组成及结构，有利于合同查阅",{"key":49,"text":191,"correct":32},"分解和落实合同任务，便于实施和检查","ACE",{"id":194,"libraryId":5,"type":36,"typeLabel":37,"stem":195,"options":196,"answer":207,"analysis":33},1142340,"合同分析的目的和作用主要体现在（ ）等方面。",[197,199,201,203,205],{"key":20,"text":198,"correct":22},"根据合同要求制定投标策略",{"key":24,"text":200,"correct":22},"分析合同漏洞，制定履行合同的对策",{"key":27,"text":202,"correct":32},"分析合同的风险，制定风险管理对策",{"key":30,"text":204,"correct":32},"分解合同任务，并落实到具体的部门、人员",{"key":49,"text":206,"correct":22},"总结合同执行情况，完善竣工验收报告","CD",{"id":209,"libraryId":5,"type":36,"typeLabel":37,"stem":210,"options":211,"answer":192,"analysis":33},1142341,"建设工程施工合同分析中，关于承包人的主要任务的叙述，正确的有（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":32},"在合同实施中，如果工程师指令的工程变更属于合同规定的工程范围，则承包人必须无条件执行",{"key":24,"text":215,"correct":22},"承包人的总任务即满足业主的要求",{"key":27,"text":217,"correct":32},"承包人的工作范围它通常由合同中的工程量清单、图纸、工程说明、技术规范所定义",{"key":30,"text":219,"correct":22},"在合同实施中，如果工程变更超过承包人应承担的风险范围，则可向工程师提出工程变更的补偿要求",{"key":49,"text":221,"correct":32},"在合同实施过程中，工程变更的补偿范围，通常以合同金额一定的百分比表示",{"id":223,"libraryId":5,"type":36,"typeLabel":37,"stem":224,"options":225,"answer":236,"analysis":33},1142342,"合同分析的目的和作用包括（ ）。",[226,228,230,232,234],{"key":20,"text":227,"correct":32},"分析合同中的漏洞，解释有争议的内容",{"key":24,"text":229,"correct":32},"分析合同风险，制订风险对策",{"key":27,"text":231,"correct":32},"合同任务分解、落实",{"key":30,"text":233,"correct":22},"预防合同双方产生争执",{"key":49,"text":235,"correct":22},"分析合同事件和工程活动的具体要求，及时作出决定","ABC",{"id":238,"libraryId":5,"type":36,"typeLabel":37,"stem":239,"options":240,"answer":251,"analysis":33},1142344,"在施工合同分析中，发包人的合作责任有（ ）。( 2015真题 )",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"施工现场的管理，给发包人的管理人员提供生活和工作条件",{"key":24,"text":244,"correct":32},"及时提供设计资料、图纸、施工场地等",{"key":27,"text":246,"correct":32},"按合同规定及时支付工程款",{"key":30,"text":248,"correct":32},"对平行的各承包人和供应商之间的责任界限作出划分",{"key":49,"text":250,"correct":32},"及时作出承包人履行合同所必需的决策","BCDE",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},1142345,"下列合同事件中，表示承包人工程施工任务完结的是（）。2018真题",[256,258,260,262],{"key":20,"text":257,"correct":22},"竣工结算",{"key":24,"text":259,"correct":22},"竣工验收",{"key":27,"text":261,"correct":32},"工程移交",{"key":30,"text":263,"correct":22},"工程保修",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":20,"analysis":33},1142346,"（2020年真题）关于承包人施工合同分析内容的说法，正确的是（ ）。",[268,269,271,273],{"key":20,"text":84,"correct":32},{"key":24,"text":270,"correct":22},"分析工程变更补偿范围，通常以合同金额的一定百分比表示，百分比值越大，承包人的风险越小",{"key":27,"text":272,"correct":22},"合同实施中，承包人必须无条件执行工程师指令的变更",{"key":30,"text":274,"correct":22},"分析索赔条款，索赔有效期越短，对承包人越有利",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":20,"analysis":33},1142347,"施工合同交底是指（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":32},"承包人的合同管理人员向其内部项目管理人员交底",{"key":24,"text":282,"correct":22},"发包人向承包人进行合同交底",{"key":27,"text":284,"correct":22},"监理工程师向承包人进行合同交底",{"key":30,"text":286,"correct":22},"施工项目经理向施工现场操作人员进行交底",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},1142348,"建设工程施工合同交底是指（ ）进行交底。",[291,293,295,297],{"key":20,"text":292,"correct":22},"发包人向承包人合同管理人员",{"key":24,"text":294,"correct":22},"监理人向承包人合同管理人员",{"key":27,"text":296,"correct":32},"承包人合同管理人员向其内部项目管理人员",{"key":30,"text":298,"correct":22},"承包人项目经理向现场操作人员",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":30,"analysis":33},1142349,"施工合同交底是指由合同管理人员组织相关人员（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"参与起草合同条款",{"key":24,"text":306,"correct":22},"参与合同谈判和合同签订",{"key":27,"text":308,"correct":22},"研究分析合同中的不妥之处",{"key":30,"text":310,"correct":32},"学习合同的主要内容和合同分析结果",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":30,"analysis":33},1142350,"在进行合同分析以后，应由（）作“合同交底”。",[315,317,319,321],{"key":20,"text":316,"correct":22},"各层次管理者向合同管理人员",{"key":24,"text":318,"correct":22},"合同管理人员向劳务作业人员",{"key":27,"text":320,"correct":22},"项目经理向合同管理人员",{"key":30,"text":322,"correct":32},"合同管理人员向各层次管理者",{"id":324,"libraryId":5,"type":36,"typeLabel":37,"stem":325,"options":326,"answer":337,"analysis":33},1142351,"施工合同交底是合同管理的一项重要工作，合同交底的目的和任务包括（ ）。",[327,329,331,333,335],{"key":20,"text":328,"correct":32},"将合同事件的责任分解落实",{"key":24,"text":330,"correct":32},"明确成本目标和消耗标准",{"key":27,"text":332,"correct":22},"跟踪业主方的失误，发现索赔的机会",{"key":30,"text":334,"correct":22},"寻求对自己有利的合同解释",{"key":49,"text":336,"correct":32},"明确完不成任务的后果","ABE",{"id":339,"libraryId":5,"type":36,"typeLabel":37,"stem":340,"options":341,"answer":352,"analysis":33},1142352,"施工合同交底的主要目的和任务有（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":32},"将各种合同事件的责任分解到各工程小组或分包人",{"key":24,"text":345,"correct":32},"明确各项工作或各个工程的工期要求",{"key":27,"text":347,"correct":32},"明确各个工程小组（分包人）之间的责任界限",{"key":30,"text":349,"correct":22},"争取对自身有利的合同条款",{"key":49,"text":351,"correct":32},"明确完不成任务的影响和法律后果","ABCE",{"id":354,"libraryId":5,"type":36,"typeLabel":37,"stem":355,"options":356,"answer":363,"analysis":33},1142353,"建设工程施工合同交底的目的和任务主要有（ ）。",[357,358,359,360,362],{"key":20,"text":330,"correct":32},{"key":24,"text":351,"correct":32},{"key":27,"text":349,"correct":22},{"key":30,"text":361,"correct":32},"明确相关事件之间的逻辑关系",{"key":49,"text":345,"correct":32},"ABDE",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1142354,"在施工合同实施中，“项目经理将各种任务的责任分解，并落实到具体人员”的活动属于（ ）的内容。2014",[368,370,372,374],{"key":20,"text":369,"correct":22},"合同分析",{"key":24,"text":371,"correct":22},"合同跟踪",{"key":27,"text":373,"correct":32},"合同交底",{"key":30,"text":375,"correct":22},"合同实施控制",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},1142355,"施工合同的实施中，应由（ ）对各工程小组进行建设工程施工合同交底。 2016",[380,382,384,386],{"key":20,"text":381,"correct":22},"施工员",{"key":24,"text":383,"correct":22},"项目技术负责人",{"key":27,"text":385,"correct":32},"项目经理",{"key":30,"text":387,"correct":22},"施工企业负责人",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1142356,"根据《建设工程施工合同（示范文本）》，合同实施工程中工程师同意采用承包人的合理化建议，由此所发生的费用或获得的收益应由（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":32},"发包人与承包人另行约定分担或分享",{"key":24,"text":395,"correct":22},"发包人承担或享有",{"key":27,"text":397,"correct":22},"发包人、承包人和工程师根据约定分担或分享",{"key":30,"text":399,"correct":22},"承包人承担或享有",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},1142357,"下列合同实施偏差的调整措施中，属于组织措施的是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":32},"增加人员投入",{"key":24,"text":407,"correct":22},"增加资金投入",{"key":27,"text":409,"correct":22},"变更技术方案",{"key":30,"text":411,"correct":22},"变更合同条款",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},1142358,"工程师同意采用承包人的合理化建议，所发生费用和获得收益的分担或分享，由（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"发包人决定",{"key":24,"text":419,"correct":22},"承包人决定",{"key":27,"text":421,"correct":32},"发包人和承包人另行约定",{"key":30,"text":423,"correct":22},"工程师决定",{"id":425,"libraryId":5,"type":36,"typeLabel":37,"stem":426,"options":427,"answer":352,"analysis":33},1142359,"根据我国施工合同示范文本，工程变更包括设计变更和工程质量标准等其他实质性内容的变更，其中设计变更包括（ ）。",[428,430,432,434,436],{"key":20,"text":429,"correct":32},"更改工程有关部分的标高、基线、位置和尺寸",{"key":24,"text":431,"correct":32},"增减合同中约定的工程量",{"key":27,"text":433,"correct":32},"改变有关工程的施工时间和顺序",{"key":30,"text":435,"correct":22},"改变任何工作的质量和性质",{"key":49,"text":437,"correct":32},"其他有关工程变更需要的附加工作",{"id":439,"libraryId":5,"type":36,"typeLabel":37,"stem":440,"options":441,"answer":236,"analysis":33},1142360,"下列各项中属于承包商合同跟踪对象的是（ ）。",[442,444,446,448,450],{"key":20,"text":443,"correct":32},"分包人的工作",{"key":24,"text":445,"correct":32},"业主的工作",{"key":27,"text":447,"correct":32},"监理工程师的工作",{"key":30,"text":449,"correct":22},"设计方的工作",{"key":49,"text":451,"correct":22},"政府质量监督机构的工作",{"id":453,"libraryId":5,"type":36,"typeLabel":37,"stem":454,"options":455,"answer":236,"analysis":33},1142361,"根据工程实施的实际情况，可以提出工程变更的单位有（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":32},"承包方",{"key":24,"text":459,"correct":32},"业主方",{"key":27,"text":461,"correct":32},"设计方",{"key":30,"text":463,"correct":22},"供货商",{"key":49,"text":465,"correct":22},"质检站",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},1142362,"业主在向中标人授标前，要求中标人对施工方案进行修改，由此引起的费用增加由（ ）承担。",[470,472,474,476],{"key":20,"text":471,"correct":22},"监理人",{"key":24,"text":473,"correct":22},"招标人",{"key":27,"text":475,"correct":32},"中标人",{"key":30,"text":477,"correct":22},"业主",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},1142363,"根据《建设工程施工合同（示范文本）》（GF-99-0201），不属于设计变更范围的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"更改工程有关的标高、基线、位置、尺寸",{"key":24,"text":485,"correct":22},"改变工程质量等级要求",{"key":27,"text":487,"correct":22},"增减合同中约定的工作量",{"key":30,"text":489,"correct":32},"改变工程施工的时间和顺序",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1142364,"下列建设工程施工合同跟踪的对象中，属于对业主跟踪的是（ ）。 2016",[494,496,498,500],{"key":20,"text":495,"correct":22},"成本的增减",{"key":24,"text":497,"correct":32},"图纸的提供",{"key":27,"text":499,"correct":22},"施工的质量",{"key":30,"text":501,"correct":22},"分包人失误",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},1142365,"关于施工合同跟踪的说法，错误的是（ ）。( 2015真题 )",[506,508,510,512],{"key":20,"text":507,"correct":22},"承包单位的合同管理职能部门对合同执行者的履行情况进行跟踪、监督和检查",{"key":24,"text":509,"correct":22},"合同执行者本身对合同计划的执行情况进行跟踪、检查和对比",{"key":27,"text":511,"correct":22},"合同跟踪的内容和业主是否及时给予了指令、答复等",{"key":30,"text":513,"correct":32},"可以将工程任务发包给专业分包完成，并由专业分包对合同计划的执行进行跟踪、检查和对比",{"id":515,"libraryId":5,"type":36,"typeLabel":37,"stem":516,"options":517,"answer":177,"analysis":33},1142367,"下列工程变更情况中，应由业主承担责任的有（ ）",[518,520,522,524,526],{"key":20,"text":519,"correct":32},"不可抗力导致的设计修改",{"key":24,"text":521,"correct":32},"环境变化导致的设计修改",{"key":27,"text":523,"correct":32},"原设计错误导致的设计修改",{"key":30,"text":525,"correct":32},"政府部门要求导致的设计修改",{"key":49,"text":527,"correct":22},"施工方案出现错误导致的设计修改",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1142371,"施工合同履行过程中，承包商向指定分包商支付工程款的时间应当是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"分包合同约定的付款时间，不论承包人是否收到了业主支付的工程款",{"key":24,"text":535,"correct":32},"承包商收到业主工程款之后",{"key":27,"text":537,"correct":22},"业主向承包人支付工程款之前14天",{"key":30,"text":539,"correct":22},"业主向承包人支付工程款之前7天",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1142372,"关于工程变更的说法，正确的是（）。