[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":628},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,31,50,2721,[13,34,46,58,70,82,93,105,117,135,146,158,170,182,191,200,212,222,234,246,258,268,280,289,301,310,319,327,335,347,359,371,383,395,407,422,437,451,466,481,495,510,525,540,552,567,581,593,604,616],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1142111,1,"单选题","（2020年真题）关于招标信息发布的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","投资1000万的工程施工招标可以采用不公开的方式发布信息",false,{"key":24,"text":25,"correct":22},"B","招标公告只能在中国招标投标公共服务平台发布",{"key":27,"text":28,"correct":29},"C","自招标文件出售之日起至停止出售之日止，最短不得少于5天",true,{"key":31,"text":32,"correct":22},"D","投标人必须自费购买相关招标或资格预审文件，未中标时予以退还","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1142112,"在建设工程施工投标过程中，施工方案应由投标人的（ ）主持制定。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目经理",{"key":24,"text":41,"correct":22},"法人代表",{"key":27,"text":43,"correct":29},"技术负责人",{"key":31,"text":45,"correct":22},"分管投标的负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1142113,"某按工程量清单计划的招标工程，投标人在复核工程量清单时发现工程数量与设计文件和现场实际有较大的差异，则投标人的正确处理方式是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"自行调整清单数据，在附录中加以说明，并按调整后的数量投标",{"key":24,"text":53,"correct":22},"根据清单数量和投标人复核的数量分别报价，供业主选择",{"key":27,"text":55,"correct":29},"以适当的方式要求业主澄清，视结果进行投标",{"key":31,"text":57,"correct":22},"不予理会，按照投标文件提供的清单数量进行投标",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1142114,"建设工程项目施工投标文件一般应包括投标函、投标报价、施工组织设计和（ ）等内容。",[62,64,66,68],{"key":20,"text":63,"correct":22},"资格预审文件",{"key":24,"text":65,"correct":22},"政府法律文件",{"key":27,"text":67,"correct":29},"商务和技术偏差表",{"key":31,"text":69,"correct":22},"评标办法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1142115,"下列关于投标截止日期的叙述中，不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"招标人所规定的投标截止日就是提交投标书最后的期限",{"key":24,"text":77,"correct":22},"投标人在招标截止日之前所提交的投标是有效的，超过该日期之后就会被视为无效投标",{"key":27,"text":79,"correct":22},"在招标文件要求提交投标文件的截止时间后送达的投标文件，招标人可以拒收",{"key":31,"text":81,"correct":29},"投标的截止日期就是公布中标人的日期",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1142116,"工程施工投标过程中，施工方案由投标人的（ ）主持制定。",[86,88,90,91],{"key":20,"text":87,"correct":22},"拟派项目经理",{"key":24,"text":89,"correct":22},"分管投标的副总经理",{"key":27,"text":43,"correct":29},{"key":31,"text":92,"correct":22},"分管生产的副总经理",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1142117,"投标单位取得投标资格，获得招标文件之后的首要工作是研究招标文件，其次的工作是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"选择施工方案",{"key":24,"text":100,"correct":29},"进行各项调查研究",{"key":27,"text":102,"correct":22},"确定投标策略",{"key":31,"text":104,"correct":22},"复核工程量",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1142118,"建设工程招标投标活动中，自投标截止时间到投标有效期终止之前，关于投标文件处理的叙述，正确的是（ ）",[109,111,113,115],{"key":20,"text":110,"correct":22},"投标人可以替换已提交的投标文件",{"key":24,"text":112,"correct":22},"投标人可以补充或修改已提交的投标文件",{"key":27,"text":114,"correct":22},"投标人在期间送达的，也应视为有效",{"key":31,"text":116,"correct":29},"投标人撤回投标文件的，其投标保证金将被没收",{"id":118,"libraryId":5,"type":119,"typeLabel":120,"stem":121,"options":122,"answer":134,"analysis":33},1142119,2,"多选题","招标人须知是招标人向投标人传递的基础信息文件，投标人应特别注意其中的（ ）。",[123,125,127,129,131],{"key":20,"text":124,"correct":29},"招标工程的范围和详细内容",{"key":24,"text":126,"correct":22},"招标人的责权利",{"key":27,"text":128,"correct":22},"施工技术说明",{"key":31,"text":130,"correct":29},"投标文件的组成",{"key":132,"text":133,"correct":29},"E","重要的时间安排","ADE",{"id":136,"libraryId":5,"type":119,"typeLabel":120,"stem":137,"options":138,"answer":134,"analysis":33},1142120,"投标人须知是招标人向投标人传递基础信息的文件，投标人应特别注意其中的（ ）等内容。",[139,141,142,143,144],{"key":20,"text":140,"correct":29},"招标工程的范围",{"key":24,"text":126,"correct":22},{"key":27,"text":128,"correct":22},{"key":31,"text":130,"correct":29},{"key":132,"text":145,"correct":29},"重要时间安排",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":27,"analysis":33},1142122,"根据《中华人民共和国招标投标法实施条例》（国务院令613号），投标有效期从（ ）起计算。( 2015真题 )",[150,152,154,156],{"key":20,"text":151,"correct":22},"提交投标文件开始之日",{"key":24,"text":153,"correct":22},"购买招标文件的截止之日",{"key":27,"text":155,"correct":29},"提交投标文件的截止之日",{"key":31,"text":157,"correct":22},"招标文件规定开标之日",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},1142124,"工程师的检查检验不应影响施工的正常进行。如影响施工正常进行，检查检验不合格时，影响正常施工的费用由承包人承担。除此之外，影响正常施工的追加合同价款由（ ）承担，相应顺延工期。",[162,164,166,168],{"key":20,"text":163,"correct":22},"承包人",{"key":24,"text":165,"correct":29},"发包人",{"key":27,"text":167,"correct":22},"设计单位",{"key":31,"text":169,"correct":22},"监理单位",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":31,"analysis":33},1142125,"下列关于建设工程承包合同的说法中，正确的是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"总价合同不允许对合同总价进行调整",{"key":24,"text":177,"correct":22},"与单价合同相比，总价合同对施工单位更有利",{"key":27,"text":179,"correct":22},"与总价合同相比，单价合同对业主更有利",{"key":31,"text":181,"correct":29},"建设工程合同中可以混合采用单价与包干计价方式",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1142126,"根据《建设工程施工合同（示范文本）》（GF-99-0201），“以书面形式提供有关水文地质勘探资料和地下管线资料，提供现场测量基准点，基准线和水准点有关资料，并进行现场交验”是（ ）的责任和义务。",[186,187,188,189],{"key":20,"text":165,"correct":29},{"key":24,"text":167,"correct":22},{"key":27,"text":163,"correct":22},{"key":31,"text":190,"correct":22},"监理人",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":31,"analysis":33},1142127,"根据《建设程施工合同（示范文本）》( GF-1999-0201)的规定，在工程施工过程中，双方对工程质量有争议，由双方同意的工程质量检测机构鉴定，所需要的费用以及因此造成的损失，由（ ）承担。",[195,196,197,198],{"key":20,"text":165,"correct":22},{"key":24,"text":163,"correct":22},{"key":27,"text":190,"correct":22},{"key":31,"text":199,"correct":29},"责任方",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1142128,"在建设工程项目施工过程中，由于实际地质条件与勘察资料不符，而发生了设计变更，使基底换填增加了工作量，对于该新增工作量的综合单价，应（ ）作为结算依据。",[204,206,208,210],{"key":20,"text":205,"correct":22},"由设计单位提出，经发包人确认后",{"key":24,"text":207,"correct":29},"由承包人提出，经发包人确认后",{"key":27,"text":209,"correct":22},"由发包人提出，经承包人确认后",{"key":31,"text":211,"correct":22},"由监理工程师提出，经设计单位复核后",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1142130,"发包人供应的材料设备使用前，由（ ）负责检验或试验。",[216,217,218,220],{"key":20,"text":165,"correct":22},{"key":24,"text":163,"correct":29},{"key":27,"text":219,"correct":22},"工程师",{"key":31,"text":221,"correct":22},"政府有关机构",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},1142131,"在施工过程中，工程师发现曾检验合格的工程部位仍存在施工质量问题，则修复该部位工程质量缺陷时，应（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"由发包人承担费用，工期给予顺延",{"key":24,"text":229,"correct":22},"由承包人承担费用，工期给予顺延",{"key":27,"text":231,"correct":22},"由发包人承担费用，工期不给予顺延",{"key":31,"text":233,"correct":29},"由承包人承担费用，工期不给予顺延",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},1142132,"承包人在工程变更确定后（ ）天内，可提出变更涉及的追加合同价款要求的报告。",[238,240,242,244],{"key":20,"text":239,"correct":29},"14",{"key":24,"text":241,"correct":22},"7",{"key":27,"text":243,"correct":22},"15",{"key":31,"text":245,"correct":22},"30",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1142133,"我国《建设工程施工合同（示范文本）》由（ ）三部分组成。",[250,252,254,256],{"key":20,"text":251,"correct":22},"协议书、合同条款和工程图纸",{"key":24,"text":253,"correct":22},"协议书、合同条款和专用条款",{"key":27,"text":255,"correct":22},"合同条款、专用条款和工程图纸",{"key":31,"text":257,"correct":29},"协议书、通用条款和专用条款",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1142134,"根据《建设工程施工合同（示范文本）》，发包人未按合同约定预付工程款时，承包商可按合同约定向发包人发出要求预付的通知，发包人收到通知后仍不能按要求预付的，承包商最早可在发出通知后（ ）天停止施工。",[262,263,264,266],{"key":20,"text":241,"correct":29},{"key":24,"text":239,"correct":22},{"key":27,"text":265,"correct":22},"21",{"key":31,"text":267,"correct":22},"28",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1142135,"工程师认为确有必要暂停施工时，应当以书面形式要求承包人暂停施工，并在提出要求后（ ）小时内提出书面处理意见。承包人应当按照工程师的要求停止施工，并妥善保护已完工程。",[272,274,276,278],{"key":20,"text":273,"correct":22},"12",{"key":24,"text":275,"correct":22},"24",{"key":27,"text":277,"correct":22},"36",{"key":31,"text":279,"correct":29},"48",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},1142136,"由发包人供应的材料设备，承包人派人参加清点后由承包人妥善保管，（ ）支付相应保管费用。",[284,285,287,288],{"key":20,"text":163,"correct":22},{"key":24,"text":286,"correct":22},"供应商",{"key":27,"text":165,"correct":29},{"key":31,"text":190,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},1142137,"某建设工程项目承发包双方签订了设计——施工总承包合同，下列属于承包人工作范围的是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"落实项目资金",{"key":24,"text":296,"correct":22},"办理规划许可证",{"key":27,"text":298,"correct":22},"办理施工许可证",{"key":31,"text":300,"correct":29},"完成设计文件",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":27,"analysis":33},1142138,"承包人将施工组织设计和工程进度计划提交工程师，工程师对进度计划予以确认或者提出修改意见，对于施工组织设计和工程进度计划本身的缺陷应由（ ）承担责任。",[305,306,307,308],{"key":20,"text":219,"correct":22},{"key":24,"text":165,"correct":22},{"key":27,"text":163,"correct":29},{"key":31,"text":309,"correct":22},"工程师和承包人",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1142139,"施工合同双方对工程质量有争议，由双方同意的工程质量检测机构鉴定，所需要的费用以及因此造成的损失，由（ ）承担。",[314,315,316,317],{"key":20,"text":165,"correct":22},{"key":24,"text":163,"correct":22},{"key":27,"text":199,"correct":29},{"key":31,"text":318,"correct":22},"双方共同确定",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1142140,"根据《建设工程施工合同（示范文本）》，承包人在工程变更确定后（ ）天内，可提出变更涉及的追加合同价款要求的报告，经工程师确认后相应调整合同价款。",[323,324,325,326],{"key":20,"text":239,"correct":29},{"key":24,"text":265,"correct":22},{"key":27,"text":267,"correct":22},{"key":31,"text":245,"correct":22},{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1142141,"投料试车应在工程竣工验收后进行，由（ ）负责。",[331,332,333,334],{"key":20,"text":165,"correct":29},{"key":24,"text":163,"correct":22},{"key":27,"text":219,"correct":22},{"key":31,"text":221,"correct":22},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":27,"analysis":33},1142142,"某工程竣工验收阶段，承包人于6月1日向工程师递交了竣工验收报告；发包人于6月15日组织生产设备启动试车检验；6月18日试车完毕后发包人、承包人、工程师和设计代表在试车记录上签字确认质量合格；工程师于6月20日签发工程移交证书。