[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":629},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,11,50,2721,[13,34,44,56,68,80,98,113,123,133,146,158,173,182,196,207,222,233,245,256,268,280,291,303,318,333,348,356,370,384,395,407,419,431,443,455,465,477,492,504,516,528,537,545,557,569,581,593,605,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1140961,1,"单选题","编制施工项目成本计划，关键是确定项目的（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","概算成本",false,{"key":24,"text":25,"correct":22},"B","成本构成",{"key":27,"text":28,"correct":29},"C","目标成本",true,{"key":31,"text":32,"correct":22},"D","实际成本","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1140962,"施工成本计划的编制以成本预测为基础，关键是确定（ ）。",[38,39,41,43],{"key":20,"text":28,"correct":29},{"key":24,"text":40,"correct":22},"预算成本",{"key":27,"text":42,"correct":22},"计划成本",{"key":31,"text":32,"correct":22},{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":31,"analysis":33},1140963,"建设工程项目施工成本计划可分别按施工成本组成、子项目组成和工程进度编制，在工程实践中，经常（ ）。",[48,50,52,54],{"key":20,"text":49,"correct":22},"按施工成本组成编制",{"key":24,"text":51,"correct":22},"按子项目组成编制",{"key":27,"text":53,"correct":22},"按工程进度编制",{"key":31,"text":55,"correct":29},"将三种方法结合起来使用",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":27,"analysis":33},1140964,"根据《建设工程工程量清单计价规范》（GB 50500-2008），工程排污费属于建筑安装工程费中的（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"企业管理费",{"key":24,"text":63,"correct":22},"措施费",{"key":27,"text":65,"correct":29},"规费",{"key":31,"text":67,"correct":22},"直接工程费",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1140965,"按建设项目工程成本构成编制施工成本计划时，将施工成本分解为（ ）等。",[72,74,76,78],{"key":20,"text":73,"correct":22},"直接费、间接费、利润、税金",{"key":24,"text":75,"correct":29},"人工费、材料费、施工机械使用费、措施项目费、企业管理费",{"key":27,"text":77,"correct":22},"单位工程施工成本及分部、分项工程施工成本",{"key":31,"text":79,"correct":22},"分部分项工程费、其他项目费、规费",{"id":81,"libraryId":5,"type":82,"typeLabel":83,"stem":84,"options":85,"answer":97,"analysis":33},1140967,2,"多选题","常用的建设工程项目施工成本计划可按（ ）编制。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"施工成本组成",{"key":24,"text":89,"correct":22},"人力资源需求",{"key":27,"text":91,"correct":29},"项目组成",{"key":31,"text":93,"correct":29},"工程进度",{"key":95,"text":96,"correct":22},"E","交通费","ACD",{"id":99,"libraryId":5,"type":82,"typeLabel":83,"stem":100,"options":101,"answer":112,"analysis":33},1140968,"建设工程项目施工成本计划应在（ ）的前提下进行编制。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"项目施工组织设计完成",{"key":24,"text":105,"correct":29},"项目实施方案不断优化",{"key":27,"text":107,"correct":29},"项目实施方案确定",{"key":31,"text":109,"correct":22},"组织管理措施确定",{"key":95,"text":111,"correct":22},"项目质量目标确定","BC",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":27,"analysis":33},1140970,"建设工程项目按其成本构成编制施工成本计划，是指将施工成本分解为（ ）。",[117,118,119,121],{"key":20,"text":73,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":120,"correct":29},"人工费、材料费、施工机械使用费、措施费、企业管理费",{"key":31,"text":122,"correct":22},"建筑工程费和安装工程费",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},1140971,"下列各项中，属于施工成本按成本组成分解的是（ ）。",[127,128,130,132],{"key":20,"text":73,"correct":22},{"key":24,"text":129,"correct":22},"直接工程费、企业管理费、利润、税金",{"key":27,"text":131,"correct":22},"直接工程费、措施费、企业管理费、利润、税金",{"key":31,"text":120,"correct":29},{"id":134,"libraryId":5,"type":82,"typeLabel":83,"stem":135,"options":136,"answer":145,"analysis":33},1140972,"施工成本可以按成本构成分解为人工费，材料费和（ ）等。",[137,139,141,143,144],{"key":20,"text":138,"correct":29},"措施项目费",{"key":24,"text":140,"correct":22},"暂估价",{"key":27,"text":142,"correct":29},"施工机械使用费",{"key":31,"text":65,"correct":22},{"key":95,"text":61,"correct":29},"ACE",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1140973,"编制施工成本计划时，施工成本可按成本构成分解为人工费、材料费、施工机械使用费、( )。",[150,152,154,156],{"key":20,"text":151,"correct":29},"措施项目费和企业管理费",{"key":24,"text":153,"correct":22},"直接费和间接费",{"key":27,"text":155,"correct":22},"规费和企业管理费",{"key":31,"text":157,"correct":22},"间接费、利润和税金",{"id":159,"libraryId":5,"type":82,"typeLabel":83,"stem":160,"options":161,"answer":172,"analysis":33},1140974,"下列建筑安装工程费用中，属于企业管理费用的有（）。2018真题",[162,164,166,168,170],{"key":20,"text":163,"correct":29},"检验试验费",{"key":24,"text":165,"correct":29},"劳动保护费",{"key":27,"text":167,"correct":29},"城市维护建设税",{"key":31,"text":169,"correct":22},"增值税",{"key":95,"text":171,"correct":29},"教育费附加","ABCE",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1140975,"施工成本计划的编制以成本预测为基础，关键是确定（ ）。2014",[177,178,179,181],{"key":20,"text":28,"correct":29},{"key":24,"text":40,"correct":22},{"key":27,"text":180,"correct":22},"固定成本",{"key":31,"text":32,"correct":22},{"id":183,"libraryId":5,"type":82,"typeLabel":83,"stem":184,"options":185,"answer":112,"analysis":33},1140976,"按最早开始时间编制的施工计划及各工作每月成本强度（单位：万元\u002F月）如下图，D工作可以按最早开始时间或最迟开始时间进行安排。则4月份的施工成本计划值可以是（ ）万元。( 2015真题 )",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"60",{"key":24,"text":189,"correct":29},"50",{"key":27,"text":191,"correct":29},"25",{"key":31,"text":193,"correct":22},"15",{"key":95,"text":195,"correct":22},"10",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},1140979,"已知某施工项目的计划数据资料如下表所示，则第3周的施工成本计划值是（ ）万元。",[200,202,203,205],{"key":20,"text":201,"correct":22},"30",{"key":24,"text":187,"correct":22},{"key":27,"text":204,"correct":22},"75",{"key":31,"text":206,"correct":29},"90",{"id":208,"libraryId":5,"type":82,"typeLabel":83,"stem":209,"options":210,"answer":221,"analysis":33},1140980,"按施工进度编制施工成本计划时，若所有工作均按照最早开始时间安排，则对项目目标控制的影响有（ ）。",[211,213,215,217,219],{"key":20,"text":212,"correct":29},"工程按期竣工的保证率较高",{"key":24,"text":214,"correct":22},"工程质量会更好",{"key":27,"text":216,"correct":29},"不利于节约资金贷款利息",{"key":31,"text":218,"correct":22},"有利于降低投资",{"key":95,"text":220,"correct":22},"不能保证工程质量","AC",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1140984,"某项目施工成本计划如下图，则5月末计划累积成本支出为（）万元。