[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,33,50,2721,[13,34,52,67,79,91,103,115,127,139,151,161,169,181,190,205,220,232,244,252,260,274,286,298,310,322,337,349,357,370,385,399,407,419,431,441,453,461,475,484,496,508,520,532,546,555,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1142215,1,"单选题","有关于建设工程项目总承包单位工作内容，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","负责办理项目的审查、核准或手续，取得项目用地的使用权",false,{"key":24,"text":25,"correct":26},"B","按照合同约定：完成设计、采购、施工、竣工试验和竣工后试验",true,{"key":28,"text":29,"correct":22},"C","完成拆迁补偿工作，使项目具备法律规定的开工条件",{"key":31,"text":32,"correct":22},"D","项目总承包单位可自主确定设计人员和设计分包者","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1142216,2,"多选题","根据《建设项目工程总承包合同示范文本（试行）》GF-2011-0216，承包人在技术和设计方面的工作和义务有（ ）。2017",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"提供建筑设计总体布局、功能分区方案",{"key":24,"text":43,"correct":22},"提供项目基础资料",{"key":28,"text":45,"correct":22},"提供现场障碍资料",{"key":31,"text":47,"correct":22},"组织设计阶段审查会议",{"key":49,"text":50,"correct":26},"E","对工程的安全、环境保护、职业健康标准负责","AE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},1142217,"根据《建设项目工程总承包合同示范文本（试行）》（GF—2011—0216），承包人主要权利和义务有（ ）。( 2015真题 )",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"根据合同约定，自费修复竣工后试验中发现的缺陷",{"key":24,"text":59,"correct":26},"按照合同约定和发包人的要求，提出相关报表",{"key":28,"text":61,"correct":26},"根据合同约定，以书面形式向发包人发出暂停通知",{"key":31,"text":63,"correct":26},"根据合同约定，对因发包人原因带来的损失要求赔偿",{"key":49,"text":65,"correct":22},"负责办理项目审批，核准或备案手续，取得项目用地的使用权","ABCD",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1142218,"根据《建设项目工程总承包合同示范文本（试行）》（GF-2011-0216），发包人的义务是（ ）。2014",[71,73,75,77],{"key":20,"text":72,"correct":22},"组织竣工验收",{"key":24,"text":74,"correct":22},"提交临时占地资料",{"key":28,"text":76,"correct":22},"提供设计审查所需的资料",{"key":31,"text":78,"correct":26},"负责办理项目备案手续",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1142219,"（2020年真题）根据《建设项目总承包合同示范文本(试行)》，关于建设工程项目发包人权利和义务的说法，错误的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"负责办理项目的审批、核准或备案手续，取得项目用地的使用权",{"key":24,"text":86,"correct":22},"履行合同中约定的合同价格调整、付款、竣工结算义务",{"key":28,"text":88,"correct":22},"发包人认为有必要的时候，有权以书面形式发出暂停通知",{"key":31,"text":90,"correct":26},"发包人对因承包人原因给发包人带来的损失不能提出赔偿",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1142220,"工程咨询服务合同的计价方式主要采用（）。2018真题",[95,97,99,101],{"key":20,"text":96,"correct":26},"总价合同和成本加酬金合同",{"key":24,"text":98,"correct":22},"总价合同和单价合同",{"key":28,"text":100,"correct":22},"单价合同和成本加酬金合同",{"key":31,"text":102,"correct":22},"总价合同、单价合同和成本加酬金合同",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1142221,"（2020年真题）下列计算方法中，不属于工程咨询合同咨询费计算方法的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":26},"工程进度百分比",{"key":24,"text":110,"correct":22},"人月费单价法",{"key":28,"text":112,"correct":22},"工程建设费用百分比",{"key":31,"text":114,"correct":22},"按日计费法",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},1142222,"某工程由于图纸、规范等准备不充分，招标方仅能制定一个估算指标，则在招标时宜采用成本加酬金合同形式的（