[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":660},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,32,50,2721,[13,38,53,67,79,94,106,118,130,142,154,166,178,193,208,223,237,249,261,273,285,300,314,323,335,347,359,371,383,397,412,424,436,448,459,471,482,494,506,521,536,551,561,576,588,600,612,624,636,648],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1142164,2,"多选题","根据《建筑工程施工合同（示范文本）》通用条款，除专用条款另有约定外，发包人的责任与义务有（）。2018真题",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","按照承包人实际需要的数量免费提供图纸",false,{"key":24,"text":25,"correct":26},"B","对施工现场发掘的文物古迹采取妥善保护措施",true,{"key":28,"text":29,"correct":26},"C","负责完善无法满足施工需求的场外交通设施",{"key":31,"text":32,"correct":26},"D","最迟于开工日期7天前向承包人移交施工现场",{"key":34,"text":35,"correct":22},"E","无条件向承包人提供银行保函形式的支付担保","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1142165,"根据《建设工程施工合同（示范文本）》（GF-2013-0201），发包人责任和义务有（ ）。2014",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"办理建设工程施工许可证",{"key":24,"text":45,"correct":26},"办理建设工程规划许可证",{"key":28,"text":47,"correct":22},"办理工伤保险",{"key":31,"text":49,"correct":26},"提供场外交通条件",{"key":34,"text":51,"correct":22},"负责施工场地周边的环境保护","ABD",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":28,"analysis":37},1142166,1,"单选题","（2019年真题）某建设工程项目在施工中发生下列人工费,完成业主要求的合同外工作,花费3万元，由于业主原因导致施工工效降低,使人工费增加3万元,施工机械故障造成人员误工损失1万元,则施工单位可向业主索赔的合理人工费为（）",[59,61,63,65],{"key":20,"text":60,"correct":22},"3",{"key":24,"text":62,"correct":22},"4",{"key":28,"text":64,"correct":26},"6",{"key":31,"text":66,"correct":22},"7",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":24,"analysis":37},1142167,"（2019年真题）某工程承包人于2019年5月15日提交了竣工验收申请报告，6月10日工程竣工验收合格，6月15日发包人签发了工程接收证书，根据《建设工程施工合同(示范文本)》通用条款，该工的缺陷责任期、保修期起算日分别为（）",[71,73,75,77],{"key":20,"text":72,"correct":22},"6月10日、6月15日",{"key":24,"text":74,"correct":26},"5月15日、6月10日",{"key":28,"text":76,"correct":22},"5月15日、6月15日",{"key":31,"text":78,"correct":22},"6月15日、6月10日",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1142168,"（2019年真题）根据《建设工程施工合同示范文本》，除专用合同条款另有约定外，发包人的责任和义务主要有( )。",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"最迟于开工日期14天前向承包人发出开工通知",{"key":24,"text":86,"correct":26},"应按照约定向承包人免费提供图纸",{"key":28,"text":88,"correct":26},"提供场外交通设施的技术参数和具体条件",{"key":31,"text":90,"correct":26},"提供“三通一平”施工条件",{"key":34,"text":92,"correct":26},"提供正常施工所需的出入施工现场的交通条件","BCDE",{"id":95,"libraryId":5,"type":55,"typeLabel":56,"stem":96,"options":97,"answer":20,"analysis":37},1142169,"（2020年真题）根据《建设工程施工合同(示范文本)》，工程隐蔽部位经承包人自检确认具备覆盖条件的，承包人应在共同检查前（ ）小时书面形式通知监理人检查。",[98,100,102,104],{"key":20,"text":99,"correct":26},"48",{"key":24,"text":101,"correct":22},"12",{"key":28,"text":103,"correct":22},"24",{"key":31,"text":105,"correct":22},"36",{"id":107,"libraryId":5,"type":55,"typeLabel":56,"stem":108,"options":109,"answer":24,"analysis":37},1142170,"关于物资采购合同价格，按规定应由国家定价但国家尚无定价的材料，其价格应（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"由供需双方协商确定",{"key":24,"text":113,"correct":26},"报请物价主管部门批准",{"key":28,"text":115,"correct":22},"由工程师确定",{"key":31,"text":117,"correct":22},"由政府质量监督部门确定",{"id":119,"libraryId":5,"type":55,"typeLabel":56,"stem":120,"options":121,"answer":31,"analysis":37},1142171,"建筑施工企业与物资供应企业就某构件材料的供应签订合同，如该建筑材料不属于国家定价的产品，则其价格应（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"报请物价主管部门确定",{"key":24,"text":125,"correct":22},"参考国家定价确定",{"key":28,"text":127,"correct":22},"按当地工程造价管理部门公布的指导价确定",{"key":31,"text":129,"correct":26},"由供需双方协定确定",{"id":131,"libraryId":5,"type":55,"typeLabel":56,"stem":132,"options":133,"answer":31,"analysis":37},1142172,"关于设备采购合同价款的支付，下列表述不正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"设备制造前，采购方支付设备价格的10%作为预付款",{"key":24,"text":137,"correct":22},"供货方按照交货顺序在规定的时间内将货物送达交货地点，采购方支付该批设备价的80%",{"key":28,"text":139,"correct":22},"剩余的10%作为设备保证金，待保证期满，采购方签发最终验收证书后支付",{"key":31,"text":141,"correct":26},"履约证书交付后，设备保证金全部返还",{"id":143,"libraryId":5,"type":55,"typeLabel":56,"stem":144,"options":145,"answer":31,"analysis":37},1142173,"某工程施工过程中，由于供货商提供的设备（施工单位采购）质量存在缺陷，导致返工并造成损失，施工单位应向（ ）索赔，以补偿自己的损失。",[146,148,150,152],{"key":20,"text":147,"correct":22},"业主",{"key":24,"text":149,"correct":22},"工程师",{"key":28,"text":151,"correct":22},"设备生产商",{"key":31,"text":153,"correct":26},"设备供应商",{"id":155,"libraryId":5,"type":55,"typeLabel":56,"stem":156,"options":157,"answer":28,"analysis":37},1142174,"在建筑材料采购合同中，委托运输部门运输、送货或代运的产品，其交货期限一般以（ ）的日期为准。",[158,160,162,164],{"key":20,"text":159,"correct":22},"货物送达交货地点",{"key":24,"text":161,"correct":22},"供方向承运单位提出申请",{"key":28,"text":163,"correct":26},"承运单位签发",{"key":31,"text":165,"correct":22},"需方收货戳记",{"id":167,"libraryId":5,"type":55,"typeLabel":56,"stem":168,"options":169,"answer":24,"analysis":37},1142175,"设备采购合同中，在设备制造前，采购方应支付设备价格的（ ）作为预付款。",[170,172,174,176],{"key":20,"text":171,"correct":22},"5%",{"key":24,"text":173,"correct":26},"10%",{"key":28,"text":175,"correct":22},"15%",{"key":31,"text":177,"correct":22},"20%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":192,"analysis":37},1142176,"某建筑材料采购合同中，约定由采购方于2011年6月30日到指定地点提取约定数量的货物，7月10日支付货款总额；6月25日采购方接到了提前提货通知，采购方派车于6月28日接收货物；发现供货方交货数量大于约定数量。