[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":637},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,3,50,2721,[13,34,46,58,76,88,100,112,124,136,148,160,172,184,199,211,223,235,247,259,271,283,295,306,321,333,347,359,371,383,395,407,419,431,442,451,463,475,487,502,516,530,544,556,568,579,591,603,613,625],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1140498,1,"单选题","工作流程组织反映一个组织系统中各项工作之间的（ ）关系。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","静态组织",false,{"key":24,"text":25,"correct":26},"B","动态组织",true,{"key":28,"text":29,"correct":22},"C","工艺",{"key":31,"text":32,"correct":22},"D","从属","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1140499,"承包商就已完工，经检验合格的工程提出支付申请，监理工程师复核后，业主批准支付申请，此工作程序属于（ ）流程。( 2015真题 )",[38,40,42,44],{"key":20,"text":39,"correct":22},"物资采购工作",{"key":24,"text":41,"correct":22},"信息处理工作",{"key":28,"text":43,"correct":22},"设计工作",{"key":31,"text":45,"correct":26},"管理工作",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1140500,"关于工作流程组织的说法，正确的是（ ）。2014",[50,52,54,56],{"key":20,"text":51,"correct":26},"同一项目不同参与方都有工程流程组织任务",{"key":24,"text":53,"correct":22},"工程流程组织不包括物质流程组织",{"key":28,"text":55,"correct":22},"一个工作流程图只能有一个项目参与方",{"key":31,"text":57,"correct":22},"一项管理工作只能有一个工作流程图",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},1140501,2,"多选题","每一个建设项目根据其特点，应确定的工作流程有（）。2018真题",[64,66,68,70,72],{"key":20,"text":65,"correct":26},"设计准备工作的流程",{"key":24,"text":67,"correct":26},"施工招标工作的流程",{"key":28,"text":69,"correct":26},"施工作业的流程",{"key":31,"text":71,"correct":22},"工作任务分工的流程",{"key":73,"text":74,"correct":26},"E","信息处理的流程","ABCE",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":28,"analysis":33},1140503,"如果两个单位之间有合同关系，在合同结构图中用（ ）联系。",[80,82,84,86],{"key":20,"text":81,"correct":22},"直线",{"key":24,"text":83,"correct":22},"箭线",{"key":28,"text":85,"correct":26},"双向箭杆",{"key":31,"text":87,"correct":22},"单向箭杆",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":28,"analysis":33},1140504,"如图所示的组织工具是（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":22},"项目结构图",{"key":24,"text":95,"correct":22},"组织结构图",{"key":28,"text":97,"correct":26},"合同结构图",{"key":31,"text":99,"correct":22},"线性组织结构图",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":24,"analysis":33},1140506,"建设工程（ ）指的是通过调查研究和收集资料，在充分占有信息的基础上，针对建设工程项目的决策和实施或决策和实施中的某个问题，进行组织、管理、经济和技术等方面的科学分析和论证，旨在为项目建设的决策和实施增值。",[104,106,108,110],{"key":20,"text":105,"correct":22},"项目决策",{"key":24,"text":107,"correct":26},"项目策划",{"key":28,"text":109,"correct":22},"项目审批",{"key":31,"text":111,"correct":22},"项目执行",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1140507,"建设工程项目策划旨在为项目建设的（ ）和实施增值。",[116,118,120,122],{"key":20,"text":117,"correct":22},"设计",{"key":24,"text":119,"correct":26},"决策",{"key":28,"text":121,"correct":22},"控制",{"key":31,"text":123,"correct":22},"策划",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":28,"analysis":33},1140508,"建设工程项目策划的最终目的是为了（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"分析和论证项目的投资目标",{"key":24,"text":131,"correct":22},"选择项目的融资方式",{"key":28,"text":133,"correct":26},"使项目建设的决策和实施增值",{"key":31,"text":135,"correct":22},"确定项目管理的组织形式",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1140509,"工程项目策划指的是通过调查研究和收集资料，在充分占有信息的基础上，针对项目的决策和实施，进行组织、管理、经济和技术等方面的科学分析和论证，其目的是为（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"进行项目各方面的科学分析和论证",{"key":24,"text":143,"correct":26},"项目建设的决策和实施增值",{"key":28,"text":145,"correct":22},"调查研究和收集资料",{"key":31,"text":147,"correct":22},"针对项目决策的某个问题进行论证",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},1140510,"建设工程项目决策阶段策划中，属于组织策划的是（ ）",[152,154,156,158],{"key":20,"text":153,"correct":22},"融资方案",{"key":24,"text":155,"correct":26},"项目编码体系分析",{"key":28,"text":157,"correct":22},"项目的规模、组成",{"key":31,"text":159,"correct":22},"项目效益分析",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":24,"analysis":33},1140511,"建设工程项目决策阶段策划的主要任务是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"定义如何组织项目建设",{"key":24,"text":167,"correct":26},"定义项目开发或建设的任务和意义",{"key":28,"text":169,"correct":22},"定义如何组织项目开发",{"key":31,"text":171,"correct":22},"定义项目开发的程序和内容",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":28,"analysis":33},1140512,"工程项目策划的过程是专家知识的组织和集成，以及信息的组织和集成的过程，其实质是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"施工管理的过程",{"key":24,"text":179,"correct":22},"建设管理的过程",{"key":28,"text":181,"correct":26},"知识管理的过程",{"key":31,"text":183,"correct":22},"项目管理的过程",{"id":185,"libraryId":5,"type":60,"typeLabel":61,"stem":186,"options":187,"answer":198,"analysis":33},1140513,"工程项目策划要整合多方面的知识和经验，其中包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"设计经验",{"key":24,"text":191,"correct":22},"开发经验",{"key":28,"text":193,"correct":22},"项目结构与分析技术",{"key":31,"text":195,"correct":26},"施工经验",{"key":73,"text":197,"correct":26},"管理经验","ADE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1140514,"不属于建设工程项目决策阶段策划基本内容的是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"组织策划",{"key":24,"text":206,"correct":26},"项目目标论证",{"key":28,"text":208,"correct":22},"合同策划",{"key":31,"text":210,"correct":22},"管理策划",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1140515,"关于建设工程项目策划的说法，正确的是（ ）。2014",[215,217,219,221],{"key":20,"text":216,"correct":22},"工程项目策划只针对建设工程项目的决策和实施",{"key":24,"text":218,"correct":26},"旨在为项目建设的决策和实施增值",{"key":28,"text":220,"correct":22},"工程项目策划师一个封闭性的工作过程",{"key":31,"text":222,"correct":22},"其实质就是知识组合的过程",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1140516,"下列建设工程项目决策阶段的工作内容中，属于组织策划的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"业主方项目管理的组织结构",{"key":24,"text":230,"correct":22},"生产运营期经营管理总体方案",{"key":28,"text":232,"correct":22},"编码体系的建立",{"key":31,"text":234,"correct":26},"实施期组织总体方案",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1140519,"建设工程项目实施阶段策划的主要任务是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"定义项目开发或减少的任务",{"key":24,"text":242,"correct":26},"确定如何组织该项目的开发或建设",{"key":28,"text":244,"correct":22},"确定建设项目的进度目标",{"key":31,"text":246,"correct":22},"编制项目投资总体规划",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1140520,"建设工程项目实施阶段策划是在建设项目立项之后，为了把项目决策付诸实施而形成的（ ）的项目实施方案。",[251,253,255,257],{"key":20,"text":252,"correct":22},"实施性",{"key":24,"text":254,"correct":26},"指导性",{"key":28,"text":256,"correct":22},"纲领性",{"key":31,"text":258,"correct":22},"操作性",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1140521,"项目实施的组织策划的主要工作内容不包括（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"项目管理工作流程",{"key":24,"text":266,"correct":22},"建立编码体系",{"key":28,"text":268,"correct":22},"管理职能分工",{"key":31,"text":270,"correct":26},"确定质量目标",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1140522,"建设工程项目实施阶段策划的主要任务是确定（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"项目建设的总目标",{"key":24,"text":278,"correct":22},"如何实现项目的目标",{"key":28,"text":280,"correct":22},"项目建设的指导思想",{"key":31,"text":282,"correct":26},"如何组织项目的建设",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1140523,"关于项目实施阶段策划的说法，正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"策划是一个封闭性的，专业性较强的工作过程",{"key":24,"text":290,"correct":26},"项目目标的分析和再论证是其基本内容之一",{"key":28,"text":292,"correct":22},"项目实施阶段策划的主要任务是进行项目实施的管理策划",{"key":31,"text":294,"correct":22},"实施阶段策划的范围和深度有明确的统一规定",{"id":296,"libraryId":5,"type":60,"typeLabel":61,"stem":297,"options":298,"answer":305,"analysis":33},1140524,"建设工程项目实施阶段组织策划的主要工作内容是（ ）。",[299,300,301,302,304],{"key":20,"text":264,"correct":26},{"key":24,"text":234,"correct":22},{"key":28,"text":266,"correct":26},{"key":31,"text":303,"correct":26},"任务分工和管理职能分",{"key":73,"text":228,"correct":26},"ACDE",{"id":307,"libraryId":5,"type":60,"typeLabel":61,"stem":308,"options":309,"answer":320,"analysis":33},1140525,"在建设工程项目实施阶段的策划工作中，对项目目标分析和再论证的主要工作内容包括（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":26},"项目功能分解",{"key":24,"text":313,"correct":26},"编制项目总投资规划和投资目标论证",{"key":28,"text":315,"correct":26},"编制项目建设总进度规划",{"key":31,"text":317,"correct":26},"确定项目质量目标",{"key":73,"text":319,"correct":22},"确定项目建设的规模和标准","ABCD",{"id":322,"libraryId":5,"type":60,"typeLabel":61,"stem":323,"options":324,"answer":332,"analysis":33},1140526,"下列建设工程项目实施阶段策划的工作中，属于项目目标分析和再论证工作内容的有（ ）。",[325,326,327,329,330],{"key":20,"text":246,"correct":26},{"key":24,"text":315,"correct":26},{"key":28,"text":328,"correct":22},"项目实施环境调查",{"key":31,"text":311,"correct":26},{"key":73,"text":331,"correct":26},"建筑面积分配","ABDE",{"id":334,"libraryId":5,"type":60,"typeLabel":61,"stem":335,"options":336,"answer":320,"analysis":33},1140527,"建设工程项目实施阶段策划的内容包括（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":26},"项目实施的组织策划",{"key":24,"text":340,"correct":26},"项目实施期管理策划",{"key":28,"text":342,"correct":26},"项目实施的风险策划",{"key":31,"text":344,"correct":26},"项目实施的合同策划",{"key":73,"text":346,"correct":22},"项目实施的咨询策划",{"id":348,"libraryId":5,"type":60,"typeLabel":61,"stem":349,"options":350,"answer":75,"analysis":33},1140528,"建设工程项目实施阶段策划的工作内容包括（ ）。",[351,352,354,355,357],{"key":20,"text":338,"correct":26},{"key":24,"text":353,"correct":26},"项目实施的技术策划",{"key":28,"text":344,"correct":26},{"key":31,"text":356,"correct":22},"项目实施的信息策划",{"key":73,"text":358,"correct":26},"项目目标的分析和再论证",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1140529,"下列工程项目策划工作中，属于项目决策阶段合同策划的是（ ）。( 2015真题 )",[363,365,367,369],{"key":20,"text":364,"correct":22},"组织方案设计竞赛",{"key":24,"text":366,"correct":22},"确定项目设计合同结构方案",{"key":28,"text":368,"correct":22},"拟定施工合同文本",{"key":31,"text":370,"correct":26},"确定实施期合同结构总体方案",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":31,"analysis":33},1140531,"下列建设工程项目策划工作中，属于实施阶段策划的是（ ）。 2016",[375,377,379,381],{"key":20,"text":376,"correct":22},"编制项目实施期组织总体方案",{"key":24,"text":378,"correct":22},"编制项目实施期管理总体方案",{"key":28,"text":380,"correct":22},"编制项目实施期合同结构总体方案",{"key":31,"text":382,"correct":26},"制订项目风险管理与工程保险方案",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},1140532,"下列项目策划工作中，属于实施阶段管理策划的是（ ）。2014",[387,389,391,393],{"key":20,"text":388,"correct":26},"项目实施各阶段项目管理的工作内容策划",{"key":24,"text":390,"correct":22},"项目实施期管理总体方案策划",{"key":28,"text":392,"correct":22},"生产运营期设施管理总体方案策划",{"key":31,"text":394,"correct":22},"生产运营期经营管理总体方案策划",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":28,"analysis":33},1140533,"下列工程项目策划工作中，属于建设工程项目实施阶段管理策划的是（ ）。( 2015真题 )",[399,401,403,405],{"key":20,"text":400,"correct":22},"确定项目实施期管理总体方案",{"key":24,"text":402,"correct":22},"确定生产运营期设施管理总体方案",{"key":28,"text":404,"correct":26},"确定项目风险管理与工程保险方案",{"key":31,"text":406,"correct":22},"确定生产运营期经营管理总体方案",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1140534,"施工总承包管理模式与施工总承包模式相比，在合同价方面的特点是（）。