[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":628},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,13,50,2721,[13,34,46,58,70,82,90,102,110,122,134,146,158,170,182,198,211,226,239,253,266,280,294,309,319,331,343,351,366,377,385,397,409,421,436,447,459,471,483,497,512,524,536,548,560,572,584,596,608,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1141088,1,"单选题","在建设工程项目施工成本分析方法中，可用来分析各种因素对成本的影响程度的方法是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","相关比率法",false,{"key":24,"text":25,"correct":22},"B","比重分析法",{"key":27,"text":28,"correct":29},"C","连环置换法",true,{"key":31,"text":32,"correct":22},"D","动态比率法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1141089,"在施工成本分析的比较法中，通过（ ），可以看出各项技术经济指标的变动情况，反映施工管理水平的提高程度。",[38,40,42,44],{"key":20,"text":39,"correct":22},"实际指标与目标指标的对比",{"key":24,"text":41,"correct":29},"本期实际指标与上期实际指标对比",{"key":27,"text":43,"correct":22},"与本行业平均水平、先进水平对比",{"key":31,"text":45,"correct":22},"本期实际指标与未来指标对比",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1141090,"以下关于综合成本分析方法的表述中，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"进行分部分项工程成本分析时，应分析每一个分部分项工程的成本",{"key":24,"text":53,"correct":29},"月度成本分析的依据是当月的成本报表",{"key":27,"text":55,"correct":22},"企业年度成本要求一年结算一次，可将部分成本转入下一个年度",{"key":31,"text":57,"correct":22},"单位工程竣工成本分析是对预算成本、目标成本、实际成本的比较",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1141091,"某分部工程计划工程量5000m3，计划成本380元\u002Fm3，实际完成工程量为4500m3，实际成本400元\u002Fm3。用赢得值法分析该分部工程的施工成本偏差为（ ）元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"-100000",{"key":24,"text":65,"correct":22},"-190000",{"key":27,"text":67,"correct":29},"-90000",{"key":31,"text":69,"correct":22},"-200000",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1141092,"进行年度成本分析，可以更有效地管理项目成本，年度成本分析的重点是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"分析上一年度的三材节约率",{"key":24,"text":77,"correct":22},"分析上一年度的成本管理薄弱环节",{"key":27,"text":79,"correct":29},"规划下一年度的成本管理措施",{"key":31,"text":81,"correct":22},"预测下一年度的成本降低水平",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1141093,"下列施工成本分析方法中，可以用来分析各种因素对成本影响程度的是（ ）",[86,87,88,89],{"key":20,"text":21,"correct":22},{"key":24,"text":28,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":32,"correct":22},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},1141094,"分部分项工程成本分析“三算”对比分析，是指（ ）的比较。",[94,96,98,100],{"key":20,"text":95,"correct":29},"预算成本、目标成本、实际成本",{"key":24,"text":97,"correct":22},"概算成本、预算成本、决算成本",{"key":27,"text":99,"correct":22},"月度成本、季度成本、年度成本",{"key":31,"text":101,"correct":22},"预算成本、计划成本、目标成本",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},1141095,"分部分项工程成本分析采用的“三算”对比分析法，其“三算”对比指的是（ ）的比较。",[106,107,108,109],{"key":20,"text":97,"correct":22},{"key":24,"text":95,"correct":29},{"key":27,"text":99,"correct":22},{"key":31,"text":101,"correct":22},{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":24,"analysis":33},1141096,"属于施工项目定期的、经常性的中间成本分析是（ ）成本分析。",[114,116,118,120],{"key":20,"text":115,"correct":22},"竣工",{"key":24,"text":117,"correct":29},"月（季）度",{"key":27,"text":119,"correct":22},"分部分项工程",{"key":31,"text":121,"correct":22},"年度",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1141097,"通过（ ）比率法的分析，可以考察成本总量的构成情况及各成本项目占成本总量的比重，同时也可看出量、本、利的比例关系，从而为寻求降低成本的途径指明方向。",[126,128,130,132],{"key":20,"text":127,"correct":22},"相关",{"key":24,"text":129,"correct":29},"构成",{"key":27,"text":131,"correct":22},"动态",{"key":31,"text":133,"correct":22},"静态",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":20,"analysis":33},1141098,"在进行月（季）度成本分析时，如果发现是属于预算定额规定的“政策性”亏损，则应该（ ）。",[138,140,142,144],{"key":20,"text":139,"correct":29},"从控制支出着手，把超支额压缩到最低限度",{"key":24,"text":141,"correct":22},"增加收入，弥补亏损",{"key":27,"text":143,"correct":22},"采取增收节支措施，防止今后再超支",{"key":31,"text":145,"correct":22},"停止生产，等待机会",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":31,"analysis":33},1141099,"能够通过技术经济指标的对比，检查目标的完成情况，分析产生差异的原因，进而挖掘内部潜力的分析方法是（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"因素分析法",{"key":24,"text":153,"correct":22},"差额分析法",{"key":27,"text":155,"correct":22},"差率法",{"key":31,"text":157,"correct":29},"比较法",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":31,"analysis":33},1141100,"施工项目年度成本分析的重点是（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"通过实际成本与目标成本的对比，分析目标成本落实的情况",{"key":24,"text":165,"correct":22},"通过对技术组织措施执行效果的分析，寻求更加有效的节约途径",{"key":27,"text":167,"correct":22},"通过实际成本与计划成本的对比，分析成本降低水平",{"key":31,"text":169,"correct":29},"针对下一年度进展情况，规划切实可行的成本管理措施",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},1141101,"关于成本分析基本方法的说明，正确的是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"施工成本分析的基本方法包括：成本分析表法、因素分析法、比率法、差额计算法等",{"key":24,"text":177,"correct":22},"因素分析法在应用时必须注意各项指标的可比性",{"key":27,"text":179,"correct":29},"连环置换法可用来分析各种因素对成本的影响程度",{"key":31,"text":181,"correct":22},"比率法包括相关比率法、差额比率法和动态比率法",{"id":183,"libraryId":5,"type":184,"typeLabel":185,"stem":186,"options":187,"answer":197,"analysis":33},1141102,2,"多选题","常用于施工成本分析比率法有（ ）。",[188,189,191,193,194],{"key":20,"text":21,"correct":29},{"key":24,"text":190,"correct":29},"构成比率法",{"key":27,"text":192,"correct":22},"置换比率法",{"key":31,"text":32,"correct":29},{"key":195,"text":196,"correct":22},"E","连环比率法","ABD",{"id":199,"libraryId":5,"type":184,"typeLabel":185,"stem":200,"options":201,"answer":210,"analysis":33},1141103,"施工成本分析常用的比率法有（ ）。",[202,204,205,206,208],{"key":20,"text":203,"correct":29},"结构对比分析法",{"key":24,"text":21,"correct":29},{"key":27,"text":32,"correct":29},{"key":31,"text":207,"correct":22},"趋势比率法",{"key":195,"text":209,"correct":22},"静态比率法","ABC",{"id":212,"libraryId":5,"type":184,"typeLabel":185,"stem":213,"options":214,"answer":225,"analysis":33},1141104,"单位工程竣工成本分析包括的内容有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"目标利润分析",{"key":24,"text":218,"correct":22},"目标成本分析",{"key":27,"text":220,"correct":22},"预算成本分析",{"key":31,"text":222,"correct":29},"主要资源节超对比分析",{"key":195,"text":224,"correct":29},"主要技术节约措施及其经济效果分析","DE",{"id":227,"libraryId":5,"type":184,"typeLabel":185,"stem":228,"options":229,"answer":238,"analysis":33},1141105,"施工成本分析常用的方法包括（ ）。",[230,231,233,235,236],{"key":20,"text":157,"correct":29},{"key":24,"text":232,"correct":29},"比率法",{"key":27,"text":234,"correct":29},"差额计算法",{"key":31,"text":28,"correct":29},{"key":195,"text":237,"correct":22},"实际费用法","ABCD",{"id":240,"libraryId":5,"type":184,"typeLabel":185,"stem":241,"options":242,"answer":252,"analysis":33},1141106,"单位工程竣工成本分析包括（ ）。",[243,245,247,248,250],{"key":20,"text":244,"correct":22},"分部分项工程成本分析",{"key":24,"text":246,"correct":29},"主要技术节约措施及经济效果分析",{"key":27,"text":222,"correct":29},{"key":31,"text":249,"correct":22},"年度成本分析",{"key":195,"text":251,"correct":29},"竣工成本分析","BCE",{"id":254,"libraryId":5,"type":184,"typeLabel":185,"stem":255,"options":256,"answer":265,"analysis":33},1141107,"单位工程竣工成本分析的内容包括（ ）。",[257,258,260,261,263],{"key":20,"text":251,"correct":29},{"key":24,"text":259,"correct":29},"经济效果分析",{"key":27,"text":222,"correct":29},{"key":31,"text":262,"correct":22},"成本指标对比分析",{"key":195,"text":264,"correct":29},"主要技术节约措施分析","ABCE",{"id":267,"libraryId":5,"type":184,"typeLabel":185,"stem":268,"options":269,"answer":279,"analysis":33},1141108,"关于综合成本的分析方法，下列说法正确的是（ ）。",[270,272,274,275,277],{"key":20,"text":271,"correct":29},"分部分项工程成本法分析的方法是进行预算成本、目标成本和实际成本的三算对比",{"key":24,"text":273,"correct":22},"每一个分部分项工程都必须进行成本分析",{"key":27,"text":53,"correct":29},{"key":31,"text":276,"correct":22},"年度成本分析的重点是分析产量、工期、质量、三才节约率对成本的影响",{"key":195,"text":278,"correct":29},"单位工程竣工成本分析应包括对主要资源节超比进行对比分析","ACE",{"id":281,"libraryId":5,"type":184,"typeLabel":185,"stem":282,"options":283,"answer":293,"analysis":33},1141109,"施工项目月度成本分析的依据是当月的成本报表，分析的方法和内容包括（ ）。",[284,286,288,290,292],{"key":20,"text":285,"correct":29},"通过实际成本与预算成本的对比，分析当月的成本降低水平",{"key":24,"text":287,"correct":29},"通过实际成本与目标成本的对比，分析目标成本的落实情况",{"key":27,"text":289,"correct":22},"通过累计实际成本与累计预算成本的对比，分析竣工成本降低水平",{"key":31,"text":291,"correct":29},"通过对各成本项目的成本分析，了解成本总量的构成比例",{"key":195,"text":165,"correct":29},"ABDE",{"id":295,"libraryId":5,"type":184,"typeLabel":185,"stem":296,"options":297,"answer":308,"analysis":33},1141110,"关于部分分项工程施工成本分析的说法，正确的有（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":29},"分部分项工程成本分析的对象为已完成分部分项工程",{"key":24,"text":301,"correct":29},"分部分项工程成本分析是施工项目成本分析的基础",{"key":27,"text":303,"correct":22},"必须对施工项目中的所有分部分项工程进行成本分析",{"key":31,"text":305,"correct":22},"分部分项工程成本分析的方法就是进行实际成本与目标的成本比较",{"key":195,"text":307,"correct":29},"对主要分部分项工程要做到从开工到竣工进行系统的成本分析","ABE",{"id":310,"libraryId":5,"type":184,"typeLabel":185,"stem":311,"options":312,"answer":293,"analysis":33},1141111,"工程项目施工成本分析的基本方法有（ ）。",[313,314,315,317,318],{"key":20,"text":157,"correct":29},{"key":24,"text":151,"correct":29},{"key":27,"text":316,"correct":22},"统计核算法",{"key":31,"text":234,"correct":29},{"key":195,"text":232,"correct":29},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":27,"analysis":33},1141112,"在建设工程项目施工成本分析中，成本盈亏异常分析属于（ ）方法。