[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,15,50,2721,[13,34,52,64,79,91,105,119,131,143,155,167,179,191,201,213,225,235,247,259,271,283,295,305,320,335,350,362,371,382,394,406,417,429,441,455,470,481,493,504,513,528,542,554,566,575,586,598,606,614],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1141199,1,"单选题","下列建设工程项目总进度目标论证的工作中，属于项目结构分析的是（ ）。2017",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","将项目进行逐层分解",true,{"key":24,"text":25,"correct":26},"B","了解和调查项目的总体部署",false,{"key":28,"text":29,"correct":26},"C","对每一个工作项进行编码",{"key":31,"text":32,"correct":26},"D","调查项目实施的主客观条件","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1141200,2,"多选题","项目总进度目标认证时应调研和收集的资料包括（）。2018真题",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"项目决策阶段有关项目进度目标确定的情况和资料",{"key":24,"text":43,"correct":22},"与进度有关的该项目组织、管理、经济和技术资料",{"key":28,"text":45,"correct":22},"类似项目的进度资料",{"key":31,"text":47,"correct":26},"该项目施工总承包单位的信用等级",{"key":49,"text":50,"correct":22},"E","该项目的总体部署","ABCE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1141201,"建设工程项目总进度目标论证的工作包括：①编制各层进度计划；②项目结构分析；③编制总进度计划；④项目的工作编码。其正确的工作程序是（）。2018真题",[56,58,60,62],{"key":20,"text":57,"correct":22},"②→④→①→③",{"key":24,"text":59,"correct":26},"④→③→②→①",{"key":28,"text":61,"correct":26},"②→④→③→①",{"key":31,"text":63,"correct":26},"④→②→①→③",{"id":65,"libraryId":5,"type":36,"typeLabel":37,"stem":66,"options":67,"answer":78,"analysis":33},1141203,"建设工程项目总进度目标认证时，在进行项目的工作编码前应完成的工作有（ ）。 2016",[68,70,72,74,76],{"key":20,"text":69,"correct":26},"编制各层进度计划",{"key":24,"text":71,"correct":26},"协调各层进度计划的关系",{"key":28,"text":73,"correct":22},"调查研究和收集资料",{"key":31,"text":75,"correct":22},"进度计划系统的结构分析",{"key":49,"text":77,"correct":22},"项目结构分析","CDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":28,"analysis":33},1141205,"横道图进度计划的优点是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"便于确定关键工作",{"key":24,"text":86,"correct":26},"工作之间的逻辑关系表达清楚",{"key":28,"text":88,"correct":22},"表达方式直观",{"key":31,"text":90,"correct":26},"工作时差易于分析",{"id":92,"libraryId":5,"type":36,"typeLabel":37,"stem":93,"options":94,"answer":104,"analysis":33},1141206,"与网络计划相比较，横道图进度计划法具有（ ）特点。",[95,97,98,100,102],{"key":20,"text":96,"correct":22},"适用于手工编制计划",{"key":24,"text":86,"correct":26},{"key":28,"text":99,"correct":26},"能够确定计划的关键工作和关键线路",{"key":31,"text":101,"correct":22},"计划调整只能用手工方式进行，工作量大",{"key":49,"text":103,"correct":26},"适应于大型项目的进度计划系统","AD",{"id":106,"libraryId":5,"type":36,"typeLabel":37,"stem":107,"options":108,"answer":118,"analysis":33},1141207,"关于横道图进度计划法的表述正确的有（ ）。",[109,110,112,114,116],{"key":20,"text":96,"correct":22},{"key":24,"text":111,"correct":22},"工序（工作）之间的逻辑关系可以设法表达，不易表达清楚",{"key":28,"text":113,"correct":22},"没有通过严谨的进度计划时间参数计算，不能确定计划的关键工作、关键路线与时差",{"key":31,"text":115,"correct":22},"计划调整只能用手工方式进行，其工作量较大",{"key":49,"text":117,"correct":26},"能适应大的进度计划系统","ABCD",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":31,"analysis":33},1141209,"与工程网络计划方法相比，横道图进度计划方法的缺点是不能（ ）。",[123,125,127,129],{"key":20,"text":124,"correct":26},"直观表示计划中工作的持续时间",{"key":24,"text":126,"correct":26},"确定实施计划所需要的资源数量",{"key":28,"text":128,"correct":26},"直观表示计划完成所需要的时间",{"key":31,"text":130,"correct":22},"确定计划中的关键工作和时差",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":28,"analysis":33},1141210,"某工程基础包含开挖基槽、浇筑混凝土垫层，砌筑砖基础三项工作，分三个施工段组织流水施工，每项工作均由一个专业班组施工，各工作在各施工段上的流水节拍分别是4天、1天和2天，混凝土垫层和砖基础之间有1天的技术间歇。在保证各专业班组连续施工的情况下，完成该基础施工的工期是（ ）天。",[135,137,139,141],{"key":20,"text":136,"correct":26},"8",{"key":24,"text":138,"correct":26},"12",{"key":28,"text":140,"correct":22},"18",{"key":31,"text":142,"correct":26},"22",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":28,"analysis":33},1141211,"一般情况下，横道图能反映出工作的（ ）。( 2015真题 )",[147,149,151,153],{"key":20,"text":148,"correct":26},"总时差",{"key":24,"text":150,"correct":26},"最迟开始时间",{"key":28,"text":152,"correct":22},"持续时间",{"key":31,"text":154,"correct":26},"自由时差",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":31,"analysis":33},1141212,"（2019年真题）关于如下横道图进度计划的说法正确的是（）。",[159,161,163,165],{"key":20,"text":160,"correct":26},"如果不要求工程连续，工期可压缩1周",{"key":24,"text":162,"correct":26},"圈梁浇筑和基础回填间的流水步距是2周",{"key":28,"text":164,"correct":26},"所有工作都没有机动时间",{"key":31,"text":166,"correct":22},"圈梁浇筑工作的流水节拍是2周",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":20,"analysis":33},1141214,"关于双代号时标网络计划的一般规定，表述不正确的是（ ）。",[171,173,175,177],{"key":20,"text":172,"correct":22},"双代号时标网络计划必须以垂直时间坐标为尺度表示工作时间",{"key":24,"text":174,"correct":26},"时标网络计划中所有符号在时间坐标上的水平投影位置，都必须与其时间参数相对应",{"key":28,"text":176,"correct":26},"时标网络计划中虚工作必须以垂直方向的虚箭线表示",{"key":31,"text":178,"correct":26},"时标的时间单位应根据需要在编制网络计划之前确定，可为时、天、周、月或季",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":31,"analysis":33},1141215,"双代号时标网络计划的特点之一是（ ）。",[183,185,187,189],{"key":20,"text":184,"correct":26},"可以在图上直接显示工作开始与结束时间和自由时差，但不能显示关键线路",{"key":24,"text":186,"correct":26},"不能在图上直接显示工作开始与结束时间，但可以直接显示自由时差和关键线路",{"key":28,"text":188,"correct":26},"可以在图上直接显示工作开始与结束时间，但不能显示自由时差和关键线路",{"key":31,"text":190,"correct":22},"可以在图上直接显示工作开始与结束时间，自由时差和关键线路",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":31,"analysis":33},1141216,"双代号时标网络计划的一般规定表述中，不正确的是（ ）。",[195,196,197,199],{"key":20,"text":176,"correct":26},{"key":24,"text":174,"correct":26},{"key":28,"text":198,"correct":26},"时标网络计划必须以水平时间坐标为尺度表示工作时间",{"key":31,"text":200,"correct":22},"时标的时间单位应根据需要在编制网络计划之前确定，只为天、时",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1141217,"根据JGJ\u002FT121-99《工程网络计划技术规程》，在双代号时标网络计划中是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"以波形线表示工作，以虚箭线表示虚工作，以实箭线表示工作的自由时差",{"key":24,"text":208,"correct":26},"以波形线表示工作，以实箭线表示虚工作，以虚箭线表示工作的自由时差",{"key":28,"text":210,"correct":26},"以实箭线表示工作，以波形线表示虚工作，以虚箭线表示工作的自由时差",{"key":31,"text":212,"correct":22},"以实箭线表示工作，以虚箭线表示虚工作，以波形线表示工作的自由时差",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1141218,"单代号网络计划中的（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"箭线表示工作及其进行的方向，节点表示工作之间的逻辑关系",{"key":24,"text":220,"correct":26},"节点表示工作，箭线表示工作进行的方向",{"key":28,"text":222,"correct":26},"箭线表示工作及其进行的方向，节点表示工作的开始或结束",{"key":31,"text":224,"correct":22},"节点表示工作，箭线表示工作之间的逻辑关系",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1141219,"双代号时标网络计划中，波形线表示工作的（ ）。",[229,230,232,234],{"key":20,"text":148,"correct":26},{"key":24,"text":231,"correct":26},"相干时差",{"key":28,"text":233,"correct":26},"工作时间",{"key":31,"text":154,"correct":22},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},1141220,"关于双代号网络图的绘图规则，下列说明中，错误的是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":26},"双代号网络图中，不允许出现循环回路",{"key":24,"text":242,"correct":26},"双代号网路图中，只能有一个起点",{"key":28,"text":244,"correct":26},"双代号网络图中，可以使用虚箭线表示工作之间的逻辑关系",{"key":31,"text":246,"correct":22},"双代号网路图中，箭线不能交叉",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1141221,"下面关于工程网络计划的表述中，正确的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"单代号搭接网络计划属于肯定型网络计划",{"key":24,"text":254,"correct":26},"双代号网络计划属于非肯定型网络计划",{"key":28,"text":256,"correct":26},"双代号时标网络计划属于非肯定型网络计划",{"key":31,"text":258,"correct":26},"双代号网络计划属于事件网络计划",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1141222,"单代号搭接网络的时间参数计算时，若某项中间工作的最早开始时间为负值，则应当（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":26},"将该工作与最后一项工作联系起来",{"key":24,"text":266,"correct":22},"在该工作与起点节点之间添加虚箭线",{"key":28,"text":268,"correct":26},"增大该工作的时间间隔",{"key":31,"text":270,"correct":26},"调整其紧前工作的持续时间",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1141223,"在某工程双代号时标网络计划中，除以终点节点为完成节点的工作外，工作箭线的波形线表示（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":26},"工作的总时差",{"key":24,"text":278,"correct":26},"工作与其紧前工作之间的时间间隔",{"key":28,"text":280,"correct":26},"工作的持续时间",{"key":31,"text":282,"correct":22},"工作与其紧后工作之间的时间间隔",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1141224,"某工程单目标双代号网络计划如下图所示，图中错误的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"有多个起点节点",{"key":24,"text":290,"correct":22},"有多个终点节点",{"key":28,"text":292,"correct":26},"有双向箭头联线",{"key":31,"text":294,"correct":26},"有循环回路",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1141225,"根据下表逻辑关系控制的双代号网络图，图中存在的作图错误是（ ）。",[299,300,302,304],{"key":20,"text":290,"correct":22},{"key":24,"text":301,"correct":26},"节点编号不对",{"key":28,"text":303,"correct":26},"逻辑关系不对",{"key":31,"text":288,"correct":26},{"id":306,"libraryId":5,"type":36,"typeLabel":37,"stem":307,"options":308,"answer":319,"analysis":33},1141226,"某工程中各项工作间的逻辑关系、相应的双代号网络计划如下图所示，图中错误的有（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"多个终点节点",{"key":24,"text":312,"correct":22},"多个起点节点",{"key":28,"text":314,"correct":26},"工作代号重复",{"key":31,"text":316,"correct":22},"不符合给定逻辑关系",{"key":49,"text":318,"correct":22},"节点编号有误","BDE",{"id":321,"libraryId":5,"type":36,"typeLabel":37,"stem":322,"options":323,"answer":334,"analysis":33},1141227,"在各种计划方法中，（ ）的工作进度线与时间坐标相对应。",[324,326,328,330,332],{"key":20,"text":325,"correct":26},"形象进度计划",{"key":24,"text":327,"correct":22},"横道图计划",{"key":28,"text":329,"correct":26},"单代号搭接网络计划",{"key":31,"text":331,"correct":26},"双代号网络计划",{"key":49,"text":333,"correct":22},"双代号时标网络计划","BE",{"id":336,"libraryId":5,"type":36,"typeLabel":37,"stem":337,"options":338,"answer":349,"analysis":33},1141228,"按工作持续时间的特点不同，工程网络计划可划分为（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":22},"肯定型网络计划",{"key":24,"text":342,"correct":22},"随机型网络计划",{"key":28,"text":344,"correct":26},"分级型网络计划",{"key":31,"text":346,"correct":26},"事件型网络计划",{"key":49,"text":348,"correct":22},"非肯定型网络计划","ABE",{"id":351,"libraryId":5,"type":36,"typeLabel":37,"stem":352,"options":353,"answer":361,"analysis":33},1141229,"某分部工程双代号网络计划如下图所示，其作图错误包括（ ）。",[354,355,356,358,360],{"key":20,"text":288,"correct":26},{"key":24,"text":290,"correct":22},{"key":28,"text":357,"correct":22},"存在循环回路",{"key":31,"text":359,"correct":22},"节点编号重复",{"key":49,"text":318,"correct":22},"BCDE",{"id":363,"libraryId":5,"type":36,"typeLabel":37,"stem":364,"options":365,"answer":319,"analysis":33},1141230,"某分部工程中各项工作间的逻辑关系见下表，相应的双代号网络计划如下图所示，图中错误的有（ ）。",[366,367,368,369,370],{"key":20,"text":310,"correct":26},{"key":24,"text":312,"correct":22},{"key":28,"text":314,"correct":26},{"key":31,"text":316,"correct":22},{"key":49,"text":318,"correct":22},{"id":372,"libraryId":5,"type":36,"typeLabel":37,"stem":373,"options":374,"answer":381,"analysis":33},1141231,"某分部工程双代号网络计划如下图所示，其存在的绘图错误有（ ）。",[375,376,377,378,379],{"key":20,"text":310,"correct":26},{"key":24,"text":312,"correct":22},{"key":28,"text":318,"correct":22},{"key":31,"text":357,"correct":26},{"key":49,"text":380,"correct":22},"有多余虚工作","BCE",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1141232,"某道路工程在进行基层和面层施工时，为了给面层铺设提供工作面和工作条件，需待基层铺设一定时间后才能进行面层摊铺，这种时间间隔是（）时距。",[386,388,390,392],{"key":20,"text":387,"correct":22},"STS",{"key":24,"text":389,"correct":26},"FTF",{"key":28,"text":391,"correct":26},"STF",{"key":31,"text":393,"correct":26},"FTS",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1141233,"如按工程进度编制施工成本计划，在编制网络计划时应充分考虑进度控制对项目分解深度的要求，同时还应考虑施工成本支出计划对（ ）的要求。",[398,400,402,404],{"key":20,"text":399,"correct":26},"成本目标",{"key":24,"text":401,"correct":26},"项目目标",{"key":28,"text":403,"correct":26},"成本分解",{"key":31,"text":405,"correct":22},"项目划分",{"id":407,"libraryId":5,"type":36,"typeLabel":37,"stem":408,"options":409,"answer":416,"analysis":33},1141234,"下列双代号网络图是根据下表给定的工作之间的逻辑关系绘制成的，图中的错误包括（ ）。",[410,411,412,413,414],{"key":20,"text":318,"correct":22},{"key":24,"text":294,"correct":26},{"key":28,"text":288,"correct":26},{"key":31,"text":290,"correct":22},{"key":49,"text":415,"correct":22},"不符合给定的逻辑关系","ADE",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},1141235,"某双代号网络图如下图所示，存在的错误是（）。",[421,423,425,427],{"key":20,"text":422,"correct":26},"出现无箭头连线",{"key":24,"text":424,"correct":26},"出现无箭头节点连线",{"key":28,"text":426,"correct":26},"出现多个起点节点",{"key":31,"text":428,"correct":22},"工作代号相同",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1141236,"某网络计划如下图，逻辑关系正确的是（ ）。