2018真题",[411,413,415,417],{"key":20,"text":412,"correct":22},"合同总价可以一次确定",{"key":24,"text":414,"correct":26},"分包合同价对业主相对透明",{"key":28,"text":416,"correct":22},"不利于业主节约投资",{"key":31,"text":418,"correct":22},"确定建设项目合同总额的依据不足",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},1140535,"下列项目策划的工作内容中，属于项目决策阶段合同策划的是（）。2018真题",[423,425,427,429],{"key":20,"text":424,"correct":22},"项目管理委托的合同结构方案",{"key":24,"text":426,"correct":22},"方案设计竞赛的组织",{"key":28,"text":428,"correct":26},"实施期合同结构总体方案",{"key":31,"text":430,"correct":22},"项目物资采购的合同结构方案",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},1140537,"下列项目策划的工作内容中，属于项目实施管理策划的是（）。2018真题",[435,437,439,440],{"key":20,"text":436,"correct":22},"项目实施期管理总体方案",{"key":24,"text":438,"correct":22},"生产运营期设施管理总体方案",{"key":28,"text":230,"correct":22},{"key":31,"text":441,"correct":26},"项目风险管理与工程保险方案",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1140539,"（2020年真题）下列工程项目策划工作中，属于实施阶段策划的是（ ）。",[446,447,448,450],{"key":20,"text":390,"correct":22},{"key":24,"text":342,"correct":26},{"key":28,"text":449,"correct":22},"实施期合同结构总体方案策划",{"key":31,"text":394,"correct":22},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},1140541,"建设工程项目施工总承包管理合同中一般只确定（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"建筑安装工程造价",{"key":24,"text":458,"correct":22},"建设安装工程直接费",{"key":28,"text":460,"correct":22},"施工总承包间接费",{"key":31,"text":462,"correct":26},"施工总承包管理费",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":28,"analysis":33},1140542,"可以接受业主方、施工方、供货方或建设项目工程总承包方的委托，提供代表委托方利益的项目管理服务的组织是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"设计单位",{"key":24,"text":470,"correct":22},"建设单位",{"key":28,"text":472,"correct":26},"项目管理咨询企业",{"key":31,"text":474,"correct":22},"房地产公司",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},1140543,"在国际上，项目管理咨询公司所提供的代表委托方利益的项目管理服务性质属于（ ）服务。",[479,481,483,485],{"key":20,"text":480,"correct":22},"工程采购",{"key":24,"text":482,"correct":26},"工程顾问",{"key":28,"text":484,"correct":22},"工程监督",{"key":31,"text":486,"correct":22},"工程技术",{"id":488,"libraryId":5,"type":60,"typeLabel":61,"stem":489,"options":490,"answer":501,"analysis":33},1140544,"施工总承包管理模式与施工总承包模式相比，在合同价方面的优点有（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":26},"在施工总承包管理模式下，分包合同价对业主是透明的",{"key":24,"text":494,"correct":26},"所有分包都通过招标获得有竞争力的投标报价，对业主方节约投资有利",{"key":28,"text":496,"correct":26},"整个建设项目的合同总额的确定较有依据",{"key":31,"text":498,"correct":22},"在施工总承包管理模式下，由业主直接支付分包单位的工程款项",{"key":73,"text":500,"correct":22},"施工总承包管理合同中一般需要确定建筑安装工程造价","ABC",{"id":503,"libraryId":5,"type":60,"typeLabel":61,"stem":504,"options":505,"answer":501,"analysis":33},1140545,"在国际上，业主方项目管理的方式有多种可能，在以下描述中，正确的是（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"业主方自行完成其项目管理任务",{"key":24,"text":509,"correct":26},"业主方委托项目管理咨询公司进行项目管理",{"key":28,"text":511,"correct":26},"业主方与项目管理咨询公司共同进行项目管理任务",{"key":31,"text":513,"correct":22},"业主方委托本工程的总承包管理公司完成其项目管理任务",{"key":73,"text":515,"correct":22},"业主方委托本工程的项目总承包公司完成其项目管理任务",{"id":517,"libraryId":5,"type":60,"typeLabel":61,"stem":518,"options":519,"answer":75,"analysis":33},1140546,"在国际上，工程项目管理咨询公司为（ ）提供服务。",[520,522,524,526,528],{"key":20,"text":521,"correct":26},"施工方",{"key":24,"text":523,"correct":26},"业主",{"key":28,"text":525,"correct":26},"设计方",{"key":31,"text":527,"correct":22},"监理方",{"key":73,"text":529,"correct":26},"建设物资供应方",{"id":531,"libraryId":5,"type":60,"typeLabel":61,"stem":532,"options":533,"answer":501,"analysis":33},1140547,"施工总承包管理模式在投资控制方面的特点有（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"一部分施工图完成后，业主就可单独或与施工总承包管理单位共同进行该部分工程的招标",{"key":24,"text":537,"correct":26},"分包合同的投标报价和合同价以施工图为依据",{"key":28,"text":539,"correct":26},"在对施工总承包管理单位进行招标时，只确定施工总承包管理费，而不确定工程总造价，这可能成为业主控制总投资的风险",{"key":31,"text":541,"correct":22},"多数情况下，由业主与分包人直接签约，这样有可能减少业主的风险",{"key":73,"text":543,"correct":22},"一般以施工图设计为投标报价的基础",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1140548,"施工总承包管理模式表现在投资控制方面的特点不包括( )。",[548,550,552,554],{"key":20,"text":549,"correct":22},"某一部分工程的施工图完成后，由业主单独或与施工总承包管理单位共同进行该部分工程的施工招标，分包合同的投标报价较有依据",{"key":24,"text":551,"correct":26},"对分包单位的费用控制主要由施工总承包管理单位进行",{"key":28,"text":553,"correct":22},"每一部分工程的施工，发包人都可以通过招标选择最好的施工单位承包，获得最低的报价，对降低工程造价有利",{"key":31,"text":555,"correct":22},"在进行施工总承包管理单位的招标时，只确定总承包管理费，没有合同总造价，是业主承担的风险之一",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1140549,"我国积极推行建设工程总承包，其主要意义在于促进设计与施工的紧密结合，以达到（ ）的目的。",[560,562,564,566],{"key":20,"text":561,"correct":22},"降低项目投资风险",{"key":24,"text":563,"correct":26},"为项目建设增值",{"key":28,"text":565,"correct":22},"实行固定总价包干",{"key":31,"text":567,"correct":22},"业主免于参与项目建设管理",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1140550,"某工程采用建设工程项目总承包模式，业主依据总承包合同约定，委托一家装饰装修单位分包该工程项目的装饰装修任务，则该装饰装修单位应对（ ）负责。",[572,573,575,577],{"key":20,"text":523,"correct":22},{"key":24,"text":574,"correct":26},"项目总承包单位",{"key":28,"text":576,"correct":22},"工程监理单位",{"key":31,"text":578,"correct":22},"质量监督机构",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},1140551,"某施工总承包企业将玻璃幕墙的安装分包给某专业分包商，则该分包商（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":26},"对总承包企业负责",{"key":24,"text":586,"correct":22},"对业主单位负责",{"key":28,"text":588,"correct":22},"对总承包企业和业主负责",{"key":31,"text":590,"correct":22},"对总承包企业、设计单位和业主负责",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1140552,"采用工程项目总承包模式的建设工程项目，发包人可将（ ）等一系列工作全部发包给一家承包单位。",[595,597,599,601],{"key":20,"text":596,"correct":22},"勘察、设计、施工、监理",{"key":24,"text":598,"correct":26},"设计、施工、材料和设备采购",{"key":28,"text":600,"correct":22},"资金筹措、勘察、设计、材料和设备采购",{"key":31,"text":602,"correct":22},"资金筹措、勘察、设计、施工、监理",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":20,"analysis":33},1140553,"工程总承包企业按照合同约定对工程项目的质量、工期、造价等向（ ）负责。",[607,608,609,611],{"key":20,"text":523,"correct":26},{"key":24,"text":468,"correct":22},{"key":28,"text":610,"correct":22},"政府主管部门",{"key":31,"text":612,"correct":22},"监理单位",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":28,"analysis":33},1140554,"在国际上，民用建筑工程项目总承包的招标，对工程项目多数采用（ ）描述的方式。",[617,619,621,623],{"key":20,"text":618,"correct":22},"构造",{"key":24,"text":620,"correct":22},"施工图",{"key":28,"text":622,"correct":26},"功能",{"key":31,"text":624,"correct":22},"规模",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":31,"analysis":33},1140555,"在建设项目工程总承包方的工作中，办理项目资料归档，进行项目总结，对项目部人员进行考核评价，解散项目部，属于（ ）阶段的工作。",[629,631,633,635],{"key":20,"text":630,"correct":22},"施工",{"key":24,"text":632,"correct":22},"试运行",{"key":28,"text":634,"correct":22},"合同收尾",{"key":31,"text":636,"correct":26},"项目管理收尾",[638,641,644,647,650,653],{"id":15,"name":639,"category":7,"favorite":640},"领导干部任职前廉政法规知识测试题",92,{"id":642,"name":643,"category":7,"favorite":15},595,"建筑结构与设备",{"id":645,"name":646,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":648,"name":649,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":651,"name":652,"category":7,"favorite":8},534,"BIM工程师",{"id":654,"name":652,"category":7,"favorite":8},535]