2018真题",[226,228,230,232],{"key":20,"text":227,"correct":22},"325",{"key":24,"text":229,"correct":29},"270",{"key":27,"text":231,"correct":22},"180",{"key":31,"text":204,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1140985,"某项目按施工进度编制的施工成本计划入下图，则4月份计划成本是（ ）万元。( 2015真题 )",[237,239,241,243],{"key":20,"text":238,"correct":22},"300",{"key":24,"text":240,"correct":29},"400",{"key":27,"text":242,"correct":22},"750",{"key":31,"text":244,"correct":22},"1150",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1140987,"某施工承包企业将其承接的高速公路项目的目标总成本，分解为桥梁工程，隧道工程成本，道路工程成本等子项，并编制相应的成本计划。这是按（ ）编制施工成本计划。",[249,251,252,254],{"key":20,"text":250,"correct":22},"成本组成",{"key":24,"text":91,"correct":29},{"key":27,"text":253,"correct":22},"工程类别",{"key":31,"text":255,"correct":22},"工程性质",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1140988,"大中型工程项目是由多个（ ）组成的。",[260,262,264,266],{"key":20,"text":261,"correct":29},"单项工程",{"key":24,"text":263,"correct":22},"单体工程",{"key":27,"text":265,"correct":22},"单位工程",{"key":31,"text":267,"correct":22},"分项工程",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1140989,"在编制成本支出计划时，要在项目的总的方面考虑总的预备费，也要在（ ）中安排适当的不可预见费。",[272,274,276,278],{"key":20,"text":273,"correct":22},"所有的分项工程中",{"key":24,"text":275,"correct":22},"所有的检验批中",{"key":27,"text":277,"correct":22},"主要的检验批中",{"key":31,"text":279,"correct":29},"主要的分项工程中",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1140990,"编制大中型建设工程项目施工成本支出计划时，要在项目总的方面考虑总的预备费，也要在（ ）中考虑不可预见费。",[284,286,288,289],{"key":20,"text":285,"correct":22},"前期工作",{"key":24,"text":287,"correct":29},"主要分项工程",{"key":27,"text":61,"correct":22},{"key":31,"text":290,"correct":22},"施工成本考核",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1140991,"对大中型工程项目，按项目组成编制施工成本计划时，其总成本分解的顺序是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":29},"单项工程成本→单位（子单位）工程成本→分部（子分部）工程成本→分项工程成本",{"key":24,"text":298,"correct":22},"单位（子单位）工程成本→单项工程成本→分部（子）分部→工程成本→分项工程成本",{"key":27,"text":300,"correct":22},"分项工程成本→分部（子分部）工程成本→单位（子单位）工程成本→单项工程成本",{"key":31,"text":302,"correct":22},"分部（子分部）工程成本→分项工程成本→单项工程成本→单位（子单位）工程成本",{"id":304,"libraryId":5,"type":82,"typeLabel":83,"stem":305,"options":306,"answer":317,"analysis":33},1140992,"关于施工成本计划编制的说法，正确的有（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"在编制施工成本支出计划时，无需考虑不可预见费",{"key":24,"text":310,"correct":22},"施工成本可分解为人工费、材料费、机械费、间接费和税金",{"key":27,"text":312,"correct":29},"编制施工成本计划可利用控制项目进度的网络进度计划",{"key":31,"text":314,"correct":29},"编制施工成本计划的关键是确立目标成本",{"key":95,"text":316,"correct":29},"按进度编制的施工成本计划可以用\"时间-成本累积曲线\"来表示","CDE",{"id":319,"libraryId":5,"type":82,"typeLabel":83,"stem":320,"options":321,"answer":332,"analysis":33},1140993,"施工总成本目标确定之后，还需通过编制详细的实施性施工成本计划把目标成本层层分解，落实到施工过程的每个环节，有效地进行成本控制，施工成本计划的编制方式有（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":29},"按施工成本组成",{"key":24,"text":325,"correct":29},"按工程进度",{"key":27,"text":327,"correct":22},"按工程适用范围",{"key":31,"text":329,"correct":22},"按项目内容",{"key":95,"text":331,"correct":29},"按项目组成","ABE",{"id":