( 2015真题 )",[323,325,327,329],{"key":20,"text":324,"correct":22},"因素分析",{"key":24,"text":326,"correct":22},"综合成本分析",{"key":27,"text":328,"correct":29},"专项成本分析",{"key":31,"text":330,"correct":22},"成本项目分析",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1141113,"某项目施工成本数据如下表，根据差额计算法，成本降低率提高对成本降低额的影响程度为（ ）万元。( 2015真题 )",[335,337,339,341],{"key":20,"text":336,"correct":22},"0.6",{"key":24,"text":338,"correct":22},"0.7",{"key":27,"text":340,"correct":22},"1.1",{"key":31,"text":342,"correct":29},"1.2",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1141114,"下列施工成本分析方法中，可以用来分析各种因素对成本影响程度的是（ ）。 2016",[347,348,349,350],{"key":20,"text":28,"correct":29},{"key":24,"text":21,"correct":22},{"key":27,"text":25,"correct":22},{"key":31,"text":32,"correct":22},{"id":352,"libraryId":5,"type":184,"typeLabel":185,"stem":353,"options":354,"answer":365,"analysis":33},1141115,"关于分部分项工程成本分析，下列说法正确的有（ ）。 2016",[355,357,359,361,363],{"key":20,"text":356,"correct":29},"分部分项成本分析是施工项目成本分析的基础",{"key":24,"text":358,"correct":22},"必须对施工项目所有的分部分项进行成本分析",{"key":27,"text":360,"correct":22},"分部分项成本分析的方法是进行实际成本与目标成本比较",{"key":31,"text":362,"correct":29},"分部分项成本分析的对象为已完分部分项工程",{"key":195,"text":364,"correct":29},"对主要的分部分项工程要做到从开工到竣工进行系统的成本分析","ADE",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1141118,"在进行月(季)度成本分析时，如果存在“政策性”亏损，则应（ ）。 2016",[370,371,373,375],{"key":20,"text":141,"correct":22},{"key":24,"text":372,"correct":22},"降低标准，防止再超支",{"key":27,"text":374,"correct":22},"暂停生产，等待政策调整",{"key":31,"text":376,"correct":29},"控制支出，压缩超支额",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1141119,"下列施工成本分析方法中，用来分析各种因素对成本影响程度的是（ ）。2014",[381,382,383,384],{"key":20,"text":21,"correct":22},{"key":24,"text":28,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":32,"correct":22},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1141120,"某施工项目某月的成本数据如下表，应用差额计算法得到预算成本增加对成本的影响是（ ）万元。2014",[389,391,393,395],{"key":20,"text":390,"correct":22},"12.0",{"key":24,"text":392,"correct":22},"8.0",{"key":27,"text":394,"correct":22},"6.4",{"key":31,"text":396,"correct":29},"1.6",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1141122,"某工程各门窗安装班组的相关经济指标如下表，按照成本分析的比率法，人均效益最好的班组是（）。2018真题",[401,403,405,407],{"key":20,"text":402,"correct":29},"甲",{"key":24,"text":404,"correct":22},"乙",{"key":27,"text":406,"correct":22},"丙",{"key":31,"text":408,"correct":22},"丁",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},1141123,"某分项工程的混凝土成本数据如下表所示。应用因素分析法分析各因素对成本的影响程度，可得到的正确结论是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"由于产量增加50，成本增加21300元",{"key":24,"text":416,"correct":22},"由于单价提高40，成本增加35020元",{"key":27,"text":418,"correct":29},"实际成本与目标成本的差额为56320元",{"key":31,"text":420,"correct":22},"由于损耗下降2%，成本减少9600元",{"id":422,"libraryId":5,"type":184,"typeLabel":185,"stem":423,"options":424,"answer":435,"analysis":33},1141124,"某项目成本及成本构成比例数据如下表，正确的有（ ）。