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"成本加固定费用合同",{"key":24,"text":122,"correct":22},"成本加固定比例费用合同",{"key":28,"text":124,"correct":26},"成本加奖金合同",{"key":31,"text":126,"correct":22},"最大成本加费用合同",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1142223,"关于成本加酬金合同的特点和应用，下列说法正确的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":26},"采用该计价方式不利于业主方的投资控制",{"key":24,"text":134,"correct":22},"采用该计价方式不利于业主方的进度控制",{"key":28,"text":136,"correct":22},"该计价方式不宜用于项目管理合同",{"key":31,"text":138,"correct":22},"该计价方式不宜用于施工总承包管理合同",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},1142224,"当实行施工总承包管理模式或CM模式时，业主与施工总承包管理单位或CM单位的合同一般采用（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"单价合同",{"key":24,"text":146,"correct":22},"固定总价合同",{"key":28,"text":148,"correct":26},"成本加酬金合同",{"key":31,"text":150,"correct":22},"可变动单价合同",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},1142225,"业主方承担全部工程量和价格风险的合同是（ ）。",[155,157,158,159],{"key":20,"text":156,"correct":22},"变动总价合同",{"key":24,"text":146,"correct":22},{"key":28,"text":148,"correct":26},{"key":31,"text":160,"correct":22},"变动单价合同",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1142226,"当工程项目实行施工总承包管理模式时，业主与施工总成本管理单位的合同一般采用（ ）。",[165,166,167,168],{"key":20,"text":144,"correct":22},{"key":24,"text":146,"correct":22},{"key":28,"text":156,"correct":22},{"key":31,"text":148,"correct":26},{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},1142227,"当实行施工总承包管理模式时，业主与施工总承包管理单位的合同一般采用（ ）合同。",[173,175,177,179],{"key":20,"text":174,"correct":26},"成本加酬金",{"key":24,"text":176,"correct":22},"固定单价",{"key":28,"text":178,"correct":22},"固定总价",{"key":31,"text":180,"correct":22},"变动总价",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":33},1142228,"在非代理型（风险型）CM模式的合同中采用的成本加酬金的方式是（ ）。",[185,186,187,188],{"key":20,"text":124,"correct":22},{"key":24,"text":126,"correct":26},{"key":28,"text":122,"correct":22},{"key":31,"text":189,"correct":22},"最大成本加比例费用合同",{"id":191,"libraryId":5,"type":36,"typeLabel":37,"stem":192,"options":193,"answer":204,"analysis":33},1142229,"对业主而言，成本加酬金合同的优点有（ ）。",[194,196,198,200,202],{"key":20,"text":195,"correct":26},"可以利用承包商的施工技术专家，帮助改进或弥补设计中的不足",{"key":24,"text":197,"correct":26},"可以根据自身力量和需要，较深入地介入和控制工程施工和管理",{"key":28,"text":199,"correct":22},"可以转移风险，有利于业主方的投资控制",{"key":31,"text":201,"correct":26},"可以通过分段施工缩短工期",{"key":49,"text":203,"correct":26},"可以减少承包商的对立情绪","ABDE",{"id":206,"libraryId":5,"type":36,"typeLabel":37,"stem":207,"options":208,"answer":219,"analysis":33},1142231,"下列成本加酬金合同的优点中，对主业有利的有（ ）。( 2015真题 )",[209,211,213,215,217],{"key":20,"text":210,"correct":22},"可以确定合同工程内容、工程量及合同终止时间",{"key":24,"text":212,"correct":26},"可以通过分段施工缩短施工工期",{"key":28,"text":214,"correct":22},"可以通过最高限价约束工程成本，转移全部风险",{"key":31,"text":216,"correct":26},"可以利用承包商的施工技术专家帮助改进设计的不足",{"key":49,"text":218,"correct":26},"可以较深入介入和控制工程施工和管理","BDE",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":28,"analysis":33},1142232,"在非代理型施工管理模式（CM模式）的合同中，通常采用（ ）合同。