[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,10,50,2721,[13,38,53,67,79,91,103,112,124,132,144,156,164,172,184,196,209,223,238,251,266,275,286,298,306,321,333,345,356,368,376,386,398,410,421,436,447,459,471,483,491,500,512,519,531,543,555,567,582,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1140897,2,"多选题","施工成本分析是在成本形成过程中，将施工项目的成本核算资料与（ ）进行比较，以了解成本变动情况。 2016",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","类似施工项目的预算成本",false,{"key":24,"text":25,"correct":22},"B","本施工项目的实际成本",{"key":27,"text":28,"correct":29},"C","本施工项目的目标成本",true,{"key":31,"text":32,"correct":29},"D","本施工项目的预算成本",{"key":34,"text":35,"correct":29},"E","类似施工项目的实际成本","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1140898,"下列指标中，属于项目部施工成本考核的有（ ）。( 2015真题 )",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"施工成本降低额",{"key":24,"text":45,"correct":29},"施工成本降低率",{"key":27,"text":47,"correct":22},"施工生产总成本",{"key":31,"text":49,"correct":22},"劳动力不均衡系数",{"key":34,"text":51,"correct":22},"生产能力利用率","AB",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":27,"analysis":37},1140899,1,"单选题","关于施工成本分析的说法，正确的是（ ）。2014",[59,61,63,65],{"key":20,"text":60,"correct":22},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":62,"correct":22},"施工成本分析是科学地预测成本水平及其发展趋势",{"key":27,"text":64,"correct":29},"施工成本分析贯穿于施工成本管理的全过程",{"key":31,"text":66,"correct":22},"施工成本分析是预测成本控制的薄弱环节",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":31,"analysis":37},1140900,"关于建设工程项目施工成本的说法，正确的是（ ）。 2016",[71,73,75,77],{"key":20,"text":72,"correct":22},"施工成本计划是对未来的成本水平和发展趋势作出估计",{"key":24,"text":74,"correct":22},"施工成本核算是通过实际成本与计划的对比，评定成本计划的完成情况",{"key":27,"text":76,"correct":22},"施工成本考核是通过成本的归集和分配，计算施工项目的实际成本",{"key":31,"text":78,"correct":29},"施工成本管理是通过采取措施，把成本控制在计划范围内，并最大程度的节约成本",{"id":80,"libraryId":5,"type":55,"typeLabel":56,"stem":81,"options":82,"answer":31,"analysis":37},1140904,"下列施工成本管理的措施中，属于组织措施的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"确定最佳的施工方案",{"key":24,"text":86,"correct":22},"对施工成本管理目标进行风险分析，并制定防范性对策",{"key":27,"text":88,"correct":22},"选用合适的合同结构",{"key":31,"text":90,"correct":29},"加强施工定额管理和施工任务单管理，控制活动和物化活动的消耗",{"id":92,"libraryId":5,"type":55,"typeLabel":56,"stem":93,"options":94,"answer":31,"analysis":37},1140905,"在施工成本管理的各类措施中，一般不需增加费用，而且是其他各类措施的前提和保障的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"过程控制措施",{"key":24,"text":98,"correct":22},"经济措施",{"key":27,"text":100,"correct":22},"技术措施",{"key":31,"text":102,"correct":29},"组织措施",{"id":104,"libraryId":5,"type":55,"typeLabel":56,"stem":105,"options":106,"answer":24,"analysis":37},1140906,"在施工成本管理的措施中，（ ）是人们最易接受和采用的措施。",[107,108,109,110],{"key":20,"text":102,"correct":22},{"key":24,"text":98,"correct":29},{"key":27,"text":100,"correct":22},{"key":31,"text":111,"correct":22},"合同措施",{"id":113,"libraryId":5,"type":55,"typeLabel":56,"stem":114,"options":115,"answer":31,"analysis":37},1140907,"下列施工成本管理的措施中，属于技术措施的是（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"加强施工任务单的管理",{"key":24,"text":119,"correct":22},"编制施工成本控制工作计划",{"key":27,"text":121,"correct":22},"寻求施工过程中的索赔机会",{"key":31,"text":123,"correct":29},"确定最合适的施工机械方案",{"id":125,"libraryId":5,"type":55,"typeLabel":56,"stem":126,"options":127,"answer":20,"analysis":37},1140909,"落实施工成本管理的组织机构和人员，明确各级施工成本管理人员的任务和职能分工、权利和责任，属于施工成本管理措施中的（ ）。",[128,129,130,131],{"key":20,"text":102,"correct":29},{"key":24,"text":98,"correct":22},{"key":27,"text":100,"correct":22},{"key":31,"text":111,"correct":22},{"id":133,"libraryId":5,"type":55,"typeLabel":56,"stem":134,"options":135,"answer":20,"analysis":37},1140910,"建设工程项目施工成本管理的组织措施之一是（ ）。",[136,138,140,142],{"key":20,"text":137,"correct":29},"编制施工成本控制工作流程图",{"key":24,"text":139,"correct":22},"制定施工方案并对其进行分析论证",{"key":27,"text":141,"correct":22},"进行工程风险分析并制定防范性对策",{"key":31,"text":143,"correct":22},"防止和处理施工索赔",{"id":145,"libraryId":5,"type":55,"typeLabel":56,"stem":146,"options":147,"answer":31,"analysis":37},1140911,"施工成本管理的最根本、最重要的基础工作是（ ）。",[148,150,152,154],{"key":20,"text":149,"correct":22},"明确成本管理的指导思想",{"key":24,"text":151,"correct":22},"建立企业内部施工定额",{"key":27,"text":153,"correct":22},"科学设计施工成本核算账册",{"key":31,"text":155,"correct":29},"建立成本管理责任体系",{"id":157,"libraryId":5,"type":55,"typeLabel":56,"stem":158,"options":159,"answer":31,"analysis":37},1140912,"编制资金使用计划属于施工成本管理措施中的（ ）。",[160,161,162,163],{"key":20,"text":102,"correct":22},{"key":24,"text":100,"correct":22},{"key":27,"text":111,"correct":22},{"key":31,"text":98,"correct":29},{"id":165,"libraryId":5,"type":55,"typeLabel":56,"stem":166,"options":167,"answer":24,"analysis":37},1140914,"确定最合适的施工机械、设备使用方案属于施工成本管理措施中的（ ）。",[168,169,170,171],{"key":20,"text":102,"correct":22},{"key":24,"text":100,"correct":29},{"key":27,"text":98,"correct":22},{"key":31,"text":111,"correct":22},{"id":173,"libraryId":5,"type":55,"typeLabel":56,"stem":174,"options":175,"answer":31,"analysis":37},1140915,"建设工程项目施工成本管理最根本、最重要的基础工作是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"成本管理目标的确立",{"key":24,"text":179,"correct":22},"成本管理任务的分工",{"key":27,"text":181,"correct":22},"成本管理组织制度的建立",{"key":31,"text":183,"correct":29},"成本管理责任体系的建立",{"id":185,"libraryId":5,"type":55,"typeLabel":56,"stem":186,"options":187,"answer":27,"analysis":37},1140916,"施工成本管理的基础工作内容是多方面的，成本管理的（ ）是其中最根本、最重要的基础工作，涉及成本管理的一系列组织制度、工作程序、业务标准和责任制度的建立。",[188,190,192,194],{"key":20,"text":189,"correct":22},"动态控制",{"key":24,"text":191,"correct":22},"纠偏控制",{"key":27,"text":193,"correct":29},"责任体系的建立",{"key":31,"text":195,"correct":22},"成本计划的组成",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":52,"analysis":37},1140917,"下列施工成本管理措施中，属于经济措施的有（ ）。",[200,202,204,206,207],{"key":20,"text":201,"correct":29},"编制资金使用计划",{"key":24,"text":203,"correct":29},"及时准确记录、收集、整理、核算实际发生的成本",{"key":27,"text":205,"correct":22},"选用最合适的施工机械",{"key":31,"text":119,"correct":22},{"key":34,"text":208,"correct":22},"使用先进、高效的机械设备",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":222,"analysis":37},1140918,"下列施工成本管理的措施中，属于组织措施的有（ ）。",[213,215,216,218,220],{"key":20,"text":214,"correct":22},"进行技术经济分析，确定最佳施工方案",{"key":24,"text":119,"correct":29},{"key":27,"text":217,"correct":22},"对成本目标进行风险分析，并制定防范性对策",{"key":31,"text":219,"correct":29},"确定合理详细的工程流程",{"key":34,"text":221,"correct":22},"做好资金使用计划，严格控制各项开支","BD",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},1140919,"下列施工成本管理的措施中，属于经济措施的有（ ）。