[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":647},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,12,50,2721,[13,34,46,58,70,82,94,106,115,127,139,149,167,182,197,212,227,242,251,263,275,290,302,316,328,336,348,360,372,387,399,411,423,434,446,460,474,486,498,512,524,536,548,560,572,584,596,608,623,638],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1141021,1,"单选题","费用偏差原因分析中，组织不落实属于（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","客观原因",false,{"key":24,"text":25,"correct":22},"B","施工原因",{"key":27,"text":28,"correct":29},"C","业主原因",true,{"key":31,"text":32,"correct":22},"D","设计原因","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1141022,"具有形象、直观、一目了然等优点的施工成本偏差分析法是（ ），它能够准确表达出施工成本的绝对偏差。",[38,40,42,44],{"key":20,"text":39,"correct":22},"排列图法",{"key":24,"text":41,"correct":22},"表格法",{"key":27,"text":43,"correct":29},"横道图法",{"key":31,"text":45,"correct":22},"曲线法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1141023,"某工程公司工期为3个月，2013年5月1日开工，5～7月份计划完成工程量分别为500t、2000t、1500t，计划单价为5000元\u002Ft；实际完成工程量分别为400t、1600t、2000t，5～7月份实际价格均为4000元\u002Ft。则6月末的费用偏差为（ ）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"160",{"key":24,"text":53,"correct":22},"-160",{"key":27,"text":55,"correct":29},"200",{"key":31,"text":57,"correct":22},"-200",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1141024,"下列方法中，可用于分析建设工程项目施工成本偏差的方法是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"因素分析法和比较法",{"key":24,"text":65,"correct":29},"曲线法和表格法",{"key":27,"text":67,"correct":22},"连环置换法和比率法",{"key":31,"text":69,"correct":22},"连环置换法和曲线法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1141025,"应用S形曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离表示施工（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"进度累计偏差",{"key":24,"text":77,"correct":29},"成本累计偏差",{"key":27,"text":79,"correct":22},"进度局部偏差",{"key":31,"text":81,"correct":22},"成本局部偏差",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1141026,"某工程10月份拟完工程计划施工成本50万元，已完工程计划施工成本45万元，已完工程实际施工成本48万元，该工程10月底施工成本偏差和进度偏差分别是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"成本超支3万元，进度拖延5万元",{"key":24,"text":89,"correct":22},"成本超支3万元，进度拖延3万元",{"key":27,"text":91,"correct":22},"成本节约2万元，进度提前5万元",{"key":31,"text":93,"correct":22},"成本节约2万元，进度提前3万元",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1141027,"在偏差计算中，如果施工成本偏差小于零，进度偏差大于零，则结论为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工成本节约，工期拖延",{"key":24,"text":101,"correct":22},"施工成本节约，工期提前",{"key":27,"text":103,"correct":22},"施工成本超支，工期拖延",{"key":31,"text":105,"correct":29},"施工成本超支，工期提前",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1141028,"偏差分析的方法不包括（ ）。",[110,111,112,113],{"key":20,"text":43,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":114,"correct":29},"比较法",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},1141029,"施工成本偏差分析可采用不同的表达方法，常用的有（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":29},"横道图法、表格法和曲线法",{"key":24,"text":122,"correct":22},"网络图法、横道图法和表格法",{"key":27,"text":124,"correct":22},"比较法、因素分析法和差额计算法",{"key":31,"text":126,"correct":22},"网络图法、表格法和曲线法",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1141030,"下列施工成本材料费的控制中，可以影响材料价格的因素是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"材料领用的指标",{"key":24,"text":134,"correct":22},"材料的投料计量",{"key":27,"text":136,"correct":22},"材料消耗量的大小",{"key":31,"text":138,"correct":29},"材料的采购运输",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1141031,"应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离，表示（ ）。",[143,145,147,148],{"key":20,"text":144,"correct":29},"成本偏差",{"key":24,"text":146,"correct":22},"进度偏差",{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":150,"libraryId":5,"type":151,"typeLabel":152,"stem":153,"options":154,"answer":166,"analysis":33},1141032,2,"多选题","采用过程控制的方法控制施工成本时，控制的要点有（ )。",[155,157,159,161,163],{"key":20,"text":156,"correct":29},"人工费、材料费按量价分离原则进行控制",{"key":24,"text":158,"correct":22},"材料价格由项目经理负责控制",{"key":27,"text":160,"correct":22},"零星材料采用定额控制方法进行控制",{"key":31,"text":162,"correct":29},"提高劳动生产率，降低工程耗用人工工日，是控制人工费的主要手段",{"key":164,"text":165,"correct":29},"E","对分包费用的控制，重点是做好分包工程询价、验收和结算等工作","ADE",{"id":168,"libraryId":5,"type":151,"typeLabel":152,"stem":169,"options":170,"answer":181,"analysis":33},1141033,"应用表格法进行偏差分析的特点是（ ）。",[171,173,175,177,179],{"key":20,"text":172,"correct":22},"形象、直观、一目了然",{"key":24,"text":174,"correct":22},"一般在项目的较高管理层应用",{"key":27,"text":176,"correct":29},"灵活、适用性强",{"key":31,"text":178,"correct":29},"信息量大",{"key":164,"text":180,"correct":29},"表格处理可借助于计算机，从而节约大量数据处理所需的人力，并大大提高速度","CDE",{"id":183,"libraryId":5,"type":151,"typeLabel":152,"stem":184,"options":185,"answer":196,"analysis":33},1141034,"横道图法是分析建设工程项目施工成本偏差的常用方法，其特点包括（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"能够直观地显示偏差分析所需用的资料",{"key":24,"text":189,"correct":29},"能够准确表达施工成本的绝对偏差",{"key":27,"text":191,"correct":22},"能够准确表达施工成本的相对偏差",{"key":31,"text":193,"correct":22},"能够直观地显示施工成本的局部偏差和累计偏差",{"key":164,"text":195,"correct":29},"能够直观地显示偏差的严重程序","BE",{"id":198,"libraryId":5,"type":151,"typeLabel":152,"stem":199,"options":200,"answer":211,"analysis":33},1141035,"关于项目费用偏差分析方法的说法，正确的有（ ）。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"横道图法是最常用的一种方法",{"key":24,"text":204,"correct":29},"横道图法形象，直观",{"key":27,"text":206,"correct":22},"曲线法能够直接用于定量分析",{"key":31,"text":208,"correct":29},"表格法反映信息量大",{"key":164,"text":210,"correct":29},"表格法具有灵活，适用性强的特点","BDE",{"id":213,"libraryId":5,"type":151,"typeLabel":152,"stem":214,"options":215,"answer":226,"analysis":33},1141036,"下列产生费用偏差的原因中，属于业主原因的有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":29},"增加内容",{"key":24,"text":219,"correct":29},"建设手续不全",{"key":27,"text":221,"correct":22},"工期拖延",{"key":31,"text":223,"correct":29},"投资规划不当",{"key":164,"text":225,"correct":22},"图纸提供不及时","ABD",{"id":228,"libraryId":5,"type":151,"typeLabel":152,"stem":229,"options":230,"answer":241,"analysis":33},1141037,"施工机械使用费主要由台班数量和台班单价两方面决定，为有效控制施工机械使用费的支出，工机械使用费的控制措施有（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":29},"加强机械操作人员的培训工作，不断提高操作技能，提高施工机械台班的生产效率",{"key":24,"text":234,"correct":22},"降低材料成本，严把施工机械配件和工程材料采购关，尽量做到工程项目所进材料质优价廉",{"key":27,"text":236,"correct":29},"加强设备租赁计划管理，减少不必要的设备闲置和浪费，充分利用社会闲置机械资源",{"key":31,"text":238,"correct":29},"核定设备台班定额产量，实行超产奖励办法，加快施工生产进度，提高机械设备单位时间的生产效率和利用率",{"key":164,"text":240,"correct":29},"加强现场设备的维修、保养工作，降低大修、经常性修理等各项费用的开支","ACDE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1141038,"进行施工成本偏差分析最常用的一种方法是（ ）。",[246,247,248,249],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":250,"correct":22},"直方图法",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":27,"analysis":33},1141039,"建设工程项目施工成本偏差是指（ ）之差。",[255,257,259,261],{"key":20,"text":256,"correct":22},"已完工程实际施工成本与拟完工程计划施工成本",{"key":24,"text":258,"correct":22},"已完工程计划施工成本与拟完工程计划施工成本",{"key":27,"text":260,"correct":29},"已完工程实际施工成本与已完工程计划施工成本",{"key":31,"text":262,"correct":22},"已完工程计划施工成本与拟完工程实际施工成本",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":24,"analysis":33},1141040,"某工程每月所需混凝土量相同，混凝土用量为3200m3，计划4个月完成，混凝土综合价格为1000元\u002Fm3；实际混凝土用量为5000m3，用时5个月，从第1个月至第5个月各月混凝土价格指数（%）为100，115，110，105，115。则根据赢得值法，前3个月的费用偏差为（ ）万元。( 2015真题 )",[267,269,271,273],{"key":20,"text":268,"correct":22},"-30",{"key":24,"text":270,"correct":29},"-25",{"key":27,"text":272,"correct":22},"-22",{"key":31,"text":274,"correct":22},"-20",{"id":276,"libraryId":5,"type":151,"typeLabel":152,"stem":277,"options":278,"answer":289,"analysis":33},1141041,"某工作横道图费用偏差分析如下图，正确的有（ ）。( 2015真题 )",[279,281,283,285,287],{"key":20,"text":280,"correct":29},"费用超支",{"key":24,"text":282,"correct":29},"进度较快",{"key":27,"text":284,"correct":22},"效率较高",{"key":31,"text":286,"correct":22},"可采用抽出部分人员，放慢进度的措施",{"key":164,"text":288,"correct":29},"投入超前","ABE",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1141042,"某施工项目部根据以往项目的材料实际耗用情况，结合具体施工项目要求，制定领用材料标准控制发料。这种材料用量控制方法是（ ）。( 2015真题 )",[294,296,298,300],{"key":20,"text":295,"correct":22},"定额控制",{"key":24,"text":297,"correct":22},"计量控制",{"key":27,"text":299,"correct":29},"指标控制",{"key":31,"text":301,"correct":22},"包干控制",{"id":303,"libraryId":5,"type":151,"typeLabel":152,"stem":304,"options":305,"answer":211,"analysis":33},1141043,"关于施工成本偏差分析方法的说法，正确的有（ ）。 2016",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"横道图法是进行偏差分析最常用的一种方法",{"key":24,"text":309,"correct":29},"横道图法具有形象、直观等优点",{"key":27,"text":311,"correct":22},"曲线法不能用于定量分析",{"key":31,"text":313,"correct":29},"表格法反映的信息量大",{"key":164,"text":315,"correct":29},"表格法具有灵活、适用性强的优点",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1141044,"某分项工程某月计划工程量为3200m2，计划单价为15元\u002Fm2；月底核定承包商实际完成工程量为2800m2，实际单价为20元\u002Fm2，则该工程的已完成工作实际费用（ACWP）为（ ）元。 2016",[320,322,324,326],{"key":20,"text":321,"correct":29},"56000",{"key":24,"text":323,"correct":22},"42000",{"key":27,"text":325,"correct":22},"48000",{"key":31,"text":327,"correct":22},"64000",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},1141045,"应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离表示项目进展的（ ）。 2016",[332,333,334,335],{"key":20,"text":75,"correct":22},{"key":24,"text":79,"correct":22},{"key":27,"text":77,"correct":29},{"key":31,"text":81,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},1141047,"某工程项目的赢得值曲线如下图，关于项目偏差原因分析与纠偏措施的说法，正确的是（ ）。