2014",[224,226,228,230],{"key":20,"text":225,"correct":22},"成本加固定费用",{"key":24,"text":227,"correct":22},"成本加固定比例费用",{"key":28,"text":229,"correct":26},"最大成本加费用",{"key":31,"text":231,"correct":22},"成本加奖金",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},1142233,"关于成本加酬金合同的说法，正确的是（ ）。 2016",[236,238,240,242],{"key":20,"text":237,"correct":26},"当实行风险型CM模式时，适宜采用最大成本加费用合同",{"key":24,"text":239,"correct":22},"成本加固定费用的合同，承包商的酬金不可调整",{"key":28,"text":241,"correct":22},"成本加固定比例费用的合同，有利于缩短工期",{"key":31,"text":243,"correct":22},"当设计深度达到可以报总价的深度时，适宜采用成本加奖金合同",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1142235,"某项目招标时，因图纸、规范准备不充分，不能据此确定合同价格，而仅能制定一个估算指标，则适宜采用的合同形式（）。2018真题",[248,249,250,251],{"key":20,"text":120,"correct":22},{"key":24,"text":126,"correct":22},{"key":28,"text":122,"correct":22},{"key":31,"text":124,"correct":26},{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},1142236,"（2019年真题）某项目招标时,因工程初期很难描述工作范围和性质,无法按常规编制招标文件,则适宜采用的合同形式是( )",[256,257,258,259],{"key":20,"text":124,"correct":22},{"key":24,"text":120,"correct":22},{"key":28,"text":126,"correct":22},{"key":31,"text":122,"correct":26},{"id":261,"libraryId":5,"type":36,"typeLabel":37,"stem":262,"options":263,"answer":273,"analysis":33},1142237,"（2020年真题）对业主而言，成本加酬金合同的优点有（ ）",[264,265,267,269,271],{"key":20,"text":201,"correct":26},{"key":24,"text":266,"correct":22},"适用于技术简单、结构方案容易确定的工程",{"key":28,"text":268,"correct":22},"适用于时间紧迫的抢险救灾工程",{"key":31,"text":270,"correct":26},"根据自身力量和需要，深入介入控制工程施工和管理",{"key":49,"text":272,"correct":26},"通过确定最大保证价格约束工程成本","ADE",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1142238,"在固定总价合同形式下，承包人承担的风险是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"全部工程量的风险，不包括通货膨胀的风险",{"key":24,"text":281,"correct":26},"全部工程量和通货膨胀的风险",{"key":28,"text":283,"correct":22},"工程变更的风险，不包括工程量和通货膨胀的风险",{"key":31,"text":285,"correct":22},"通货膨胀的风险，不包括工程量的风险",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1142239,"《建设工程施工合同示范文本》规定，合同双方可约定，可对合同价款进行调整的条件不包括（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"工程造价管理部门公布的价格调整",{"key":24,"text":293,"correct":26},"一周内非承包商原因停水、电、气造成停工累计超过5小时",{"key":28,"text":295,"correct":22},"法律法规政策变化",{"key":31,"text":297,"correct":22},"设计变更、工程量变化",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1142240,"建设工程施工承包的总价合同一般是在（ ）完成，施工任务和范围比较明确，业主的目标、要求和条件都清楚的情况下才采用。",[302,304,306,308],{"key":20,"text":303,"correct":26},"施工图设计",{"key":24,"text":305,"correct":22},"施工组织设计",{"key":28,"text":307,"correct":22},"施工现场规划",{"key":31,"text":309,"correct":22},"总图设计",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1142241,"一般而言，采用固定总价合同时，承包商的投标报价较高的原因是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"承包商丧失了今后一切的索赔权力",{"key":24,"text":317,"correct":22},"业主因今后工程款结算的工作量减少而给予承包商的费用补偿",{"key":28,"text":319,"correct":22},"业主今后可以增加工程范围和内容而不给予承包商另外的费用补偿",{"key":31,"text":321,"correct":26},"承包商会将工程量及一切不可预见因素的风险补偿加到投标报价之中",{"id":323,"libraryId":5,"type":36,"typeLabel":37,"stem":324,"options":325,"answer":336,"analysis":33},1142242,"按照我国相关规定，变动总价合同可以调整总价的情况包括（ ）。",[326,328,330,332,334],{"key":20,"text":327,"correct":26},"通货膨胀",{"key":24,"text":329,"correct":26},"设计变更",{"key":28,"text":331,"correct":22},"承包商施工成本增加",{"key":31,"text":333,"correct":26},"工程量变化",{"key":49,"text":335,"correct":22},"一周内停电时间超过6小时","ABD",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1142243,"采用固定总价合同，承包商需承担一定风险，下列风险中，属于承包商价格风险的是（ ）。( 2015真题 )",[341,343,345,347],{"key":20,"text":342,"correct":22},"设计深度不够造成的误差",{"key":24,"text":344,"correct":22},"工程量计算错误",{"key":28,"text":346,"correct":22},"工程范围不确定",{"key":31,"text":348,"correct":26},"漏报计价项目",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},1142244,"采用工程总承包模式的大型建设工程项目，建设周期三年，其合同计价方式一般采用（ ）。( 2015真题 )",[353,354,355,356],{"key":20,"text":146,"correct":22},{"key":24,"text":144,"correct":22},{"key":28,"text":148,"correct":22},{"key":31,"text":156,"correct":26},{"id":358,"libraryId":5,"type":36,"typeLabel":37,"stem":359,"options":360,"answer":369,"analysis":33},1142245,"采用固定总价合同时，承包商承担的价格风险有（）。2018真题",[361,363,364,366,368],{"key":20,"text":362,"correct":26},"漏报项目",{"key":24,"text":346,"correct":22},{"key":28,"text":365,"correct":26},"报价计算错误",{"key":31,"text":367,"correct":26},"物价和人工费上涨",{"key":49,"text":344,"correct":22},"ACD",{"id":371,"libraryId":5,"type":36,"typeLabel":37,"stem":372,"options":373,"answer":384,"analysis":33},1142246,"关于固定总价合同的说法，正确的有（ ）。 2016",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"合同总价一次包死，业主不承担投资风险",{"key":24,"text":377,"correct":26},"图纸和工程内容明确是使用这种合同的前提之一",{"key":28,"text":379,"correct":26},"固定总价合同也有调整合同总价的可能",{"key":31,"text":381,"correct":26},"合同双方结算比较简单",{"key":49,"text":383,"correct":22},"在国际上很少采用固定总价合同","BCD",{"id":386,"libraryId":5,"type":36,"typeLabel":37,"stem":387,"options":388,"answer":384,"analysis":33},1142248,"对建设周期一年半以上的工程项目，采用变动总价合同时，应考虑引起价格变化的因素有（ ）。2014",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"银行利率的调整",{"key":24,"text":392,"correct":26},"材料费的上涨",{"key":28,"text":394,"correct":26},"人工工资的上涨",{"key":31,"text":396,"correct":26},"国家政策改变引起的工程费用上涨",{"key":49,"text":398,"correct":22},"设计变更引起的费用变化",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1142249,"业主和承包商都不存在工程量方面的风险的合同是（ ）。",[403,404,405,406],{"key":20,"text":144,"correct":26},{"key":24,"text":146,"correct":22},{"key":28,"text":156,"correct":22},{"key":31,"text":148,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1142250,"对于采用单价合同招标的工程，如投标书中有明显的数字计算错误，业主有权先做出修改再评标。