[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143682":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1143682,799,1,"单选题","施工合同的实施中，应由（ ）对各工程小组进行建设工程施工合同交底。（2016）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工员",false,{"key":16,"text":17,"correct":14},"B","项目技术负责人",{"key":19,"text":20,"correct":21},"C","项目经理",true,{"key":23,"text":24,"correct":14},"D","施工企业负责人","项目经理或合同管理人员应将各种任务或事件的责任分解，落实到具体的工作小组、人员或分包单位。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]