那么采购方可采取的正确行为有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":22},"应在7月8日支付货款总额",{"key":24,"text":185,"correct":26},"仍可在7月10日交付货款总额",{"key":28,"text":187,"correct":26},"只提取约定数量的货物",{"key":31,"text":189,"correct":22},"支付6月25日-28日未及时提货的保管费用",{"key":34,"text":191,"correct":26},"对多交货部分代为保管，但保管费应由供货方承担","BCE",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":207,"analysis":37},1142177,"在建筑材料采购合同中，货物的验收方式主要有（ ）。",[197,199,201,203,205],{"key":20,"text":198,"correct":26},"驻厂验收",{"key":24,"text":200,"correct":26},"提运验收",{"key":28,"text":202,"correct":26},"接运验收",{"key":31,"text":204,"correct":22},"使用验收",{"key":34,"text":206,"correct":26},"入库验收","ABCE",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},1142178,"根据物资采购合同的规定，交货日期的确定可以按照（ ）方式。",[212,214,216,218,220],{"key":20,"text":213,"correct":26},"供货方负责送货的，以采购方收货戳记的日期为准",{"key":24,"text":215,"correct":22},"凡委托运输部门或单位运输、送货或代运的产品，一般以向承运单位提出申请的日期为准",{"key":28,"text":217,"correct":26},"凡委托运输部门或单位运输、送货或代运的产品，一般以供货方发运产品时承运单位签发的日期为准",{"key":31,"text":219,"correct":26},"采购方提货的，以供货方按合同规定通知的提货日期为准",{"key":34,"text":221,"correct":22},"供货方负责送货的，以供货方发出日期为准","ACD",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":93,"analysis":37},1142179,"关于建筑材料采购合同中违约责任的说法，正确的有（ ）。2017",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"供货方提前发运或交付的货物，采购方要按实际发运或交付时间付款",{"key":24,"text":230,"correct":26},"供货方发生逾期交货，要按合同约定依据逾期交货部分货款总价计算违约金",{"key":28,"text":232,"correct":26},"供货方部分交货，应按合同约定的违约金比例乘以不能交货部分货款计算违约金",{"key":31,"text":234,"correct":26},"合同签订后采购方中途退货，应向供货方支付按退货货款总额计算的违约金",{"key":34,"text":236,"correct":26},"合同签订后，采购方逾期付款，应按照合同约定支付逾期付款利息",{"id":238,"libraryId":5,"type":55,"typeLabel":56,"stem":239,"options":240,"answer":20,"analysis":37},1142180,"关于物资采购交货日期的说法，正确的是（ ）。( 2015真题 )",[241,243,245,247],{"key":20,"text":242,"correct":26},"凡委托运输部门送货的，以供货方发运产品时承运单位签发的日期为准",{"key":24,"text":244,"correct":22},"供货方负责送货的，以供货方按合同规定通知的提货日期为准",{"key":28,"text":246,"correct":22},"采购方提货的，以采购方收获戳记的日期为准",{"key":31,"text":248,"correct":22},"凡委托运输单位代运的产品，以向承运单位提出申请的日期为准",{"id":250,"libraryId":5,"type":55,"typeLabel":56,"stem":251,"options":252,"answer":20,"analysis":37},1142181,"根据《建设工程委托监理合同（示范文本）》（GF-2000-0201），监理人发现工程设计不符合国家规定的质量标准时，正确的做法是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"书面报告委托人并要求设计人改正",{"key":24,"text":256,"correct":22},"指令施工单位征求设计人的修改意见",{"key":28,"text":258,"correct":22},"及时向设计人报告问题的具体情况",{"key":31,"text":260,"correct":22},"口头联系设计人并书面报告委托人",{"id":262,"libraryId":5,"type":55,"typeLabel":56,"stem":263,"options":264,"answer":31,"analysis":37},1142182,"建设工程监理合同标准条件中应包括（ ）等内容。",[265,267,269,271],{"key":20,"text":266,"correct":22},"合同适用的法律",{"key":24,"text":268,"correct":22},"监理业务执行的起止时间",{"key":28,"text":270,"correct":22},"监理的工作范围和内容",{"key":31,"text":272,"correct":26},"合同生效、变更与终止",{"id":274,"libraryId":5,"type":55,"typeLabel":56,"stem":275,"options":276,"answer":24,"analysis":37},1142183,"在工程监理过程中，监理人如果发现工程承包人的人员工作不力，可以要求（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"终止承包人合同",{"key":24,"text":280,"correct":26},"承包人调换有关人员",{"key":28,"text":282,"correct":22},"业主撤换有关人员",{"key":31,"text":284,"correct":22},"暂停施工",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1142184,"在工程监理合同中，监理人的义务包括（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"由委托人所提供的设施和物品，属于委托人的财产，在监理工作完成或中止时，应将其设施和剩余的物品按合同约定的时间和方式移交给委托人",{"key":24,"text":292,"correct":26},"按照合同约定或监理投标书的承诺派出监理机构及人员，完成监理范围内的监理业务，按合同约定定期向委托人报告监理工作",{"key":28,"text":294,"correct":22},"征得委托人同意，监理人发布开工令、停工令、复工令",{"key":31,"text":296,"correct":26},"在履行监理合同义务期间，应认真、勤奋地工作，为委托人提供咨询意见，并公正维护各方面的合法权益",{"key":34,"text":298,"correct":26},"在合同期内和合同终止后，未征得有关方面同意，不得泄露与监理工程及其监理业务有关的保密资料","ABDE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":36,"analysis":37},1142185,"关于监理人的权利，下列说法正确的是（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"当发现工程设计不符合设计合同约定的质量标准时，有权通知设计人更正",{"key":24,"text":307,"correct":26},"对不符合设计要求的材料，有权通知承包人停止使用",{"key":28,"text":309,"correct":26},"对工程实际竣工日期有签认权",{"key":31,"text":311,"correct":26},"对工程结算有否决权",{"key":34,"text":313,"correct":22},"无需征得委托人同意，有权发布停工令",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":36,"analysis":37},1142186,"按照我国相关规定，监理工程师具有的权利包括（ ）。",[318,319,320,321,322],{"key":20,"text":305,"correct":22},{"key":24,"text":307,"correct":26},{"key":28,"text":309,"correct":26},{"key":31,"text":311,"correct":26},{"key":34,"text":313,"correct":22},{"id":324,"libraryId":5,"type":55,"typeLabel":56,"stem":325,"options":326,"answer":28,"analysis":37},1142187,"根据《建设工程监理合同（示范文本）》，监理工作的内容包括（）。2018真题",[327,329,331,333],{"key":20,"text":328,"correct":22},"主持图纸会审会议",{"key":24,"text":330,"correct":22},"主持第一次工地会议",{"key":28,"text":332,"correct":26},"编制工程质量评估报告",{"key":31,"text":334,"correct":22},"组织工程竣工验收",{"id":336,"libraryId":5,"type":55,"typeLabel":56,"stem":337,"options":338,"answer":28,"analysis":37},1142188,"根据《建设工程监理合同（示范文本）》GF-2012-0202，关于监理人职责的说法，正确的是（ ）。2017",[339,341,343,345],{"key":20,"text":340,"correct":22},"委托人与承包人之间发生合同争议时，监理人应代表委托人进行处理",{"key":24,"text":342,"correct":22},"在任何情况下，监理人的指令都必须经委托人批准后方可发出",{"key":28,"text":344,"correct":26},"委托人与承包人合同争议提交仲裁机构时，监理人应提供必要的证明资料",{"key":31,"text":346,"correct":22},"监理人发现承包人的人员不能胜任本职工作时，无权要求承包人予以替换",{"id":348,"libraryId":5,"type":55,"typeLabel":56,"stem":349,"options":350,"answer":28,"analysis":37},1142189,"根据《建设工程施工专业分包合同（示范文本）》的规定，下列关于分包人与发包人的关系表述中，不正确的