[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,18,50,2721,[13,34,46,58,70,82,93,109,124,139,151,166,178,188,200,212,223,234,243,254,269,281,296,311,323,335,348,360,375,386,396,407,418,426,434,449,461,471,482,494,506,518,530,542,554,565,577,585,600,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1141370,1,"单选题","下列各项措施中，（ ）是建设工程项目进度控制的技术措施。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","确定各类进度计划的审批程序",false,{"key":24,"text":25,"correct":22},"B","选择工程承发包模式",{"key":27,"text":28,"correct":29},"C","优选项目设计、施工方案",true,{"key":31,"text":32,"correct":22},"D","选择合理的合同结构","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1141371,"下列措施中，属于进度控制的组织措施的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"进度控制会议的组织设计",{"key":24,"text":41,"correct":22},"利用网络方法编制工程进度计划",{"key":27,"text":43,"correct":22},"承发包模式的选择",{"key":31,"text":45,"correct":22},"更换施工机械",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1141372,"项目进度控制的主要工作环节中，首先应进行的工作是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"编制进度计划",{"key":24,"text":53,"correct":29},"分析和论证进度目标",{"key":27,"text":55,"correct":22},"定期跟踪进度计划的执行情况",{"key":31,"text":57,"correct":22},"采取纠偏措施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1141373,"在建设工程项目管理机构中，应有专门的工作部门和符合进度控制岗位资格的专人负责进度控制工作，这是进度控制中重要的（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"组织措施",{"key":24,"text":65,"correct":22},"合同措施",{"key":27,"text":67,"correct":22},"经济措施",{"key":31,"text":69,"correct":22},"技术措施",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1141374,"建设工程项目进度控制工作包括：①编制进度计划；②调整进度计划；③进度目标的分析和论证；④跟踪检查计划的执行情况。其正确的工作程序是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"①-②-③-④",{"key":24,"text":77,"correct":22},"③-①-②-④",{"key":27,"text":79,"correct":29},"③-①-④-②",{"key":31,"text":81,"correct":22},"④-②-③-①",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1141375,"建设工程项目进度控制的主要工作环节不包括（ ）。",[86,88,89,91],{"key":20,"text":87,"correct":22},"进度目标的分析和论证",{"key":24,"text":57,"correct":22},{"key":27,"text":90,"correct":22},"调整进度计划",{"key":31,"text":92,"correct":29},"评审设计方案",{"id":94,"libraryId":5,"type":95,"typeLabel":96,"stem":97,"options":98,"answer":108,"analysis":33},1141376,2,"多选题","建设工程项目进度控制的主要工作环节包括（ ）。",[99,101,103,105,106],{"key":20,"text":100,"correct":29},"分析论证进度目标",{"key":24,"text":102,"correct":29},"跟踪检查进度计划执行情况",{"key":27,"text":104,"correct":22},"确定进度目标",{"key":31,"text":51,"correct":29},{"key":107,"text":57,"correct":29},"E","ABDE",{"id":110,"libraryId":5,"type":95,"typeLabel":96,"stem":111,"options":112,"answer":123,"analysis":33},1141377,"下列进度控制的措施中，属于组织措施的有（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"选择承发包模式",{"key":24,"text":116,"correct":22},"进行工程进度的风险分析",{"key":27,"text":118,"correct":22},"落实资金供应的条件",{"key":31,"text":120,"correct":29},"编制项目进度控制的工作流程",{"key":107,"text":122,"correct":29},"进行有关进度控制会议的组织设计","DE",{"id":125,"libraryId":5,"type":95,"typeLabel":96,"stem":126,"options":127,"answer":138,"analysis":33},1141378,"关于建设工程项目进度控制措施的说法，正确的有（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":29},"各类进度计划的编制程序、审批程序属于组织措施的范畴",{"key":24,"text":131,"correct":29},"管理措施主要涉及管理的思想、方法和承发包模式",{"key":27,"text":133,"correct":29},"风险管理属于进度控制管理措施的范畴",{"key":31,"text":135,"correct":29},"应用信息技术属于进度控制管理措施的范畴",{"key":107,"text":137,"correct":22},"在工程进度受阻时，应首先对有无设计变更的可能性进行分析","ABCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},1141379,"下列进度控制措施中，属于组织措施的是（ ）。