2017",[340,342,344,346],{"key":20,"text":341,"correct":22},"效率高，进度较慢，投入延后",{"key":24,"text":343,"correct":22},"效率较高,进度较慢，投入超前",{"key":27,"text":345,"correct":29},"抽出部分人员，放慢进度",{"key":31,"text":347,"correct":22},"增加人员投入，加快速度",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1141049,"施工成本的过程控制中，人工费的控制实行（ ）方法。2014",[352,354,356,358],{"key":20,"text":353,"correct":22},"量化管理",{"key":24,"text":355,"correct":29},"量价分离",{"key":27,"text":357,"correct":22},"弹性管理",{"key":31,"text":359,"correct":22},"指标包干",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":27,"analysis":33},1141050,"某项目地面铺贴的清单工程量为1000m2，预算费用单价60元\u002Fm2，计划每天施工100m2。2018真题第6天检查时发现，实际完成800m2，实际费用为5万元。2018真题根据上述情况，预计项目完工时的费用偏差（ACV）是（）元。2018真题",[364,366,368,370],{"key":20,"text":365,"correct":22},"2500",{"key":24,"text":367,"correct":22},"2000",{"key":27,"text":369,"correct":29},"－2500",{"key":31,"text":371,"correct":22},"－2000",{"id":373,"libraryId":5,"type":151,"typeLabel":152,"stem":374,"options":375,"answer":386,"analysis":33},1141051,"某混凝土工程的清单综合单价1000元\u002Fm3，按月结算，进度数据如下表。按赢得值法计算，3月末已完工作实际费用（ACWP）是9790千元。该工程3月末参数或指标正确的有（）。2018真题",[376,378,380,382,384],{"key":20,"text":377,"correct":29},"已完工作预算费用（BCWP）是9100千元",{"key":24,"text":379,"correct":29},"进度偏差（SV）是－1600千元",{"key":27,"text":381,"correct":29},"费用绩效指数（CPI）是0.93",{"key":31,"text":383,"correct":29},"计划工作预算费用（BCWS）是10700千元",{"key":164,"text":385,"correct":22},"费用偏差（CV）是690千元","ABCD",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":31,"analysis":33},1141052,"某建设工程项目施工过程中，收集到的分部工程A的资料见下表。分部工程A的施工成本节约（ ）元。",[391,393,395,397],{"key":20,"text":392,"correct":22},"35000",{"key":24,"text":394,"correct":22},"32000",{"key":27,"text":396,"correct":22},"18000",{"key":31,"text":398,"correct":29},"15000",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1141053,"下图所示为拟完工程和已完工程计划施工成本的比较，图中△表示t时刻的（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"施工成本节约值",{"key":24,"text":406,"correct":22},"施工成本增加值",{"key":27,"text":408,"correct":29},"施工进度滞后量",{"key":31,"text":410,"correct":22},"施工进度提前量",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1141057,"（2020年真题）某工程第三个月末时的已完工作实际费用(ACWP)为1200万元、已完工作预算费用(BCWP)为1000万元、计划工作预算费用(BCWS)为1500万元，根据赢得值法判断分析应采取的措施是（ ）",[415,417,419,421],{"key":20,"text":416,"correct":22},"迅速增加人员投入",{"key":24,"text":418,"correct":29},"增加高效人员投入",{"key":27,"text":420,"correct":22},"抽出部分人员，增加少量骨干人员",{"key":31,"text":422,"correct":22},"用工作效率高的人员更换一批工作效率低的人员",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1141058,"（2020年真题）某混凝上工程施工情况如下图，清单综合单价为1000元\u002Fm3，按月结算，根据赢得值法，该工程6月末进度偏差(SV)是（ ）万元。",[427,429,430,432],{"key":20,"text":428,"correct":29},"-215",{"key":24,"text":57,"correct":22},{"key":27,"text":431,"correct":22},"-125",{"key":31,"text":433,"correct":22},"-60",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},1141060,"关于施工项目或成本核算方法的说法，正确的是（）。