当总价和单价的计算结果不一致时，正确的做法（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"按市场价调整单价",{"key":24,"text":414,"correct":22},"分别调整单价和总价",{"key":28,"text":416,"correct":22},"以总价为准调整单价",{"key":31,"text":418,"correct":26},"以单价为准调整总价",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},1142251,"固定单价合同适用于（ ）的项目。",[423,425,427,429],{"key":20,"text":424,"correct":22},"工期长，工程量变化幅度很大",{"key":24,"text":426,"correct":22},"工期长，工程量变化幅度不太大",{"key":28,"text":428,"correct":26},"工期短，工程量变化幅度不太大",{"key":31,"text":430,"correct":22},"工期短，工程量变化幅度很大",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},1142252,"某按单价合同进行计价的招标工程，在评标过程中，发现某投标人的总价与单价的计算结果不一致，究其原因是投标人在计算时，将混凝土单价500元m3误作为30元\u002Fm3的结果，对此，业主有权（ ）",[435,436,438,439],{"key":20,"text":416,"correct":22},{"key":24,"text":437,"correct":22},"要求投标者重新提报混凝土单价",{"key":28,"text":418,"correct":26},{"key":31,"text":440,"correct":22},"将该投标文件作废标处理",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1142253,"采用单价合同时，最后工程结算的总价是根据（ ）计算确定的。",[445,447,449,451],{"key":20,"text":446,"correct":22},"发包人提供的清单工程量及承包方所填报的单价",{"key":24,"text":448,"correct":22},"发包人提供的清单工程量及承包方实际发生的单价",{"key":28,"text":450,"correct":22},"实际完成并经工程师计量的工程量及承包人实际发生的单价",{"key":31,"text":452,"correct":26},"实际完成并经工程师计量的工程量及承包人所填报的单价",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1142254,"对于采用单价合同的招标工程，如投标书中有明显的数学计算错误，业主有权先做修改再评标。当总价和单价的计算结果不一致时，正确的做法是（ ）。",[457,458,459,460],{"key":20,"text":414,"correct":22},{"key":24,"text":412,"correct":22},{"key":28,"text":416,"correct":22},{"key":31,"text":418,"correct":26},{"id":462,"libraryId":5,"type":36,"typeLabel":37,"stem":463,"options":464,"answer":273,"analysis":33},1142255,"当建设工程施工承包合同的计价方式采用变动单价时，合同中可以约定合同单价调整的情况有（ ）。",[465,467,469,471,473],{"key":20,"text":466,"correct":26},"工程量发生比较大的变化",{"key":24,"text":468,"correct":22},"承包商自身成本发生比较大的变化",{"key":28,"text":470,"correct":22},"业主资金不到位",{"key":31,"text":472,"correct":26},"通货膨胀达到一定水平",{"key":49,"text":474,"correct":26},"国家相关政策发生变化",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1142256,"下列合同形式中，承包人承担风险最大的合同类型是（ ）。",[479,480,481,483],{"key":20,"text":146,"correct":26},{"key":24,"text":120,"correct":22},{"key":28,"text":482,"correct":22},"固定价格合同",{"key":31,"text":126,"correct":22},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":28,"analysis":33},1142257,"根据FIDIC《施工合同条件》，对投标书中明显数字计算错误的修正，正确的是（ ）。2014",[488,490,492,494],{"key":20,"text":489,"correct":22},"业主应征求投标人意见后才能进行评标",{"key":24,"text":491,"correct":22},"当总价和单价计算结果不一致时，以总价为准调整单价",{"key":28,"text":493,"correct":26},"当总价和单价计算结果不一致时，以单价为准调整总价",{"key":31,"text":495,"correct":22},"投标人有一次修改报价的机会",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1142258,"某单价合同的投标报价单中，投标人的投标书出现了明显的数字计算错误，导致总价和单价计算结果不一致，下列行为中，属于业主权利的是（ ）。( 2015真题 )",[500,502,504,506],{"key":20,"text":501,"correct":22},"业主有权先作修改再评价，以总价作为最终报价结果",{"key":24,"text":503,"correct":22},"业主没有权利先修改后评价，可以宣布该投标人废标",{"key":28,"text":505,"correct":22},"业主没有权利修改再评标，可以请该投标人再报价",{"key":31,"text":507,"correct":26},"业主有权利先作修改再评标，以单价为准调整的总价作为最终报价结果",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1142259,"关于单价合同中承包商风险的说法，正确的是（ ）。