( 2015真题 )",[425,427,429,431,433],{"key":20,"text":426,"correct":29},"成本增加比例最大的是间接成本",{"key":24,"text":428,"correct":22},"成本降低最多的项目是机械费",{"key":27,"text":430,"correct":29},"成本节约效益最大的是材料费",{"key":31,"text":432,"correct":29},"成本节约做得好的是措施费",{"key":195,"text":434,"correct":29},"直接成本增加比例最大的是人工费","ACDE",{"id":437,"libraryId":5,"type":184,"typeLabel":185,"stem":438,"options":439,"answer":446,"analysis":33},1141125,"单位工程竣工成本分析的内容包括（ ）。2014",[440,441,442,444,445],{"key":20,"text":328,"correct":22},{"key":24,"text":251,"correct":29},{"key":27,"text":443,"correct":22},"成本总量构成比例分析",{"key":31,"text":222,"correct":29},{"key":195,"text":246,"correct":29},"BDE",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1141128,"关于项目进度控制的说法，正确的是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"进度控制必须要保证工程质量和成本",{"key":24,"text":454,"correct":29},"进度目标的分析和论证是进度控制的首要工作",{"key":27,"text":456,"correct":22},"项目进度控制的依据是实施性进度计划",{"key":31,"text":458,"correct":22},"进度计划软件是基于横道图原理开发的",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},1141129,"建设工程项目进度计划应体现资源的合理使用、工序的合理组织、工作面的合理安排等，为达到上述目的（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"进度计划不必过早形成计划系统",{"key":24,"text":466,"correct":22},"应对进度计划进行动态控制",{"key":27,"text":468,"correct":29},"应对进度计划进行多方案比较与优化",{"key":31,"text":470,"correct":22},"应增大影响进度风险的敏感度系数",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1141130,"在进行施工进度控制时，必须树立和坚持的最基本的工程管理原则是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":29},"在确保工程质量的前提下，控制工程的进度",{"key":24,"text":478,"correct":22},"在确保投资的前提下，达到进度、成本的平衡",{"key":27,"text":480,"correct":22},"在确保工程投资的前提下，控制工程的进度",{"key":31,"text":482,"correct":22},"在满足各项目参与方利益最大的前提下，控制工程的进度",{"id":484,"libraryId":5,"type":184,"typeLabel":185,"stem":485,"options":486,"answer":365,"analysis":33},1141131,"关于建设工程项目进度控制的说法，正确的有（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":29},"进度控制的过程，就是随着项目的进展，进度计划不断调整的过程",{"key":24,"text":490,"correct":22},"施工方进度控制的目的就是尽量缩短工期",{"key":27,"text":492,"correct":22},"项目各参与方进度控制的目标和时间范畴是相同的",{"key":31,"text":494,"correct":29},"施工进度控制直接关系到工程的质量和成本",{"key":195,"text":496,"correct":29},"进度控制的目的是通过控制以实现工程的进度目标",{"id":498,"libraryId":5,"type":184,"typeLabel":185,"stem":499,"options":500,"answer":511,"analysis":33},1141132,"建设工程项目进度控制的主要工作环节包括（ ）等。",[501,503,505,507,509],{"key":20,"text":502,"correct":29},"进度目标的分析和论证",{"key":24,"text":504,"correct":22},"进度控制工作只能分工",{"key":27,"text":506,"correct":29},"定期跟踪进度计划的执行情况",{"key":31,"text":508,"correct":29},"采取纠偏措施及调整进度计划",{"key":195,"text":510,"correct":22},"进度控制工作流程的编制","ACD",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1141133,"建设工程项目在施工时盲目赶工，会导致（ ）。( 2015真题 )",[516,518,520,522],{"key":20,"text":517,"correct":22},"安全事故发生的概率减小",{"key":24,"text":519,"correct":22},"施工成本增加的概率减小",{"key":27,"text":521,"correct":22},"文明施工实现的概率增加",{"key":31,"text":523,"correct":29},"质量事故发生的概率增加",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1141134,"建设工程项目进度控制的过程包括：①收集资料和调查研究；②进度计划的跟踪检查③编制进度计划；④根据进度偏差情况纠偏或调整进度计划，其正确的工作步骤是（ ）。 