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"分包人须服从承包人转发的发包人或工程师与分包工程有关的指令",{"key":24,"text":354,"correct":22},"未经承包人允许，分包人不得以任何理由与发包人或工程师发生直接工作联系",{"key":28,"text":356,"correct":26},"分包人可以直接与发包人或工程师发生直接工作联系，不需要经过承包人的同意",{"key":31,"text":358,"correct":22},"未经承包人允许，不得直接接受发包人或工程师的指令",{"id":360,"libraryId":5,"type":55,"typeLabel":56,"stem":361,"options":362,"answer":24,"analysis":37},1142190,"专业工程分包合同中，关于禁止转包或再分包的规定，下列表述不正确的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"分包人不得将其承包的分包工程转包给他人",{"key":24,"text":366,"correct":26},"分包人可以将其承包的分包工程的全部或部分再分包给他人",{"key":28,"text":368,"correct":22},"分包人经承包人同意可以将劳务作业再分包给具有相应劳务分包资质的劳务分包企业",{"key":31,"text":370,"correct":22},"分包人应对再分包的劳务作业的质量等相关事宜进行督促和检查，并承担相关连带责任",{"id":372,"libraryId":5,"type":55,"typeLabel":56,"stem":373,"options":374,"answer":31,"analysis":37},1142191,"关于分包合同价款的表述，正确的是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":22},"分包工程合同价款应与总承包合同相应部分价款一致",{"key":24,"text":378,"correct":22},"分包工程合同价款应低于总承包合同相应部分价款",{"key":28,"text":380,"correct":22},"分包工程合同价款应高于总承包合同相应部分价款",{"key":31,"text":382,"correct":26},"分包合同价款与总包合同相应部分价款无任何连带关系",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":36,"analysis":37},1142192,"根据《建设工程施工劳务分包合同（示范文本）》，劳务报酬可按（ ）方式结算。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"成本加酬金",{"key":24,"text":390,"correct":26},"固定总价",{"key":28,"text":392,"correct":26},"计时单价",{"key":31,"text":394,"correct":26},"计件单价",{"key":34,"text":396,"correct":22},"实际人工工资",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":411,"analysis":37},1142193,"关于对施工分包单位进行管理的说法，正确的有（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"对业主指定分包单位进行管理的第一责任主体是业主",{"key":24,"text":404,"correct":22},"分包工程在分包单位自检合格的基础上可以直接提请业主或监理工程师验收",{"key":28,"text":406,"correct":26},"总承包单位要积极为分包工程的施工创造条件，协调各分包单位之间的关系",{"key":31,"text":408,"correct":26},"分包单位的选择要符合资质类别和等级的有关规定，并经业主和监理机构的认可",{"key":34,"text":410,"correct":26},"总承包单位建立工地例会制度，及时处理分包单位施工过程中出现的问题","CDE",{"id":413,"libraryId":5,"type":55,"typeLabel":56,"stem":414,"options":415,"answer":28,"analysis":37},1142194,"按照我国现行规定，建设企业专业承包序列企业资质设（ ）个等级，60个资质类别。",[416,418,420,422],{"key":20,"text":417,"correct":22},"1-2",{"key":24,"text":419,"correct":22},"1-3",{"key":28,"text":421,"correct":26},"2-3",{"key":31,"text":423,"correct":22},"2-4",{"id":425,"libraryId":5,"type":55,"typeLabel":56,"stem":426,"options":427,"answer":24,"analysis":37},1142196,"（2019年真题）根据《建设工程施工专业分包合同(示范文本)》,关于发包人、承包人和分包人关系的说法,正确的是( )",[428,430,432,434],{"key":20,"text":429,"correct":22},"发包人向分包人提供具备施工条件的施工场地",{"key":24,"text":431,"correct":26},"就分包范围内的有关工作,承包人随时可以向分包人发出指令",{"key":28,"text":433,"correct":22},"分包