2014",[143,145,147,149],{"key":20,"text":144,"correct":22},"编制工程网络进度计划",{"key":24,"text":146,"correct":22},"编制资源需求计划",{"key":27,"text":148,"correct":22},"编制先进完整的施工方案",{"key":31,"text":150,"correct":29},"编制进度控制的工作流程",{"id":152,"libraryId":5,"type":95,"typeLabel":96,"stem":153,"options":154,"answer":165,"analysis":33},1141381,"项目进度控制时，进度控制会议的组织设计的内容有（ ）。2014",[155,157,159,161,163],{"key":20,"text":156,"correct":22},"会议的具体流程",{"key":24,"text":158,"correct":29},"会议的类型",{"key":27,"text":160,"correct":29},"会议的主持人",{"key":31,"text":162,"correct":29},"会议的召开时间",{"key":107,"text":164,"correct":29},"会议文件的整理","BCDE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1141382,"建设工程项目进度控制在管理观念方面不存在的问题是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"缺乏动态控制的观念",{"key":24,"text":173,"correct":22},"缺乏进度计划多方案比较和选优的观念",{"key":27,"text":175,"correct":22},"缺乏进度计划系统的观念",{"key":31,"text":177,"correct":29},"缺乏组织管理的观念",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1141383,"建设工程项目进度控制中的管理措施不包括（ ）。",[182,184,185,187],{"key":20,"text":183,"correct":22},"重视信息技术的应用",{"key":24,"text":114,"correct":22},{"key":27,"text":186,"correct":22},"用工程网络计划的方法编制进度计划",{"key":31,"text":120,"correct":29},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1141384,"下列进度控制措施中，属于管理措施的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"建立进度控制的会议制度",{"key":24,"text":195,"correct":29},"分析影响项目工程进度的风险",{"key":27,"text":197,"correct":22},"制定项目进度控制的工作流程",{"key":31,"text":199,"correct":22},"选用有利的设计和施工技术",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1141385,"建设工程项目进度控制措施中，采用信息技术辅助进度控制属于进度控制的（ ）措施。",[204,206,208,210],{"key":20,"text":205,"correct":22},"经济",{"key":24,"text":207,"correct":22},"技术",{"key":27,"text":209,"correct":22},"组织",{"key":31,"text":211,"correct":29},"管理",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1141386,"下列措施中，属于进度控制的管理措施的是（ ）。",[216,218,220,221],{"key":20,"text":217,"correct":22},"调整进度控制任务分工表",{"key":24,"text":219,"correct":22},"进行进度控制会议的组织设计",{"key":27,"text":114,"correct":29},{"key":31,"text":222,"correct":22},"改进施工方法",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1141387,"常见的影响工程进度的风险不包括（ ）风险。",[227,228,230,232],{"key":20,"text":209,"correct":22},{"key":24,"text":229,"correct":29},"资金时间",{"key":27,"text":231,"correct":22},"资源",{"key":31,"text":233,"correct":22},"合同",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1141388,"为了实现项目的进度目标，应选择合理的合同结构，以避免过多的合同交界面而影响工程的进展。这属于进度控制的（ ）。",[238,239,240,241],{"key":20,"text":63,"correct":22},{"key":24,"text":67,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":242,"correct":29},"管理措施",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},1141389,"在建设工程项目进度控制的管理措施中，直接关系到工程实施的组织和协调的是（ ）。",[247,249,250,252],{"key":20,"text":248,"correct":22},"管理方法的选择",{"key":24,"text":43,"correct":29},{"key":27,"text":251,"correct":22},"合同类型的选择",{"key":31,"text":253,"correct":22},"信息管理的应用",{"id":255,"libraryId":5,"type":95,"typeLabel":96,"stem":256,"options":257,"answer":268,"analysis":33},1141390,"为顺利地实施建设工程项目的进度控制，项目管理者应当强化（ ）的管理理念。