334,"libraryId":5,"type":82,"typeLabel":83,"stem":335,"options":336,"answer":347,"analysis":33},1140994,"某项目实施过程中，绘制了下图所示的时间—成本累积曲线，该图反映的项目程度的正确信息有（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":29},"Ⅱ阶段进度慢",{"key":24,"text":340,"correct":22},"Ⅰ阶段进度慢",{"key":27,"text":342,"correct":22},"Ⅲ阶段进度慢",{"key":31,"text":344,"correct":29},"Ⅳ阶段进度慢",{"key":95,"text":346,"correct":22},"工程施工连续","AD",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1140995,"施工成本计划是施工项目成本控制的一个重要环节。一般情况下，施工成本计划总额应控制在（ ）的范围内。",[352,353,354,355],{"key":20,"text":180,"correct":22},{"key":24,"text":28,"correct":29},{"key":27,"text":40,"correct":22},{"key":31,"text":32,"correct":22},{"id":357,"libraryId":5,"type":82,"typeLabel":83,"stem":358,"options":359,"answer":369,"analysis":33},1140996,"建设工程施工成本控制要以工程承包合同为依据，围绕降低工程成本这个目标，从（ ）方面，努力挖掘增收节支潜力，以求获得最大的经济效益。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"工程变更",{"key":24,"text":363,"correct":22},"会计核算",{"key":27,"text":365,"correct":29},"预算收入",{"key":31,"text":367,"correct":22},"成本计划",{"key":95,"text":32,"correct":29},"CE",{"id":371,"libraryId":5,"type":82,"typeLabel":83,"stem":372,"options":373,"answer":383,"analysis":33},1140997,"工程项目施工成本控制的依据有（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"工程造价",{"key":24,"text":377,"correct":29},"施工组织设计",{"key":27,"text":379,"correct":29},"工程承包合同",{"key":31,"text":381,"correct":29},"进度报告",{"key":95,"text":361,"correct":29},"BCDE",{"id":385,"libraryId":5,"type":82,"typeLabel":83,"stem":386,"options":387,"answer":172,"analysis":33},1140998,"建设工程项目施工成本控制的主要依据有（ ）。",[388,389,390,392,394],{"key":20,"text":379,"correct":29},{"key":24,"text":381,"correct":29},{"key":27,"text":391,"correct":29},"施工成本计划",{"key":31,"text":393,"correct":22},"施工成本预测资料",{"key":95,"text":361,"correct":29},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1141000,"项目成本指标控制的工作包括：①采集成本数据，监测成本形成过程；②制定对策，纠正偏差；③找出偏差，分析原因；④确定成本管理分层次目标。其正确的工作程序是（）。2018真题",[399,401,403,405],{"key":20,"text":400,"correct":29},"④→①→③→②",{"key":24,"text":402,"correct":22},"①→②→③→④",{"key":27,"text":404,"correct":22},"①→③→②→④",{"key":31,"text":406,"correct":22},"②→④→③→①",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},1141001,"建设工程项目施工成本控制涉及的时间范围是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"从设计准备开始至项目竣工验收时止",{"key":24,"text":414,"correct":22},"从设计阶段开始至项目动用时止",{"key":27,"text":416,"correct":29},"从工程投标报价开始至项目竣工结算完成为止",{"key":31,"text":418,"correct":22},"从项目开工时开始至项目竣工结算完成为止",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1141002,"施工成本控制的基本步骤为（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"比较-纠偏-分析-预测-检查",{"key":24,"text":426,"correct":29},"比较-分析-预测-纠偏-检查",{"key":27,"text":428,"correct":22},"比较-预测-分析-检查-纠偏",{"key":31,"text":430,"correct":22},"比较-检查-预测-纠偏-分析",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},1141003,"施工成本控制的核心和最具实质性的一步是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"分析和预测",{"key":24,"text":438,"correct":22},"纠偏和检查",{"key":27,"text":440,"correct":22},"比较和预测",{"key":31,"text":442,"correct":29},"分析和纠偏",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1141004,"施工项目部应依据项目施工成本计划，在对施工成本实际值与计划值进行比较的基础上进行（ ）这一步是施工成本控制工作的核心。",[447,449,451,453],{"key":20,"text":448,"correct":22},"预算",{"key":24,"text":450,"correct":29},"分析",{"key":27,"text":452,"correct":22},"检查",{"key":31,"text":454,"correct":22},"核算",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1141005,"在施工成本控制的步骤中，最具实质性的一步分别是（ ）。",[459,461,462,464],{"key":20,"text":460,"correct":22},"比较",{"key":24,"text":452,"correct":22},{"key":27,"text":463,"correct":29},"纠偏",{"key":31,"text":450,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1141006,"施工成本控制工作包括，~①比较、②~分析、~③预测、~④纠偏、~⑤检查，正确的顺序是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":29},"①②③④⑤",{"key":24,"text":472,"correct":22},"④①③⑤②",{"key":27,"text":474,"correct":22},"①③②⑤④",{"key":31,"text":476,"correct":22},"③①⑤②④",{"id":478,"libraryId":5,"type":82,"typeLabel":83,"stem":479,"options":480,"answer":491,"analysis":33},1141007,"在施工成本控制过程中，采取措施纠正成本偏差之前需要完成的的工作有（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":22},"检查纠偏的执行情况和效果",{"key":24,"text":484,"correct":29},"比较计划值与实际值",{"key":27,"text":486,"correct":29},"确定偏差的严重性及偏差产生的原因",{"key":31,"text":488,"correct":29},"估计完成项目所需的总费用",{"key":95,"text":490,"correct":22},"考核成本降低的实际效果","BCD",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1141008,"施工成本控制工作的一般步骤是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"检查－分析－比较－预测－纠偏",{"key":24,"text":499,"correct":29},"比较－分析－预测－纠偏－检查",{"key":27,"text":501,"correct":22},"预测－比较－分析－检查－纠偏",{"key":31,"text":503,"correct":22},"预测－检查－分析－比较－纠偏",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1141009,"关于施工成本控制程序的说法，正确的是（ ）。 2016",[508,510,512,514],{"key":20,"text":509,"correct":22},"管理行为控制程序是成本全过程控制的重点",{"key":24,"text":511,"correct":22},"指标控制程序是对成本进行过程控制的基础",{"key":27,"text":513,"correct":22},"管理行为控制程序是项目施工成本结果控制的主要内容",{"key":31,"text":515,"correct":29},"管理行为控制程序和指标控制程序在实施过程中相互制约",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1141011,"关于施工成本控制的说法，正确的是（ ）。2014",[520,522,524,526],{"key":20,"text":521,"correct":22},"施工成本管理体系由社会有关组织进行评审和认证",{"key":24,"text":523,"correct":29},"要做好施工成本的过程控制，必须制定规范化的过程控制程序",{"key":27,"text":525,"correct":22},"管理行为控制程序是进行成本过程控制的重点",{"key":31,"text":527,"correct":22},"管理行为控制程序和指标控制程序是相互独立的",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":27,"analysis":33},1141012,"施工成本控制的各工作步骤中，其核心是（ ）。",[532,533,535,536],{"key":20,"text":460,"correct":22},{"key":24,"text":534,"correct":22},"预测",{"key":27,"text":450,"correct":29},{"key":31,"text":463,"correct":22},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1141013,"施工成本控制的各工作步骤中，最核心的工作是（ ）。",[541,542,543,544],{"key":20,"text":450,"correct":29},{"key":24,"text":534,"correct":22},{"key":27,"text":460,"correct":22},{"key":31,"text":463,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1141014,"对总额1000万元的工程项目进行期中检查，截止检查时已完成工作预算费用410万元，计划工作预算费用为400万元，已完工作实际费用为430万元，则其费用绩效指数为（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":29},"0.953",{"key":24,"text":552,"correct":22},"0.430",{"key":27,"text":554,"correct":22},"0.930",{"key":31,"text":556,"correct":22},"1.075",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1141015,"某工程主体结构混凝土工程为3200m3，预算单价为550元\u002Fm3，计划4个月内均衡完成。