则承包人的实际竣工日期应为（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"6月15日",{"key":24,"text":342,"correct":22},"6月18日",{"key":27,"text":344,"correct":29},"6月1日",{"key":31,"text":346,"correct":22},"6月20日",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},1142143,"工程承包合同价值在80万元的项目，建筑安装工程费用的主要结算是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"按月结算",{"key":24,"text":354,"correct":29},"竣工后一次结算",{"key":27,"text":356,"correct":22},"分段结算",{"key":31,"text":358,"correct":22},"按天结算",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1142144,"根据《建设工程施工合同（示范文本）》（GF-99-0201），建设工程的投料试车应（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"在工程竣工验收前由承包人负责",{"key":24,"text":366,"correct":22},"在工程竣工验收前由供货人负责",{"key":27,"text":368,"correct":22},"在工程竣工验收后由供货人负责",{"key":31,"text":370,"correct":29},"在工程竣工验收后由发包人负责",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1142145,"某独立土方工程按（工程量清单计价规范）计价。招标文件中预计工程量10万立方米，合同中规定：土方工程单价30元\u002F立方米。当实际工程量超过估计工程量10%时，超出部分价格调整为25元\u002F立方米。工程完成后实际工程量12万立方米，则该土方工程的结算工程款为（ ）万元。",[375,377,379,381],{"key":20,"text":376,"correct":29},"355",{"key":24,"text":378,"correct":22},"350",{"key":27,"text":380,"correct":22},"325",{"key":31,"text":382,"correct":22},"300",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1142146,"根据《建设工程施工合同》的规定，关于工程款（进度款）的叙述，不正确的是（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"在确认计量结果14d内，发包人应向承包人支付工程款（进度款）",{"key":24,"text":390,"correct":22},"按约定时间发包人应扣回的预付款，与工程款（进度款）同期结算",{"key":27,"text":392,"correct":22},"发包人超过约定的支付时间不支付工程款，承包人可向发包人发出要求付款的通知，发包人收到承包人通知后仍不能按要求付款，可与承包人协商签订延期付款协议，经承包人同意后可延期支付",{"key":31,"text":394,"correct":29},"发包人不按合同约定支付工程款，双方又未达成延期付款协议，导致施工无法进行的，应由承包人承担违约责任",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},1142147,"根据合同通用条款规定的文件解释优先顺序，下列文件中具有最优先解释权的是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"规范标准",{"key":24,"text":402,"correct":22},"中标通知书",{"key":27,"text":404,"correct":29},"协议书",{"key":31,"text":406,"correct":22},"设计文件",{"id":408,"libraryId":5,"type":119,"typeLabel":120,"stem":409,"options":410,"answer":421,"analysis":33},1142148,"按照建设工程承发包方式分类，建设工程合同类型包括（ ）。",[411,413,415,417,419],{"key":20,"text":412,"correct":29},"勘察、设计或施工总承包合同",{"key":24,"text":414,"correct":22},"总价合同",{"key":27,"text":416,"correct":29},"工程项目总承包合同",{"key":31,"text":418,"correct":22},"工程监理合同",{"key":132,"text":420,"correct":22},"建设工程物资采购合同","AC",{"id":423,"libraryId":5,"type":119,"typeLabel":120,"stem":424,"options":425,"answer":436,"analysis":33},1142149,"根据《建设工程施工合同（示范文本）》（GF-2013-0201），属于发包人工作的有（ ）。