[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":626},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,22,50,2721,[13,38,52,64,76,88,100,112,124,136,151,166,180,191,206,220,232,247,259,271,281,290,305,320,332,344,356,368,380,392,404,419,428,437,449,461,473,484,494,504,514,522,534,546,557,569,579,587,599,613],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1141590,2,"多选题","施工质量计划的基本内容包括（ ）。 2016",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","质量总目标及分解目标",true,{"key":24,"text":25,"correct":26},"B","工序质量偏差的纠正",false,{"key":28,"text":29,"correct":22},"C","质量管理组织机构和职责",{"key":31,"text":32,"correct":22},"D","施工质量控制点及跟踪控制的方式",{"key":34,"text":35,"correct":22},"E","质量记录的要求","ACDE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},1141591,1,"单选题","下列施工企业作业质量控制点中，属于“待检点”的是（ ）。2014",[44,46,48,50],{"key":20,"text":45,"correct":22},"隐蔽工程",{"key":24,"text":47,"correct":26},"重要部位",{"key":28,"text":49,"correct":26},"特种作业",{"key":31,"text":51,"correct":26},"专门工艺",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":24,"analysis":37},1141592,"关于施工质量计划的说法，正确的是（ ）。2014",[56,58,60,62],{"key":20,"text":57,"correct":26},"施工质量计划是以施工项目为对象由建设单位编制的计划",{"key":24,"text":59,"correct":22},"施工质量计划应包括施工组织方案",{"key":28,"text":61,"correct":26},"施工质量计划一经审核批准后不得修改",{"key":31,"text":63,"correct":26},"施工总承包单位不对分包单位的施工质量计划进行审核",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":20,"analysis":37},1141594,"根据施工质量控制点的要求，混凝土冬期施工应重点控制的技术参数是（）。2018真题",[68,70,72,74],{"key":20,"text":69,"correct":22},"受冻临界强度",{"key":24,"text":71,"correct":26},"养护标准",{"key":28,"text":73,"correct":26},"内外温差",{"key":31,"text":75,"correct":26},"保温系数",{"id":77,"libraryId":5,"type":40,"typeLabel":41,"stem":78,"options":79,"answer":28,"analysis":37},1141597,"保证施工质量的重要措施是（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":26},"加强施工人员的管理",{"key":24,"text":83,"correct":26},"采用技术先进、经济合理、安全可靠的施工技术工艺方案",{"key":28,"text":85,"correct":22},"合理选择和正确使用施工机械设备",{"key":31,"text":87,"correct":26},"采用节能低碳的新型建筑材料和设备",{"id":89,"libraryId":5,"type":40,"typeLabel":41,"stem":90,"options":91,"answer":20,"analysis":37},1141598,"对于建设工程项目管理者而言，一般情形下属于不可控的是（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":22},"社会因素",{"key":24,"text":95,"correct":26},"人的因素",{"key":28,"text":97,"correct":26},"管理因素",{"key":31,"text":99,"correct":26},"技术因素",{"id":101,"libraryId":5,"type":40,"typeLabel":41,"stem":102,"options":103,"answer":31,"analysis":37},1141599,"下列影响施工质量的生产要素中，只能通过采取预测预防的控制方法以消除其对施工质量不利影响的是（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"施工人员",{"key":24,"text":107,"correct":26},"材料设备",{"key":28,"text":109,"correct":26},"施工机械",{"key":31,"text":111,"correct":22},"环境因素",{"id":113,"libraryId":5,"type":40,"typeLabel":41,"stem":114,"options":115,"answer":24,"analysis":37},1141600,"施工生产要素的质量控制中，对模板、脚手架等施工设施，除按使用的标准定型选用外，一般应按（ ）要求进行专项设计。",[116,118,120,122],{"key":20,"text":117,"correct":26},"施工质量",{"key":24,"text":119,"correct":22},"设计及施工",{"key":28,"text":121,"correct":26},"施工工艺",{"key":31,"text":123,"correct":26},"现场安全",{"id":125,"libraryId":5,"type":40,"typeLabel":41,"stem":126,"options":127,"answer":31,"analysis":37},1141601,"按现行施工管理制度规定，工地现场安装的危险性较大的起重机械设备安装完毕，必须经（ ）验收合格方能使用。",[128,130,132,134],{"key":20,"text":129,"correct":26},"建设单位",{"key":24,"text":131,"correct":26},"设备供应部门",{"key":28,"text":133,"correct":26},"安全管理部门",{"key":31,"text":135,"correct":22},"专业管理部门",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":150,"analysis":37},1141602,"建设工程项目的施工方案包括（ ）。",[140,142,144,146,148],{"key":20,"text":141,"correct":26},"材料采购方案",{"key":24,"text":143,"correct":22},"技术方案",{"key":28,"text":145,"correct":26},"人员培训方案",{"key":31,"text":147,"correct":22},"组织方案",{"key":34,"text":149,"correct":26},"质量管理认证方案","BD",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":165,"analysis":37},1141603,"下列各施工生产要素的质量控制手段中，属于对施工工艺质量控制的有（ ）。",[155,157,159,161,163],{"key":20,"text":156,"correct":26},"坚持分包商资质考核制度",{"key":24,"text":158,"correct":26},"坚持特殊工种持证上岗制度",{"key":28,"text":160,"correct":26},"禁止使用明令淘汰的施工方法",{"key":31,"text":162,"correct":22},"合理布置施工总平面图",{"key":34,"text":164,"correct":22},"制订合理有效的有针对性的施工技术方案","DE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":179,"analysis":37},1141604,"建设工程施工技术方案的内容包括（ ）。",[170,172,174,175,177],{"key":20,"text":171,"correct":26},"施工区段划分",{"key":24,"text":173,"correct":26},"施工流向",{"key":28,"text":121,"correct":22},{"key":31,"text":176,"correct":26},"劳动力安排",{"key":34,"text":178,"correct":22},"施工方法","CE",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":190,"analysis":37},1141605,"下列各施工生产要素的质量控制手段中，属于对劳动主体质量控制的有（ ）。",[184,185,186,187,188],{"key":20,"text":162,"correct":26},{"key":24,"text":158,"correct":22},{"key":28,"text":160,"correct":26},{"key":31,"text":156,"correct":22},{"key":34,"text":189,"correct":22},"组织项目管理者培训学习","BDE",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":205,"analysis":37},1141606,"建设工程项目施工生产要素的质量控制包括（ ）。",[195,197,199,201,203],{"key":20,"text":196,"correct":22},"施工人员的质量控制",{"key":24,"text":198,"correct":22},"材料设备的质量控制",{"key":28,"text":200,"correct":26},"工序施工质量控制",{"key":31,"text":202,"correct":22},"工艺方案的质量控制",{"key":34,"text":204,"correct":22},"施工环境的控制","ABDE",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":36,"analysis":37},1141607,"施工方案质量控制的内容有（ ）。",[210,212,214,216,218],{"key":20,"text":211,"correct":22},"合理划分施工区段",{"key":24,"text":213,"correct":26},"制订材料进场验收程序",{"key":28,"text":215,"correct":22},"编制新材料专项技术方案",{"key":31,"text":217,"correct":22},"明确工序质量验收标准",{"key":34,"text":219,"correct":22},"合理选用施工机械设备",{"id":221,"libraryId":5,"type":40,"typeLabel":41,"stem":222,"options":223,"answer":31,"analysis":37},1141608,"下列施工生产要素的质量控制内容中，属于工艺方案质量控制的是（ ）。 2016",[224,226,228,230],{"key":20,"text":225,"correct":26},"施工企业坚持执业资格注册制度和作业人员持证上岗制度",{"key":24,"text":227,"correct":26},"施工企业在施工过程中优先采用节能低碳的新型建筑材料和设备",{"key":28,"text":229,"correct":26},"施工企业对施工中使用的模具、脚手架等施工设备进行专项设计",{"key":31,"text":231,"correct":22},"施工企业合理布置施工总平面图和各阶段施工平面图",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":246,"analysis":37},1141609,"下列施工质量控制点的管理工作中，属于事前质量控制的有（ ）。