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"明确成本管理人员的工作任务和责、权、利",{"key":24,"text":230,"correct":22},"对不同的技术方案进行技术经济分析",{"key":27,"text":232,"correct":29},"编制资金使用计划，确定施工成本管理目标",{"key":31,"text":234,"correct":29},"通过偏差原因分析，预测未完工程施工成本",{"key":34,"text":236,"correct":22},"防止分包商的索赔","CD",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":250,"analysis":37},1140920,"工程项目施工成本管理的基础工作包括（ ）。",[242,243,244,246,248],{"key":20,"text":155,"correct":29},{"key":24,"text":151,"correct":29},{"key":27,"text":245,"correct":22},"及时进行成本核算",{"key":31,"text":247,"correct":22},"编制项目成本计划",{"key":34,"text":249,"correct":29},"科学设计成本核算账册","ABE",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":265,"analysis":37},1140921,"施工成本管理应从多方面采取措施，可以归纳为（ ）措施。",[255,257,259,261,263],{"key":20,"text":256,"correct":29},"组织",{"key":24,"text":258,"correct":29},"技术",{"key":27,"text":260,"correct":29},"经济",{"key":31,"text":262,"correct":29},"合同",{"key":34,"text":264,"correct":22},"管理","ABCD",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":250,"analysis":37},1140922,"工程项目成本管理的基础工作包括（ ）。",[270,271,272,273,274],{"key":20,"text":155,"correct":29},{"key":24,"text":151,"correct":29},{"key":27,"text":245,"correct":22},{"key":31,"text":247,"correct":22},{"key":34,"text":249,"correct":29},{"id":276,"libraryId":5,"type":55,"typeLabel":56,"stem":277,"options":278,"answer":24,"analysis":37},1140923,"下列施工成本管理的措施中，属于组织措施的是（ ）。2014",[279,281,283,285],{"key":20,"text":280,"correct":22},"选用合适的分包项目合同结构",{"key":24,"text":282,"correct":29},"确定合理的施工高成本控制工作流程",{"key":27,"text":284,"correct":22},"确定合适的施工机械，设备使用方案",{"key":31,"text":86,"correct":22},{"id":287,"libraryId":5,"type":55,"typeLabel":56,"stem":288,"options":289,"answer":24,"analysis":37},1140925,"关于施工承包合同中缺陷责任与保修的说法，正确的是（ ）。2017",[290,292,294,296],{"key":20,"text":291,"correct":22},"缺陷责任期自实际竣工日期起计算，最长不超过12个月",{"key":24,"text":293,"correct":29},"缺陷责任期满，承包人仍应按合同约定的各部位保修年限承担保修义务",{"key":27,"text":295,"correct":22},"因发包人原因导致工程无法按合同约定期限进行竣工验收的，缺陷责任期自竣工验收合格之日开始计算",{"key":31,"text":297,"correct":22},"发包人未经竣工验收擅自使用工程的，缺陷责任期自承包人提交竣工验收申请报告之日开始计算",{"id":299,"libraryId":5,"type":55,"typeLabel":56,"stem":300,"options":301,"answer":27,"analysis":37},1140926,"结合项目的施工组织设计及自然地理条件，降低材料的库存成本和运输成本，属于成本管理的（）措施。2018真题",[302,303,304,305],{"key":20,"text":256,"correct":22},{"key":24,"text":260,"correct":22},{"key":27,"text":258,"correct":29},{"key":31,"text":262,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":320,"analysis":37},1140927,"根据《建筑工程施工合同（示范文本）》（GF—2013—0201），可以顺延工期的情况有（ ）。