( 2015真题 )",[433,435,437,439],{"key":20,"text":434,"correct":22},"E的紧前工作是BD",{"key":24,"text":436,"correct":26},"A完成后同时进行CF",{"key":28,"text":438,"correct":26},"AB均完成后进行E",{"key":31,"text":440,"correct":26},"F的紧前工作是DE",{"id":442,"libraryId":5,"type":36,"typeLabel":37,"stem":443,"options":444,"answer":381,"analysis":33},1141237,"在双代号网络图中，虚箭线的作用有（ ）。( 2015真题 )",[445,447,449,451,453],{"key":20,"text":446,"correct":26},"指向",{"key":24,"text":448,"correct":22},"联系",{"key":28,"text":450,"correct":22},"区分",{"key":31,"text":452,"correct":26},"过桥",{"key":49,"text":454,"correct":22},"断路",{"id":456,"libraryId":5,"type":36,"typeLabel":37,"stem":457,"options":458,"answer":469,"analysis":33},1141238,"某工程项目的双代号时标网络计划，当计划执行到第4周末及第10周末时，检查得出实际进度前锋线如下图所示，检查结果表明（ ）。( 2015真题 )",[459,461,463,465,467],{"key":20,"text":460,"correct":26},"第4周末检查时工作B拖后1周，但不影响总工期",{"key":24,"text":462,"correct":22},"第4周末检查时工作A拖后1周，影响总工期1周",{"key":28,"text":464,"correct":22},"第10周末检查时工作G拖后1周，但不影响总工期",{"key":31,"text":466,"correct":26},"第10周末检查时工作I提前1周，可使总工期提前1周",{"key":49,"text":468,"correct":26},"在第5周到第10周内，工作F和工作I的实际进度正常","BC",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1141239,"某双代号网络计划中，工作M的自由时差3天，总时差5天。在进度计划实施检查中发现工作M实际进度落后，且影响总工期2天。在其他工作均正常的前提下，工作M的实际进度落后（ ）天。 2016",[474,476,478,480],{"key":20,"text":475,"correct":22},"7",{"key":24,"text":477,"correct":26},"5",{"key":28,"text":479,"correct":26},"6",{"key":31,"text":136,"correct":26},{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":28,"analysis":33},1141240,"关于单代号搭接网络计划时距的说法，正确的是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":26},"时距是某工作具有的特殊时间参数",{"key":24,"text":488,"correct":26},"相邻工作间只能有一种时距的限制",{"key":28,"text":490,"correct":22},"时距一般标注在箭头的上方",{"key":31,"text":492,"correct":26},"时距是时间间隔的特殊形式",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1141241,"根据《工程网络计划技术规程》JQJ\u002FT121-2015，网络图存在的绘图错误是（ ）。2017",[497,499,500,502],{"key":20,"text":498,"correct":22},"编号相同的工作",{"key":24,"text":312,"correct":26},{"key":28,"text":501,"correct":26},"相同的节点编号",{"key":31,"text":503,"correct":26},"无箭尾节点的箭线",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1141242,"某双代号时标网络计划如下图，工作G的最迟开始时间是第（ ）天。",[508,510,511,512],{"key":20,"text":509,"correct":26},"4",{"key":24,"text":477,"correct":22},{"key":28,"text":479,"correct":26},{"key":31,"text":475,"correct":26},{"id":514,"libraryId":5,"type":36,"typeLabel":37,"stem":515,"options":516,"answer":527,"analysis":33},1141244,"某工程工作逻辑关系如下表，C工作的紧后工作有（ ）。