人可直接致函发包人或工程师",{"key":31,"text":435,"correct":22},"分包合同价款与总承包合同相应部分价款存在连带关系",{"id":437,"libraryId":5,"type":55,"typeLabel":56,"stem":438,"options":439,"answer":28,"analysis":37},1142197,"（2019年真题）关于专业工程分包人责任和义务的说法,正确的是（）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"分包人必须服从发包人直接发出的指令",{"key":24,"text":443,"correct":22},"必须完成规定的设计内容,并承担由此发生的费用",{"key":28,"text":445,"correct":26},"分包人应履行总包合同中与分包工程有关的承包人的义务,另有约定除外",{"key":31,"text":447,"correct":22},"在合同约定的时间内,向监理人提交施工组织设计,并在批准后执行",{"id":449,"libraryId":5,"type":55,"typeLabel":56,"stem":450,"options":451,"answer":20,"analysis":37},1142198,"（2020年真题）根据《建设工程施工专业分包合同(示范文本)》，关于专业工程分包人责任和义务的说法，正确的是（ ）。",[452,454,455,457],{"key":20,"text":453,"correct":26},"分包人应允许发包人授权的人员在工作时间内合理进入分包工程施工场地",{"key":24,"text":441,"correct":22},{"key":28,"text":456,"correct":22},"遵守政府有关主管部门的管理规定但不用办理有关手续",{"key":31,"text":458,"correct":22},"分包人可以直接与发包人或工程师发生直接工作联系",{"id":460,"libraryId":5,"type":55,"typeLabel":56,"stem":461,"options":462,"answer":24,"analysis":37},1142199,"根据《建设工程施工劳务分包合同（示范文本）》，劳务分包人在施工现场内使用的安全保护用品，应由（ ）负责供应。",[463,465,467,469],{"key":20,"text":464,"correct":22},"劳务分包人",{"key":24,"text":466,"correct":26},"工程承包人",{"key":28,"text":468,"correct":22},"工程发包人",{"key":31,"text":470,"correct":22},"安全生产监督管理部门",{"id":472,"libraryId":5,"type":55,"typeLabel":56,"stem":473,"options":474,"answer":24,"analysis":37},1142200,"根据《建设工程施工劳务分包合同（示范文本）》，工程承包人应在确认劳务分包人递交的结算资料后（ ）天内向劳务分包人支付劳务报酬尾款。",[475,476,478,480],{"key":20,"text":66,"correct":22},{"key":24,"text":477,"correct":26},"14",{"key":28,"text":479,"correct":22},"28",{"key":31,"text":481,"correct":22},"30",{"id":483,"libraryId":5,"type":55,"typeLabel":56,"stem":484,"options":485,"answer":31,"analysis":37},1142201,"劳务分包合同中关于保险的叙述，不正确的是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"保险事故发生时，劳务分包人和承包人有责任采取必要的措施，防止或减少损失",{"key":24,"text":489,"correct":22},"劳务分包人必须为从事危险作业的职工办理意外伤害保险，并为施工场地内自有人员生命财产和施工机械设备办理保险，支付保险费用",{"key":28,"text":491,"correct":22},"劳务分包人施工开始前，承包人应获得发包人为施工场地内的自有人员及第三人人员生命财产办理的保险，不需劳务分包人支付保险费用",{"key":31,"text":493,"correct":26},"运至施工场地用于劳务施工的材料和待安装设备，由承包人办理或获得保险，由劳务分包人支付保险费用",{"id":495,"libraryId":5,"type":55,"typeLabel":56,"stem":496,"options":497,"answer":31,"analysis":37},1142202,"根据《建设工程施工劳务分包合同（示范文本）》，劳务分包人的义务之一是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"负责编制施工组织设计",{"key":24,"text":501,"correct":22},"组织编制年、季、月施工计划",{"key":28,"text":503,"correct":22},"负责与监理、设计及有关部门联系",{"key":31,"text":505,"correct":26},"做好已完工程部分的成品保护工作",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":520,"analysis":37},1142203,"根据《建设工程施工劳务分包合同（示范文本）》，需由劳务分包人承担的保险费用