( 2015真题 )",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"发包人比计划开工日晚5天下达开工通知",{"key":24,"text":313,"correct":29},"发包人未按合同约定提供施工现场",{"key":27,"text":315,"correct":29},"发包人提供的测量基准点存在错误",{"key":31,"text":317,"correct":29},"监理未按合同约定发出指示、批准文件",{"key":34,"text":319,"correct":22},"分包商或供货商延误","BCD",{"id":322,"libraryId":5,"type":55,"typeLabel":56,"stem":323,"options":324,"answer":24,"analysis":37},1140930,"工程项目投标及签订合同阶段的估算成本计划是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"控制性成本计划",{"key":24,"text":328,"correct":29},"竞争性成本计划",{"key":27,"text":330,"correct":22},"指导性成本计划",{"key":31,"text":332,"correct":22},"实施性成本计划",{"id":334,"libraryId":5,"type":55,"typeLabel":56,"stem":335,"options":336,"answer":31,"analysis":37},1140931,"项目施工准备阶段的成本计划是以项目实施方案为依据，采用（ ）编制而形成的实施性施工成本计划。",[337,339,341,343],{"key":20,"text":338,"correct":22},"概算定额",{"key":24,"text":340,"correct":22},"单位估价表",{"key":27,"text":342,"correct":22},"预算定额",{"key":31,"text":344,"correct":29},"施工定额",{"id":346,"libraryId":5,"type":55,"typeLabel":56,"stem":347,"options":348,"answer":20,"analysis":37},1140932,"以项目实施方案为依据，落实项目经理的责任目标为出发点的实施性施工成本计划的编制依据是（ ）。",[349,351,353,354],{"key":20,"text":350,"correct":29},"企业的施工定额",{"key":24,"text":352,"correct":22},"企业的预算定额",{"key":27,"text":338,"correct":22},{"key":31,"text":355,"correct":22},"投资估算指标",{"id":357,"libraryId":5,"type":55,"typeLabel":56,"stem":358,"options":359,"answer":31,"analysis":37},1140933,"施工企业在工程投标阶段编制的估算成本计划是一种（ ）成本计划。",[360,362,364,366],{"key":20,"text":361,"correct":22},"指导性",{"key":24,"text":363,"correct":22},"实施性",{"key":27,"text":365,"correct":22},"作业性",{"key":31,"text":367,"correct":29},"竞争性",{"id":369,"libraryId":5,"type":55,"typeLabel":56,"stem":370,"options":371,"answer":27,"analysis":37},1140934,"按照企业的预算定额标准制定的设计预算成本计划，且一般情况下只确定责任总成本目标，这是指（ ）。",[372,373,374,375],{"key":20,"text":326,"correct":22},{"key":24,"text":328,"correct":22},{"key":27,"text":330,"correct":29},{"key":31,"text":332,"correct":22},{"id":377,"libraryId":5,"type":55,"typeLabel":56,"stem":378,"options":379,"answer":27,"analysis":37},1140935,"在施工成本计划中，（ ）施工成本计划是项目施工准备阶段的施工预算成本计划，是以项目实施方案为依据，落实项目经理责任目标为出发点，采用企业的施工定额通过施工预算的编制而形成的。",[380,382,383,384],{"key":20,"text":381,"correct":22},"控制性",{"key":24,"text":367,"correct":22},{"key":27,"text":363,"correct":29},{"key":31,"text":385,"correct":22},"项目性",{"id":387,"libraryId":5,"type":55,"typeLabel":56,"stem":388,"options":389,"answer":27,"analysis":37},1140936,"关于施工图预算和施工预算的说法，错误的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"施工预算的材料消耗量一般低于施工图预算的材料消耗量。",{"key":24,"text":393,"correct":22},"施工预算是施工企业内部管理的一种文件，与建设单位无直接关系。",{"key":27,"text":395,"correct":29},"施工图预算中的脚手架是根据施工方案确定的搭设方式和材料计算的。",{"key":31,"text":397,"correct":22},"施工预算的用工量一般比施工图预算的用工量低。",{"id":399,"libraryId":5,"type":55,"typeLabel":56,"stem":400,"options":401,"answer":27,"analysis":37},1140937,"关于施工图预算和施工预算的对比，下列说法中正确的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"施工图预算是施工企业组织生产的依据",{"key":24,"text":405,"correct":22},"施工预算既适合于建设单位，也适合于施工单位",{"key":27,"text":407,"correct":29},"施工图预算与施工预算对比的方法有实物对比法和金额对比法",{"key":31,"text":409,"correct":22},"施工定额的材料损耗率一般都高于计价定额",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":250,"analysis":37},1140938,"对于—个施工项目而言，其成本计划是一个不断深化的过程。