2017",[512,514,516,518],{"key":20,"text":513,"correct":22},"单价合同中承包商存在工程量方面的风险",{"key":24,"text":515,"correct":26},"固定单价合同条件下，承包商存在通货膨胀带来的单价上涨的风险",{"key":28,"text":517,"correct":22},"单价合同中承包商存在投标总价过低方面的风险",{"key":31,"text":519,"correct":22},"变动单价合同下，承包商存在通货膨胀带来的单价上涨的风险",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},1142260,"某按变动单价计价的建筑施工合同中，投标时约定的工程量为10000m3，其中人工费占比30%，工程量变化不调整单价，中标合同价为30万元；施工期间人工费平均上涨15%，竣工结算工程量为20000m3，其他条件均无变化，则竣工结算价为（ ）万元。 2016",[524,526,528,530],{"key":20,"text":525,"correct":26},"62.7",{"key":24,"text":527,"correct":22},"31.35",{"key":28,"text":529,"correct":22},"60",{"key":31,"text":531,"correct":22},"69",{"id":533,"libraryId":5,"type":36,"typeLabel":37,"stem":534,"options":535,"answer":66,"analysis":33},1142261,"（2019年真题）关于单价合同的说法,正确的有（）。",[536,538,540,542,544],{"key":20,"text":537,"correct":26},"投标报价单中总价和单价计算结果不一致时,以单价为准调整总价",{"key":24,"text":539,"correct":26},"对于投标书中岀现明显的数字计算错误,业主有权利先作修改再评标",{"key":28,"text":541,"correct":26},"采用单价合同时,业主和承包人都不担心存在工程量方面的风险",{"key":31,"text":543,"correct":26},"采用变动单价合同时,承包人的风险相对较",{"key":49,"text":545,"correct":22},"采用固定单价合同时,业主招标准备时间铃长",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1142262,"（2020年真题）某按单价合同进行计价的招标工程，在评标过程中发现某投标人的总价与单价的计算结果不一致，原因是投标人在计算时将钢材单价4000元\u002F吨误作为2000元\u002F吨。对此，业主有权（ ）。",[550,551,552,554],{"key":20,"text":416,"correct":22},{"key":24,"text":418,"correct":26},{"key":28,"text":553,"correct":22},"要求投标人重新提交钢材单价",{"key":31,"text":440,"correct":22},{"id":556,"libraryId":5,"type":36,"typeLabel":37,"stem":557,"options":558,"answer":569,"analysis":33},1142264,"下列工程合同风险中，属于信用风险的是（）。2018真题",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"物价上涨",{"key":24,"text":562,"correct":26},"知假买假",{"key":28,"text":564,"correct":26},"偷工减料",{"key":31,"text":566,"correct":26},"违法分包",{"key":49,"text":568,"correct":26},"拖欠工程款","BCDE",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1142265,"下列施工合同风险中，属于管理风险的是（ ）。( 2015真题 )",[574,576,578,580],{"key":20,"text":575,"correct":22},"业主改变设计方案",{"key":24,"text":577,"correct":26},"对环境调查和预测的风险",{"key":28,"text":579,"correct":22},"自然环境的变化",{"key":31,"text":581,"correct":22},"合同所依据环境的变化",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1142267,"（2020年真题）根据《中华人民共和国担保法》，建设工程中采用的投标保函、履约保函属于（ ）担保。",[586,588,590,592],{"key":20,"text":587,"correct":26},"保证",{"key":24,"text":589,"correct":22},"抵押",{"key":28,"text":591,"correct":22},"留置",{"key":31,"text":593,"correct":22},"定金",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":31,"analysis":33},1142268,"建设工程履约担保的有效期始于（ ）之日。",[598,600,602,604],{"key":20,"text":599,"correct":22},"合同签订",{"key":24,"text":601,"correct":22},"合同生效",{"key":28,"text":603,"correct":22},"承包人收到工程预付款",{"key":31,"text":605,"correct":26},"工程开工",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},1142269,"建设工程合同签订后，发包人给承包人一定比例的预付款，一般为合同金额的（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"15%",{"key":24,"text":613,"correct":22},"20%",{"key":28,"text":615,"correct":26},"10%",{"key":31,"text":617,"correct":22},"25%",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]