有（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":22},"施工场地内工程承包人自有人员生命财产",{"key":24,"text":513,"correct":22},"运至施工现场用于施工的材料和待安装设备",{"key":28,"text":515,"correct":22},"承包人提供给劳务人员使用的机械设备",{"key":31,"text":517,"correct":26},"从事危险作业的劳务分包人职工的意外伤害",{"key":34,"text":519,"correct":26},"施工场地内劳务分包人自有的施工机械设备","DE",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":535,"analysis":37},1142204,"关于劳务分包合同中工时及工程量确认的叙述，正确的有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":26},"采用固定劳务报酬方式的，施工过程中不计算工程量",{"key":24,"text":528,"correct":26},"采用按确认的工程量计算劳务报酬的，由劳务分包人按月（或旬、日）将完成的工程量报承包人，由承包人确认",{"key":28,"text":530,"correct":22},"采用按确定的工时计算劳务报酬的，由劳务分包人按月将提供劳务人数报承包人，由承包确认",{"key":31,"text":532,"correct":22},"用按确认的工程量计算劳务报酬的，施工过程中不计算工时",{"key":34,"text":534,"correct":26},"对劳务分包人未经承包人认可，超出设计图纸范围和因劳务分包人原因造成返工的工程量，承包人不予计量","ABE",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":550,"analysis":37},1142205,"某建设工程项目中，甲公司作为工程发包人与乙公司签订了工程承包合同，乙公司又与劳务分包人丙公司签订了该工程的劳务分包合同，则在劳务分包合同中，关于丙公司应承担义务的说法，正确的有（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":26},"丙公司须服从乙公司转发的发包人及工程师的指令",{"key":24,"text":543,"correct":22},"丙公司负责组织实施施工管理的各项工作，对工期和质量向发包人负责",{"key":28,"text":545,"correct":26},"丙公司应自觉接受乙公司及有关部门的管理，监督和检查",{"key":31,"text":547,"correct":26},"丙公司未经乙公司授权或允许，不得擅自与甲公司及有关部门建立工作联系",{"key":34,"text":549,"correct":26},"丙公司应按时提交报表、有关的技术经济资料，配合乙公司办理交工验收","ACDE",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":36,"analysis":37},1142206,"根据《建设工程施工劳务分包合同（示范文本）》，劳务报酬的结算方式有（ ）。",[555,556,558,559,560],{"key":20,"text":388,"correct":22},{"key":24,"text":557,"correct":26},"固定劳务报酬",{"key":28,"text":392,"correct":26},{"key":31,"text":394,"correct":26},{"key":34,"text":396,"correct":22},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":575,"analysis":37},1142207,"根据《建设工程质量管理条例》，转包行为有（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"发包人与施工总承包商签订合同后又向总承包商指定分包",{"key":24,"text":568,"correct":26},"承包商将其承包的全部建设工程转给他人承包",{"key":28,"text":570,"correct":26},"承包商将其承包的全部工程肢解后以分包的名义分别转给他人承包",{"key":31,"text":572,"correct":22},"施工总承包商将其承包的主体结构工程施工任务全部转包给他人承包",{"key":34,"text":574,"correct":22},"分包人将其承包的建设工程再分包","BC",{"id":577,"libraryId":5,"type":55,"typeLabel":56,"stem":578,"options":579,"answer":31,"analysis":37},1142208,"根据《建设工程施工劳务分包合同（示范文本）》GF-2003-0214，合同中对固定劳动报酬可以约定调整的情况是（ ）。2017",[580,582,584,586],{"key":20,"text":581,"correct":22},"市场人工价格低于合同约定基准价格，按变化前后价格差予以调整",{"key":24,"text":583,"correct":22},"工程量超出设计图纸范围导致劳务价格变化的，按变化前后价格差予以调整",{"key":28,"text":585,"correct":22},"施工时超出原施工要求导致劳务价格变化的，按变化前后价格差予以调整",{"key":31,"text":587,"correct":26},"法律及政策变化导致劳务价格变化的，按变化前后价格差予以调整",{"id":589,"libraryId":5,"type":55,"typeLabel":56,"stem":590,"options":591,"answer":31,"analysis":37},1142209,"根据《建设工程施工劳务分包合同（示范文本）》（GF-2003-2014）,应由劳务分包人完成的工作是（ ）。 