开工后，混凝土实际采购价格为560\u002Fm3。施工至第二个月月底，实际累计完成混凝土工程量为1800m3，则此时的进度偏差为（ ）万元。",[561,563,565,567],{"key":20,"text":562,"correct":22},"11.8",{"key":24,"text":564,"correct":22},"11.2",{"key":27,"text":566,"correct":29},"11.0",{"key":31,"text":568,"correct":22},"-1.8",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1141016,"某施工企业进行土方开挖工程，按合同约定3 月份的计划工作量为2400m3,计划单价是12 元\u002Fm3；到月底检查时，确认承包商完成的工程量为2000m3，实际单价为15 元\u002Fm3。则该工程的进度偏差（SV）和进度绩效指数(SPI)分别为（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"0.6 万元；0.80",{"key":24,"text":576,"correct":22},"-0.6 万元；0.83",{"key":27,"text":578,"correct":29},"-0.48 万元；0.83",{"key":31,"text":580,"correct":22},"0.48 万元；0.80",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1141017,"某土方工程，计划总工程量为4800m3，预算单价为580元\u002F m3，计划6个月内均衡完成，开工后，实际单价为600元\u002F m3，施工至第3个月底，累计实际完成工程量3000m3，若运用赢得值法分析，则至第3个月底的费用偏差为（ ）万元。",[585,587,589,591],{"key":20,"text":586,"correct":22},"-34.8",{"key":24,"text":588,"correct":29},"-6",{"key":27,"text":590,"correct":22},"6",{"key":31,"text":592,"correct":22},"34.8",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},1141018,"某工程在第10周末显示的成本数据为：BCWS=33万元，BCWP=23万元，ACWP= 22万元，按照赢得值原理，结论是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":29},"进度拖后，低于预算",{"key":24,"text":600,"correct":22},"进度拖后，高于预算",{"key":27,"text":602,"correct":22},"进度提前，高于预算",{"key":31,"text":604,"correct":22},"进度提前，低于预算",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},1141019,"某分项工程计划工程量3000ｍ3，计划成本15元\u002Fｍ3，实际完成工程量2500ｍ3，实际成本20元\u002Fｍ3，则该分项工程的施工进度偏差为（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":29},"拖后7500元",{"key":24,"text":612,"correct":22},"提前7500元",{"key":27,"text":614,"correct":22},"拖后12500元",{"key":31,"text":616,"correct":22},"提前12500元",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":20,"analysis":33},1141020,"下列公式中，表示赢得值法评价指标中费用偏差指标的是（ ）。",[621,623,625,627],{"key":20,"text":622,"correct":29},"费用偏差=已完工作预算费用-已完工作实际费用",{"key":24,"text":624,"correct":22},"费用偏差=已完工作预算费用-计划工作预算费用",{"key":27,"text":626,"correct":22},"费用偏差=已完工作预算费用／已完工作实际费用",{"key":31,"text":628,"correct":22},"费用偏差=已完工作预算费用／计划工作预算费用",[630,633,636,639,642,645],{"id":15,"name":631,"category":7,"favorite":632},"领导干部任职前廉政法规知识测试题",92,{"id":634,"name":635,"category":7,"favorite":15},595,"建筑结构与设备",{"id":637,"name":638,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":640,"name":641,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":643,"name":644,"category":7,"favorite":8},534,"BIM工程师",{"id":646,"name":644,"category":7,"favorite":8},535]