[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":646},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,14,50,2721,[13,34,52,64,76,88,100,112,127,142,157,170,184,193,205,217,232,245,257,269,281,293,305,317,329,342,355,370,383,395,410,422,436,448,460,472,484,496,508,520,532,544,553,565,577,589,599,608,622,634],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1141143,1,"单选题","施工方进度控制的任务是依据（ ）对施工进度的要求控制施工进度。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","监理规划",false,{"key":24,"text":25,"correct":26},"B","施工任务委托合同",true,{"key":28,"text":29,"correct":22},"C","施工任务单",{"key":31,"text":32,"correct":22},"D","设计任务书","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1141144,2,"多选题","业主方进度控制的任务是控制整个项目实施阶段的进度，包括控制（ ）以及施工进度。",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"设计准备阶段的工作进度",{"key":24,"text":43,"correct":26},"物资采购工作进度",{"key":28,"text":45,"correct":22},"征地拆迁工作进度",{"key":31,"text":47,"correct":26},"项目动用前准备阶段工作进度",{"key":49,"text":50,"correct":26},"E","设计工作进度","ABDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":28,"analysis":33},1141145,"如果一个进度计划系统由总进度计划、项目子系统进度计划、项目子系统的单项工程进度计划组成。该进度计划系统是由（ ）的计划组成的计划系统。",[56,58,60,62],{"key":20,"text":57,"correct":22},"不同功能",{"key":24,"text":59,"correct":22},"不同项目参与方",{"key":28,"text":61,"correct":26},"不同深度",{"key":31,"text":63,"correct":22},"不同周期",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":28,"analysis":33},1141146,"作为建设工程项目进度控制的依据，建设工程项目进度计划系统应（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":22},"在项目的前期决策阶段建立",{"key":24,"text":71,"correct":22},"在项目的初步设计阶段完善",{"key":28,"text":73,"correct":26},"在项目的进展过程中逐步形成",{"key":31,"text":75,"correct":22},"在项目的准备阶段建立",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":31,"analysis":33},1141147,"下列关于项目进度计划系统的说法，正确的是（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":22},"项目进度计划系统应该在项目决策阶段完成",{"key":24,"text":83,"correct":22},"项目进度计划系统应该在开工之前完成",{"key":28,"text":85,"correct":22},"项目进度计划系统应该在施工图招标前完成",{"key":31,"text":87,"correct":26},"项目进度计划系统是随着项目的进展逐步形成的",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1141148,"建设工程项目进度计划系统分为总进度计划、子系统进度计划和单项工程进度计划，这是根据进度计划的不同（ ）编制的。",[92,94,96,98],{"key":20,"text":93,"correct":22},"功能",{"key":24,"text":95,"correct":26},"深度",{"key":28,"text":97,"correct":22},"周期",{"key":31,"text":99,"correct":22},"编制主体",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},1141149,"在建设工程项目进度计划系统中，由业主方、设计方、施工和设备安装方编制的进度计划应与（ ）编制的进度计划相互协调。",[104,106,108,110],{"key":20,"text":105,"correct":22},"监理方",{"key":24,"text":107,"correct":22},"政府行政主管部门",{"key":28,"text":109,"correct":22},"投资方",{"key":31,"text":111,"correct":26},"采购和供货方",{"id":113,"libraryId":5,"type":36,"typeLabel":37,"stem":114,"options":115,"answer":126,"analysis":33},1141150,"建设工程项目进度计划系统的内容包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"总进度纲要",{"key":24,"text":119,"correct":26},"二级进度计划",{"key":28,"text":121,"correct":22},"进度计划审批程序",{"key":31,"text":123,"correct":22},"进度计划实施效果分析",{"key":49,"text":125,"correct":22},"工程实际进度信息","AB",{"id":128,"libraryId":5,"type":36,