2018真题",[544,546,548,550],{"key":20,"text":545,"correct":22},"承包人可直接变更能缩短工期的施工方案",{"key":24,"text":547,"correct":32},"业主要求变更施工方案，承包人可以索赔相应费用",{"key":27,"text":549,"correct":22},"工程变更价款未确定之前，承包人可以不执行变更指示",{"key":30,"text":551,"correct":22},"因政府部门要求导致的设计修改，由业主和承包人共同承担责任",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":30,"analysis":33},1142373,"索赔成立的前提条件不包括（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"与合同对照，事件已经造成承包人实际损失",{"key":24,"text":559,"correct":22},"造成损失的原因，不属于承包人的行为责任或风险责任",{"key":27,"text":561,"correct":22},"承包人按合同规定的程序和时间提交索赔意向通知和索赔报告",{"key":30,"text":563,"correct":32},"索赔额计算正确",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1142374,"由于特殊恶劣气候，导致承包商工期延长和成本上升，则承包商有权索赔（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"成本，但不包括工期",{"key":24,"text":571,"correct":32},"工期，但不包括成本",{"key":27,"text":573,"correct":22},"工期、成本，但不包括利润",{"key":30,"text":575,"correct":22},"工期、成本和利润",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1142375,"在工程索赔中，工地的交接记录（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"不可以作为索赔证据",{"key":24,"text":583,"correct":32},"可以作为索赔证据",{"key":27,"text":585,"correct":22},"能否作为索赔证据应视具体情况而定",{"key":30,"text":587,"correct":22},"只能作为索赔参考",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},1142376,"建设工程索赔最主要的依据是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":32},"合同文件",{"key":24,"text":595,"correct":22},"法律、法规",{"key":27,"text":597,"correct":22},"工程建设惯例",{"key":30,"text":599,"correct":22},"投标书及其附件",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":27,"analysis":33},1142377,"因货币贬值、汇率变化、物价和工资上涨、政策法令变化引起的索赔属于（ ）索赔。",[604,606,608,610],{"key":20,"text":605,"correct":22},"费用",{"key":24,"text":607,"correct":22},"工程变更",{"key":27,"text":609,"correct":32},"其他",{"key":30,"text":611,"correct":22},"工程终止",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":27,"analysis":33},1142378,"建设工程中的反索赔是相对索赔而言的，反索赔的提出者（ ）。",[616,618,620,622],{"key":20,"text":617,"correct":22},"仅限发包方",{"key":24,"text":619,"correct":22},"仅限承包方",{"key":27,"text":621,"correct":32},"发包方和承包方均可",{"key":30,"text":623,"correct":22},"仅限监理方",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":27,"analysis":33},1142379,"某工程由于业主方提供的施工图纸有误，造成施工总包单位人员窝工75工日，增加用工8工日；由于施工分包单位设备安装质量不合格返工处理造成人员窝工60工日，增加用工6工日。合同约定人工费日工资标准为50元，窝工补偿标准为日工资标准的70%，则业主应给予施工总包单位的人工费索赔金额是（ ）元。",[628,630,632,634],{"key":20,"text":629,"correct":22},"5425",{"key":24,"text":631,"correct":22},"4150",{"key":27,"text":633,"correct":32},"3025",{"key":30,"text":635,"correct":22},"2905",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":30,"analysis":33},1142380,"关于建设工程索赔成立的条件，下列说法中正确的是（ ）。",[640,642,644,646],{"key":20,"text":641,"correct":22},"导致索赔的事件必须是对方的过错，索赔才能成立",{"key":24,"text":643,"correct":22},"只要对方有过错，不管是否造成损失，索赔都可以成立",{"key":27,"text":645,"correct":22},"只要索赔事件的事实存在，在合同有效期内任何时候提出索赔都可以成立",{"key":30,"text":647,"correct":32},"不按照合同规定的程序提交索赔报告，索赔不能成立",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":20,"analysis":33},1142381,"在施工期间，承包商可能遇到不能预见的地下岩石，导致工期拖延，这类风险应由（ ）承担。",[652,654,656,658],{"key":20,"text":653,"correct":32},"发包人",{"key":24,"text":655,"correct":22},"承包人",{"key":27,"text":657,"correct":22},"发包人和承包人共同",{"key":30,"text":659,"correct":22},"监理工程师",[661,664,667,670,673,676],{"id":15,"name":662,"category":7,"favorite":663},"领导干部任职前廉政法规知识测试题",92,{"id":665,"name":666,"category":7,"favorite":15},595,"建筑结构与设备",{"id":668,"name":669,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":671,"name":672,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":674,"name":675,"category":7,"favorite":8},534,"BIM工程师",{"id":677,"name":675,"category":7,"favorite":8},535]