2018真题",[438,440,442,444],{"key":20,"text":439,"correct":22},"表格核算法的优点是覆盖面较大",{"key":24,"text":441,"correct":22},"会计核算法不核算工程项目在施工过程中出现的债权债务",{"key":27,"text":443,"correct":29},"表格核算法可用于工程项目施工各岗位成本的责任核算",{"key":31,"text":445,"correct":22},"会计核算法不能用于整个企业的生产经营核算",{"id":447,"libraryId":5,"type":151,"typeLabel":152,"stem":448,"options":449,"answer":181,"analysis":33},1141064,"下列施工费用中，可直接计入直接成本的有（）。2018真题",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"周转材料购置费",{"key":24,"text":453,"correct":22},"管理人员差旅交通费",{"key":27,"text":455,"correct":29},"人工费",{"key":31,"text":457,"correct":29},"施工机械使用费",{"key":164,"text":459,"correct":29},"材料采购保管费",{"id":461,"libraryId":5,"type":151,"typeLabel":152,"stem":462,"options":463,"answer":166,"analysis":33},1141065,"根据《财政部关于印发的通知》（财会[2013]17号），建筑业企业可设置的成本项目有（）。2018真题",[464,466,468,470,472],{"key":20,"text":465,"correct":29},"直接人工",{"key":24,"text":467,"correct":22},"借款费用",{"key":27,"text":469,"correct":22},"相关税费",{"key":31,"text":471,"correct":29},"其他直接费用",{"key":164,"text":473,"correct":29},"分包成本",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1141066,"工程成本应当包括（）所发生的，与执行合同有关的直接费用和间接费用。2018真题",[478,480,482,484],{"key":20,"text":479,"correct":22},"从工程投标开始至竣工验收为止",{"key":24,"text":481,"correct":22},"从场地移交开始至项目移交为止",{"key":27,"text":483,"correct":29},"从合同签订开始至合同完成为止",{"key":31,"text":485,"correct":22},"从项目设计开始至竣工投产为止",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},1141068,"（2020年真题）根据《财政部关于印发(试行)的通知》，下列工程成本费用中，属于其他直接费用的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"有助于工程形成的其他材料费",{"key":24,"text":493,"correct":22},"为管理工程施工所发生的费用",{"key":27,"text":495,"correct":29},"工程定位复测费",{"key":31,"text":497,"correct":22},"企业管理人员的差旅交通费",{"id":499,"libraryId":5,"type":151,"typeLabel":152,"stem":500,"options":501,"answer":211,"analysis":33},1141070,"下列成本计划指标中，属于数量指标的有（）。2018真题",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"设计预算成本计划降低率",{"key":24,"text":505,"correct":29},"工程项目计划总成本指标",{"key":27,"text":507,"correct":22},"责任目标成本计划降低率",{"key":31,"text":509,"correct":29},"按主要生产要素划分的计划成本指标",{"key":164,"text":511,"correct":29},"各单位工程计划成本指标",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1141075,"下列关于施工成本分析的依据的说明中，正确的是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"会计核算的范围比业务核算大",{"key":24,"text":519,"correct":22},"会计核算不仅能对已发生的业务进行核算，还能对未发生的业务进行核算",{"key":27,"text":521,"correct":22},"会计核算的计量尺度比统计核算宽",{"key":31,"text":523,"correct":29},"会计核算主要是价值核算",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1141076,"建设工程项目施工成本分析是指（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"在成本计划编制阶段对施工成本的估算和分解",{"key":24,"text":531,"correct":29},"在成本形成过程中对施工成本进行的对比评价和总结",{"key":27,"text":533,"correct":22},"在完成施工任务后对施工成本进行的对比评价和总结",{"key":31,"text":535,"correct":22},"在成本预算阶段对施工成本的估算和分解",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1141077,"对已经发生的、正在发生的和尚未发生的经济活动进行核算，属于（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"会计核算",{"key":24,"text":543,"correct":29},"业务核算",{"key":27,"text":545,"correct":22},"动态核算",{"key":31,"text":547,"correct":22},"统计核算",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1141078,"关于统计核算的叙述中，错误的