[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-799-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":628},{"id":5,"name":6,"category":7,"favorite":8},799,"一建建设工程项目管理","建筑工程",0,1,50,2721,[13,38,53,66,78,90,102,114,126,137,149,161,173,184,195,207,219,231,242,254,266,278,293,305,320,333,342,354,366,378,390,405,414,426,438,452,467,479,491,503,515,525,533,545,557,571,586,600,612,620],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1140387,2,"多选题","根据《建设工程施工合同(示范文本)》(GF—2013一0201)，除在专用合同条款中明确的事项外，承包人必须向发包人提交（ ），项目经理才能履行职责。 2016",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","项目经理与承包人之间的劳动合同",true,{"key":24,"text":25,"correct":26},"B","项目经理工作履历",false,{"key":28,"text":29,"correct":26},"C","项目经理持有的建造师执业资格证书",{"key":31,"text":32,"correct":22},"D","承包人为项目经理缴纳社会保险的有效证明",{"key":34,"text":35,"correct":26},"E","项目经理的专业技术职称证书","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1140388,"采用过程控制的方法控制施工成本时，控制的要点有（ ）。2014",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"材料费同样采用“量价分离”原则进行控制",{"key":24,"text":45,"correct":26},"材料价格由项目经理负责控制",{"key":28,"text":47,"correct":22},"对分包费用的控制，重点是做好分包工程询价、验收和结算等工作",{"key":31,"text":49,"correct":22},"实行弹性需求的劳务管理制度",{"key":34,"text":51,"correct":22},"做好施工机械配件和工程材料采购计划","ACDE",{"id":54,"libraryId":5,"type":9,"typeLabel":55,"stem":56,"options":57,"answer":28,"analysis":37},1140389,"单选题","采用平行委托施工的单项工程，其施工总进度计划应由（ ）编制。2014",[58,60,62,64],{"key":20,"text":59,"correct":26},"业主方",{"key":24,"text":61,"correct":26},"设计方",{"key":28,"text":63,"correct":22},"施工方",{"key":31,"text":65,"correct":26},"投资方",{"id":67,"libraryId":5,"type":9,"typeLabel":55,"stem":68,"options":69,"answer":24,"analysis":37},1140390,"承包商采购的合格水泥，进入工地90天后，再次检查发现该批水泥强度值低于国家规范要求值，由此产生的损失应由（ ）负责。2014",[70,72,74,76],{"key":20,"text":71,"correct":26},"业主",{"key":24,"text":73,"correct":22},"承包商",{"key":28,"text":75,"correct":26},"生产商",{"key":31,"text":77,"correct":26},"供货商",{"id":79,"libraryId":5,"type":9,"typeLabel":55,"stem":80,"options":81,"answer":28,"analysis":37},1140392,"业主方项目管理最重要的任务是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":26},"质量控制",{"key":24,"text":85,"correct":26},"合同管理",{"key":28,"text":87,"correct":22},"安全管理",{"key":31,"text":89,"correct":26},"投资控制",{"id":91,"libraryId":5,"type":9,"typeLabel":55,"stem":92,"options":93,"answer":24,"analysis":37},1140393,"建设工程项目实施阶段管理工作的主要任务是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"确定项目实施的组织",{"key":24,"text":97,"correct":22},"通过管理使项目的目标得以实现",{"key":28,"text":99,"correct":26},"确定建设项目的进度目标",{"key":31,"text":101,"correct":26},"通过管理保证建设项目的质量",{"id":103,"libraryId":5,"type":9,"typeLabel":55,"stem":104,"options":105,"answer":31,"analysis":37},1140394,"建设工程项目的全寿命周期包括项目的（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":26},"可行性研究阶段、设计阶段、施工阶段",{"key":24,"text":109,"correct":26},"可行性研究阶段、施工阶段、使用阶段",{"key":28,"text":111,"correct":26},"决策阶段、实施阶段、保修阶段",{"key":31,"text":113,"correct":22},"决策阶段、实施阶段、使用阶段",{"id":115,"libraryId":5,"type":9,"typeLabel":55,"stem":116,"options":117,"answer":31,"analysis":37},1140395,"建设工程管理的核心任务是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":26},"目标控制",{"key":24,"text":121,"correct":26},"提高建设项目生命周期价值",{"key":28,"text":123,"correct":26},"实现业主的建设目标和为工程的建设增值",{"key":31,"text":125,"correct":22},"为工程的建设和使用增值",{"id":127,"libraryId":5,"type":9,"typeLabel":55,"stem":128,"options":129,"answer":28,"analysis":37},1140396,"项目管理的核心任务是（ ）。",[130,132,134,135],{"key":20,"text":131,"correct":26},"环境管理",{"key":24,"text":133,"correct":26},"信息管理",{"key":28,"text":119,"correct":22},{"key":31,"text":136,"correct":26},"组织协调",{"id":138,"libraryId":5,"type":9,"typeLabel":55,"stem":139,"options":140,"answer":28,"analysis":37},1140397,"根据建设工程的总进度目标要求，项目管理的主要任务是在项目的（ ）阶段对项目的目标进行控制。",[141,143,145,147],{"key":20,"text":142,"correct":26},"决策",{"key":24,"text":144,"correct":26},"计划",{"key":28,"text":146,"correct":22},"实施",{"key":31,"text":148,"correct":26},"分析",{"id":150,"libraryId":5,"type":9,"typeLabel":55,"stem":151,"options":152,"answer":31,"analysis":37},1140398,"建设工程项目管理就是自项目开始到项目完成，通过（ ）使项目目标得以实现。",[153,155,157,159],{"key":20,"text":154,"correct":26},"项目策划和项目组织",{"key":24,"text":156,"correct":26},"项目控制和项目协调",{"key":28,"text":158,"correct":26},"项目组织和项目控制",{"key":31,"text":160,"correct":22},"项目策划和项目控制",{"id":162,"libraryId":5,"type":9,"typeLabel":55,"stem":163,"options":164,"answer":31,"analysis":37},1140399,"建设项目管理的发展趋势中，属于第四代项目管理的是（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":26},"传统的项目管理",{"key":24,"text":168,"correct":26},"组合管理",{"key":28,"text":170,"correct":26},"多个相互有关联的项目的项目管理",{"key":31,"text":172,"correct":22},"变更管理",{"id":174,"libraryId":5,"type":9,"typeLabel":55,"stem":175,"options":176,"answer":28,"analysis":37},1140400,"项目全寿命管理中，项目决策阶段的管理被称为（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":26},"决策管理",{"key":24,"text":180,"correct":26},"实施管理",{"key":28,"text":182,"correct":22},"开发管理",{"key":31,"text":168,"correct":26},{"id":185,"libraryId":5,"type":9,"typeLabel":55,"stem":186,"options":187,"answer":31,"analysis":37},1140401,"建设工程项目管理的核心任务是项目的（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":26},"目标规划",{"key":24,"text":191,"correct":26},"目标比选",{"key":28,"text":193,"correct":26},"目标论证",{"key":31,"text":119,"correct":22},{"id":196,"libraryId":5,"type":9,"typeLabel":55,"stem":197,"options":198,"answer":31,"analysis":37},1140402,"建设工程项目管理的内涵是自项目开始至项目完成，通过项目策划和项目控制，以使项目的费用目标、进度目标和质量目标得以实现。其中费用目标对施工方而言是（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":26},"投资目标",{"key":24,"text":202,"correct":26},"效益目标",{"key":28,"text":204,"correct":26},"进度目标",{"key":31,"text":206,"correct":22},"成本目标",{"id":208,"libraryId":5,"type":9,"typeLabel":55,"stem":209,"options":210,"answer":28,"analysis":37},1140403,"对于一个建设工程项目而言，（ ）是管理的核心。",[211,213,215,217],{"key":20,"text":212,"correct":26},"供货方的项目管理",{"key":24,"text":214,"correct":26},"施工方的项目管理",{"key":28,"text":216,"correct":22},"业主方的项目管理",{"key":31,"text":218,"correct":26},"设计方的项目管理",{"id":220,"libraryId":5,"type":9,"typeLabel":55,"stem":221,"options":222,"answer":28,"analysis":37},1140404,"建设工程项目管理的核心任务是项目的目标（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":26},"比较",{"key":24,"text":226,"correct":26},"管理",{"key":28,"text":228,"correct":22},"控制",{"key":31,"text":230,"correct":26},"规划",{"id":232,"libraryId":5,"type":9,"typeLabel":55,"stem":233,"options":234,"answer":20,"analysis":37},1140405,"编制可行性研究报告属于建设工程项目（ ）阶段的主要任务。",[235,236,238,240],{"key":20,"text":142,"correct":22},{"key":24,"text":237,"correct":26},"设计",{"key":28,"text":239,"correct":26},"动工前准备",{"key":31,"text":241,"correct":26},"施工",{"id":243,"libraryId":5,"type":9,"typeLabel":55,"stem":244,"options":245,"answer":31,"analysis":37},1140406,"建设工程项目管理的时间范畴是建设工程项目的（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":26},"施工阶段",{"key":24,"text":249,"correct":26},"设计准备阶段、设计阶段、施工阶段、保修阶段",{"key":28,"text":251,"correct":26},"决策阶段和实施阶段",{"key":31,"text":253,"correct":22},"实施阶段",{"id":255,"libraryId":5,"type":9,"typeLabel":55,"stem":256,"options":257,"answer":31,"analysis":37},1140407,"关于项目管理和工程管理，下列说法中正确的是（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":26},"项目管理的时间是项目的全寿命周期",{"key":24,"text":261,"correct":26},"工程管理的时间是项目的实施阶段",{"key":28,"text":263,"correct":26},"项目管理的核心任务是目标论证",{"key":31,"text":265,"correct":22},"工程管理的核心任务是为工程的建设和使用增值",{"id":267,"libraryId":5,"type":9,"typeLabel":55,"stem":268,"options":269,"answer":20,"analysis":37},1140408,"项目实施阶段包括一系列的工作，以下属于其工作内容的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"设计变更",{"key":24,"text":273,"correct":26},"确定项目定义",{"key":28,"text":275,"correct":26},"编写可行性研究报告",{"key":31,"text":277,"correct":26},"项目决策风险分析",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":292,"analysis":37},1140409,"建设工程决策阶段项目管理工作的内容有（ ）。",[282,284,286,288,290],{"key":20,"text":283,"correct":22},"确定和落实建设地点",{"key":24,"text":285,"correct":22},"确定建设项目的投资目标、进度目标和质量目标",{"key":28,"text":287,"correct":26},"编制施工组织设计",{"key":31,"text":289,"correct":22},"确定建设任务和建设原则",{"key":34,"text":291,"correct":22},"确定和落实项目建设的资金","ABDE",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":304,"analysis":37},1140410,"项目管理作为一门学科在不断的发展，它包括（ ）等几代的发展。",[297,298,300,302,303],{"key":20,"text":166,"correct":22},{"key":24,"text":299,"correct":26},"现代的项目管理",{"key":28,"text":301,"correct":26},"全过程的项目管理",{"key":31,"text":168,"correct":22},{"key":34,"text":172,"correct":22},"ADE",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},1140411,"关于建设工程项目管理的说法，正确的有（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":22},"建设工程管理工作的核心任务是为工程的建设和使用增值",{"key":24,"text":312,"correct":22},"业主方的项目管理工作涉及项目实施阶段的全过程",{"key":28,"text":314,"correct":22},"项目决策阶段项目管理工作的任务之一是进行项目定义",{"key":31,"text":316,"correct":26},"建造师的业务范围只限于项目实施阶段的项目管理工作",{"key":34,"text":318,"correct":26},"只有施工企业对项目的管理才称为施工方的项目管理","ABC",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":292,"analysis":37},1140412,"建设工程项目的实施阶段包括（ ）。",[324,326,328,330,331],{"key":20,"text":325,"correct":22},"设计阶段",{"key":24,"text":327,"correct":22},"设计准备阶段",{"key":28,"text":329,"correct":26},"可行性研究性阶段",{"key":31,"text":247,"correct":22},{"key":34,"text":332,"correct":22},"动用前准备阶段",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":335,"answer":292,"analysis":37},1140413,[336,337,338,340,341],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":22},{"key":28,"text":339,"correct":26},"可行性研究阶段",{"key":31,"text":247,"correct":22},{"key":34,"text":332,"correct":22},{"id":343,"libraryId":5,"type":9,"typeLabel":55,"stem":344,"options":345,"answer":31,"analysis":37},1140414,"关于建设工程管理内涵的说法，正确的是（ ）。