[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":643},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,17,50,2721,[13,34,52,64,75,83,95,107,119,127,134,142,153,161,176,191,206,221,236,249,261,276,291,304,312,324,336,348,360,371,386,401,415,429,444,455,469,481,495,510,525,539,551,563,574,586,598,606,618,632],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1141312,1,"单选题","（2019年真题）某工程网络计划图如下，工作D的最迟开始时间是第（）天。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","3",false,{"key":24,"text":25,"correct":22},"B","5",{"key":27,"text":28,"correct":22},"C","6",{"key":30,"text":31,"correct":32},"D","8",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1141317,2,"多选题","（2020年真题）某双代号网络计划如下图，关于工作时间参数的说法，正确的有（ ）",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"工作B的最迟完成时间是第8天",{"key":24,"text":43,"correct":22},"工作C的最迟开始时间是第7天",{"key":27,"text":45,"correct":22},"工作F的自由时差是1天",{"key":30,"text":47,"correct":32},"工作G的总时差是2天",{"key":49,"text":50,"correct":22},"E","工作H的最早开始时间是第13天","AD",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":30,"analysis":33},1141318,"下图所示双代号网络计划的关键路线为（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":22},"①-⑧",{"key":24,"text":59,"correct":22},"①-②-⑥-⑧",{"key":27,"text":61,"correct":22},"①-③-⑦-⑧",{"key":30,"text":63,"correct":32},"①-④-⑤-⑦-⑧",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},1141319,"某分部工程单代号网络计划如下图所示，节点中下方的数字为该工作的持续时间，单位：天。其关键线路有（ ）条。",[68,70,72,73],{"key":20,"text":69,"correct":22},"1",{"key":24,"text":71,"correct":32},"2",{"key":27,"text":21,"correct":22},{"key":30,"text":74,"correct":22},"4",{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":27,"analysis":33},1141321,"某双代号网络计划如下图所示，其关键线路有（ ）条。",[79,80,81,82],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":22},{"key":27,"text":21,"correct":32},{"key":30,"text":74,"correct":22},{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":20,"analysis":33},1141322,"在工程网络计划中，关键线路是指（ ）。",[87,89,91,93],{"key":20,"text":88,"correct":32},"单代号网络计划中总的工作持续时间最长的线路",{"key":24,"text":90,"correct":22},"双代号网络计划中由关键节点组成的线路",{"key":27,"text":92,"correct":22},"一个网络计划只有一条关键线路",{"key":30,"text":94,"correct":22},"双代号时标网络计划中无虚箭线的线路",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":20,"analysis":33},1141323,"在双代号网络计划中，关键工作是指（ ）的工作。",[99,101,103,105],{"key":20,"text":100,"correct":32},"最迟完成时间与最早完成时间之差最小",{"key":24,"text":102,"correct":22},"持续时间最长",{"key":27,"text":104,"correct":22},"两端节点均为关键节点",{"key":30,"text":106,"correct":22},"自由时差最小",{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":30,"analysis":33},1141325,"下列关于关键工作的说明中，正确的有（ ）。",[111,113,115,117],{"key":20,"text":112,"correct":22},"总时差为0的工作是关键工作",{"key":24,"text":114,"correct":22},"双代号网络图中，两端节点为关键节点的工作是关键工作",{"key":27,"text":116,"correct":22},"持续时间最长的工作是关键工作",{"key":30,"text":118,"correct":32},"关键工作的时差可以为负值",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":24,"analysis":33},1141326,"某工程双代号网络计划如下图所示，其关键线路有（ ）条。",[123,124,125,126],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":32},{"key":27,"text":21,"correct":22},{"key":30,"text":74,"correct":22},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":129,"answer":27,"analysis":33},1141327,[130,131,132,133],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":22},{"key":27,"text":21,"correct":32},{"key":30,"text":74,"correct":22},{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":30,"analysis":33},1141328,"某工程双代号网络计划如下图所示，其中关键线路共有（ ）条。",[138,139,140,141],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":22},{"key":27,"text":21,"correct":22},{"key":30,"text":74,"correct":32},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1141329,"工程网络计划中的关键工作是指（ ）的工作。",[146,147,149,151],{"key":20,"text":106,"correct":22},{"key":24,"text":148,"correct":32},"总时差最小",{"key":27,"text":150,"correct":22},"工作持续时间最长",{"key":30,"text":152,"correct":22},"时距为零",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1141330,"某工程双代号网络计划图如下：其中关键线路有（ ）条。",[157,158,159,160],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":32},{"key":27,"text":21,"correct":22},{"key":30,"text":74,"correct":22},{"id":162,"libraryId":5,"type":36,"typeLabel":37,"stem":163,"options":164,"answer":175,"analysis":33},1141332,"在工程网络计划中，当计划工期等于计算工期时，关键工作的判定（ ）。",[165,167,169,171,173],{"key":20,"text":166,"correct":32},"该工作的总时差为零",{"key":24,"text":168,"correct":22},"该工作与其紧后工作之间的时间间隔为零",{"key":27,"text":170,"correct":32},"该工作的最早开始时间与最迟开始时间相等",{"key":30,"text":172,"correct":22},"该工作的自由时差最小",{"key":49,"text":174,"correct":22},"该工作的持续时间最长","AC",{"id":177,"libraryId":5,"type":36,"typeLabel":37,"stem":178,"options":179,"answer":190,"analysis":33},1141333,"在工程网络计划中，关键工作是指（ ）的工作。",[180,182,184,186,188],{"key":20,"text":181,"correct":22},"双代号网络计划中持续时间最长",{"key":24,"text":183,"correct":22},"单代号网络计划中与紧后工作之间时间间隔为零",{"key":27,"text":185,"correct":32},"最迟完成时间与最早完成时间的差值最小",{"key":30,"text":187,"correct":32},"最迟开始时间与最早开始时间的差值最小",{"key":49,"text":189,"correct":22},"双代号时标网络计划中无波形线","CD",{"id":192,"libraryId":5,"type":36,"typeLabel":37,"stem":193,"options":194,"answer":205,"analysis":33},1141334,"下列关于网络图的关键线路的说明，正确的是（ ）。",[195,197,199,201,203],{"key":20,"text":196,"correct":22},"由关键工作组成的线路是关键线路",{"key":24,"text":198,"correct":32},"在所有的网络中，关键线路肯定是持续时间最长的线路",{"key":27,"text":200,"correct":22},"网络的关键路线只能有一条",{"key":30,"text":202,"correct":32},"在网络计划的执行过程中，关键路线可能发生转移",{"key":49,"text":204,"correct":22},"关键线路上的工作持续时间最长","BD",{"id":207,"libraryId":5,"type":36,"typeLabel":37,"stem":208,"options":209,"answer":220,"analysis":33},1141335,"某分部工程双代号网络计划如下图所示，提供的正确信息有（ ）。",[210,212,214,216,218],{"key":20,"text":211,"correct":22},"工作B为关键工作",{"key":24,"text":213,"correct":22},"工作D的自由时差为4",{"key":27,"text":215,"correct":32},"工作F为关键工作",{"key":30,"text":217,"correct":22},"工作E为非关键工作",{"key":49,"text":219,"correct":32},"工作M、H为非关键工作","CE",{"id":222,"libraryId":5,"type":36,"typeLabel":37,"stem":223,"options":224,"answer":235,"analysis":33},1141336,"关于双代号工程网络计划说法，正确的有（ ）。",[225,227,229,231,233],{"key":20,"text":226,"correct":32},"总时差最小的工作为关键工作",{"key":24,"text":228,"correct":32},"网络计划中以终点节点为完成节点的工作，其自由时差和总时差相等",{"key":27,"text":230,"correct":22},"关键线路上允许有虚箭线和波形线的存在",{"key":30,"text":232,"correct":22},"每项工作的自由时差为零，其总时差必为零",{"key":49,"text":234,"correct":32},"除了以网络计划终点为完成节点的工作，其他工作的最迟完成时间应等于其紧后工作最迟开始时间的最小值","ABE",{"id":237,"libraryId":5,"type":36,"typeLabel":37,"stem":238,"options":239,"answer":175,"analysis":33},1141337,"在工程网络计划中，关键线路是指（ ）的线路。",[240,242,244,245,247],{"key":20,"text":241,"correct":32},"单代号网络计划中相邻工作之间时间间隔全部为零",{"key":24,"text":243,"correct":22},"双代号网络计划中由关键节点组成",{"key":27,"text":189,"correct":32},{"key":30,"text":246,"correct":22},"双代号时标网络计划中无虚箭线",{"key":49,"text":248,"correct":22},"单代号搭接网络计划中相邻工作之间时距之和最大",{"id":250,"libraryId":5,"type":36,"typeLabel":37,"stem":251,"options":252,"answer":260,"analysis":33},1141338,"在工程网络计划中，关键工作是（ ）的工作。",[253,254,256,257,259],{"key":20,"text":148,"correct":32},{"key":24,"text":255,"correct":32},"关键线路上",{"key":27,"text":102,"correct":22},{"key":30,"text":258,"correct":22},"自由时差为零",{"key":49,"text":152,"correct":22},"AB",{"id":262,"libraryId":5,"type":36,"typeLabel":37,"stem":263,"options":264,"answer":275,"analysis":33},1141339,"关于关键线路和关键工作的说法，正确的有（ ）。",[265,267,269,271,273],{"key":20,"text":266,"correct":22},"关键线路上相邻工作的时间间隔为零",{"key":24,"text":268,"correct":32},"关键线路上各工作持续时间之和最长",{"key":27,"text":270,"correct":32},"关键线路可能有多条",{"key":30,"text":272,"correct":22},"关键工作的总时差一定为零",{"key":49,"text":274,"correct":22},"关键工作的最早开始时间等于最迟开始时间","BC",{"id":277,"libraryId":5,"type":36,"typeLabel":37,"stem":278,"options":279,"answer":290,"analysis":33},1141340,"下列关于网络图的关键线路的说明，正确的有（ ）。",[280,282,284,286,288],{"key":20,"text":281,"correct":32},"双代号时标网络图中持续时间最长的线路是关键线路",{"key":24,"text":283,"correct":22},"单代号网络图中所有工作的时间间隔之和最大的线路是关键线路",{"key":27,"text":285,"correct":32},"双代号时标网络图中没有波形线的线路是关键线路",{"key":30,"text":287,"correct":32},"网络图的关键路线可能不止一条",{"key":49,"text":289,"correct":22},"关键路线在项目进行过程中不能改变","ACD",{"id":292,"libraryId":5,"type":36,"typeLabel":37,"stem":293,"options":294,"answer":220,"analysis":33},1141341,"关于判别网络计划关键线路的说法，正确的有（ ）。 2016",[295,297,299,301,302],{"key":20,"text":296,"correct":22},"相邻两工作间的间隔时间均为零的线路",{"key":24,"text":298,"correct":22},"双代号网络计划中无虚箭线的线路",{"key":27,"text":300,"correct":32},"总持续时间最长的线路",{"key":30,"text":90,"correct":22},{"key":49,"text":303,"correct":32},"时标网络计划中无波形线的线路",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":30,"analysis":33},1141342,"某双代号网络计划如下图(时间单位：天)，其关键线路有（ ）条。 2016",[308,309,310,311],{"key":20,"text":71,"correct":22},{"key":24,"text":21,"correct":22},{"key":27,"text":25,"correct":22},{"key":30,"text":74,"correct":32},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1141343,"关于关键工作和关键线路的说法正确的是（ ）。2014",[316,318,320,322],{"key":20,"text":317,"correct":32},"关键线路上的工作全部是关键工作",{"key":24,"text":319,"correct":22},"关键工作不能在非关键线路上",{"key":27,"text":321,"correct":22},"关键线路上不允许出现虚工作",{"key":30,"text":323,"correct":22},"关键线路上的工作总时差均为零",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1141344,"关于进度调整的说法，正确的是（ ）",[328,330,332,334],{"key":20,"text":329,"correct":32},"根据计划检查的结果在必要时进行计划的调整",{"key":24,"text":331,"correct":22},"网络计划中某项工作进度超前，不需要进行计划的调整",{"key":27,"text":333,"correct":22},"非关键线路上的工作不需要进行调整",{"key":30,"text":335,"correct":22},"当某项工作实际进度拖延的时间超过其总时差时，只需要考虑总工期的限制",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":33},1141345,"当工程网络计划中某项工作的实际进度偏差影响到总工期而需要通过缩短某些工作的持续时间调整进度计划时，这些工作是指（ ）的可被压缩的工作。",[340,342,344,346],{"key":20,"text":341,"correct":32},"关键线路和超过计划工期的非关键线路上",{"key":24,"text":343,"correct":22},"关键线路上资源消耗量比较少",{"key":27,"text":345,"correct":22},"关键线路上持续时间比较长",{"key":30,"text":347,"correct":22},"施工工艺及采用技术比较简单",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1141346,"当关键线路的实际速度比计划进度拖后时，应在尚未完成的关键工作中，选择（ ）的工作，压缩其作业持续时间。",[352,354,356,358],{"key":20,"text":353,"correct":32},"资源强度小或费用低",{"key":24,"text":355,"correct":22},"资源强度小且持续时间短",{"key":27,"text":357,"correct":22},"资源强度大或持续时间短",{"key":30,"text":359,"correct":22},"资源强度大且费用高",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1141347,"当关键线路的实际进度比计划进度拖后时，应在尚未完成的关键工作中，选择（ ）的工作缩短其持续时间，并重新计算未完成部分的时间参数，将其作为一个新计划实施。",[364,365,367,369],{"key":20,"text":353,"correct":32},{"key":24,"text":366,"correct":22},"直接费用高",{"key":27,"text":368,"correct":22},"资源占用量大",{"key":30,"text":370,"correct":22},"工作时间长",{"id":372,"libraryId":5,"type":36,"typeLabel":37,"stem":373,"options":374,"answer":385,"analysis":33},1141348,"网络计划调整的内容包括（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"调整逻辑关系",{"key":24,"text":378,"correct":32},"重新估计某些工作的持续时间",{"key":27,"text":380,"correct":22},"调整关键工作时差",{"key":30,"text":382,"correct":32},"调整关键线路的长度",{"key":49,"text":384,"correct":32},"增、减工作项目","ABDE",{"id":387,"libraryId":5,"type":36,"typeLabel":37,"stem":388,"options":389,"answer":400,"analysis":33},1141349,"下图所示的双代号时标网络计划，执行到第4周末及第10周末时，检查其实际进度如，图中前锋线所示，检查结果表明（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":32},"第4周末检查时工作A拖后1周，影响工期1周",{"key":24,"text":393,"correct":22},"第4周末检查时工作B拖后1周，但不影响工期",{"key":27,"text":395,"correct":22},"第10周末检查时工作I提前一周，可使工期提前1周",{"key":30,"text":397,"correct":22},"在第5周到第10周内，工作F和工作I的实际进度正常",{"key":49,"text":399,"correct":32},"第10周末检查时工作G拖后1周，但不影响工期","AE",{"id":402,"libraryId":5,"type":36,"typeLabel":37,"stem":403,"options":404,"answer":290,"analysis":33},1141350,"当计算工期超过计划工期时，可压缩关键工作的持续时间以满足要求。在确定缩短持续时间的关键工作时，宜选择（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":32},"缩短持续时间而不影响质量和安全的工作",{"key":24,"text":408,"correct":22},"有多项紧前工作的工作",{"key":27,"text":410,"correct":32},"有充足备用资源的工作",{"key":30,"text":412,"correct":32},"缩短持续时间所增加的费用相对较少的工作",{"key":49,"text":414,"correct":22},"单位时间消耗资源量大的工作",{"id":416,"libraryId":5,"type":36,"typeLabel":37,"stem":417,"options":418,"answer":385,"analysis":33},1141351,"当工程施工的实际进度与计划进度不符时，需要对网络计划做出调整，调整的内容有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":32},"调整关键路线的长度",{"key":24,"text":422,"correct":32},"调整非关键工作时差",{"key":27,"text":424,"correct":22},"调整组织结构",{"key":30,"text":426,"correct":32},"增减工作项目",{"key":49,"text":428,"correct":32},"调整资源的收入",{"id":430,"libraryId":5,"type":36,"typeLabel":37,"stem":431,"options":432,"answer":443,"analysis":33},1141352,"非关键工作时差可采用的调整方法有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":32},"延长工作的持续时间",{"key":24,"text":436,"correct":32},"将工作在其最早开始时间与最迟完成时间范围内移动",{"key":27,"text":438,"correct":32},"缩短工作的持续时间",{"key":30,"text":440,"correct":22},"选择资源强度小或费用低的工作缩短其持续时间",{"key":49,"text":442,"correct":22},"选择资源占用量大的工作延长其持续时间","ABC",{"id":445,"libraryId":5,"type":36,"typeLabel":37,"stem":446,"options":447,"answer":443,"analysis":33},1141353,"非关键工作时差的调整应在其时差的范围内进行，以便更充分地利用资源、降低成本或满足施工的需要。每一次调整后都必须重新计算时间参数，观察该调整对计划全局的影响。