2016",[528,530,532,534],{"key":20,"text":529,"correct":29},"①-③-②-④",{"key":24,"text":531,"correct":22},"①-②-③-④",{"key":27,"text":533,"correct":22},"①-③-④-②",{"key":31,"text":535,"correct":22},"③-①-②-④",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1141135,"在项目实施阶段，设计方编制的设计工作进度应尽可能与招标、施工和（ ）等工作进度相协调。",[540,542,544,546],{"key":20,"text":541,"correct":22},"项目选址",{"key":24,"text":543,"correct":22},"可行性研究",{"key":27,"text":545,"correct":22},"竣工验收",{"key":31,"text":547,"correct":29},"物资采购",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1141136,"建设工程项目的业主和参与方都有进度控制的任务，各方（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"控制的目标相同、但控制的时间范畴不同",{"key":24,"text":555,"correct":22},"控制的目标不同、但控制的时间范畴相同",{"key":27,"text":557,"correct":22},"控制的目标和时间范畴均相同",{"key":31,"text":559,"correct":29},"控制的目标和时间范畴各不相同",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1141137,"施工方应视项目特点和进度控制的需要，编制（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"项目动用前准备工作计划",{"key":24,"text":567,"correct":29},"施工进度计划",{"key":27,"text":569,"correct":22},"设计进度计划",{"key":31,"text":571,"correct":22},"主要设备采购工作计划",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1141138,"业主方项目进度控制的任务是控制（ ）的进度。",[576,578,580,582],{"key":20,"text":577,"correct":22},"项目设计阶段",{"key":24,"text":579,"correct":22},"整个项目决策阶段",{"key":27,"text":581,"correct":22},"项目施工阶段",{"key":31,"text":583,"correct":29},"整个项目实施阶段",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},1141139,"建设项目设计方进度控制的任务是依据（ ）对设计工作进度的要求，控制设计工作进度。",[588,590,592,594],{"key":20,"text":589,"correct":22},"可行性研究报告",{"key":24,"text":591,"correct":22},"设计大纲",{"key":27,"text":593,"correct":22},"设计总进度纲要",{"key":31,"text":595,"correct":29},"设计任务委托合同",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},1141140,"建设工程施工进度控制中，业主方的任务是控制整个项目（ ）的进度。",[600,602,604,606],{"key":20,"text":601,"correct":29},"实施阶段",{"key":24,"text":603,"correct":22},"决策阶段",{"key":27,"text":605,"correct":22},"项目全寿命周期",{"key":31,"text":607,"correct":22},"使用阶段",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":27,"analysis":33},1141141,"设计方进度控制的任务是依据（ ）对设计工作进度的要求控制设计工作进度，这是设计方履行合同的义务。",[612,613,615,616],{"key":20,"text":589,"correct":22},{"key":24,"text":614,"correct":22},"设计标准和规范",{"key":27,"text":595,"correct":29},{"key":31,"text":593,"correct":22},{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":27,"analysis":33},1141142,"业主方控制设计进度的依据是（ ）。",[621,623,624,626],{"key":20,"text":622,"correct":22},"设计合同",{"key":24,"text":569,"correct":22},{"key":27,"text":625,"correct":29},"出图计划",{"key":31,"text":627,"correct":22},"设计目标",[629,632,635,638,641,644],{"id":15,"name":630,"category":7,"favorite":631},"领导干部任职前廉政法规知识测试题",92,{"id":633,"name":634,"category":7,"favorite":15},595,"建筑结构与设备",{"id":636,"name":637,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":639,"name":640,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":642,"name":643,"category":7,"favorite":8},534,"BIM工程师",{"id":645,"name":643,"category":7,"favorite":8},535]