( 2015真题 )",[236,238,240,242,244],{"key":20,"text":237,"correct":22},"明确质量控制目标",{"key":24,"text":239,"correct":22},"确定质量抽样数量",{"key":28,"text":241,"correct":26},"质量控制人员在现场进行指导",{"key":31,"text":243,"correct":22},"向施工作业班组认真交底",{"key":34,"text":245,"correct":26},"动态跟踪管理质量控制点","ABD",{"id":248,"libraryId":5,"type":40,"typeLabel":41,"stem":249,"options":250,"answer":28,"analysis":37},1141613,"建设工程项目建成后，在规定的使用年限和正常的使用条件下，保证使用安全和建筑物、构筑物及其设备系统性能稳定，体现了项目设计质量控制中的（ ）质量控制。",[251,253,255,257],{"key":20,"text":252,"correct":26},"功能性",{"key":24,"text":254,"correct":26},"观感性",{"key":28,"text":256,"correct":22},"可靠性",{"key":31,"text":258,"correct":26},"经济性",{"id":260,"libraryId":5,"type":40,"typeLabel":41,"stem":261,"options":262,"answer":24,"analysis":37},1141614,"设计单位会同施工单位、建设单位和监理单位，对设计意图进行交底，并吸取有关各方对图纸提出的问题称为（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":26},"图纸交底",{"key":24,"text":266,"correct":22},"图纸会审",{"key":28,"text":268,"correct":26},"图纸审核",{"key":31,"text":270,"correct":26},"图纸会签",{"id":272,"libraryId":5,"type":40,"typeLabel":41,"stem":273,"options":274,"answer":31,"analysis":37},1141615,"盲目追求建筑产品质量的高标准，而不充分考虑业主的投资规模，是缺乏质量的（ ）考虑的决策，对工程质量的形成会产生不利的影响。",[275,277,278,280],{"key":20,"text":276,"correct":26},"安全性",{"key":24,"text":256,"correct":26},{"key":28,"text":279,"correct":26},"适用性",{"key":31,"text":258,"correct":22},{"id":282,"libraryId":5,"type":40,"typeLabel":41,"stem":283,"options":284,"answer":24,"analysis":37},1141616,"设计（ ）质量控制中，在于强调设计过程的多方案比较，通过价值工程、优化设计，不断提高建设工程项目的性价比。",[285,287,288,289],{"key":20,"text":286,"correct":26},"可行性",{"key":24,"text":258,"correct":22},{"key":28,"text":254,"correct":26},{"key":31,"text":252,"correct":26},{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":304,"analysis":37},1141617,"建设单位和监理单位组织设计单位向所有的施工单位进行详细的设计交底，其主要目的有（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":26},"深入发现和解决各专业设计之间可能存在的矛盾",{"key":24,"text":297,"correct":22},"充分理解设计意图",{"key":28,"text":299,"correct":22},"了解设计内容和技术要求",{"key":31,"text":301,"correct":22},"明确质量控制的重点与难点",{"key":34,"text":303,"correct":26},"消除施工图的差错，解决施工的可行性问题","BCD",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},1141618,"根据建设工程项目设计质量控制的要求，建筑工程设计图纸必须具有（ ）并按照有效的审图程序进行审查。",[309,311,313,315,317],{"key":20,"text":310,"correct":22},"国家批准的出图印章",{"key":24,"text":312,"correct":26},"审图部门的印章",{"key":28,"text":314,"correct":26},"造价工程师的执业印章",{"key":31,"text":316,"correct":22},"建筑师的执业印章",{"key":34,"text":318,"correct":22},"结构工程师的执业印章","ADE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":331,"analysis":37},1141619,"建设单位应组织设计单位进行设计交底，使施工单位（）。2018真题",[324,325,327,328,330],{"key":20,"text":297,"correct":22},{"key":24,"text":326,"correct":26},"解决各专业设计之间可能存在的矛盾",{"key":28,"text":299,"correct":22},{"key":31,"text":329,"correct":26},"清除施工图差错",{"key":34,"text":301,"correct":22},"ACE",{"id":333,"libraryId":5,"type":40,"typeLabel":41,"stem":334,"options":335,"answer":28,"analysis":37},1141620,"在施工准备阶段，绘制模板配板图属于（ ）的质量控制工作。",[336,338,340,342],{"key":20,"text":337,"correct":26},"计量控制准备",{"key":24,"text":339,"correct":26},"测量控制准备",{"key":28,"text":341,"correct":22},"施工技术准备",{"key":31,"text":343,"correct":26},"施工平面控制",{"id":345,"libraryId":5,"type":40,"typeLabel":41,"stem":346,"options":347,"answer":31,"analysis":37},1141621,"下列质量控制工作中，属于施工技术准备工作的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"做好施工现场的质量检查记录",{"key":24,"text":351,"correct":26},"复核测量控制点",{"key":28,"text":353,"correct":26},"按规定维修和校验计量器具",{"key":31,"text":355,"correct":22},"审核复查各种施工详图",{"id":357,"libraryId":5,"type":40,"typeLabel":41,"stem":358,"options":359,"answer":31,"analysis":37},1141622,"现场施工准备工作的质量控制不包括（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"计量控制",{"key":24,"text":363,"correct":26},"测量控制",{"key":28,"text":365,"correct":26},"施工平面图控制",{"key":31,"text":367,"correct":22},"施工机械控制",{"id":369,"libraryId":5,"type":40,"typeLabel":41,"stem":370,"options":371,"answer":20,"analysis":37},1141623,"为了便于过程控制和终端把关，按施工层次划分的质量控制系统过程，是指分别对（ ）所进行的控制过程。",[372,374,376,378],{"key":20,"text":373,"correct":22},"检验批、分项、分部、单位工程",{"key":24,"text":375,"correct":26},"资源投入、生产过程、产出品",{"key":28,"text":377,"correct":26},"施工准备、施工过程、竣工验收",{"key":31,"text":379,"correct":26},"施工人员、检验人员、监理人员",{"id":381,"libraryId":5,"type":40,"typeLabel":41,"stem":382,"options":383,"answer":28,"analysis":37},1141624,"对施工承包企业而言，在施工准备阶段控制施工质量的主要工作内容之一是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"办理施工许可",{"key":24,"text":387,"correct":26},"确定检验批",{"key":28,"text":389,"correct":22},"编制施工组织设计文件",{"key":31,"text":391,"correct":26},"办理质量监督手续",{"id":393,"libraryId":5,"type":40,"typeLabel":41,"stem":394,"options":395,"answer":31,"analysis":37},1141625,"施工承包企业应对建设单位提供的原始坐标点、基准线和水准点等测量控制点进行复核，并将复测结果上报（ ）审批，批准后才能建立施工测量控制网。",[396,398,400,402],{"key":20,"text":397,"correct":26},"项目技术负责人",{"key":24,"text":399,"correct":26},"企业技术负责人",{"key":28,"text":401,"correct":26},"业主",{"key":31,"text":403,"correct":22},"监理工程师",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":418,"analysis":37},1141626,"根据《建筑工程施工质量验收统一标准》（GB50300-2001）的规定，单位（子单位）工程的划分应按（ ）原则确定。",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"具备独立施工条件并能形成独立使用功能的建筑物或构筑物为一个单位工程",{"key":24,"text":411,"correct":26},"当单位工程较大或较复杂时，可按材料种类、施工特点、施工程序、专业系统及类别等划分为若干子单位工程",{"key":28,"text":413,"correct":22},"建筑规模较大的单位工程，可将其能形成独立使用功能的部分划为若干个子单位工程",{"key":31,"text":415,"correct":26},"单位工程的划分应按专业性质、建筑部位确定",{"key":34,"text":417,"correct":26},"应按主要工种、材料、施工工艺、设备类别等进行划分","AC",{"id":420,"libraryId":5,"type":40,"typeLabel":41,"stem":421,"options":422,"answer":31,"analysis":37},1141627,"现场施工准备工作的质量控制中，属于施工质量控制的一项重要基础工作是（ ）。",[423,424,425,427],{"key":20,"text":363,"correct":26},{"key":24,"text":365,"correct":26},{"key":28,"text":426,"correct":26},"施工人员的控制",{"key":31,"text":361,"correct":22},{"id":429,"libraryId":5,"type":40,"typeLabel":41,"stem":430,"options":431,"answer":20,"analysis":37},1141628,"施工技术准备工作的质量控制包括（ ）。( 2015真题 )",[432,434,435,436],{"key":20,"text":433,"correct":22},"明确质量控制方法",{"key":24,"text":361,"correct":26},{"key":28,"text":363,"correct":26},{"key":31,"text":365,"correct":26},{"id":438,"libraryId":5,"type":40,"typeLabel":41,"stem":439,"options":440,"answer":20,"analysis":37},1141629,"下列质量控制工作中，属于施工技术准备工作的是（ ）。