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":29},"它的计量尺度比会计核算窄",{"key":24,"text":555,"correct":22},"可以计算当前的实际水平，确定变动速度，可以预测发展的趋势",{"key":27,"text":557,"correct":22},"能提供绝对数指标，还能提供相对数和平均数指标",{"key":31,"text":559,"correct":22},"是利用会计核算资料和业务核算资料，把企业生产经营活动客观现状的大量数据，按统计方法加以系统整理，表明其规律性",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1141079,"在施工成本的各种核算方法中，业务核算比（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":29},"会计核算和统计核算的范围广",{"key":24,"text":567,"correct":22},"会计核算的范围窄，比统计核算的范围广",{"key":27,"text":569,"correct":22},"会计核算的范围广，比统计核算的范围窄",{"key":31,"text":571,"correct":22},"会计核算和统计核算的范围窄",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":27,"analysis":33},1141080,"施工成本分析是在（ ）的基础上，对成本的形成过程和影响因素进行分析。",[576,578,580,582],{"key":20,"text":577,"correct":22},"施工成本计划",{"key":24,"text":579,"correct":22},"施工成本预测",{"key":27,"text":581,"correct":29},"施工成本核算",{"key":31,"text":583,"correct":22},"施工成本考核",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":33},1141081,"施工企业进行会计核算时的会计要素包括（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"资产、负债、利息",{"key":24,"text":591,"correct":22},"负债、存货、折旧",{"key":27,"text":593,"correct":29},"资产、负债、所有者权益",{"key":31,"text":595,"correct":22},"利息、存货、所有者权益",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},1141082,"业务核算是施工成本分析的依据之一，其目的是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"预测成本变化发展的趋势",{"key":24,"text":603,"correct":29},"迅速取得资料，及时采取措施调整经济活动",{"key":27,"text":605,"correct":22},"计算当前的实际成本水平",{"key":31,"text":607,"correct":22},"记录企业的一切生产经营活动",{"id":609,"libraryId":5,"type":151,"typeLabel":152,"stem":610,"options":611,"answer":622,"analysis":33},1141083,"进行分部分项工程施工成本分析时，其资料来源包括（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"工程合同总价",{"key":24,"text":615,"correct":29},"实耗人工和材料",{"key":27,"text":617,"correct":29},"施工预算",{"key":31,"text":619,"correct":22},"工程概算",{"key":164,"text":621,"correct":29},"实际工程量","BCE",{"id":624,"libraryId":5,"type":151,"typeLabel":152,"stem":625,"options":626,"answer":637,"analysis":33},1141084,"关于会计核算的表述，正确的是（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":29},"主要是价值核算",{"key":24,"text":630,"correct":29},"资产、负债、所有者权益、收入、费用和利润等主要是通过会计来核算",{"key":27,"text":632,"correct":29},"是施工成本分析的重要依据",{"key":31,"text":634,"correct":22},"核算的范围比业务、统计核算要广",{"key":164,"text":636,"correct":22},"核算的目的在于迅速取得资料，在经济活动中及时采取措施进行调整","ABC",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":31,"analysis":33},1141085,"下列施工成本分析依据中，属于可对已发生，又可对尚未发生或正在发生的经济活动进行核算的是（ ） 2016",[642,643,644,646],{"key":20,"text":541,"correct":22},{"key":24,"text":547,"correct":22},{"key":27,"text":645,"correct":22},"成本预测",{"key":31,"text":543,"correct":29},[648,651,654,657,660,663],{"id":15,"name":649,"category":7,"favorite":650},"领导干部任职前廉政法规知识测试题",92,{"id":652,"name":653,"category":7,"favorite":15},595,"建筑结构与设备",{"id":655,"name":656,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":658,"name":659,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":661,"name":662,"category":7,"favorite":8},534,"BIM工程师",{"id":664,"name":662,"category":7,"favorite":8},535]