"typeLabel":37,"stem":129,"options":130,"answer":141,"analysis":33},1141151,"在建设工程项目进度计划系统中各进度计划或各子系统进度计划编制和调整时必须注意其相互间的联系和协调，如（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"总进度计划与业主方编制的整个进度计划的联系和协调",{"key":24,"text":134,"correct":26},"总进度计划与项目子系统进度计划的联系和协调",{"key":28,"text":136,"correct":26},"项目子系统进度规划与项目子系统中的单项工程进度计划的联系和协调",{"key":31,"text":138,"correct":26},"指导性进度规划与实施性进度计划之间的联系和协调",{"key":49,"text":140,"correct":26},"施工和设备安装方编制的进度计划与采购和供货方编制的进度计划之间的联系和协调","BCDE",{"id":143,"libraryId":5,"type":36,"typeLabel":37,"stem":144,"options":145,"answer":156,"analysis":33},1141152,"由不同功能的计划构成的进度计划系统包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"总进度规划",{"key":24,"text":149,"correct":22},"项目子系统进度规划",{"key":28,"text":151,"correct":26},"控制性进度计划",{"key":31,"text":153,"correct":26},"指导性进度计划",{"key":49,"text":155,"correct":22},"设计进度计划","CD",{"id":158,"libraryId":5,"type":36,"typeLabel":37,"stem":159,"options":160,"answer":169,"analysis":33},1141153,"在建设工程项目进度计划系统中，按计划的深度不同划分的进度计划包括（ ）。",[161,162,163,165,167],{"key":20,"text":147,"correct":26},{"key":24,"text":155,"correct":22},{"key":28,"text":164,"correct":26},"项目子系统进度计划",{"key":31,"text":166,"correct":22},"施工进度计划",{"key":49,"text":168,"correct":22},"业主方项目实施进行计划","AC",{"id":171,"libraryId":5,"type":36,"typeLabel":37,"stem":172,"options":173,"answer":183,"analysis":33},1141154,"根据项目进度控制不同的需要和用途，业主方和项目参与方可以按（ ）构建多个不同的建设工程项目进度计划系统。",[174,176,177,179,181],{"key":20,"text":175,"correct":26},"不同计划深度",{"key":24,"text":59,"correct":26},{"key":28,"text":178,"correct":26},"不同计划功能",{"key":31,"text":180,"correct":22},"不同计划方法",{"key":49,"text":182,"correct":26},"不同计划周期","ABCE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1141156,"某建设工程项目按施工总进度计划、各单位工程进度计划及相应分部工程计划组成了计划系统，该计划系统是由多个相互关联的不同（）的进度组成。2018真题",[188,189,191,192],{"key":20,"text":95,"correct":26},{"key":24,"text":190,"correct":22},"项目参与方",{"key":28,"text":93,"correct":22},{"key":31,"text":97,"correct":22},{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1141157,"建设项目管理供货进度计划应包括的供货环节是（）。2018真题",[197,199,201,203],{"key":20,"text":198,"correct":26},"采购、制造、运输",{"key":24,"text":200,"correct":22},"采购、制造、安装",{"key":28,"text":202,"correct":22},"选型、制造、运输",{"key":31,"text":204,"correct":22},"选型、供货、存储",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":24,"analysis":33},1141160,"（2020年真题）某项目施工横道图进度计划如下表，如果第二层支设模板需要在第一层浇筑混凝土完成1天后才能开始，则有1天的层间技术间歇，正确的层间间隙是（ ）。",[209,211,213,215],{"key":20,"text":210,"correct":22},"Z1",{"key":24,"text":212,"correct":26},"Z3",{"key":28,"text":214,"correct":22},"Z2",{"key":31,"text":216,"correct":22},"Z4",{"id":218,"libraryId":5,"type":36,"typeLabel":37,"stem":219,"options":220,"answer":231,"analysis":33},1141162,"用项目管理专用软件编制工程网络计划能够（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"确保工程网络计划计算的准确性",{"key":24,"text":224,"correct":22},"确保工程网络计划原始资料的准确性",{"key":28,"text":226,"correct":22},"确保工程网络计划计算的按时完成",{"key":31,"text":228,"correct":26},"有利于工程网络计划的及时调整",{"key":49,"text":230,"correct":26},"有利于编制资源需求计划","ADE",{"id":233,"libraryId":5,"type":36,"typeLabel":37,"stem":234,"options":235,"answer":244,"analysis":33},1141163,"计算机辅助工程网络计划编制的意义有（ ）。",[236,238,239,241,242],{"key":20,"text":237,"correct":26},"有利于工程网络计划及时调整",{"key":24,"text":230,"correct":26},{"key":28,"text":240,"correct":26},"解决当工程网络计划计算量大，手工计算难以承担的困难",{"key":31,"text":222,"correct":26},{"key":49,"text":243,"correct":22},"确保工程网络计划更加详细","ABCD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1141164,"为让业主方各工作部门和项目各参与方协同工作，可利用（ ）进行基于互联网的辅助进度控制。2014",[249,251,253,255],{"key":20,"text":250,"correct":22},"P3项目管理软件",{"key":24,"text":252,"correct":26},"项目信息门户",{"key":28,"text":254,"correct":22},"MS Project",{"key":31,"text":256,"correct":22},"MS Visio",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1141165,"（2020年真题）关于横道图进度计划特点的说法，正确的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"可以识别计划的关键工作",{"key":24,"text":264,"correct":22},"不能表达工作逻辑关系",{"key":28,"text":266,"correct":26},"调整计划的工作量较大",{"key":31,"text":268,"correct":22},"可以计算工作时差",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1141166,"对建设工程项目进度目标进行分析和论证，其目的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":26},"论证进度目标是否合理",{"key":24,"text":276,"correct":22},"制定进度控制措施",{"key":28,"text":278,"correct":22},"论证进度目标实现的经济性",{"key":31,"text":280,"correct":22},"确定调整进度目标的方法",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1141167,"在建设工程项目进度控制工作中，分析和论证进度目标的目的是分析和论证（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"进度目标的合理性及实现的可能性",{"key":24,"text":288,"correct":22},"进度目标实现措施的经济性和可操作性",{"key":28,"text":290,"correct":22},"进度目标与成本目标、质量目标的匹配性",{"key":31,"text":292,"correct":22},"进度目标与成本目标、质量目标的一致性",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1141168,"建设工程项目总进度目标的控制是（ ）项目管理的任务。",[297,299,301,303],{"key":20,"text":298,"correct":22},"施工方",{"key":24,"text":300,"correct":26},"业主方",{"key":28,"text":302,"correct":22},"设计方",{"key":31,"text":304,"correct":22},"供货方",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},1141169,"在进行建设工程项目总进度目标控制前，首先应（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"制定项目进度控制的措施",{"key":24,"text":312,"correct":22},"对项目实施进行总体部署",{"key":28,"text":314,"correct":26},"分析和论证进度目标实现的可能性",{"key":31,"text":316,"correct":22},"编制施工总进度规划",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1141170,"大型建设工程项目总进度目标论证的核心工作是通过（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"编制总进度纲要，论证总进度目标实现的可能性",{"key":24,"text":324,"correct":22},"分析工程发包组织方式，论证总进度目标分解的合理性",{"key":28,"text":326,"correct":22},"分析施工技术方面的资料，论证总进度目标的控制措施",{"key":31,"text":328,"correct":22},"分析施工组织资料，论证总进度目标实现的条件",{"id":330,"libraryId":5,"type":36,"typeLabel":37,"stem":331,"options":332,"answer":244,"analysis":33},1141171,"在建设工程项目的实施阶段，项目总进度应包括（ ）等。",[333,334,336,338,340],{"key":20,"text":50,"correct":26},{"key":24,"text":335,"correct":26},"施工前准备工作进度",{"key":28,"text":337,"correct":26},"工程物资采购工作进度",{"key":31,"text":339,"correct":26},"项目动用前准备工作进度",{"key":49,"text":341,"correct":22},"项目后评价工作进度",{"id":343,"libraryId":5,"type":36,"typeLabel":37,"stem":344,"options":345,"answer":51,"analysis":33},1141172,"建设工程项目总进度纲要的主要内容包括（ ）。",[346,348,349,351,353],{"key":20,"text":347,"correct":26},"项目实施的总体部署",{"key":24,"text":147,"correct":26},{"key":28,"text":350,"correct":22},"项目结构分析",{"key":31,"text":352,"correct":26},"确定里程碑时间的计划进度目标",{"key":49,"text":354,"correct":26},"总进度目标实现的条件",{"id":356,"libraryId":5,"type":36,"typeLabel":37,"stem":357,"options":358,"answer":369,"analysis":33},1141173,"在建设工程项目总进度目标论证中，项目的工作编码是指一个工作项的编码，编码时应考虑的因素包括对不同（ ）的标识。",[359,361,363,365,367],{"key":20,"text":360,"correct":26},"计划层",{"key":24,"text":362,"correct":26},"计划对象",{"key":28,"text":364,"correct":26},"工作类别",{"key":31,"text":366,"correct":22},"计划方式",{"key":49,"text":368,"correct":22},"计划目标","ABC",{"id":371,"libraryId":5,"type":36,"typeLabel":37,"stem":372,"options":373,"answer":382,"analysis":33},1141174,"在建设工程项目总进度目标论证过程中，项目的工作项编码应考虑对不同的（ ）进行标识。",[374,376,377,378,380],{"key":20,"text":375,"correct":22},"计划形式",{"key":24,"text":360,"correct":26},{"key":28,"text":362,"correct":26},{"key":31,"text":379,"correct":22},"计划方法",{"key":49,"text":381,"correct":22},"资源类别","BC",{"id":384,"libraryId":5,"type":36,"typeLabel":37,"stem":385,"options":386,"answer":369,"analysis":33},1141175,"项目总进度纲要主要用于论证总进度目标实现的可能性，其内容包括（ ）。",[387,388,390,391,393],{"key":20,"text":347,"correct":26},{"key":24,"text":389,"correct":26},"里程碑事件的计划进度目标",{"key":28,"text":354,"correct":26},{"key":31,"text":392,"correct":22},"施工总进度规划",{"key":49,"text":394,"correct":22},"单项工程和单位工程进度计划",{"id":396,"libraryId":5,"type":36,"typeLabel":37,"stem":397,"options":398,"answer":409,"analysis":33},1141176,"大型建设工程项目总进度目标论证的工作内容包括（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"项目设计技术路线的确定",{"key":24,"text":402,"correct":22},"项目施工总进度规划",{"key":28,"text":404,"correct":26},"项目总进度目标实现的条件",{"key":31,"text":406,"correct":22},"项目施工方案的比选",{"key":49,"text":408,"correct":26},"项目实施的总部署","CE",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1141177,"关于大型建设工程项目总进度目标论证的说法，正确的是（ ）。(单项选择题) ( 2015真题 )",[414,416,418,420],{"key":20,"text":415,"correct":22},"大型建设工程项目总进度目标论证的核心工作是编制总进度纲要",{"key":24,"text":417,"correct":26},"大型建设工程项目总进度目标论证首先开展的工作是调查研究和收集资料",{"key":28,"text":419,"correct":22},"大型建设工程项目总进度目标的确定应在项目的实施阶段进行",{"key":31,"text":421,"correct":22},"若编制的总进度计划不符合项目的总进度目标，应调整总进度目标",{"id":423,"libraryId":5,"type":36,"typeLabel":37,"stem":424,"options":425,"answer":369,"analysis":33},1141178,"建设工程项目总进度目标论证的主要任务有（ ）。( 2015真题 )",[426,428,430,432,434],{"key":20,"text":427,"correct":26},"总进度规划编制",{"key":24,"text":429,"correct":26},"工程实施条件分析",{"key":28,"text":431,"correct":26},"工程实施策划",{"key":31,"text":433,"correct":22},"项目总进度目标确定",{"key":49,"text":435,"correct":22},"项目经济评价",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1141180,"在进行建设工程项目总进度目标控制前，首先应分析和认证（ ）。 2016",[440,442,444,446],{"key":20,"text":441,"correct":26},"进度目标实现的可能性",{"key":24,"text":443,"correct":22},"进度计划系统的完整性",{"key":28,"text":445,"correct":22},"进度计划方法的适用性",{"key":31,"text":447,"correct":22},"进度控制方法的合理性",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},1141181,"某工程采用建设项目工程总承包的模式，则项目总进度目标的控制是（）的任务。