( 2015真题 )",[441,443,445,447],{"key":20,"text":442,"correct":22},"明确质量控制的重点对象",{"key":24,"text":444,"correct":26},"编制测量控制方案",{"key":28,"text":446,"correct":26},"建立施工现场计量管理的规章制度",{"key":31,"text":448,"correct":26},"正确安装设置施工机械设备",{"id":450,"libraryId":5,"type":40,"typeLabel":41,"stem":451,"options":452,"answer":20,"analysis":37},1141631,"对于地基基础设计等级为甲级或地质条件复杂，成桩质量可靠性低的灌注桩，应采用（ ）的方法进行检验。",[453,455,457,459],{"key":20,"text":454,"correct":22},"静载荷试验",{"key":24,"text":456,"correct":26},"实际测量法",{"key":28,"text":458,"correct":26},"低应变法",{"key":31,"text":460,"correct":26},"高应变法",{"id":462,"libraryId":5,"type":40,"typeLabel":41,"stem":463,"options":464,"answer":24,"analysis":37},1141632,"对装饰工程的水磨石、面砖、石材饰面等现场检查时，均应进行敲击检查其铺设质量。该方法属于现场质量检查方法中的（ ）",[465,467,469,471],{"key":20,"text":466,"correct":26},"实测法",{"key":24,"text":468,"correct":22},"目测法",{"key":28,"text":470,"correct":26},"记录法",{"key":31,"text":472,"correct":26},"试验法",{"id":474,"libraryId":5,"type":40,"typeLabel":41,"stem":475,"options":476,"answer":31,"analysis":37},1141633,"某建设工程项目由于分包单位购买的工程材料不合格，导致其中某分部工程质量不合格。在该事件中，施工质量控制的监控主体是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":26},"施工总承包单位",{"key":24,"text":480,"correct":26},"材料供应单位",{"key":28,"text":482,"correct":26},"分包单位",{"key":31,"text":129,"correct":22},{"id":485,"libraryId":5,"type":40,"typeLabel":41,"stem":486,"options":487,"answer":28,"analysis":37},1141634,"根据设计要求，检测桩身缺陷及其位置，判定桩身完整性类别，采用（ ）。",[488,489,491,492],{"key":20,"text":460,"correct":26},{"key":24,"text":490,"correct":26},"静载荷试验法",{"key":28,"text":458,"correct":22},{"key":31,"text":493,"correct":26},"动载荷试验法",{"id":495,"libraryId":5,"type":40,"typeLabel":41,"stem":496,"options":497,"answer":20,"analysis":37},1141635,"建设工程项目实施过程中，质量控制系统涉及多个质量责任主体，其中属于监控主体的是（ ）。",[498,499,501,503],{"key":20,"text":129,"correct":22},{"key":24,"text":500,"correct":26},"劳务分包单位",{"key":28,"text":502,"correct":26},"施工单位",{"key":31,"text":480,"correct":26},{"id":505,"libraryId":5,"type":40,"typeLabel":41,"stem":506,"options":507,"answer":28,"analysis":37},1141636,"对钢筋中的磷、硫含量，混凝土中粗集料中的活性氧化硅成分进行现场检查的方法是（ ）。",[508,509,510,512],{"key":20,"text":468,"correct":26},{"key":24,"text":466,"correct":26},{"key":28,"text":511,"correct":22},"理化试验",{"key":31,"text":513,"correct":26},"无损检测",{"id":515,"libraryId":5,"type":40,"typeLabel":41,"stem":516,"options":517,"answer":20,"analysis":37},1141637,"对于地基基础设计等级为甲级或地质条件复杂，成桩质量可靠性低的灌注桩，应采用（ ）的方法进行检验。检验桩数不应少于总数的1%，且不少于3根。",[518,519,520,521],{"key":20,"text":454,"correct":22},{"key":24,"text":456,"correct":26},{"key":28,"text":458,"correct":26},{"key":31,"text":460,"correct":26},{"id":523,"libraryId":5,"type":40,"typeLabel":41,"stem":524,"options":525,"answer":28,"analysis":37},1141638,"关于施工过程的作业质量控制的说法。