2017",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"工作H",{"key":24,"text":520,"correct":26},"工作G",{"key":28,"text":522,"correct":22},"工作F",{"key":31,"text":524,"correct":22},"工作E",{"key":49,"text":526,"correct":26},"工作D","ACD",{"id":529,"libraryId":5,"type":36,"typeLabel":37,"stem":530,"options":531,"answer":416,"analysis":33},1141245,"某双代号网络计划如下图（图中粗实线为关键工作），若计划工期等于计算工期，则自由时差一定等于总时差且不为零的工作有（ ）。2017",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"①－②",{"key":24,"text":535,"correct":26},"③－⑤",{"key":28,"text":537,"correct":26},"②－⑦",{"key":31,"text":539,"correct":22},"④－⑤",{"key":49,"text":541,"correct":22},"⑥－⑧",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":28,"analysis":33},1141246,"某双代号网络图如下图所示，正确的是（ ）。2014",[546,548,550,552],{"key":20,"text":547,"correct":26},"工作 C、D 应同时完成",{"key":24,"text":549,"correct":26},"工作B的紧后工作只有工作D",{"key":28,"text":551,"correct":22},"D完成后即可进行工作G",{"key":31,"text":553,"correct":26},"工作D完成后即可进行工作F",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":28,"analysis":33},1141247,"某双代号时标网络计划如下图，工作 F、工作H的最迟完成时间分别为（）。2018真题",[558,560,562,564],{"key":20,"text":559,"correct":26},"第8天、第11天",{"key":24,"text":561,"correct":26},"第8天、第9天",{"key":28,"text":563,"correct":22},"第7天、第11天",{"key":31,"text":565,"correct":26},"第7天、第9天",{"id":567,"libraryId":5,"type":36,"typeLabel":37,"stem":568,"options":569,"answer":319,"analysis":33},1141248,"某双代号网络计划如下图，绘图的错误有（）。2018真题",[570,571,572,573,574],{"key":20,"text":290,"correct":26},{"key":24,"text":288,"correct":22},{"key":28,"text":357,"correct":26},{"key":31,"text":380,"correct":22},{"key":49,"text":318,"correct":22},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":24,"analysis":33},1141249,"双代号网络计划如下图，其关键线路有（）条。2018真题",[579,580,582,584],{"key":20,"text":509,"correct":26},{"key":24,"text":581,"correct":22},"3",{"key":28,"text":583,"correct":26},"2",{"key":31,"text":585,"correct":26},"1",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1141250,"某工作间逻辑关系如下图，则正确的是（ ）。2017",[590,592,594,596],{"key":20,"text":591,"correct":26},"A、B均完成后同时进行 C、D",{"key":24,"text":593,"correct":22},"A、B均完成后进行DE",{"key":28,"text":595,"correct":26},"C均完成后同时进行",{"key":31,"text":597,"correct":26},"C完成后进行E",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":28,"analysis":33},1141251,"根据下列逻辑关系表绘制的双代号网络图如下图所示，其存在的错误是（ ）。",[602,603,604,605],{"key":20,"text":301,"correct":26},{"key":24,"text":303,"correct":26},{"key":28,"text":290,"correct":22},{"key":31,"text":288,"correct":26},{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},1141252,"某工程单目标双代号网络计划如下图所示，图中的错误是( )。",[610,611,612,613],{"key":20,"text":288,"correct":26},{"key":24,"text":290,"correct":22},{"key":28,"text":292,"correct":26},{"key":31,"text":294,"correct":26},{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":31,"analysis":33},1141253,"图示的双代号网络图中H工作有（ ）个先行工作。",[618,619,620,621],{"key":20,"text":585,"correct":26},{"key":24,"text":581,"correct":26},{"key":28,"text":509,"correct":26},{"key":31,"text":479,"correct":22},[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]