( 2015真题 )",[346,348,350,352],{"key":20,"text":347,"correct":26},"建设工程项目管理和设施管理即为建设工程管理",{"key":24,"text":349,"correct":26},"建设工程管理不涉及项目使用期的管理方对工程的管理",{"key":28,"text":351,"correct":26},"建设工程管理是对建设工程的行政事务管理",{"key":31,"text":353,"correct":22},"建设工程管理工作是一种增值服务",{"id":355,"libraryId":5,"type":9,"typeLabel":55,"stem":356,"options":357,"answer":28,"analysis":37},1140415,"根据国际设施管理协会的设施管理定义，下列管理事项中，属于物业运行管理的是（ ）。 2016",[358,360,362,364],{"key":20,"text":359,"correct":26},"空间管理",{"key":24,"text":361,"correct":26},"用户管理",{"key":28,"text":363,"correct":22},"维修管理",{"key":31,"text":365,"correct":26},"财务管理",{"id":367,"libraryId":5,"type":9,"typeLabel":55,"stem":368,"options":369,"answer":31,"analysis":37},1140416,"建设工程管理工作的核心任务是（ ）。2014",[370,372,374,376],{"key":20,"text":371,"correct":26},"项目的目标控制",{"key":24,"text":373,"correct":26},"为项目建设的决策和实施增值",{"key":28,"text":375,"correct":26},"实现工程项目实施阶段的建设目标",{"key":31,"text":377,"correct":22},"为工程建设和使用增值",{"id":379,"libraryId":5,"type":9,"typeLabel":55,"stem":380,"options":381,"answer":24,"analysis":37},1140417,"建设工程管理工作是一种增值服务工作，下列属于工程建设增值的是（ ）。2017",[382,384,386,388],{"key":20,"text":383,"correct":26},"确保工程使用安全",{"key":24,"text":385,"correct":22},"提高工程质量",{"key":28,"text":387,"correct":26},"满足最终用户的使用功能",{"key":31,"text":389,"correct":26},"有利于工程维护",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":404,"analysis":37},1140418,"关于建设工程项目管理的说法，正确的有（ ）。 2016",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"业主方是建设工程项目生产过程的总组织者",{"key":24,"text":397,"correct":22},"建设工程项目各参与方的工作性质和工作任务不尽相同",{"key":28,"text":399,"correct":26},"建设工程项目管理的核心任务是项目的费用控制",{"key":31,"text":401,"correct":26},"施工方的项目管理是项目管理的核心",{"key":34,"text":403,"correct":22},"实施建设工程项目管理需要有明确的投资、进度和质量目标","ABE",{"id":406,"libraryId":5,"type":9,"typeLabel":55,"stem":407,"options":408,"answer":20,"analysis":37},1140419,"编制设计任务书是项目（ ）阶段的工作。",[409,411,412,413],{"key":20,"text":410,"correct":22},"设计准备",{"key":24,"text":142,"correct":26},{"key":28,"text":237,"correct":26},{"key":31,"text":241,"correct":26},{"id":415,"libraryId":5,"type":9,"typeLabel":55,"stem":416,"options":417,"answer":24,"analysis":37},1140422,"某工程施工检查发现外墙面砖质量不合格，经调查发现是供应商的供货质量问题，项目部决定更换供应商，该措施属于项目目标控制的（）2015年",[418,420,422,424],{"key":20,"text":419,"correct":26},"管理措施",{"key":24,"text":421,"correct":22},"组织措施",{"key":28,"text":423,"correct":26},"经济措施",{"key":31,"text":425,"correct":26},"技术措施",{"id":427,"libraryId":5,"type":9,"typeLabel":55,"stem":428,"options":429,"answer":28,"analysis":37},1140423,"关于组织论及组织工具的说法，正确的是（ ）。