可采用的调整方法有（ ）。",[448,449,450,451,453],{"key":20,"text":436,"correct":32},{"key":24,"text":434,"correct":32},{"key":27,"text":438,"correct":32},{"key":30,"text":452,"correct":22},"不打乱原网络计划总的逻辑关系，只对局部逻辑关系进行调整",{"key":49,"text":454,"correct":22},"在增减工作后应重新计算时间参数，分析对原网络计划的影响",{"id":456,"libraryId":5,"type":36,"typeLabel":37,"stem":457,"options":458,"answer":235,"analysis":33},1141354,"调整工程网络计划时，调整内容一般包括（ ）。",[459,461,463,465,467],{"key":20,"text":460,"correct":32},"非关键工作时差",{"key":24,"text":462,"correct":32},"关键线路长度",{"key":27,"text":464,"correct":22},"工作组织关系",{"key":30,"text":466,"correct":22},"工作工艺工程",{"key":49,"text":468,"correct":32},"工作持续时间",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1141355,"关于施工进度计划调整的说法，正确的是（ ）。( 2015真题 )",[473,475,477,479],{"key":20,"text":474,"correct":22},"当资源供应发生异常时，可调整工作的工艺关系",{"key":24,"text":476,"correct":32},"当实际进度计划拖后时，可缩短关键工作持续时间",{"key":27,"text":478,"correct":22},"为充分利用资源、降低成本，应减少资源的投入",{"key":30,"text":480,"correct":22},"任何情况下均不允许增减工作项目",{"id":482,"libraryId":5,"type":36,"typeLabel":37,"stem":483,"options":484,"answer":494,"analysis":33},1141356,"网络进度计划的工期调整可通过（）来实现。2018真题",[485,487,489,491,492],{"key":20,"text":486,"correct":32},"调整关键工作持续时间",{"key":24,"text":488,"correct":22},"缩短非关键工作的持续时间",{"key":27,"text":490,"correct":22},"增加非关键工作的时差",{"key":30,"text":426,"correct":32},{"key":49,"text":493,"correct":32},"调整工作间的逻辑关系","ADE",{"id":496,"libraryId":5,"type":36,"typeLabel":37,"stem":497,"options":498,"answer":509,"analysis":33},1141357,"某工程双代号时标网络计划，在第5天末进行检查得到的实际进度前锋线如下图所示，正确的是（ ）。2014",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"H工作还剩1天机动时间",{"key":24,"text":502,"correct":22},"总工期缩短1天",{"key":27,"text":504,"correct":22},"H工作影响总工期1天",{"key":30,"text":506,"correct":32},"E工作提前1天完成",{"key":49,"text":508,"correct":32},"G工作进度落后1天","DE",{"id":511,"libraryId":5,"type":36,"typeLabel":37,"stem":512,"options":513,"answer":524,"analysis":33},1141359,"（2020年真题）某项目时标网络计划第2、4周末实际进度前锋线如下图,关于该项目进度情况的说法,正确的有（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"第2周末,工作C提前1周,工期提前1周",{"key":24,"text":517,"correct":32},"第2周末,工作A拖后2周,但不影响工期",{"key":27,"text":519,"correct":32},"第2周末,工作B拖后1周,但不影响工期",{"key":30,"text":521,"correct":32},"第4周末,工作D拖后1周,但不影响工期",{"key":49,"text":523,"correct":32},"第4周末,工作E提前1周,工期提前1周","BCDE",{"id":526,"libraryId":5,"type":36,"typeLabel":37,"stem":527,"options":528,"answer":290,"analysis":33},1141360,"（2020年真题）关于建设工程项目总进度目标论证的说法，正确的有（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":32},"总进度目标的论证涉及工程实施条件分析",{"key":24,"text":532,"correct":22},"总进度目标的论证是项目决策阶段的策划工作",{"key":27,"text":534,"correct":32},"总进度目标的论证应分析实施阶段各项工作之间的逻辑关系",{"key":30,"text":536,"correct":32},"论证前宜收集类似项目的进度资料",{"key":49,"text":538,"correct":22},"分析论证总进度目标实现的可能性应在项目实施过程中进行",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1141361,"在某工程网络计划中，已知工作M没有自由时差，但总时差为5d，监理工程师检查实际进度时发现该工作的持续时间延长了4d，说明此时工作M的实际进度（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":22},"既不影响总工期，也不影响其后续工作的正常进行",{"key":24,"text":546,"correct":32},"不影响总工期，但将其紧后工作的最早开始时间推迟4d",{"key":27,"text":548,"correct":22},"将使总工期延长4d，但不影响其后续工作的正常进行",{"key":30,"text":550,"correct":22},"将其后续工作的开始时间推迟4d，并使总工期延长1d",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":30,"analysis":33},1141362,"总时差指的是在不影响（ ）的前提下，本工作可利用的机动时间。",[555,557,559,561],{"key":20,"text":556,"correct":22},"紧后工作",{"key":24,"text":558,"correct":22},"持续时间",{"key":27,"text":560,"correct":22},"紧前工作",{"key":30,"text":562,"correct":32},"总工期",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1141363,"已知某工程双代号网络计划的计划工期等于计算工期，且工作M的开始节点和完成节点均为关键节点，则该工作（ ）。",[567,569,571,572],{"key":20,"text":568,"correct":22},"为关键工作",{"key":24,"text":570,"correct":32},"总时差等于自由时差",{"key":27,"text":258,"correct":22},{"key":30,"text":573,"correct":22},"总时差大于自由时差",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1141364,"在工程网络计划的执行过程中，监理工程师检查实际进度时，只发现工作M的总时差由原计划的2d变为-1d，说明工作M的实际进度（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":32},"拖后3d，影响工期1d",{"key":24,"text":581,"correct":22},"拖后1d，影响工期1d",{"key":27,"text":583,"correct":22},"拖后3d，影响工期2d",{"key":30,"text":585,"correct":22},"拖后2d，影响工期1d",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":30,"analysis":33},1141365,"某工程网络计划中工作M的总时差和自由时差分别为5天和3天，该计划执行过程中经检查发现只有工作M的实际进度拖后4天，则工作M的实际进度（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"既不影响总工期，也不影响其后续工作的正常执行",{"key":24,"text":593,"correct":22},"将其紧后工作的最早开始时间推迟1天，并使总工期延长1天",{"key":27,"text":595,"correct":22},"不影响其后续工作的继续进行，但使总工期延长1天",{"key":30,"text":597,"correct":32},"不影响总工期，但使其紧后工作的最早开始时间推迟1天",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},1141366,"某工程双代号时标网络计划如下图所示（单位：周），工程E可以利用的机动时间是（ ）。",[602,603,604,605],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":32},{"key":27,"text":21,"correct":22},{"key":30,"text":74,"correct":22},{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},1141367,"在工程网络计划中，如果某项工作的拖延时间超过其自由时差则（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":32},"必定影响其紧后工作的最早开始时间",{"key":24,"text":613,"correct":22},"对后续工作无影响",{"key":27,"text":615,"correct":22},"必定会影响工程总工期",{"key":30,"text":617,"correct":22},"不影响总工期",{"id":619,"libraryId":5,"type":36,"typeLabel":37,"stem":620,"options":621,"answer":494,"analysis":33},1141368,"某分部工程时标网络计划如下图所示，检查实际进度如图中前锋线所示，该图表明（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":32},"第4周末检查时预计工期将延长1周",{"key":24,"text":625,"correct":22},"第4周末检查时只有工作D拖后而影响工期",{"key":27,"text":627,"correct":22},"第4周末检查时工作A尚有总时差1周",{"key":30,"text":629,"correct":32},"第8周末检查时工作G进度拖后并影响工期",{"key":49,"text":631,"correct":32},"第8周末检查时工作E实际进度不影响总工期",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":24,"analysis":33},1141369,"已知工作A的紧后工作是B和 C，工作B的最迟开始时间为14天，最早开始时间为10天；工作C的最迟完成时间为16天，最早完成时间为14天；工作A的自由时差为5天，则工作A的总时差为（ ）天。",[636,637,639,641],{"key":20,"text":25,"correct":22},{"key":24,"text":638,"correct":32},"7",{"key":27,"text":640,"correct":22},"9",{"key":30,"text":642,"correct":22},"11",[644,647,650,653,656,659],{"id":15,"name":645,"category":7,"favorite":646},"领导干部任职前廉政法规知识测试题",92,{"id":648,"name":649,"category":7,"favorite":15},595,"建筑结构与设备",{"id":651,"name":652,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":654,"name":655,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":657,"name":658,"category":7,"favorite":8},534,"BIM工程师",{"id":660,"name":658,"category":7,"favorite":8},535]