[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143825":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1143825,799,1,"单选题","根据FIDIC《施工合同条件》，对投标书中明显数字计算错误的修正，正确的是（ ）。（2014）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","业主应征求投标人意见后才能进行评标",false,{"key":16,"text":17,"correct":14},"B","当总价和单价计算结果不一致时，以总价为准调整单价",{"key":19,"text":20,"correct":21},"C","当总价和单价计算结果不一致时，以单价为准调整总价",true,{"key":23,"text":24,"correct":14},"D","投标人有一次修改报价的机会","",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]