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"与供方互利",{"key":24,"text":261,"correct":29},"系统方法",{"key":27,"text":263,"correct":29},"动态控制",{"key":31,"text":265,"correct":29},"多方案比选",{"key":107,"text":267,"correct":22},"以顾客为关注焦点","BCD",{"id":270,"libraryId":5,"type":95,"typeLabel":96,"stem":271,"options":272,"answer":280,"analysis":33},1141391,"建设工程项目进度控制在管理观念方面存在的主要问题是（ ）。",[273,274,275,276,278],{"key":20,"text":175,"correct":29},{"key":24,"text":171,"correct":29},{"key":27,"text":173,"correct":29},{"key":31,"text":277,"correct":22},"缺乏进度计划系统化的观念",{"key":107,"text":279,"correct":22},"缺乏进度计划现代化的观念","ABC",{"id":282,"libraryId":5,"type":95,"typeLabel":96,"stem":283,"options":284,"answer":295,"analysis":33},1141392,"下列建设工程项目进度控制措施中，属于管理措施的有（ ）。( 2015真题 )",[285,287,289,291,293],{"key":20,"text":286,"correct":29},"选择合同结构",{"key":24,"text":288,"correct":29},"分析工程风险",{"key":27,"text":290,"correct":22},"建立管理组织体系",{"key":31,"text":292,"correct":29},"确定物资采购模式",{"key":107,"text":294,"correct":22},"明确管理职能","ABD",{"id":297,"libraryId":5,"type":95,"typeLabel":96,"stem":298,"options":299,"answer":310,"analysis":33},1141393,"关于建设工程项目进度控制措施的说法，正确的有（ ） 2016",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"对于工程项目的进度开展风险管理属于经济措施",{"key":24,"text":303,"correct":29},"各类进度计划的编制、审批程序属于组织措施",{"key":27,"text":305,"correct":22},"进度控制会议的组织设计属于技术措施",{"key":31,"text":307,"correct":29},"进度控制的管理措施涉及管理的思想、方法、和手段、承发包模式等",{"key":107,"text":309,"correct":29},"应用信息技术进行进度控制属于管理措施","BDE",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},1141396,"为确保工程项目进度目标的实现，应编制与进度计划相适应的资源需求计划，发现资源条件不具备，则应调整（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"进度目标",{"key":24,"text":318,"correct":22},"资源计划",{"key":27,"text":320,"correct":22},"资金计划",{"key":31,"text":322,"correct":29},"进度计划",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":20,"analysis":33},1141397,"为实现进度目标而采取的经济激励措施所需要的费用，应在（ ）中考虑加快工程进度所需要的资金。",[327,329,331,333],{"key":20,"text":328,"correct":29},"工程预算",{"key":24,"text":330,"correct":22},"投标报价",{"key":27,"text":332,"correct":22},"投资估算",{"key":31,"text":334,"correct":22},"工程概算",{"id":336,"libraryId":5,"type":95,"typeLabel":96,"stem":337,"options":338,"answer":280,"analysis":33},1141398,"下列建设工程项目进度控制措施中，属于经济措施的有（ ）。",[339,340,342,344,346],{"key":20,"text":146,"correct":29},{"key":24,"text":341,"correct":29},"明确资金供应条件",{"key":27,"text":343,"correct":29},"落实经济激励措施",{"key":31,"text":345,"correct":22},"审核设计预算",{"key":107,"text":347,"correct":22},"应用价值工程方法",{"id":349,"libraryId":5,"type":95,"typeLabel":96,"stem":350,"options":351,"answer":359,"analysis":33},1141399,"建设工程项目进度控制的经济措施包括（ ）。",[352,353,355,357,358],{"key":20,"text":120,"correct":22},{"key":24,"text":354,"correct":29},"经济激励措施",{"key":27,"text":356,"correct":29},"资金需求分析",{"key":31,"text":43,"correct":22},{"key":107,"text":122,"correct":22},"BC",{"id":361,"libraryId":5,"type":95,"typeLabel":96,"stem":362,"options":363,"answer":374,"analysis":33},1141400,"下列进度控制措施中，属于经济措施的有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"编制进度控制工作流程",{"key":24,"text":367,"correct":22},"选用恰当的承发包形式",{"key":27,"text":369,"correct":29},"按时支付工程款项",{"key":31,"text":371,"correct":29},"设立提前完工奖",{"key":107,"text":373,"correct":29},"拖延完工予以处罚","CDE",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1141401,"下列建设工程项目进度控制的措施中，属于经济措施的是（ ）。 