2019年",[430,432,434,436],{"key":20,"text":431,"correct":26},"管理职能分工反映的是一种动态组织关系",{"key":24,"text":433,"correct":26},"工作流程图是反映工作间静态逻辑关系的工具",{"key":28,"text":435,"correct":22},"组织结构模式和组织分工都是一种相对的静态组织关系",{"key":31,"text":437,"correct":26},"组织结构模式反映一个组织系统中的工作任务分工和管理职能分工",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":404,"analysis":37},1140424,"关于组织结构模式、组织分工和工作流程组织的说法，正确的有（）2015年",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"组织结构模式反映指令关系",{"key":24,"text":445,"correct":22},"工作流程组织反映工作间逻辑关系",{"key":28,"text":447,"correct":26},"组织分工是指工作任务分工",{"key":31,"text":449,"correct":26},"组织分工和工作流程组织都是动态组织关系",{"key":34,"text":451,"correct":22},"组织结构模式和组织分工是一种相对静态的组织关系",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":466,"analysis":37},1140425,"下列组织论基本内容中，属于相对静态的组织关系的有( )。2016年",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"组织分工",{"key":24,"text":459,"correct":26},"物质流程组织",{"key":28,"text":461,"correct":26},"信息处理工作流程组织",{"key":31,"text":463,"correct":26},"管理工作流程组织",{"key":34,"text":465,"correct":22},"组织结构模式","AE",{"id":468,"libraryId":5,"type":9,"typeLabel":55,"stem":469,"options":470,"answer":31,"analysis":37},1140426,"在项目的组织工具中，用以反映项目所有工作任务及其层次关系的是（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":26},"管理职能分工表",{"key":24,"text":474,"correct":26},"工作任务分工表",{"key":28,"text":476,"correct":26},"组织结构图",{"key":31,"text":478,"correct":22},"项目结构图",{"id":480,"libraryId":5,"type":9,"typeLabel":55,"stem":481,"options":482,"answer":24,"analysis":37},1140427,"建设工程项目结构图描述的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":26},"组织系统中各部门的职责分工",{"key":24,"text":486,"correct":22},"工作对象之间的关系",{"key":28,"text":488,"correct":26},"组织系统中各子系统之间的关系",{"key":31,"text":490,"correct":26},"项目参与各方的关系",{"id":492,"libraryId":5,"type":9,"typeLabel":55,"stem":493,"options":494,"answer":28,"analysis":37},1140428,"项目结构图中矩形框连接的表达采用（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":26},"单向箭线",{"key":24,"text":498,"correct":26},"双向箭线",{"key":28,"text":500,"correct":22},"直线",{"key":31,"text":502,"correct":26},"曲线",{"id":504,"libraryId":5,"type":9,"typeLabel":55,"stem":505,"options":506,"answer":31,"analysis":37},1140429,"在上海地铁和广州地铁一号线建设时都采用的组织结构模式是（ ）模式。",[507,509,511,513],{"key":20,"text":508,"correct":26},"线性组织结构",{"key":24,"text":510,"correct":26},"项目组织结构",{"key":28,"text":512,"correct":26},"职能组织结构",{"key":31,"text":514,"correct":22},"矩阵组织结构",{"id":516,"libraryId":5,"type":9,"typeLabel":55,"stem":517,"options":518,"answer":20,"analysis":37},1140430,"通过树状图的方式对一个项目的结构进行逐层分解，以反映组成该项目的所有工作任务的是（ ）。",[519,520,522,523],{"key":20,"text":478,"correct":22},{"key":24,"text":521,"correct":26},"工作流程图",{"key":28,"text":476,"correct":26},{"key":31,"text":524,"correct":26},"合同结构图",{"id":526,"libraryId":5,"type":9,"typeLabel":55,"stem":527,"options":528,"answer":20,"analysis":37},1140431,"下列组织工具中，能够反映组成项目所有工作任务的是（ ）。",[529,530,531,532],{"key":20,"text":478,"correct":22},{"key":24,"text":474,"correct":26},{"key":28,"text":524,"correct":26},{"key":31,"text":521,"correct":26},{"id":534,"libraryId":5,"type":9,"typeLabel":55,"stem":535,"options":536,"answer":31,"analysis":37},1140433,"下列影响建设工程项目管理目标实现的因素中，起决定性作用的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"人",{"key":24,"text":540,"correct":26},"方法",{"key":28,"text":542,"correct":26},"工具",{"key":31,"text":544,"correct":22},"组织",{"id":546,"libraryId":5,"type":9,"typeLabel":55,"stem":547,"options":548,"answer":24,"analysis":37},1140434,"组织分工反映的是一个组织系统中各子系统或各元素的工作任务分工和（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":26},"管理目标分工",{"key":24,"text":552,"correct":22},"管理职能分工",{"key":28,"text":554,"correct":26},"管理责任分工",{"key":31,"text":556,"correct":26},"管理权限分工",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":292,"analysis":37},1140435,"项目结构分解并没有统一的模式，应结合项目的特点并参考（ ）原则进行。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"项目实施任务",{"key":24,"text":564,"correct":22},"项目的组成",{"key":28,"text":566,"correct":26},"项目的组织原则",{"key":31,"text":568,"correct":22},"项目进展的总体部署",{"key":34,"text":570,"correct":22},"项目目标的控制",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":585,"analysis":37},1140436,"项目结构分解可以参考的原则有（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":26},"考虑项目进度总规划",{"key":24,"text":578,"correct":22},"有利于项目目标的控制",{"key":28,"text":580,"correct":22},"考虑项目的组成",{"key":31,"text":582,"correct":22},"结合项目管理的组织结构",{"key":34,"text":584,"correct":22},"考虑项目进展的总体部署","BCDE",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":599,"analysis":37},1140437,"组织分工反映了一个组织系统中各子系统或各元素的（ ）。",[590,592,594,595,597],{"key":20,"text":591,"correct":26},"指令关系",{"key":24,"text":593,"correct":22},"工作任务",{"key":28,"text":552,"correct":22},{"key":31,"text":596,"correct":22},"静态组织关系",{"key":34,"text":598,"correct":26},"动态组织关系","BCD",{"id":601,"libraryId":5,"type":9,"typeLabel":55,"stem":602,"options":603,"answer":20,"analysis":37},1140438,"关于影响系统目标实现因素的说法，正确的是（ ）。( 2015真题 )",[604,606,608,610],{"key":20,"text":605,"correct":22},"组织是影响系统目标实现的决定性因素",{"key":24,"text":607,"correct":26},"系统组织决定了系统目标",{"key":28,"text":609,"correct":26},"增加人员数量一定会有助于系统目标的实现",{"key":31,"text":611,"correct":26},"生产方法与工具的选择与系统目标实现无关",{"id":613,"libraryId":5,"type":9,"typeLabel":55,"stem":614,"options":615,"answer":24,"analysis":37},1140439,"某工程施工检查发现外墙面砖质量不合格，经调查发现是供应商的供货质量问题，项目部决定更换供应商。该措施属于项目目标控制的（ ）。( 2015真题 )",[616,617,618,619],{"key":20,"text":419,"correct":26},{"key":24,"text":421,"correct":22},{"key":28,"text":423,"correct":26},{"key":31,"text":425,"correct":26},{"id":621,"libraryId":5,"type":9,"typeLabel":55,"stem":622,"options":623,"answer":24,"analysis":37},1140440,"某住宅小区施工前，施工项目管理机构对项目分析后形成结果如下图，该图是（ ）。2017",[624,625,626,627],{"key":20,"text":476,"correct":26},{"key":24,"text":478,"correct":22},{"key":28,"text":521,"correct":26},{"key":31,"text":524,"correct":26},[629,632,635,638,641,644],{"id":9,"name":630,"category":7,"favorite":631},"领导干部任职前廉政法规知识测试题",92,{"id":633,"name":634,"category":7,"favorite":9},595,"建筑结构与设备",{"id":636,"name":637,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":639,"name":640,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":642,"name":643,"category":7,"favorite":8},534,"BIM工程师",{"id":645,"name":643,"category":7,"favorite":8},535]