在这一过程的不同阶段形成深度和作用不同的成本计划，按其作用可分为（ ）。",[414,415,416,418,420],{"key":20,"text":328,"correct":29},{"key":24,"text":332,"correct":29},{"key":27,"text":417,"correct":22},"分部分项工程施工成本计划",{"key":31,"text":419,"correct":22},"单位工程施工成本计划",{"key":34,"text":330,"correct":29},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":435,"analysis":37},1140939,"施工预算和施工图预算的区别很大，主要表现在（ ）。",[425,427,429,431,433],{"key":20,"text":426,"correct":29},"编制的依据不同",{"key":24,"text":428,"correct":29},"发挥的作用不同",{"key":27,"text":430,"correct":29},"适用的范围不同",{"key":31,"text":432,"correct":22},"编制的时间不同",{"key":34,"text":434,"correct":22},"编制的部门不同","ABC",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":36,"analysis":37},1140940,"施工项目的成本计划按其作用可分为（ ）。",[440,442,444,445,446],{"key":20,"text":441,"correct":22},"单位工程成本计划",{"key":24,"text":443,"correct":22},"分部分项工程技术成本计划",{"key":27,"text":328,"correct":29},{"key":31,"text":330,"correct":29},{"key":34,"text":332,"correct":29},{"id":448,"libraryId":5,"type":55,"typeLabel":56,"stem":449,"options":450,"answer":24,"analysis":37},1140941,"关于施工预算、施工图预算“两算”对比的说法，正确的是（ ）。( 2015真题 )",[451,453,455,457],{"key":20,"text":452,"correct":22},"施工预算的编制以预算定额为依据，施工图预算的编制以施工定额为依据",{"key":24,"text":454,"correct":29},"“两算”对比的方法包括实物对比法",{"key":27,"text":456,"correct":22},"一般情况下，施工图预算的人工数量及人工费比施工预算低",{"key":31,"text":458,"correct":22},"一般情况下，施工图预算的材料消耗量及材料费比施工预算低",{"id":460,"libraryId":5,"type":55,"typeLabel":56,"stem":461,"options":462,"answer":24,"analysis":37},1140942,"在编制施工成本计划时，通常需要进行“两算”对比分析，“两算”指的是（ ）。 2016",[463,465,467,469],{"key":20,"text":464,"correct":22},"施工图预算、成本核算",{"key":24,"text":466,"correct":29},"施工图预算、施工预算",{"key":27,"text":468,"correct":22},"施工预算、成本核算",{"key":31,"text":470,"correct":22},"施工预算、施工决算",{"id":472,"libraryId":5,"type":55,"typeLabel":56,"stem":473,"options":474,"answer":27,"analysis":37},1140943,"将已汇总的人工、材料、机械台班消耗数量分别乘以所在地区的人工工资标准、材料预算价格、机械台班单价，计算出人料机费的表格是（）。2018真题",[475,477,479,481],{"key":20,"text":476,"correct":22},"工程量计算汇总表",{"key":24,"text":478,"correct":22},"施工预算工料分析表",{"key":27,"text":480,"correct":29},"施工预算表",{"key":31,"text":482,"correct":22},"项目造价取费表",{"id":484,"libraryId":5,"type":55,"typeLabel":56,"stem":485,"options":486,"answer":31,"analysis":37},1140944,"施工企业在工程投标及签订合同阶段编制的估算成本计划，属于（ ）成本计划。 2016",[487,488,489,490],{"key":20,"text":361,"correct":22},{"key":24,"text":363,"correct":22},{"key":27,"text":365,"correct":22},{"key":31,"text":367,"correct":29},{"id":492,"libraryId":5,"type":55,"typeLabel":56,"stem":493,"options":494,"answer":27,"analysis":37},1140946,"实施性成本计划是在项目施工准备阶段，采用（ ）编制的施工成本计划。