2016",[379,381,383,384],{"key":20,"text":380,"correct":29},"落实资金供应条件",{"key":24,"text":382,"correct":22},"选择发承包模式",{"key":27,"text":116,"correct":22},{"key":31,"text":385,"correct":22},"优选工程项目的设计、施工方案",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1141404,"下列建设工程项目进度控制的措施中，属于技术措施的是（ ）。",[390,392,393,394],{"key":20,"text":391,"correct":29},"优选工程项目施工方案",{"key":24,"text":21,"correct":22},{"key":27,"text":32,"correct":22},{"key":31,"text":395,"correct":22},"选择工程承包发包模式",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":27,"analysis":33},1141405,"下列为加快进度而采取的各项措施中，属于技术措施的是（ ）。",[400,401,403,405],{"key":20,"text":365,"correct":22},{"key":24,"text":402,"correct":22},"实行班组内部承包制",{"key":27,"text":404,"correct":29},"用大模板代替小钢模",{"key":31,"text":406,"correct":22},"重视计算机软件的应用",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1141406,"建设工程项目进度控制的技术措施是（ ）。",[411,412,414,416],{"key":20,"text":25,"correct":22},{"key":24,"text":413,"correct":29},"调整施工方法",{"key":27,"text":415,"correct":22},"设立进度控制工作部门",{"key":31,"text":417,"correct":22},"编制工程风险应急计划",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":420,"answer":24,"analysis":33},1141407,[421,422,424,425],{"key":20,"text":21,"correct":22},{"key":24,"text":423,"correct":29},"优选工程项目设计、施工方案",{"key":27,"text":32,"correct":22},{"key":31,"text":25,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1141408,"为赶上已拖延的施工进度，项目部决定采用混凝土泵代替原来的塔吊运输混凝土。该纠偏措施属于（ ）。( 2015真题 )",[430,431,432,433],{"key":20,"text":242,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":29},{"id":435,"libraryId":5,"type":95,"typeLabel":96,"stem":436,"options":437,"answer":448,"analysis":33},1141409,"下列建设工程项目进度控制措施中，属于技术措施的有（）。2018真题",[438,440,442,444,446],{"key":20,"text":439,"correct":29},"深化设计，选用对实现目标有利的设计方案",{"key":24,"text":441,"correct":22},"建立图纸审查、工程变更管理制度",{"key":27,"text":443,"correct":22},"编制与进度计划相适应的资金保证计划",{"key":31,"text":445,"correct":29},"优化施工方案，合理选用机械设备",{"key":107,"text":447,"correct":22},"优化工作之间的逻辑关系，缩短持续时间","AD",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":27,"analysis":33},1141410,"下列建设工程项目进度控制的措施中，属于经济措施的是（）。2018真题",[453,455,457,459],{"key":20,"text":454,"correct":22},"重视信息技术在进度控制中的应用",{"key":24,"text":456,"correct":22},"分析设计方案对工程进度的影响，优化设计方案",{"key":27,"text":458,"correct":29},"编制与进度计划相适应的资源需求计划",{"key":31,"text":460,"correct":22},"分析影响工程进度的风险，减少进度失控的风险量",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1141412,"影响建设工程项目质量的管理因素主要是决策因素和（ ）因素。",[465,466,468,470],{"key":20,"text":209,"correct":29},{"key":24,"text":467,"correct":22},"设计",{"key":27,"text":469,"correct":22},"实施",{"key":31,"text":207,"correct":22},{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},1141413,"在建设工程项目质量的形成过程中，应在建设项目的（ ）阶段完成质量需求的识别。",[475,476,478,480],{"key":20,"text":467,"correct":22},{"key":24,"text":477,"correct":22},"竣工验收",{"key":27,"text":479,"correct":29},"决策",{"key":31,"text":481,"correct":22},"施工",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":27,"analysis":33},1141414,"建设工程项目质量的影响因素中，对于建设工程项目管理者而言不可控的是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"环境因素",{"key":24,"text":489,"correct":22},"管理因素",{"key":27,"text":491,"correct":29},"社会因素",{"key":31,"text":493,"correct":22},"人的因素",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1141415,"建设工程项目质量的形成过程体现了建设工程项目质量（ ）的系统过程。",[498,500,502,504],{"key":20,"text":499,"correct":29},"从目标决策，目标细化到目标实现",{"key":24,"text":501,"correct":22},"从目标定义，目标决策到目标实现",{"key":27,"text":503,"correct":22},"从目标决策，目标细化到目标检验",{"key":31,"text":505,"correct":22},"从目标定义，目标细化到目标检验",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},1141416,"建筑产品不仅要满足使用功能和用途的要求，而且在正常的使用条件下应能达到安全可靠的标准，这体现了（ ）的质量特性。",[510,512,514,516],{"key":20,"text":511,"correct":22},"使用功能",{"key":24,"text":513,"correct":22},"文化艺术",{"key":27,"text":515,"correct":29},"安全可靠",{"key":31,"text":517,"correct":22},"建筑环境",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":27,"analysis":33},1141417,"下列影响建设工程项目质量的因素中，属于管理因素的是（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"人的因素和技术因素",{"key":24,"text":525,"correct":22},"人的因素和环境因素",{"key":27,"text":527,"correct":29},"决策因素和组织因素",{"key":31,"text":529,"correct":22},"技术因素和决策因素",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},1141418,"某项目采用工程项目总承包的发包模式，则该项目质量目标的决策者是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":29},"建设单位",{"key":24,"text":537,"correct":22},"工程项目总承包单位",{"key":27,"text":539,"correct":22},"政府质量监督部门",{"key":31,"text":541,"correct":22},"监理单位",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},1141419,"建设工程项目质量目标的决定依据是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"建筑工程的性质",{"key":24,"text":549,"correct":22},"业主的需求和施工单位的资质条件",{"key":27,"text":551,"correct":22},"建设工程项目各参与方的情况",{"key":31,"text":553,"correct":29},"业主的需求和法律法规的要求",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},1141420,"建设工程项目质量的形成过程，体现了从目标决策，目标细化到目标实现的系统过程，而质量目标的决策是（ ）的职能。",[558,559,561,563],{"key":20,"text":535,"correct":29},{"key":24,"text":560,"correct":22},"设计单位",{"key":27,"text":562,"correct":22},"项目管理咨询单位",{"key":31,"text":564,"correct":22},"建设项目工程总承包单位",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1141421,"建设工程项目质量控制系统是面向建设工程项目而建立的质量控制系统，该系统（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"与建筑施工企业质量管理体系的目的相同",{"key":24,"text":572,"correct":22},"必须通过第三方认证机构的认证",{"key":27,"text":574,"correct":22},"必须通过监理单位的审核批准",{"key":31,"text":576,"correct":29},"涉及工程项目实施中所有的质量责任主体",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1141422,"房屋建筑的平面空间布局、通风采光性能反映建设工程项目（ ）的质量特性。",[581,582,583,584],{"key":20,"text":511,"correct":29},{"key":24,"text":515,"correct":22},{"key":27,"text":513,"correct":22},{"key":31,"text":517,"correct":22},{"id":586,"libraryId":5,"type":95,"typeLabel":96,"stem":587,"options":588,"answer":599,"analysis":33},1141423,"决定建设工程项目质量目标的主要依据是（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"监理单位的要求",{"key":24,"text":592,"correct":29},"法律法规的要求",{"key":27,"text":594,"correct":22},"总承包企业的规划",{"key":31,"text":596,"correct":29},"业主的需求",{"key":107,"text":598,"correct":22},"设计单位的需求","BD",{"id":601,"libraryId":5,"type":95,"typeLabel":96,"stem":602,"options":603,"answer":108,"analysis":33},1141424,"下列影响建设工程项目质量的因素中，属于可控因素的有（ ）。",[604,605,607,608,609],{"key":20,"text":493,"correct":29},{"key":24,"text":606,"correct":29},"技术因素",{"key":27,"text":491,"correct":22},{"key":31,"text":489,"correct":29},{"key":107,"text":487,"correct":29},{"id":611,"libraryId":5,"type":95,"typeLabel":96,"stem":612,"options":613,"answer":622,"analysis":33},1141425,"在影响建设工程项目质量的因素中，属于项目管理者可控因素的有（ ）等。",[614,616,617,618,620],{"key":20,"text":615,"correct":29},"人",{"key":24,"text":207,"correct":29},{"key":27,"text":211,"correct":29},{"key":31,"text":619,"correct":22},"社会",{"key":107,"text":621,"correct":29},"环境","ABCE",[624,627,630,633,636,639],{"id":15,"name":625,"category":7,"favorite":626},"领导干部任职前廉政法规知识测试题",92,{"id":628,"name":629,"category":7,"favorite":15},595,"建筑结构与设备",{"id":631,"name":632,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":634,"name":635,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":637,"name":638,"category":7,"favorite":8},534,"BIM工程师",{"id":640,"name":638,"category":7,"favorite":8},535]