[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143361":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1143361,799,1,"单选题","（2020年真题）根据施工质量事故调查处理的一般程序，事故处理的最后一步工作是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","提出事故鉴定结论",false,{"key":16,"text":17,"correct":14},"B","提交事故处理结果",{"key":19,"text":20,"correct":21},"C","提交事故处理报告",true,{"key":23,"text":24,"correct":14},"D","提出事故处理方案","P192-195 根据193页的图得知施工质量事故处理的一般程序最后一步为：提交事故处理报告。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]