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"保证承包人施工人员的安全和健康",{"key":24,"text":429,"correct":29},"保证向承包人提供正常施工所需的进入施工现场的交通条件",{"key":27,"text":431,"correct":29},"依据有关法律办理建设工程施工许可证",{"key":31,"text":433,"correct":29},"向承包人提供施工现场的地质勘察资料",{"key":132,"text":435,"correct":22},"负责对指定分包的管理，并对分包方的行为负责","BCD",{"id":438,"libraryId":5,"type":119,"typeLabel":120,"stem":439,"options":440,"answer":450,"analysis":33},1142150,"根据《中华人民共和国合同法》，下列合同中属于建设工程合同的有（ ）。",[441,443,445,447,448],{"key":20,"text":442,"correct":29},"勘察合同",{"key":24,"text":444,"correct":29},"设计合同",{"key":27,"text":446,"correct":29},"施工承包合同",{"key":31,"text":418,"correct":22},{"key":132,"text":449,"correct":22},"咨询合同","ABC",{"id":452,"libraryId":5,"type":119,"typeLabel":120,"stem":453,"options":454,"answer":465,"analysis":33},1142151,"施工承包合同中发包方的责任与义务有（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"按合同要求的质量完成施工任务",{"key":24,"text":458,"correct":29},"组织承包人和设计单位进行图样会审和设计交底",{"key":27,"text":460,"correct":29},"按合同规定支付合同价款",{"key":31,"text":462,"correct":29},"按合同规定及时向承包人提供所需指令、批准等",{"key":132,"text":464,"correct":29},"按合同规定主持和组织工程的验收","BCDE",{"id":467,"libraryId":5,"type":119,"typeLabel":120,"stem":468,"options":469,"answer":480,"analysis":33},1142152,"根据《建设工程施工合同（示范文本）》（GF-1999-0201），关于合同文件的优先解释顺序，正确的有（ ）。",[470,472,474,476,478],{"key":20,"text":471,"correct":29},"投标书优先于合同专用条款",{"key":24,"text":473,"correct":29},"合同专用条款优先于标准、规范",{"key":27,"text":475,"correct":29},"标准、规范优先于图纸",{"key":31,"text":477,"correct":22},"工程量清单优先于图纸",{"key":132,"text":479,"correct":29},"工程量清单优先于工程报价单","ABCE",{"id":482,"libraryId":5,"type":119,"typeLabel":120,"stem":483,"options":484,"answer":494,"analysis":33},1142153,"根据《建设工程施工合同（示范文本）》，下列工作内容中，属于承包人义务的有（ ）。",[485,487,489,491,492],{"key":20,"text":486,"correct":22},"支付施工现场邻近的古树保护费用",{"key":24,"text":488,"correct":29},"办理夜间施工许可证",{"key":27,"text":490,"correct":29},"照管未交工工程",{"key":31,"text":298,"correct":22},{"key":132,"text":493,"correct":22},"办理施工现场爆破作业申请","BC",{"id":496,"libraryId":5,"type":119,"typeLabel":120,"stem":497,"options":498,"answer":509,"analysis":33},1142154,"根据《建设工程施工合同（示范文本）》（GF-99-0201），工程师是指（ ）",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"监理单位安排的现场监理工程师",{"key":24,"text":502,"correct":29},"发包人指定的履行合同的代表",{"key":27,"text":504,"correct":22},"施工单位具有中级以上的职称人员",{"key":31,"text":506,"correct":29},"监理单位委派的总监理工程师",{"key":132,"text":508,"correct":22},"现场具有工程序列中级以上职称的人员","BD",{"id":511,"libraryId":5,"type":119,"typeLabel":120,"stem":512,"options":513,"answer":524,"analysis":33},1142155,"承包工程的结算双方实行（ ）结算方式的，当年结算的工程款应与分年度的工作量一致，年终不另清算。",[514,516,518,520,522],{"key":20,"text":515,"correct":29},"分段",{"key":24,"text":517,"correct":22},"按月",{"key":27,"text":519,"correct":22},"竣工",{"key":31,"text":521,"correct":22},"按季",{"key":132,"text":523,"correct":29},"竣工后一次","AE",{"id":526,"libraryId":5,"type":119,"typeLabel":120,"stem":527,"options":528,"answer":539,"analysis":33},1142156,"根据《建设工程施工合同（示范文本）》（GF-99-0201），对材料设备的检验或试验，正确的做法是（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"发包人供应的材料设备使用前应由发包人负责检验或试验，费用由发包人负责",{"key":24,"text":532,"correct":29},"发包人供应的材料设备使用前应由承包人负责检验或试验，费用由发包人负责",{"key":27,"text":534,"correct":22},"发包人供应的材料设备使用前应由承包人负责检验或试验，费用由承包人负责",{"key":31,"text":536,"correct":22},"承包人供应的材料设备使用前应由发包人负责检验或试验，费用由承包人负责",{"key":132,"text":538,"correct":29},"承包人供应的材料设备使用前应由承包人