2018真题",[452,454,456,458],{"key":20,"text":453,"correct":22},"业主方与监理方",{"key":24,"text":455,"correct":26},"业主方与工程总承包方",{"key":28,"text":457,"correct":22},"监理方与工程总承包方",{"key":31,"text":459,"correct":22},"工程总承包方与设计方",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},1141183,"论证建设工程项目总进度目标时，需要进行：①编制总进度计划；②项目结构分析；③项目进度计划系统的结构分析等多项工作。仅就上述三项工作而言，其顺序应为（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"①→②→③",{"key":24,"text":467,"correct":22},"③→②→①",{"key":28,"text":469,"correct":22},"②→①→③",{"key":31,"text":471,"correct":26},"②→③→①",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1141184,"建设工程项目总进度目标论证的工作包括：①进度计划系统的结构分析，②项目的工作编码，③编制各层进度计划，它们的正确次序是（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":26},"①②③",{"key":24,"text":479,"correct":22},"②①③",{"key":28,"text":481,"correct":22},"②③①",{"key":31,"text":483,"correct":22},"③②①",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},1141185,"根据建设工程项目总进度目标论证的工作步骤，在完成“项目结构分析”工作之后应立刻进行的工作是（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"调查研究和收集资料",{"key":24,"text":491,"correct":26},"进度计划系统的结构分析",{"key":28,"text":493,"correct":22},"项目的工作编码",{"key":31,"text":495,"correct":22},"编制各层的进度计划",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1141186,"建设工程项目总进度论证的工作有：①项目的工作编码；②项目结构分析；③编制各层进度计划；④进度计划系统的结构分析等。其正确的工作步骤（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":26},"②-④-①-③",{"key":24,"text":503,"correct":22},"①-②-④-③",{"key":28,"text":505,"correct":22},"①-③-④-②",{"key":31,"text":507,"correct":22},"②-④-③-①",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1141187,"建设工程项目总进度目标论证的工作包括：（1）项目结构分析；（2）编制各层进度计划；（3）进度计划系统的结构分析；（4）项目的工作编码；（5）协调各层进度计划的关系，编制总进度计划。其正确的工作顺序是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"1-3-4-2-5",{"key":24,"text":515,"correct":22},"1-3-5-2-4",{"key":28,"text":517,"correct":22},"3-5-2-1-4",{"key":31,"text":519,"correct":22},"4-1-3-2-5",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1141188,"论证建设工程项目总进度目标，需要进行：①总进度计划的编制；②进度计划系统结构分析；③项目结构的分析等多项工作。仅就上述三项工作而言，其正确的顺序为（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"1-2-3",{"key":24,"text":527,"correct":22},"2-3-1",{"key":28,"text":529,"correct":22},"3-1-2",{"key":31,"text":531,"correct":26},"3-2-1",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1141189,"论证建设工程项目总进度目标时，需要进行：①编制各层进度计划；②项目的工作编码；③进度计划系统的结构分析等项工作，对上述工作而言，正确的工作步骤是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"①-②-③",{"key":24,"text":539,"correct":22},"②-①-③",{"key":28,"text":541,"correct":22},"②-③-①",{"key":31,"text":543,"correct":26},"③-②-①",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1141190,"建设工程项目总进度目标论证的工作步骤中，进度计划系统的结构分析之后紧接着需要进行的工作是（ ）。",[548,549,550,551],{"key":20,"text":493,"correct":26},{"key":24,"text":489,"correct":22},{"key":28,"text":350,"correct":22},{"key":31,"text":552,"correct":22},"编制总进度计划",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1141191,"建设工程项目总进度目标的工作包括： （1）项目结构分析； （2）编制各层进度计划； （3）进度计划系统的结构分析； （4）项目的工作编码。 