2016",[592,594,596,598],{"key":20,"text":593,"correct":22},"收集技术资料",{"key":24,"text":595,"correct":22},"搭建生活设施",{"key":28,"text":597,"correct":22},"编制施工计划",{"key":31,"text":599,"correct":26},"加强安全教育",{"id":601,"libraryId":5,"type":55,"typeLabel":56,"stem":602,"options":603,"answer":24,"analysis":37},1142210,"在建设工程项目总承包模式下，设计人员或者设计分包者如属项目总承包合同中未指定者，则其能否承担相应工程的设计须先征得（ ）的同意。",[604,606,608,610],{"key":20,"text":605,"correct":22},"项目施工单位",{"key":24,"text":607,"correct":26},"业主代表",{"key":28,"text":609,"correct":22},"质量监督机构",{"key":31,"text":611,"correct":22},"设计主管部门",{"id":613,"libraryId":5,"type":55,"typeLabel":56,"stem":614,"options":615,"answer":31,"analysis":37},1142211,"根据《建设项目工程总承包管理规范》（GB\u002FT50358-2005）。工程总承包单位以受业主委托，按合同约定对工程建设项目的（ ）等实行全过程或若干阶段承包。",[616,618,620,622],{"key":20,"text":617,"correct":22},"决策、设计、施工",{"key":24,"text":619,"correct":22},"决策、设计、施工、采购",{"key":28,"text":621,"correct":22},"设计、施工、采购、试运行、运行管理",{"key":31,"text":623,"correct":26},"勘查、设计、施工、采购、试运行",{"id":625,"libraryId":5,"type":55,"typeLabel":56,"stem":626,"options":627,"answer":20,"analysis":37},1142212,"建设工程项目总承包的任务从时间范围上，一般可包括从（ ）到交付使用的工程建设全过程。",[628,630,632,634],{"key":20,"text":629,"correct":26},"工程立项",{"key":24,"text":631,"correct":22},"工程设计",{"key":28,"text":633,"correct":22},"工程勘察",{"key":31,"text":635,"correct":22},"工程招标",{"id":637,"libraryId":5,"type":55,"typeLabel":56,"stem":638,"options":639,"answer":24,"analysis":37},1142213,"建设过程项目总承包模式下，承包人要完成的工作是（ ）。",[640,642,644,646],{"key":20,"text":641,"correct":22},"负责项目的征地拆迁",{"key":24,"text":643,"correct":26},"进行并负责工程设计",{"key":28,"text":645,"correct":22},"编制项目可行性研究报告",{"key":31,"text":647,"correct":22},"办理项目规划许可证",{"id":649,"libraryId":5,"type":55,"typeLabel":56,"stem":650,"options":651,"answer":24,"analysis":37},1142214,"建设工程项目总承包与施工承包的最大不同之处在于项目总承包需要负责（ ）。",[652,654,656,658],{"key":20,"text":653,"correct":22},"承建项目的投料试生产",{"key":24,"text":655,"correct":26},"全部或部分工程的设计",{"key":28,"text":657,"correct":22},"总价包干",{"key":31,"text":659,"correct":22},"所有的主体和附属过程、工艺和设备等的施工与安装",[661,664,667,670,673,676],{"id":55,"name":662,"category":7,"favorite":663},"领导干部任职前廉政法规知识测试题",92,{"id":665,"name":666,"category":7,"favorite":55},595,"建筑结构与设备",{"id":668,"name":669,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":671,"name":672,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":674,"name":675,"category":7,"favorite":8},534,"BIM工程师",{"id":677,"name":675,"category":7,"favorite":8},535]