正确的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"工序施工效果的控制属于事前质量控制",{"key":24,"text":529,"correct":26},"在施工阶段，施工承包方和监理方都是质量自控主体",{"key":28,"text":531,"correct":22},"工序质量控制包括作业者的自我控制和作业者外部的检查、监督",{"key":31,"text":533,"correct":26},"工序施工质量控制主要包括工序施工效果控制和纠正质量偏差",{"id":535,"libraryId":5,"type":40,"typeLabel":41,"stem":536,"options":537,"answer":31,"analysis":37},1141639,"下列现场质量检查方法中，属于无损检测方法的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"拖线板挂锤吊线检查",{"key":24,"text":541,"correct":26},"铁锤敲击检查",{"key":28,"text":543,"correct":26},"留置试块试验检查",{"key":31,"text":545,"correct":22},"超声波探伤检查",{"id":547,"libraryId":5,"type":40,"typeLabel":41,"stem":548,"options":549,"answer":28,"analysis":37},1141640,"对已完检验批及分部分项工程的施工质量，必须在施工单位完成质量自检并确认合格之后，才能报送（ ）进行检查验收。",[550,551,553,555],{"key":20,"text":129,"correct":26},{"key":24,"text":552,"correct":26},"政府主管部门",{"key":28,"text":554,"correct":22},"监理机构",{"key":31,"text":556,"correct":26},"项目管理部门",{"id":558,"libraryId":5,"type":40,"typeLabel":41,"stem":559,"options":560,"answer":24,"analysis":37},1141641,"检测同一强度条件养护的试块强度，按统计方法评定混凝土强度的基本条件是同一强度等级的同条件养护时间的留置数量（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":26},"不宜少于3组",{"key":24,"text":564,"correct":22},"不宜少于10组",{"key":28,"text":566,"correct":26},"不宜多于3组",{"key":31,"text":568,"correct":26},"不宜多于10组",{"id":570,"libraryId":5,"type":40,"typeLabel":41,"stem":571,"options":572,"answer":20,"analysis":37},1141642,"现场质量检查方法中，装饰吊顶内连接及设备安装质量的检查采用的方法是（ ）。",[573,574,575,577],{"key":20,"text":468,"correct":22},{"key":24,"text":466,"correct":26},{"key":28,"text":576,"correct":26},"无损检测法",{"key":31,"text":578,"correct":26},"理化试验法",{"id":580,"libraryId":5,"type":40,"typeLabel":41,"stem":581,"options":582,"answer":28,"analysis":37},1141643,"对防水层进行蓄水或淋水实验，体现了现场质量检查方法中的（ ）。",[583,584,585,586],{"key":20,"text":468,"correct":26},{"key":24,"text":466,"correct":26},{"key":28,"text":578,"correct":22},{"key":31,"text":576,"correct":26},{"id":588,"libraryId":5,"type":40,"typeLabel":41,"stem":589,"options":590,"answer":28,"analysis":37},1141644,"从建设工程项目的施工组织设计到（ ）的施工计划，在实施之前都必须进行对下逐级交底，其目的是使管理者的计划和决策意图为实施人员所理解。",[591,593,595,597],{"key":20,"text":592,"correct":26},"检验批",{"key":24,"text":594,"correct":26},"分部工程",{"key":28,"text":596,"correct":22},"分部分项工程",{"key":31,"text":598,"correct":26},"单位工程",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":612,"analysis":37},1141645,"在施工阶段依据法律和合同对自控主体的质量行为和效果实施监督控制的主体为（ ）。",[603,605,606,608,610],{"key":20,"text":604,"correct":26},"承包方",{"key":24,"text":401,"correct":22},{"key":28,"text":607,"correct":22},"监理单位",{"key":31,"text":609,"correct":22},"设计单位",{"key":34,"text":611,"correct":22},"政府的工程质量监督部门","BCDE",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":246,"analysis":37},1141646,"某建设工程项目采用施工总承包方式，其中的幕墙工程和设备安装工程分别进行了专业分包，对幕墙工程施工质量实施监督控制的主体有（ ）等。",[617,619,621,623,624],{"key":20,"text":618,"correct":22},"建设行政主管部门",{"key":24,"text":620,"correct":22},"幕墙设计单位",{"key":28,"text":622,"correct":26},"设备安装单位",{"key":31,"text":129,"correct":22},{"key":34,"text":625,"correct":26},"幕墙玻璃供应商",[627,630,633,636,639,642],{"id":40,"name":628,"category":7,"favorite":629},"领导干部任职前廉政法规知识测试题",92,{"id":631,"name":632,"category":7,"favorite":40},595,"建筑结构与设备",{"id":634,"name":635,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":637,"name":638,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":640,"name":641,"category":7,"favorite":8},534,"BIM工程师",{"id":643,"name":641,"category":7,"favorite":8},535]