负责检验或试验，费用由承包人负责","BE",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":33},1142157,"根据我国施工合同示范文本，下列各项中不属于设计变更的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"增加合同中约定的工程量",{"key":24,"text":547,"correct":22},"改变有关工程的施工时间和施工顺序",{"key":27,"text":549,"correct":29},"更改工程质量标准",{"key":31,"text":551,"correct":22},"更改工程的标高、基线",{"id":553,"libraryId":5,"type":119,"typeLabel":120,"stem":554,"options":555,"answer":566,"analysis":33},1142158,"根据《建设工程施工合同(示范文本)》(GF—2013—0201)通用合同条款，关于工程施工交通运输的说法，正确的有（ ）。 2016",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"承包人未合理预见进出施工现场路径所增加的费用由发包人承担",{"key":24,"text":559,"correct":29},"发包人负责取得出入施工现场所需的批准手续和全部权利",{"key":27,"text":561,"correct":22},"因承包人原因造成的场内基本交通设施损坏的，由发包人承担修复费用",{"key":31,"text":563,"correct":29},"场外交通设施无法满足工程施工需要的，由发包人负责完善",{"key":132,"text":565,"correct":29},"运输超重件所需的道路临时加固费用由承包人承担","BDE",{"id":568,"libraryId":5,"type":119,"typeLabel":120,"stem":569,"options":570,"answer":580,"analysis":33},1142159,"根据《建设工程施工合同（示范文本）》（GF-2013-0201），合同文本由（ ）组成。2014",[571,573,575,577,579],{"key":20,"text":572,"correct":29},"通用合同条款",{"key":24,"text":574,"correct":29},"合同协议书",{"key":27,"text":576,"correct":22},"标准和技术规范",{"key":31,"text":578,"correct":29},"专用合同条款",{"key":132,"text":402,"correct":22},"ABD",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":27,"analysis":33},1142160,"根据《建设工程施工合同（示范文本）》（GF—2013—0201），工作缺陷责任期自（ ）起计算。2014",[585,587,589,591],{"key":20,"text":586,"correct":22},"合同签订日期",{"key":24,"text":588,"correct":22},"竣工验收合格之日",{"key":27,"text":590,"correct":29},"实际竣工日期",{"key":31,"text":592,"correct":22},"颁发工程接收证书之日",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},1142161,"根据《建设工程施工合同(示范文本)》(GF-2013—0201)，保修期的开始计算时间是指（ ）。 2016",[597,599,601,602],{"key":20,"text":598,"correct":29},"竣工验收合格日",{"key":24,"text":600,"correct":22},"合同基准日期",{"key":27,"text":590,"correct":22},{"key":31,"text":603,"correct":22},"保证金扣留日",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},1142162,"根据《建设工程施工合同（示范文本）》（GF-2013-0201），工程未经竣工验收，发包人擅自使用的，以（ ）为实际竣工日期。( 2015真题 )",[608,610,612,614],{"key":20,"text":609,"correct":22},"承包人提交竣工验收申请报告之日",{"key":24,"text":611,"correct":29},"转移占有工程之日",{"key":27,"text":613,"correct":22},"监理人组织竣工初验之日",{"key":31,"text":615,"correct":22},"发包人签发工程接收证书之日",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":24,"analysis":33},1142163,"某工程承包人于2018年6月15日向提交了竣工验收申请报告。7月10日竣工验收合格，7月18日发包人签发了工程接收证书。根据《建设工程监理合同（示范文本）》通用条款，该工程的实际竣工日期、保修期起算日分别为（）。2018真题",[620,622,624,626],{"key":20,"text":621,"correct":22},"7月10日、7月18日",{"key":24,"text":623,"correct":29},"6月15日、7月10日",{"key":27,"text":625,"correct":22},"6月15日、7月18日",{"key":31,"text":627,"correct":22},"7月18日、7月10日",[629,632,635,638,641,644],{"id":15,"name":630,"category":7,"favorite":631},"领导干部任职前廉政法规知识测试题",92,{"id":633,"name":634,"category":7,"favorite":15},595,"建筑结构与设备",{"id":636,"name":637,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":639,"name":640,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":642,"name":643,"category":7,"favorite":8},534,"BIM工程师",{"id":645,"name":643,"category":7,"favorite":8},535]