其正确的工作顺序是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":26},"1-3-4-2",{"key":24,"text":560,"correct":22},"1-3-2-4",{"key":28,"text":562,"correct":22},"3-2-1-4",{"key":31,"text":564,"correct":22},"4-1-3-2",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1141192,"论证建设工程项目总进度目标时，其工作内容包括：（1）编制总进度计划；（2）项目的工作编码；（3）项目结构分析等工作。上述三项工作正确的程序为（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":26},"（3）（2）（1）",{"key":24,"text":572,"correct":22},"（1）（3）（2）",{"key":28,"text":574,"correct":22},"（2）（1）（3）",{"key":31,"text":576,"correct":22},"（1）（2）（3）",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1141193,"论证大型建设工程项目总进度目标时，项目结构分析是指（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"根据建立进度计划系统的需要，分析进度计划之间的关系",{"key":24,"text":584,"correct":22},"根据项目合同体系，分析影响总进度目标实现的合同交界面",{"key":28,"text":586,"correct":22},"根据建立进度计划系统的需要，分析确定进度计划的层次",{"key":31,"text":588,"correct":26},"根据编制总进度纲要的需要，将整个项目逐层分解并确定相应的工作目录",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},1141194,"将一个子项目进度计划分解为若干个工作项，属于项目总进度目标论证工作的（ ）。",[593,595,596,598],{"key":20,"text":594,"correct":22},"项目的结构分析",{"key":24,"text":493,"correct":22},{"key":28,"text":597,"correct":22},"各层精度计划的关系协调",{"key":31,"text":491,"correct":26},{"id":600,"libraryId":5,"type":36,"typeLabel":37,"stem":601,"options":602,"answer":382,"analysis":33},1141195,"在建设工程项目总进度目标论证过程中，项目的工作编码应考虑对不同的（ ）进行标识。",[603,604,605,606,607],{"key":20,"text":375,"correct":22},{"key":24,"text":360,"correct":26},{"key":28,"text":362,"correct":26},{"key":31,"text":379,"correct":22},{"key":49,"text":381,"correct":22},{"id":609,"libraryId":5,"type":36,"typeLabel":37,"stem":610,"options":611,"answer":244,"analysis":33},1141196,"建设工程项目总进度目标论证时，调查研究和收集资料工作包括（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"收集类似项目进度资料",{"key":24,"text":615,"correct":26},"收集与进度有关的该项组织资料",{"key":28,"text":617,"correct":26},"了解该项目的总体部署",{"key":31,"text":619,"correct":26},"了解有关前期该项目进度目标的确定资料",{"key":49,"text":621,"correct":22},"了解项目的工作编码资料",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":20,"analysis":33},1141197,"关于大型建设工程项目结构分析的说法，正确的是（ ）。2014",[626,628,630,632],{"key":20,"text":627,"correct":26},"项目结构分析是将整个项目逐层分解，并确立工作目录",{"key":24,"text":629,"correct":22},"项目结构分析是将整个项目逐层分解，并确立工作编码",{"key":28,"text":631,"correct":22},"项目结构分析是将项目计划逐层分解，并确立工作目录",{"key":31,"text":633,"correct":22},"项目结构分析是将项目计划逐层分解，并确立工作编码",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":24,"analysis":33},1141198,"关于建设工程项目总进度目标论证的说法，正确的是（ ）。2014",[638,640,642,644],{"key":20,"text":639,"correct":22},"建设工程项目总进度目标指的是整个工程项目的施工进度目标",{"key":24,"text":641,"correct":26},"建设工程项目总进度目标的论证应分析项目实施阶段各项工作的进度和关系",{"key":28,"text":643,"correct":22},"大型建设工程项目总进度目标论证的核心工作是编制项目进度计划",{"key":31,"text":645,"correct":22},"建设工程项目总进度纲要应包含各子系统中的单项工程进度规划",[647,650,653,656,659,662],{"id":15,"name":648,"category":7,"favorite":649},"领导干部任职前廉政法规知识测试题",92,{"id":651,"name":652,"category":7,"favorite":15},595,"建筑结构与设备",{"id":654,"name":655,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":657,"name":658,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":660,"name":661,"category":7,"favorite":8},534,"BIM工程师",{"id":663,"name":661,"category":7,"favorite":8},535]