2014",[495,497,498,499],{"key":20,"text":496,"correct":22},"估算指标",{"key":24,"text":338,"correct":22},{"key":27,"text":344,"correct":29},{"key":31,"text":342,"correct":22},{"id":501,"libraryId":5,"type":55,"typeLabel":56,"stem":502,"options":503,"answer":20,"analysis":37},1140950,"编制施工项目成本计划的关键是确定（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":29},"目标成本",{"key":24,"text":507,"correct":22},"预算成本",{"key":27,"text":509,"correct":22},"平均成本",{"key":31,"text":511,"correct":22},"实际成本",{"id":513,"libraryId":5,"type":55,"typeLabel":56,"stem":347,"options":514,"answer":20,"analysis":37},1140951,[515,516,517,518],{"key":20,"text":350,"correct":29},{"key":24,"text":352,"correct":22},{"key":27,"text":338,"correct":22},{"key":31,"text":355,"correct":22},{"id":520,"libraryId":5,"type":55,"typeLabel":56,"stem":521,"options":522,"answer":27,"analysis":37},1140952,"建筑施工企业编制实施性成本计划时，宜以（ ）为依据。",[523,525,527,529],{"key":20,"text":524,"correct":22},"施工图预算成本",{"key":24,"text":526,"correct":22},"工程概算成本",{"key":27,"text":528,"correct":29},"施工预算成本",{"key":31,"text":530,"correct":22},"施工结算成本",{"id":532,"libraryId":5,"type":55,"typeLabel":56,"stem":533,"options":534,"answer":24,"analysis":37},1140953,"施工项目管理班子成员编制的施工项目成本计划如果达不到目标要求，则应（ ），并重新编制成本计划。",[535,537,539,541],{"key":20,"text":536,"correct":22},"重新分解落实成本目标",{"key":24,"text":538,"correct":29},"寻找降低成本的途径",{"key":27,"text":540,"correct":22},"对项目成本进行再分解",{"key":31,"text":542,"correct":22},"修订企业定额",{"id":544,"libraryId":5,"type":55,"typeLabel":56,"stem":545,"options":546,"answer":31,"analysis":37},1140954,"建设工程项目施工成本计划的编制依据不包括（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"企业定额",{"key":24,"text":550,"correct":22},"投标报价文件",{"key":27,"text":552,"correct":22},"施工组织设计或施工方案",{"key":31,"text":554,"correct":29},"项目总概算",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":320,"analysis":37},1140955,"建设工程项目施工成本计划的编制依据有（ ）。",[559,561,562,563,565],{"key":20,"text":560,"correct":22},"建设投资估算书",{"key":24,"text":550,"correct":29},{"key":27,"text":552,"correct":29},{"key":31,"text":564,"correct":29},"施工成本预测资料",{"key":34,"text":566,"correct":22},"施工招标公告",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":581,"analysis":37},1140956,"常用的建设工程项目施工成本设计可按（ ）编制。",[571,573,575,577,579],{"key":20,"text":572,"correct":29},"施工成本组成",{"key":24,"text":574,"correct":22},"人力资源需求",{"key":27,"text":576,"correct":29},"子项目组成",{"key":31,"text":578,"correct":29},"工程进度",{"key":34,"text":580,"correct":22},"材料种类","ACD",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":596,"analysis":37},1140958,"编制施工成本计划的主要依据有（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"施工图预算",{"key":24,"text":589,"correct":29},"施工预算",{"key":27,"text":591,"correct":29},"签订的工程合同",{"key":31,"text":593,"correct":29},"资源市场价格",{"key":34,"text":595,"correct":29},"分包合同","BCDE",{"id":598,"libraryId":5,"type":55,"typeLabel":56,"stem":599,"options":600,"answer":24,"analysis":37},1140960,"（2020年真题）在编制施工成本计划时通常需要进行“两算”对比，“两算”指的是（ ）。",[601,603,604,606],{"key":20,"text":602,"correct":22},"设计概算、施工图预算",{"key":24,"text":466,"correct":29},{"key":27,"text":605,"correct":22},"设计概算、投资估算",{"key":31,"text":607,"correct":22},"设计概算、施工预算",[609,612,615,618,621,624],{"id":55,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":55},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]